This document is a Request for Information (RFI) from the Army Program Director-Base Emergency Communications Systems (PD-BECS) seeking industry input for a Public Safety Answering Point (PSAP) Modernization project. The Army requires companies to engineer, furnish, and install Computer-Aided Dispatch (CAD), Next Generation 9-1-1 Call Handling Systems (NG-911 CH), and NG-911 Location Information Services (LIS) across 38 CONUS installations supporting approximately 400,000 military personnel, civilians, and dependents. The solution must comply with current NG-911 i3 standards, support various call sources, provide system redundancy, and include integrated automatic location information with capabilities for call transfers and interoperability.
Key RFI details include a response deadline of February 7, 2025, with submissions limited to five pages and sent via email to specific Army Contracting Command contacts. Vendors are asked to provide information about their past NG-911, CAD, and LIS implementation experience, including system sizes, call volumes, technical challenges, and implementation approaches. The Army anticipates initially fielding on-premise systems with future potential for cloud-hosted solutions, and requires systems to meet JITC approval, FEDRAMP assessments, and DISA cloud security requirements. The RFI is intended to develop a viable Request for Proposal (RFP) and does not constitute a formal procurement commitment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions and Answers RFI Asked:
What information and/or documents are missing that would otherwise allow your company to submit a proposal?
Respondent [Red River]
Q1- (Provide) general location of the PSAPs (or base name if available) Q2- The number of seats where call-handling solutions are required If required, number of positions that will utilize telephony and radio arbitration in a headset Q3- Local Public Branch Exchange (PBX) technology and quantities such as SIP, POTS, or PRIs
Government Response: Q1-Q3: Details regarding location or quantities will be defined and communicated in the formal solicitation.
Q4- Does the offeror need to supply hardware, or will it be a Bring-Your-Own-Device (BYOD) model?
Government Response: Offeror will be required to Engineer, Furnish, Install, (hardware and software) Secure, Test, and Train.
Q5- If the response requires hardware, are there minimum specifications?
Government Response: Engineering to be provided by the solution providers.
Q6- Are local IT teams available to support system trouble (no special training required) or is on-site support required?
Government Response: Details will be defined and communicated in the formal solicitation Respondent [Oracle] Q1- Timelines and milestones, Q2- Architecture diagrams for each center and the network as a whole, Q3- Dispatch center information: size, seats required, etc…, Q4- What products and services are in place and require integration if not procuring the entire OPSS suite on Oracle Cloud, Hybrid cloud requirements?
Government Response: Q1-Q4: Details will be defined and communicated in the formal solicitation Respondent [Motorola] Q1- (Provide) A detailed technical document that outlines the functional requirements of the solution.
Q2- (Conduct) a site survey and open discussion about the requirements would be helpful.
Government Response: Q1&Q2: Details will be defined and communicated in the formal solicitation Respondent [Mark 43] Q1- Names, locations & size of each installation, including population.
Q2- The number of dispatchers/call-takers, sworn officers, supervisory/admin users, and mobile users of the CAD at each installation.
Q3- Others requiring access to the CAD system at each installation (DPTMS, Range Control, Base Emergency Operations Center personnel, Duty Officers, etc) Q4- The number of vehicles at each installation & Mobile Data Terminals (MDTs) in each vehicle Q5- Identification of 3rd-party interfaces currently at each installation (Fire Alarms, Weapons Rooms Alarms, Force Protection Cameras, Body Worn Cameras, LE/Fire Records Reporting Systems, etc.)
Q6- State-specific CJIS Message Switch implementation requirements for each installation Q7- Priority of execution for the 38 installations, when must all 38 installations be implemented (NLT 3/5 years)?
Q8- What is the Army’s preferred pilot or phased deployment approach?
Q9- Details of legacy 9-1-1, LIS, and CAD systems currently at each installation, including contract expiration dates.
Government Response: Q1-Q9: Details will be defined and communicated in the formal solicitation Q10- Will Army Installation Management Command fund all MDTs for vehicles, mobile phones, and interfaces?
Government Response: Details regarding funding, including amount and source, are not disclosed at the RFI stage.
Q11- Is the Army open to a public safety package approach for CAD that includes: Records Management, Investigative Case Management, Booking/Jail Management and Crime Analytics capability?
Government Response: Functional capability requirements will be detailed in the formal solicitation
Q12- Will Army PEO BECS sponsor an overall DISA ATO vs each installation approving an ATO through each installation G6? An overall ATO at the DISA level will drastically speed up implementation
Government Response: This will be an Army only solicitation.
Q13- What is the preferred procurement vehicle (GSA, etc.)?
Government Response: The procurement strategy, including the preferred procurement vehicle has not yet been determined.
Q14- What is length of contract (5 (base + 4 years) or 10-year (base+ 9 years) contract.
Will it be an IDIQ contract and what ceiling?
Government Response: Details regarding the period of performance be defined and communicated in the formal solicitation
Q15- Goals for project governance for risk management, testing, and approvals across multiple bases?
Government Response: The offerors question is unclear and requires more clarity to provide a response.
Q16- Specific cybersecurity or data retention policies at each site (if they differ).
Government Response: Details will be defined and communicated in the formal solicitation.
Respondent [AKIMA]
Q1- (Provide) A comprehensive list of installations, number of call-handling (CH) or dispatcher positions per site, capabilities to be deployed at each location, and the deployment sequence to enable accurate pricing and planning.
Q2- Clarity on which installations are already connected to an ESInet and their level of readiness to support NG911.
Government Response: Q1&Q2: Details will be defined and communicated in the formal solicitation
Q3- Confirmation on whether funding is centralized or if installations must secure their own funding for NGCS services.
Government Response: Programmatically funded
Q4- The status of GIS mapping completeness
Government Response: NG-911 compliant GIS data development will be performed under a separate contract and ahead of NG-911 CH and CAD implementation
Q5- (Status of) whether current PBX systems at each site are NG911-compatible.
Government Response: Details will be defined and communicated in the formal solicitation
Q6- Confirmation on whether each installation will receive all emergency calls or only a subset, and whether text-to-911 will be enabled.
Government Response: In the RFI description. Please refer to Paragraph (2) Scope.