eighth_questions_and_answers_.pdf

PDF 159 KB Posted

Attached to
PREFABRICATED AND PORTABLE BUILDINGS Federal contract opportunity
Solicitation number
W15QKN12R0070
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to PREFABRICATED AND PORTABLE BUILDINGS, newest first.
File Type Posted
W15QKN-12-R-0070 _Amendment_0006.pdf PDF
Tenth_Questions_and_Answers_KEEP_15_November.pdf PDF
9th_Q A_08_Nov_2012.pdf PDF
2004_MEW_S-1_General_Specification_4th_Ed.pdf PDF
Amendment_0005.pdf PDF
Seventh_Questions_for_KEEP_(2)_(4).pdf PDF
Performance_Risk_Assessment_Questionnaire_Deadline_Extension.pdf PDF
W15QKN-12-R-0070 _Amendment_0004.pdf PDF
KEEP_Performance_Work_Statement_(PWS)_Oct_25.pdf PDF
Sixth_Questions_and_Answers_for_KEEP_25_Oct_2012.pdf PDF
Fifth_Questions_and_Answers_KEEP_Oct_25.pdf PDF
Fourth_Questions_and_Answers_for_KEEP_23_Oct_2012.pdf PDF
W15QKN-12-R-0070 _Amendment_0003.pdf PDF
Third_Questions_and_Answers_for_KEEP_16_Oct_2012.pdf PDF
Second_Questions_and_Answers_for_KEEP_16_Oct_2012.pdf PDF
KEEPDeliveryOrder0001PWS.pdf PDF
Questions_and_Answers_for_KEEP_15_Oct_2012.pdf PDF
Performance_Risk_Assessment_Questionnaire.pdf PDF
W15QKN-12-R-0070 _Amendment_0002.pdf PDF
W15QKN-12-R-0070 _Amendment_0001.pdf PDF
Attachment0002NotionalSketch.pptx PPTX presentation
Attachment0004GeneralOrderNumber1B(GO-1B).pdf PDF
KEEPPerformanceWorkStatement(PWS).pdf PDF
ExhibitAStartWork.pdf PDF
ExhibitDShelterSpecs.pdf PDF
ExhibitCShelterGuide.pdf PDF
ExhibitBMonthlyStatus.pdf PDF
W15QKN-12-R-0070.pdf PDF
Attachment0003BSB-NSupporttoKEEPMemorandum.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Eighth and Answers for KEEP 06 November 2012

1. In the PWS, page 7, last paragraph: Should the last sentence of this paragraph be re-worded to read: “Anticipated service size for each 20’ x 32’ (approximate) single-story shelter area is, at a minimum, 40 Amp circuit breaker, single phase, 240 VAC 50 hertz.”

Answer: The PWS verbiage is articulated correctly.

2. In order to allow for adequate technical data to be submitted, can drawings be excluded from the Technical Volume’s 25 page limit?

Answer: No. Any drawings submitted in the technical volume will counted the 25 page limit.

3. How will your agency evaluate the “total life-cycle costs” contemplated by the cited DFARS provision?

Answer: The guidance at DFARS 225.7002-1(a)(3)(i) requires that “consideration of the total life-cycle cost of tents and structures, including the costs associated with any equipment, fuel, or electricity needed to heat, cool, or light such tent or structure. It does not require that we have an itemized listing of the life-cycle cost. Note: FAR

7.105(a)(3)(i) and PGI 207.105(a)(3)(i) is not applicable to this procurement action. This solicitation does include consideration of life-cycle elements, see the solicitation

Evaluation Factors for Award Technical sub factors 1 and 2.

4. What specific life-cycle costs will be considered when the best value evaluation is made?

Answer: See the solicitation, Evaluation Factors for Award, Technical Factors, specifically subfactors 1 and 2 page 73 of 76. Life-cycle cost to be consider (verbatim) set-up, disassembly, re-assembly, labor requirements and method for repack and shipping; and, energy efficiency considerations through design, insulation, materials, sustainability, or conservation.

5. What ratings or weights will be given to each life-cycle cost factor?

Answer: Life-cycle costs will not be given separate rates or weightings, but will be considered in the evaluation process. See the solicitation, page 73 of 76, technical subfactors 1 and 2.

File details come from the government source that posted it. Updated .