Revised C5 OTA ROM Table Example (NOT REQUIRED).docx
DOCX document 14 KB Posted
- Solicitation number
- W15P7T-24-UNORFI
About this file
This document is a template for a Rough Order of Magnitude (ROM) table for a federal contract opportunity. The template includes cost elements for prime contractor labor, subcontractor/consultant labor, material/equipment, other direct costs, and travel for steps 2 and 3 of a prototype, as well as the total proposed project costs.
The related federal contract opportunity is a pre-solicitation notice for the Unified Network Operations (UNO) for the Program Executive Office Command, Control and Communications-Tactical, Program Manager Intelligence, Information and Services, and Product Director Tactical Communications Network Operations. The solicitation number is W15P7T-24-UNORFI and it is being conducted by the Department of the Army Materiel Command Army Contracting Command located at Aberdeen Proving Ground.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Teaming Information (REVISED 24JAN2024 v2).xlsx | XLSX spreadsheet | |
| Teaming Information (REVISED 24JAN2024).xlsx | XLSX spreadsheet | |
| Teaming Information.xlsx | XLSX spreadsheet | |
| TCNO UNO OTA - Government Responses to RFI QA - 20231208.xlsx | XLSX spreadsheet | |
| UNO RFI - OTA Strategy (REV 26 OCT 2023).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Element Step 2 Lab
| Step 3 Prototype |
| Total |
| Description/Comments |
| Prime Contractor Labor |
| $ |
| $ |
| $ |
| Insert generic position titles, estimated rates and labor hours |
| Subcontractor/Consultant Labor |
| $ |
| $ |
| $ |
| Insert generic position titles, estimated rates and labor hours. If more than one Subcontractor is listed, provide cost break-out by Subcontractor. |
| Material/Equipment |
| $ |
| $ |
| $ |
| Insert list of proposed material/equipment, including a high-level cost breakout. |
| Other Direct Costs (ODC) |
| $ |
| $ |
| $ |
| Describe proposed ODC (outside services, conference fees, software licenses, other fees/royalties, etc.) Provide a high-level cost breakout. |
| Travel |
| $ |
| $ |
| $ |
| Describe estimated travel (e.g., travel to customer site(s) for meetings, etc.) Provide a cost basis/ cost breakout per trip. |
| Proposed Project Total |
| $ |
| $ |
| $ |
| Sum of cost elements |
File details come from the government source that posted it. Updated .