VWCC 260-B5260-023 Project Drawings Summary
This document comprises architectural, structural, mechanical, and electrical bid drawings for the Replace AHU's at Duncan and College Services project at Virginia Western Community College (VWCC) in Roanoke, Virginia (Project Code 260-B5260-023/M23VW131). The project entails the demolition and replacement of rooftop-mounted HVAC equipment at Duncan Hall, Craig Hall, and the College Services Building, including two rooftop air-handling units (RAH-D1 and RAH-D2) at Duncan/Craig Halls, one packaged rooftop unit (RTU-1) at the Duncan Hall entrance, one packaged rooftop heat-pump unit (RTU-2) at the College Services Building, associated roof curbs, limited membrane roofing and insulation repairs, HVAC service piping and ductwork modifications, a domestic water heater replacement, and Direct-Digital Controls (DDC) integration with existing campus systems. The bid deadline is 2:00 P.M. on Wednesday, July 8, 2026, with public bid opening and reading at 2:00 P.M. on Thursday, July 9, 2026, at the Virginia Community College System office in Richmond, Virginia. Two additive bid items are identified: RTU-1 replacement (Additive Bid Item #1) and all College Services Building work (Additive Bid Item #2). The project is subject to Virginia Uniform Statewide Building Code (2021 Edition), Virginia Energy Conservation Code compliance, and high-performance building standards, though exempt from the 50-percent renovation threshold requirement.
The drawings specify equipment schedules, structural loading requirements, mechanical equipment specifications including cooling capacities ranging from 8.5 to 200 MBH, controls sequences for variable air volume operation with demand control ventilation and economizer modes, and integration with existing Building Automation Systems via BACnet communications. Structural support requirements include roof curb installations on existing open-web steel joists and concrete slabs with detailed framing specifications. Existing conditions address asbestos-containing materials found in Duncan and Craig Halls (BUR membrane and flashing), lead inspection results indicating no lead-based paint, and sprinkler/fire detection system protection requirements during construction. The contractor is required to coordinate equipment movement through occupied building corridors with the owner and State Fire Marshal, maintain existing fire alarm systems during construction, protect existing roofing from damage, and verify field dimensions against existing construction drawings. A Standard Commonwealth Bid Bond (form CO-10.2) and contract security are required; bids may be modified via fax or email prior to the deadline.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Architecture Engineering Planning InteriorsSF
C S.
co m
ROANOKE OFFICE (CORPORATE) CHARLOTTE OFFICE
305 SOUTH JEFFERSON STREET
ROANOKE, VA 24011-2003
800.873.2788
1927 SOUTH TRYON STREET, SUITE 207
CHARLOTTE, NC 28203
704.372.7327
LOUISVILLE OFFICE
2115 LEXINGTON ROAD, SUITE 100
LOUISVILLE, KY 40206
502.414.4545
PHILADELPHIA OFFICE
1777 SENTRY PARKWAY WEST
VEVA 17, SUITE 220
BLUE BELL, PA 19422
610.825.1288
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
SFCS COMM. NO.: 20301.20
3092 Colonial Ave SW, Roanoke, VA 24015
MAY 12, 2026 - BID DRAWINGS
VIRGINIA WESTERN COMMUNITY COLLEGE (VWCC)
PROJECT CODE: 260-B5260-023 (M23VW131)
AGENCY: VIRGINIA WESTERN COMMUNITY COLLEGE
T1
VICINITY MAP LOCATION MAP
NORTH
NORTH
DRAWING INDEX
APPLICABLE PROJECT CODES
CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL (CPSM) 2025, REVISION 0
DATED MARCH 17, 2025
VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VCC) 2021
VIRGINIA EXISTING BUILDING CODE (VEBC) 2021
VIRGINIA PLUMBING CODE 2021
VIRGINIA ENERGY CONSERVATION CODE (VECC) 2021
VIRGINIA MECHANICAL CODE 2021
NATIONAL ELECTRICAL CODE (NFPA 70) 2020
NATIONAL FIRE ALARM CODE (NFPA 72) 2019
HIGH PERFORMANCE BUILDINGS ACT (SECTION 6.1.3.4)
IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE
BUILDING IS EXEMPT FROM COMPLIANCE BECAUSE THE COST OF THE
RENOVATIONS DOES NOT EXCEED 50% OF THE VALUE OF THE BUILDING.
VIRGINIA ENERGY CONSERVATION CODE (VECC) COMPLIANCE PATH
ALL MAJOR ENVELOPE ELEMENTS ARE EXISTING TO REMAIN. NEW
HEATING AND COOLING EQUIPMENT AND ANY RELATED ENVELOPE
REPAIRS SHALL BE IN COMPLIANCE WITH SECTIONS C503 OF THE
VECC AND SECTIONS 601 AND 602 OF THE VEBC. THE NEW WATER
HEATER SHALL COMPLY WITH VECC SECTIONS C404.
PROJECT DESCRIPTION:
THE PROJECT ENTAILS THE REMOVAL AND REPLACEMENT OF EXISTING ROOFTOP
AIR HANDLING UNITS FOR DUNCAN HALL AND CRAIG HALL, AS WELL AS THE
REMOVAL AND REPLACEMENT OF SELECT ROOFTOP EQUIPMENT AND A WATER
HEATER FOR THE CAMPUS SECURITY BUILDING.
PROPOSED RENOVATIONS WILL AFFECT THE EXISTING BUILDING USE.
PROPOSED RENOVATIONS WILL NOT AFFECT EXISTING EGRESS PATHS AND
CAPACITIES.
LIFE SAFETY:
EXISTING EGRESS PATHS WILL BE MAINTAINED THROUGHOUT
RENOVATIONS AS ALL WORK AREAS WILL BE PARTITIONED FROM
EGRESS PATHS OR UNOCCUPIED DURING RENOVATIONS.
CONSTRUCTION MOVEMENTS WILL BE LIMITED TO THE EXTERIOR DOOR
OR WHEN THE BUILDING IS OTHERWISE UNOCCUPIED.
OWNER REPRESENTATIVE
MR. KEVIN WITTER
DIRECTOR OF FACILITIES, PLANNING AND DEVELOPMENT
VIRGINIA WESTERN COMMUNITY COLLEGE
3099 COLONIAL AVE. SW
ROANOKE, VA 24015
P: 540-857-6481
REGINALD A. WALKER, RA, LEED AP
PROJECT MANAGER, FACILITIES PLANNING AND DEVELOPMENT
VIRGINIA WESTERN COMMUNITY COLLEGE
ROANOKE, VA
OFFICE: 540-857-6456
MOBILE: 540-239-5595
ACCESSIBILITY:
THE SPECIALIZED USE OF THIS SPACE IS FOR ABLE BODIED INDIVIDUALS
UNDER SUPERVISION OF THE CONTRACTOR. THE SPACE IS NOT
INTENDED TO BE ACCESSIBLE.
COLLEGE SERVICES BUILDING
FIRE ALARM SYSTEM
DUNCAN HALL, CRAIG HALL, AND THE CSB BUILDING HAVE EXISTING FIRE
ALARM SYSTEMS THAT WILL BE MAINTAINED AND ACTIVE THROUGH THE
CONSTRUCTION.
CONTRACTOR SHALL PROTECT ALL DEVICES WITHIN THE
CONSTRUCTION AREA DURING CONSTRUCTION ACTIVITIES.
T1 COVER SHEET
ARCHITECTURAL
A3.2 DUNCAN HALL SECOND FLOOR REFLECTED CEILING PLAN
STRUCTURAL
S0.1 GENERAL NOTES AND TYPICAL DETAILS, DUNCAN AND CRAIG
S0.2 GENERAL NOTES AND TYPICAL DETAILS, CSB
S1.1 DUNCAN AND CRAIG ROOF FRAMING PLAN
S1.2 CSB ROOF PLAN
MECHANICAL
M0.0 ABBREVIATIONS, LEGENDS, NOTES AND SCHEDULES - HVAC
MD1.1 DUNCAN & CRAIG HALLS, HVAC DEMOLITION PLANS
MD1.2 CSB - ROOF AND FIRST FLOOR - HVAC DEMOLITION PLANS
M1.1 DUNCAN & CRAIG HALLS, HVAC NEW WORK PLANS
M1.2 CSB - ROOF AND FIRST FLOOR - HVAC NEW WORK PLANS
M3.0 MECHANICAL DETAILS & CONTROLS
M3.1 HVAC CONTROLS
ELECTRICAL
E0.0 ELECTRICAL SYMBOL LEGEND & ABBREVIATIONS
E1.1 DUNCAN & CRAIG FLOOR & ROOF PLAN - POWER
E1.2 CSB FLOOR & ROOF PLAN - POWER
PROJECT
SITE
PROJECT
SITE
WORKING DRAWINGS - BID DRAWINGS
DUNCAN HALL
CRAIG HALL
VIRGINIA COMMUNITY COLLEGE SYSTEM (VCCS)
PROJECT INFORMATION:
DUNCAN & CRAIG HALLS:
PER ORIGINAL DRAWINGS CREATED UNDER THE VUSBC, 1987 ED.:
PER PREVIOUS DEB DETERMINATION THE BUILDINGS ARE CONSIDERED AS ONE
BUILDING.
VCC CONSTRUCTION TYPE: IIB
CONSTRUCTION TYPE PER VCC 2021 IIB
VCC (USE) GROUP: MERCANTILE M,
BUSINESS GROUP B
DESIGN OCCUPANCY: 615
(NO OCCUPANCY NUMBER CHANGE)
RENOVATION SQ. FT.: 0
(ALL ROOF EQUIPMENT)
LIFE SAFETY DATA:
PARTIALLY SPRINKLED BUILDING
BUILDING COMPONENTS
ROOF 0 HR
BUILDING USE - BOOKSTORE, GENERAL PURPOSE CLASSROOMS (EDUCATIONAL USE)
AND STAFF OFFICES (BUSINESS USE)
COLLEGE SERVICES BUILDING:
PER ORIGINAL DRAWINGS CREATED UNDER THE VUSBC, 2000 ED.:
VCC CONSTRUCTION TYPE: 3B
CONSTRUCTION TYPE PER VCC 2021 3B
VCC (USE) GROUP: S-1, MODERATE-HAZARD STORAGE
BUISNESS; B
DESIGN OCCUPANCY: 107
(NO OCCUPANCY NUMBER CHANGE)
RENOVATION SQ. FT.: 0
(ALL ROOF EQUIPMENT)
LIFE SAFETY DATA:
FULLY SPRINKLED BUILDING
BUILDING COMPONENTS
ROOF 0 HR
BUILDING USE - FACILITIES MANAGEMENT, MAIL DISTRIBUTION, CAMPUS
POLICE AND SHIPPING AND RECEIVING.
ASBESTOS DISCLOSURE STATEMENT: CPSM - 4.12.2
DUNCAN & CRAIG HALLS:
AN ASBESTOS INSPECTION WAS PERFORMED AND ASBESTOS-
CONTAINING MATERIALS WERE FOUND GENERALLY IN THE AREA INDICATED
(BUR MEMBRANE AND FLASHING). THE ASBESTOS SURVEY / INSPECTION
REPORT IS AVAILABLE IN APPENDIX TO THE CONTRACTOR(S) FOR
DEMOLITION AND FOR CONSTRUCTION FOR HIS INFORMATION.
LEAD MATERIALS DISCLOSURE STATEMENT: CPSM - 4.13.5
AN INSPECTION TO IDENTIFY LEAD CONTAINING OR COATED BUILDING
COMPONENTS HAS BEEN CONDUCTED AND NO LEAD-BASED PAINT WAS
FOUND. THIS REPORT IS PROVIDED FOR THE CONTRACTOR'S USE AND MAY
NOT BE ALL INCLUSIVE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
COMPLY WITH ALL VIRGINIA OCCUPATIONAL SAFETY AND HEALTH (VOSH)
REGULATIONS AS THEY PERTAIN TO EMPLOYEE EXPOSURES TO LEAD. ALL
LEAD AND LEAD-COATED BUILDING COMPONENTS SHALL BE RECYCLED TO
THE EXTENT POSSIBLE.
COLLEGE SERVICES BUILDING:
THE BUILDING WAS CONSTRCTEDIN 2005 AND WAS CONSTRUCTED WITHOUT
LEAD OR ASBESTOS-CONTAINING MATERIALS AS NOTED ON RECORD
DRAWING AS BUILTS.
** THE INTENT IS FOR OWNER OCCUPANCY WITHIN THE BUILDING
DURING THE COURSE OF DEMOLITION AND CONSTRUCTION.
THE CONTRACTOR SHALL NOT MOVE EQUIPMENT, MATERIALS, OR
TOOLS THROUGH THE MAIN LOBBYS/CORRIDOR WHILE THE
BUILDING IS OCCUPIED AS THE MAIN LOBBY/CORRIDOR IS A
REQUIRED MEANS OF EGRESS FOR THE REMAINDER OF THE
BUILDING. THE CONTRACTOR SHALL COORDINATE THE MOVEMENT
OF EQUIPMENT MATERIALS OR TOOLS WITH THE OWNER TO
ENSURE THE MAIN LOBBY/CORRIDOR AND ALL EGRESS SPACES
REMAIN FREE AND CLEAR FOR EGRESS OF ALL OCCUPANTS.
NO MATERIALS, TOOLS, OR EQUIPMENT SHALL BE PLACED OR
STORED IN THE CORRIDOR WHILE THE BUIDLING IS OCCUPIED
DURING THE REGULAR HOURS.
CONTRACTOR TO COORDINATE ANY REQUIRED WORK IN THE MAIN
LOBBY/CORRIDOR WITH THE BUILDING OWNER AND THE STATE
FIRE MARSHAL.
THE REMOVAL OF EXISTING CEILING MEMBRANES TO
ACCOMMODATE THE WORK WILL IMPAIR FIRE SPRINKLERS AND
SMOKE/HEAT DETECTORS. IF A SMALL AREA OF CEILING IS
REMOVED AT A TIME, IT MAY BE REASONABLE TO INSTRUCT THE
CONTRACTOR TO REPLACE ALL CEILING TILES AT THE END OF
EACH WORK DAY.
ALTERNATIVELY, ALL IMPACTED PENDANT SPRINKLER HEADS MAY
BE TEMPORARILY REPLACED WITH UPRIGHT HEADS AND TURNED
UP SUCH THAT THEY ARE WITHIN AN NFPA 13-COMPLIANT
DISTANCE FROM THE EXPOSED STRUCTURE ABOVE. SIMILARLY,
SMOKE/HEAT DETECTORS MAY BE TEMPORARILY RELOCATED TO
THE UNDERSIDE OF THE ROOF STRUCTURE IF CONSTRUCTION
ACTIVITIES ARE SUCH THAT THE DEVICES MAY REMAIN
UNCOVERED AND OPERATIONAL.
IF NONE OF THESE TEMPORARY SAFETY MEASURES ARE
IMPLEMENTED, AN APPROVED FIRE WATCH SHALL BE EMPLOYED
WHILE THE BUILDING IS OCCUPIED OR THE BUILDING SHALL BE
EVACUATED FOR THE DURATION OF THE IMPAIRMENT
PROTECTION AND REPAIR OF ROOF:
CONTRACTOR SHALL PROTECT ALL EXISTING ROOFING FROM DAMAGE PROR
TO MOVING MATERIALS OR EQUIPMENT OVER ROOF. CONTRACTOR SHALL
PROTECT ANY DAMAGE TO ROOFING TO RESTORE ORIGINAL CONDITION. ANY
REQUIRED REPAIRS SHALL BE INSPECTED BY ARCHITECT OR ENGINEER FOR
OWNERS ROOF SURVEY INSPECTOR PRIOR TO FINAL ACCEPTANCE.
THE WORK INCLUDES PATCHING AND REPAIR OF ALL MEMBRANE
ROOF AREAS IMPACTED BY THE INSTALLATION.
AN ASBESTOS INSPECTION WAS PERFORMED AND NO
ASBESTOS-CONTAINING ROOFING WERE FOUND. THE
ASBESTOS SURVEY / INSPECTION REPORT IS AVAILABLE
TO THE CONTRACTOR(S) FOR DEMOLITION AND FOR
CONSTRUCTION FOR HIS INFORMATION.
ADDITIVE BID ITEM #1:
RTU-1 LOCATED ON THE STAIR CONNECTOR
BETWEEN DUNCAN & CRAIG HALLS, TO BE
PROVIDED AS ADDITIVE BID ITEM #1
ADDITIVE BID ITEM #2:
THE FOLLOWING WORK SCOPE SHALL BE
PROVIDED AS ADDITIVE BID ITEM #2, ALL WORK
WITHIN THE COLLEGE SERVICES BUILDING.
ADDITIVE BID ITEMS
04/24/2026
Chios Walker
05/12/2026
05/12/26
05/12/2026
04/24/202605/12/2026
10' - 0"10' - 0"10' - 0" 10' - 0" 10' - 0" 10' - 0"
10' - 0" 10' - 0"8' - 0" 8' - 0"
9' - 0"
10' - 0"10' - 0"
EXPOSED
9' - 0"
REMOVE CEILING TILES AS NECESSARY
FOR INSTALLATION OF NEW DUCT AND
PIPE CONNTECTION. REINSTALL /
REPLACE CEILING TILES AS NECESSARY
AFTER INSTALLATION OF NEW WORK. IF
NECESSARY, REPAIR ANY DAMAGE TO
CEILING GRID TO MATCH EXISTING
ADJACENT.
CORR
REMOVE CEILING TILES AS NECESSARY
FOR INSTALLATION OF NEW DUCT AND
PIPE CONNTECTION. REINSTALL /
REPLACE CEILING TILES AS NECESSARY
AFTER INSTALLATION OF NEW WORK. IF
NECESSARY, REPAIR ANY DAMAGE TO
CEILING GRID TO MATCH EXISTING
ADJACENT.
10' - 0"10' - 0"10' - 0" 10' - 0" 10' - 0" 10' - 0"
10' - 0" 10' - 0"8' - 0" 8' - 0"
9' - 0"
10' - 0"10' - 0"
EXPOSED
9' - 0"
EXISTING CEILING CONSISTS OF ACOUTIC
CEILING TILE AND ASSOCIATED GRID.
REMOVE AS INDICATED TO COORDINATE WITH
NEW WORK.
NO WORK
*NOTIFY A/E IMMEDIATLY IS WORK IS REQUIRED
OUTSIDE OF ANNOTATED AREA.
1/8" = 1'-0"A3.2
DUNCAN HALL SECOND FLOOR REFLECTED CEILING NEW WORK PLAN1
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
PLAN NOTES
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:55:40 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC Duncan & Craig Hall - ARCH CENTRAL.rvt
CHK
DRW
Project Number
DUNCAN HALL SECOND
FLOOR REFLECTED
CEILING PLAN
A3.2
DES
1/8" = 1'-0"A3.2
DUNCAN HALL SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN2
04/24/202605/12/2026
1.
2.
3.
4.
GENERAL STRUCTURAL NOTES, DUNCAN HALL
BASIS OF DESIGN
DESIGN IS IN ACCORDANCE WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING
CODE (USBC-2021 EDITION).
DESIGN OF CONCRETE STRUCTURES IS BASED ON THE REQUIREMENTS OF ACI
318 “BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, ” EDITION AS
REFERENCED IN GOVERNING BUILDING CODE.
DESIGN OF STRUCTURAL STEEL IS BASED ON THE REQUIREMENTS OF AISC 360
“SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS,” EDITION AS REFERENCED
IN GOVERNING BUILDING CODE AND AISC MANUAL OF STEEL CONSTRUCTION,
15TH EDITION.
DESIGN LOADS:
ROOF LIVE LOAD: PITCHED: FLAT: 30 PSF.
ROOF SNOW LOAD
GROUND SNOW LOAD (Pg): 50 PSF FLAT-ROOF SNOW LOAD (Pf): 35 PSF SNOW EXPOSURE FACTOR (Ce): 1.0 THERMAL FACTOR (Ct): 1.0
SNOW LOAD RISK CATEGORY: III
WIND DESIGN DATA
ULTIMATE WIND SPEED, Vult: 116 MPH (3-SECOND GUST) NOMINAL WIND SPEED, Vasd: 90 MPH (3-SECOND GUST)
RISK CATEGORY: III
EXPOSURE CATEGORY: B
INTERNAL PRESSURE COEFFICIENT (GCpi): +/- 0.18
COMPONENTS AND CLADDING DESIGN PRESSURES (ULTIMATE, FOR
REFERENCE ONLY. SPECIFIC DESIGN PRESSURES FOR EACH
COMPONENT SHALL BE CALCULATED BY THE LICENSED PROFESSIONAL
ENGINEER RESPONSIBLE FOR THE COMPONENT ’S DESIGN):
ROOF PRESSURES:
EFFECTIVE WIND AREA (SF)
ZONE 10 50 100
1 +16/-36 +16/-30 +16/-28 1’ +16/-21 +16/-21 +16/-21 2 +16/-47 +16/-40 +16/-37 3 +16/-64 +16/-50 +16/-44
WALL PRESSURES:
EFFECTIVE WIND AREA (SF)
ZONE 10 50 100
4 +21/-22 +19/-20 +18/-19 5 +21/-28 +19/-23 +18/-21 SEE ASCE 7 FOR ZONE LOCATIONS. EDGE DISTANCE “0.2h” = 4.8 FT.
RAIN DESIGN DATA
i=RAIN INTENSITY= 5.62 IN/HOUR (15 MIN RAINFALL INTENSITY)
MECHANICAL EQUIPMENT LOADS SHOWN ARE DESIGN MINIMUMS. NO
PROVISIONS HAVE BEEN MADE FOR MECHANICAL EQUIPMENT LOADS EXCEPT AS
SHOWN. CONTRACTOR SHALL ESTABLISH AND COORDINATE ACTUAL LOADS OF
ALL SELECTED EQUIPMENT. SUBMIT ALL SELECTED EQUIPMENT AND ALL
ADDITIONAL EQUIPMENT REQUIREMENTS FOR APPROVAL. COORDINATE ALL
EQUIPMENT LOADS WITH MATERIAL FABRICATORS.
DESIGN INCLUDES NO PROVISION FOR FUTURE VERTICAL EXPANSION OF THE
STRUCTURE.
GENERAL REQUIREMENTS AND CONDITIONS
WHERE A SECTION OR DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL APPLY
TO ALL LIKE CONDITIONS EVEN THOUGH NOT SPECIFICALLY MARKED ON THE
PLANS.
DIMENSIONS AND ELEVATIONS SHOWN FOR EXISTING CONSTRUCTION ARE
BASED ON EXISTING CONSTRUCTION DRAWINGS AND ARE NOT FIELD-
MEASURED. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, ELEVATIONS,
AND GEOMETRY AT EXISTING CONSTRUCTION. REPORT DISCREPANCIES TO THE
ARCHITECT IMMEDIATELY.
WHERE ATTACHMENTS (BOLTS, WELDS, STRAPS, ETC…) ARE DENOTED AS “ON-
CENTER” ALONG A MEMBER LENGTH, IT IS IMPLIED THAT AT LEAST ONE (1)
ATTACHMENT IS PLACED AT THE BEGINNING AND END OF SUCH MEMBER (WITHIN
6”, UNLESS NOTED OTHERWISE).
THE CONTRACTOR SHALL PROTECT THE STRUCTURE DURING CONSTRUCTION
AGAINST EARTH PRESSURE, WIND AND OTHER FORCES UNTIL PERMANENT
SUPPORTS ARE IN PLACE.
RELATED WORK SPECIFIED OR SHOWN ELSEWHERE
REFER TO PROJECT SPECIFICATIONS AND OTHER PROJECT DRAWINGS FOR
RELATED WORK SPECIFIED OR SHOWN ELSEWHERE INCLUDING BUT NOT
LIMITED TO THE FOLLOWING:
PENETRATIONS, SLEEVES, OPENINGS.
INSERTS, EMBEDS, ANCHOR BOLTS AND ANCHORAGE FOR ATTACHMENT
OF NON-STRUCTURAL ITEMS.
SIZE AND LOCATION OF EQUIPMENT FOUNDATIONS AND PADS
ROOF CURBS FOR ROOF MOUNTED EQUIPMENT.
STRUCTURAL STEEL
STRUCTURAL STEEL SHALL COMPLY WITH THE PROVISIONS OF AISC 303 AND
AISC 360.
STEEL FABRICATION SHALL BE PERFORMED BY A FABRICATOR QUALIFIED BY THE
AISC QUALITY CERTIFICATION PROGRAM AS AN AISC-CERTIFIED PLAN,
CATEGORY STD.
STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING:
“W” SHAPES, BEAMS AND COLUMNS: ASTM A992.
COLD-FORMED STRUCTURAL STEEL TUBING: ASTM A 500, GRADE C.
STEEL PIPE: ASTM A 53, TYPE E OR S, GRADE B.
OTHER SHAPES, PLATES AND BARS: ASTM A572, GRADE 50.
PRIME STRUCTURAL STEEL WITH FABRICATOR’S STANDARD LEAD- AND
CHROMATE-FREE NONASPHALTIC, RUST-INHIBITING PROMER COMPLYING WITH
MPI #79. DO NOT PRIME SURFACES THAT RECEIVE FIELD WELDS OR SPRAYED
APPLIED FIREPROOFING.
ALL BOLTS SHALL BE ¾” DIAMETER, ASTM F3125, GRADE A325-N, TYPE 1, SNUG-
TIGHTENED, UNLESS NOTED OTHERWISE.
WELDING PROCEDURES AND PERSONNEL SHALL BE QUALIFIED BY AWS D1.1.
WELDING ELECTRODES SHALL BE E70XX.
MINIMUM WELDS SHALL BE 3/16” FILLET WELD ALL AROUND UNLESS INDICATED
OTHERWISE.
DO NOT USE THERMAL CUTTING OF STRUCTURAL STEEL DURING ERECTION.
DO NOT ENLARGE UNFAIR HOLES IN MEMBERS BY BURNING OR BY USING DRIFT
PINS.
SUBMIT SHOP DRAWINGS SHOWING FABRICATION OF ALL STRUCTURAL STEEL
COMPONENTS. INCLUDE CONNECTION DETAILS, HOLES, WELDS, AND BOLTS.
EXPANSION & ADHESIVE ANCHORS
ALL MECHANICAL ANCHORS SHALL BE 1/4” DIAMETER WITH 1 5/8” MINIMUM
EMBEDMENT UNLESS NOTED OTHERWISE. INSTALL PER MANUFACTURER ’S
REQUIREMENTS IN CONCRETE OR FULLY GROUTED MASONRY. MINIMUM
NOMINAL ALLOWABLE TENSION= 3950 LB
NO ANCHOR SHALL BE INSTALLED PRIOR TO RECEIVING PROPER INSTALLATION
TRAINING FROM A MANUFACTURER’S REPRESENTATIVE. ALL ANCHORS SHALL
BE INSTALLED BY PERSONNEL TRAINED BY MANUFACTURER’S REPRESENTATIVE.
ABV ABOVE
ADH AHR ADHESIVE ANCHOR
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
APPROX APPROXIMATE
ARCH. ARCHITECTURAL
BLDG BUILDING
BLW BELOW
BM BEAM
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNITS
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
DIA DIAMETER
DIAG DIAGONAL
DIM. DIMENSION
DWG(S) DRAWING(S)
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EMBED EMBEDMENT
EOS EDGE OF SLAB
EQ EQUAL
EQUIP. EQUIPMENT
EW EACH WAY
EXST EXISTING
EXT EXTERIOR
EXPN AHR EXPANSION ANCHOR
FIN. FLR FINISHED FLOOR
FLG FLANGE
FRMG FRAMING
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
HORIZ HORIZONTAL
INFO INFORMATION
INT INTERIOR
JST JOIST
JT JOINT
K KIP (1000 POUNDS)
KSI KIPS PER SQUARE INCH
LBS POUNDS
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MID MIDDLE
MIN MINIMUM
MTL METAL
NTS NOT TO SCALE
OC (O/C) ON CENTER
OPNG OPENING
PAF POWER-ACTUATED FASTENER
PERP PERPENDICULAR
PL PLATE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
R RADIUS
REINF REINFORCEMENT, REINFORCED
REQ’D REQUIRED
SCHED SCHEDULE
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
STD STANDARD
STIFF. STIFFENER
STL STEEL
STRL STRUCTURAL
SYM SYMMETRICAL
T&B TOP AND BOTTOM
THK THICK
TOF TOP OF FOOTING
TOS TOP OF STEEL
TRANSV TRANSVERSE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
WP WORKING POINT
WWF WELDED WIRE FABRIC
GREATER
THAN 6"
6" MAX
GREATER THAN 6"
CONCENTRATED LOAD IS NOT WITHIN 6" OF A TOP OR BOTTOM CHORD PANEL POINT.
THE JOIST TOP OR BOTTOM CHORD PANEL POINT. ADD A DIAGONAL L2x2x3/16 WHERE THE ALL NEW CONCENTRATED LOADS TO THE STEEL JOIST SHALL BE CONNECTED WITHIN 6" OF NOTE 1:
NOTE 1
NOTE 1
NEW MECH UNIT CURB
1/8" 1"
EACH
END-TYP
EXIST ROOF BAR JOIST
EXIST METAL ROOF DECK
SEE 2S0.1
EXISTING JOIST SPACING
AS REQUIRED
AS
R
EQ
U
IR
ED
L3 1/2x3 1/2x5/16 AT OPENINGS;
L5x3 1/2x5/16 LLH AT MECH UNIT CURBS
OPEN
PLAN
NOTE: ESTABLISH OPENING SIZE
W/ SELECTED EQUIPMENT.
COORDINATE OPENING SIZE W/
MECHANICAL REQUIREMENTS.
L3 1/2x3 1/2x5/16 AT OPENINGS;
L5x3 1/2x5/16 LLH AT MECH UNIT CURBS
SECTION
1/8"
TYP
1/8"
TYP
EXIST JOIST OR BEAM
WELD DECK TO
ANGLE @ 12" OC
EXIST DECK
CENTER ANGLE UNDER
MECH UNIT CURB, TYP
L3 1/2x3 1/2x5/16 AT OPENINGS;
L5x3 1/2x5/16 LLV AT MECH UNIT CURBS
10'-5" COLUMN SPACING; VIF
AS REQUIRED
AS
R
EQ
U
IR
ED
OPEN
PLAN
NOTE: ESTABLISH OPENING SIZE
W/ SELECTED EQUIPMENT.
COORDINATE OPENING SIZE W/
MECHANICAL REQUIREMENTS.
L4x4x5/16 AT OPENINGS
SECTION
3/16"
TYP
1/4" DIA. CONCRETE SCREW
ANCHOR @ 12" OC W/ 1 5/8"
MINIMUM EMBEDMENT, TYP. DO
NOT CUT EXIST REINFORCING. EXIST CONCRETE SLAB
L4x4x5/16 AT OPENINGS
** THE CONTRACTOR SHALL NOT MOVE EQUIPMENT, MATERIALS, OR TOOLS
THROUGH THE MAIN LOBBY/CORRIDOR WHILE THE BUILDING IS OCCUPIED AS
THE MAIN LOBBY/CORRIDOR IS A REQUIRED MEANS OF EGRESS FOR THE
REMAINDER OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE THE
MOVEMENT OF EQUIPMENT MATERIALS OR TOOLS WITH THE OWNER TO ENSURE
THE MAIN LOBBY/CORRIDOR AND ALL EGRESS SPACES REMAIN FREE AND CLEAR
FOR EGRESS OF ALL OCCUPANTS.
NO MATERIALS, TOOLS, OR EQUIPMENT SHALL BE PLACED OR STORED IN THE
CORRIDOR WHILE THE BUIDLING IS OCCUPIED DURING THE REGULAR HOURS.
CONTRACTOR TO COORDINATE ANY REQUIRED WORK IN THE MAIN
LOBBY/CORRIDOR WITH THE BUILDING OWNER AND THE STATE FIRE MARSHAL.
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:41:59 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC Duncan & Craig Hall - STRUC CENTRAL.rvt
LBF
20301.20
GENERAL NOTES AND
TYPICAL DETAILS, DUNCAN
AND CRAIG
S0.1
LBF
N.T.S.S0.1
STRUCTURAL ABBREVIATIONS1
N.T.S.S0.1
CONCENTRATED LOADS AT STEEL
JOISTS AT DUNCAN HALL3
N.T.S.S0.1
FRAMING AT JOISTS FOR NEW CURBS
AND OPENINGS AT DUNCAN HALL2
N.T.S.S0.1
FRAMING AT CONCRETE SLAB FOR NEW OPENINGS4
(NOTE: THIS DETAIL ALSO APPLIES TO ADDITIVE BID ITEM #1)
(NOTE: THIS DETAIL ALSO APPLIES TO ADDITIVE BID ITEM #1)
1.
2.
3.
4.
GENERAL STRUCTURAL NOTES, COLLEGE SERVICES BUILDING (CSB)
BASIS OF DESIGN
DESIGN IS IN ACCORDANCE WITH THE VIRGINIA UNIFORM STATEWIDE BUILDING
CODE (USBC-2021 EDITION).
DESIGN OF CONCRETE STRUCTURES IS BASED ON THE REQUIREMENTS OF ACI
318 “BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, ” EDITION AS
REFERENCED IN GOVERNING BUILDING CODE.
DESIGN OF STRUCTURAL STEEL IS BASED ON THE REQUIREMENTS OF AISC 360
“SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS,” EDITION AS REFERENCED
IN GOVERNING BUILDING CODE AND AISC MANUAL OF STEEL CONSTRUCTION,
15TH EDITION.
DESIGN LOADS:
ROOF LIVE LOAD: PITCHED: FLAT: 30 PSF.
ROOF SNOW LOAD
GROUND SNOW LOAD (Pg): 42 PSF FLAT-ROOF SNOW LOAD (Pf): 30 PSF SNOW EXPOSURE FACTOR (Ce): 1.0 THERMAL FACTOR (Ct): 1.0
SNOW LOAD RISK CATEGORY: II
WIND DESIGN DATA
ULTIMATE WIND SPEED, Vult: 108 MPH (3-SECOND GUST) NOMINAL WIND SPEED, Vasd: 84 MPH (3-SECOND GUST)
RISK CATEGORY: II
EXPOSURE CATEGORY: B
INTERNAL PRESSURE COEFFICIENT (GCpi): +/- 0.18
COMPONENTS AND CLADDING DESIGN PRESSURES (ULTIMATE, FOR
REFERENCE ONLY. SPECIFIC DESIGN PRESSURES FOR EACH
COMPONENT SHALL BE CALCULATED BY THE LICENSED PROFESSIONAL
ENGINEER RESPONSIBLE FOR THE COMPONENT ’S DESIGN):
ROOF PRESSURES:
EFFECTIVE WIND AREA (SF)
ZONE 10 50 100
1 +16/-27 +16/-23 +16/-21 1’ +16/-16 +16/-16 +16/-16 2 +16/-36 +16/-31 +16/-29 3 +16/-49 +16/-39 +16/-34
WALL PRESSURES:
EFFECTIVE WIND AREA (SF)
ZONE 10 50 100
4 +16/-17 +16/-16 +16/-16 5 +16/-21 +16/-18 +16/-16 SEE ASCE 7 FOR ZONE LOCATIONS. EDGE DISTANCE “0.2h” = 2.6 FT.
RAIN DESIGN DATA
i=RAIN INTENSITY= 5.62 IN/HOUR (15 MIN RAINFALL INTENSITY)
MECHANICAL EQUIPMENT LOADS SHOWN ARE DESIGN MINIMUMS. NO
PROVISIONS HAVE BEEN MADE FOR MECHANICAL EQUIPMENT LOADS EXCEPT AS
SHOWN. CONTRACTOR SHALL ESTABLISH AND COORDINATE ACTUAL LOADS OF
ALL SELECTED EQUIPMENT. SUBMIT ALL SELECTED EQUIPMENT AND ALL
ADDITIONAL EQUIPMENT REQUIREMENTS FOR APPROVAL. COORDINATE ALL
EQUIPMENT LOADS WITH MATERIAL FABRICATORS.
DESIGN INCLUDES NO PROVISION FOR FUTURE VERTICAL EXPANSION OF THE
STRUCTURE.
GENERAL REQUIREMENTS AND CONDITIONS
WHERE A SECTION OR DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL APPLY
TO ALL LIKE CONDITIONS EVEN THOUGH NOT SPECIFICALLY MARKED ON THE
PLANS.
DIMENSIONS AND ELEVATIONS SHOWN FOR EXISTING CONSTRUCTION ARE
BASED ON EXISTING CONSTRUCTION DRAWINGS AND ARE NOT FIELD-
MEASURED. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS, ELEVATIONS,
AND GEOMETRY AT EXISTING CONSTRUCTION. REPORT DISCREPANCIES TO THE
ARCHITECT IMMEDIATELY.
WHERE ATTACHMENTS (BOLTS, WELDS, STRAPS, ETC…) ARE DENOTED AS “ON-
CENTER” ALONG A MEMBER LENGTH, IT IS IMPLIED THAT AT LEAST ONE (1)
ATTACHMENT IS PLACED AT THE BEGINNING AND END OF SUCH MEMBER (WITHIN
6”, UNLESS NOTED OTHERWISE).
THE CONTRACTOR SHALL PROTECT THE STRUCTURE DURING CONSTRUCTION
AGAINST EARTH PRESSURE, WIND AND OTHER FORCES UNTIL PERMANENT
SUPPORTS ARE IN PLACE.
RELATED WORK SPECIFIED OR SHOWN ELSEWHERE
REFER TO PROJECT SPECIFICATIONS AND OTHER PROJECT DRAWINGS FOR
RELATED WORK SPECIFIED OR SHOWN ELSEWHERE INCLUDING BUT NOT
LIMITED TO THE FOLLOWING:
PENETRATIONS, SLEEVES, OPENINGS.
INSERTS, EMBEDS, ANCHOR BOLTS AND ANCHORAGE FOR ATTACHMENT
OF NON-STRUCTURAL ITEMS.
SIZE AND LOCATION OF EQUIPMENT FOUNDATIONS AND PADS
ROOF CURBS FOR ROOF MOUNTED EQUIPMENT.
STRUCTURAL STEEL
STRUCTURAL STEEL SHALL COMPLY WITH THE PROVISIONS OF AISC 303 AND
AISC 360.
STEEL FABRICATION SHALL BE PERFORMED BY A FABRICATOR QUALIFIED BY THE
AISC QUALITY CERTIFICATION PROGRAM AS AN AISC-CERTIFIED PLAN,
CATEGORY STD.
STRUCTURAL STEEL SHALL CONFORM TO THE FOLLOWING:
“W” SHAPES, BEAMS AND COLUMNS: ASTM A992.
COLD-FORMED STRUCTURAL STEEL TUBING: ASTM A 500, GRADE C.
STEEL PIPE: ASTM A 53, TYPE E OR S, GRADE B.
OTHER SHAPES, PLATES AND BARS: ASTM A572, GRADE 50.
PRIME STRUCTURAL STEEL WITH FABRICATOR’S STANDARD LEAD- AND
CHROMATE-FREE NONASPHALTIC, RUST-INHIBITING PROMER COMPLYING WITH
MPI #79. DO NOT PRIME SURFACES THAT RECEIVE FIELD WELDS OR SPRAYED
APPLIED FIREPROOFING.
ALL BOLTS SHALL BE ¾” DIAMETER, ASTM F3125, GRADE A325-N, TYPE 1, SNUG-
TIGHTENED, UNLESS NOTED OTHERWISE.
WELDING PROCEDURES AND PERSONNEL SHALL BE QUALIFIED BY AWS D1.1.
WELDING ELECTRODES SHALL BE E70XX.
MINIMUM WELDS SHALL BE 3/16” FILLET WELD ALL AROUND UNLESS INDICATED
OTHERWISE.
DO NOT USE THERMAL CUTTING OF STRUCTURAL STEEL DURING ERECTION.
DO NOT ENLARGE UNFAIR HOLES IN MEMBERS BY BURNING OR BY USING DRIFT
PINS.
SUBMIT SHOP DRAWINGS SHOWING FABRICATION OF ALL STRUCTURAL STEEL
COMPONENTS. INCLUDE CONNECTION DETAILS, HOLES, WELDS, AND BOLTS.
EXPANSION & ADHESIVE ANCHORS
ALL ADHESIVE ANCHORS SHALL BE 5/8” DIAMETER WITH 5” MINIMUM EMBEDMENT
UNLESS NOTED OTHERWISE. INSTALL PER MANUFACTURER ’S REQUIREMENTS IN
CONCRETE OR FULLY GROUTED MASONRY.
NO ANCHOR SHALL BE INSTALLED PRIOR TO RECEIVING PROPER INSTALLATION
TRAINING FROM A MANUFACTURER’S REPRESENTATIVE. ALL ANCHORS SHALL
BE INSTALLED BY PERSONNEL TRAINED BY MANUFACTURER’S REPRESENTATIVE.
ABV ABOVE
ADH AHR ADHESIVE ANCHOR
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
APPROX APPROXIMATE
ARCH. ARCHITECTURAL
BLDG BUILDING
BLW BELOW
BM BEAM
BOT BOTTOM
BRG BEARING
BTWN BETWEEN
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLR CLEAR
CMU CONCRETE MASONRY UNITS
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONT CONTINUOUS
DIA DIAMETER
DIAG DIAGONAL
DIM. DIMENSION
DWG(S) DRAWING(S)
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EMBED EMBEDMENT
EOS EDGE OF SLAB
EQ EQUAL
EQUIP. EQUIPMENT
EW EACH WAY
EXST EXISTING
EXT EXTERIOR
EXPN AHR EXPANSION ANCHOR
FIN. FLR FINISHED FLOOR
FLG FLANGE
FRMG FRAMING
FTG FOOTING
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
HORIZ HORIZONTAL
INFO INFORMATION
INT INTERIOR
JST JOIST
JT JOINT
K KIP (1000 POUNDS)
KSI KIPS PER SQUARE INCH
LBS POUNDS
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MID MIDDLE
MIN MINIMUM
MTL METAL
NTS NOT TO SCALE
OC (O/C) ON CENTER
OPNG OPENING
PAF POWER-ACTUATED FASTENER
PERP PERPENDICULAR
PL PLATE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
R RADIUS
REINF REINFORCEMENT, REINFORCED
REQ’D REQUIRED
SCHED SCHEDULE
SHT SHEET
SIM SIMILAR
SOG SLAB ON GRADE
STD STANDARD
STIFF. STIFFENER
STL STEEL
STRL STRUCTURAL
SYM SYMMETRICAL
T&B TOP AND BOTTOM
THK THICK
TOF TOP OF FOOTING
TOS TOP OF STEEL
TRANSV TRANSVERSE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VERT VERTICAL
VIF VERIFY IN FIELD
W/ WITH
WP WORKING POINT
WWF WELDED WIRE FABRIC
EXISTING JOIST SPACING
AS REQUIRED
AS
R
EQ
U
IR
ED
L3 1/2x3 1/2x5/16 AT OPENINGS;
L5x3 1/2x5/16 LLH AT MECH UNIT CURBS
OPEN
PLAN
NOTE: ESTABLISH OPENING SIZE
W/ SELECTED EQUIPMENT.
COORDINATE OPENING SIZE W/
MECHANICAL REQUIREMENTS.
L3 1/2x3 1/2x5/16 AT OPENINGS;
L5x3 1/2x5/16 LLH AT MECH UNIT CURBS
SECTION
1/8"
TYP
1/8"
TYP
EXIST JOIST OR BEAM
WELD DECK TO
ANGLE @ 12" OC
EXIST DECK
CENTER ANGLE UNDER
MECH UNIT CURB, TYP
L3 1/2x3 1/2x5/16 AT OPENINGS;
L5x3 1/2x5/16 LLV AT MECH UNIT CURBS
GREATER
THAN 6"
6" MAX
GREATER THAN 6"
CONCENTRATED LOAD IS NOT WITHIN 6" OF A TOP OR BOTTOM CHORD PANEL POINT.
THE JOIST TOP OR BOTTOM CHORD PANEL POINT. ADD A DIAGONAL L2x2x3/16 WHERE THE ALL NEW CONCENTRATED LOADS TO THE STEEL JOIST SHALL BE CONNECTED WITHIN 6" OF NOTE 1:
NOTE 1
NOTE 1
NEW MECH UNIT CURB
1/8" 1"
EACH
END-TYP
EXIST ROOF BAR JOIST
EXIST METAL ROOF DECK
SEE 2S0.1
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:43:51 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC College Services Building - STRUC CENTRAL.rvt
LBF
20301.20
GENERAL NOTES AND
TYPICAL DETAILS, CSB
S0.2
LBF
N.T.S.S0.2
STRUCTURAL ABBREVIATIONS1
N.T.S.S0.2
FRAMING FOR NEW CURBS AND
OPENINGS AT CSB2
N.T.S.S0.2
CONCENTRATED LOADS AT STEEL
JOISTS AT CSB3
NOTE: ALL WORK THIS SHEET TO BE
PROVIDED AS PART OF ADDITIVE BID
ITEM #2.
RTU-1 TO BE PROVIDED AS
ADDITIVE BID ITEM #1
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
N
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
PLAN NOTES
GENERAL NOTES
PLAN NORTH
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:41:59 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC Duncan & Craig Hall - STRUC CENTRAL.rvt
LBF
20301.20
DUNCAN AND CRAIG ROOF
FRAMING PLAN
S1.1
LBF
1. SEE MECH DRAWINGS FOR EQUIPMENT LOCATION AND
CURB REQUIREMENTS.
2. EXISTING FRAMING TO BE FIELD VERIFIED.
NEW ROOFTOP EQUIPMENT, SEE MECHANICAL
DRAWINGS. SEE 2/S0.1 FOR FRAMING UNDER NEW
EQUIPMENT ROOF CURBS AND AROUND NEW DUCT
PENETRATION AS REQUIRED IN FIELD. REUSE
EXISTING PENETRATIONS WHERE POSSIBLE.
EXISTING METAL ROOF DECK ON EXISTING OPEN WEB
STEEL JOISTS. PATCH ABANDONED HOLES WITH 1 1/2"
22 GA TYPE B METAL ROOF DECK WITH #8 SCREWS @
12" OC AROUND PERIMETER.
NEW ROOFTOP EQUIPMENT, SEE MECHANICAL
DRAWINGS. SEE 4/S0.1 FOR FRAMING AROUND NEW
DUCT PENETRATION AS REQUIRED IN FIELD. REUSE
EXISTING PENETRATIONS WHERE POSSIBLE.
EXISTING 10" THICK CONCRETE ROOF SLAB.
1/8" = 1'-0"S1.1
DUNCAN AND CRAIG ROOF FRAMING PLAN1
5542 LB
4446 LB765 LB
KEY PLAN
NORTH
WORK LOCATION:
4'4'00 8'8' 16'16'
SCALE: 1/8" = 1'-0"
VIF
3' - 4"
VIF
2' - 4"
VIF
2' - 11"
VIF
3' - 3"
NOTE: ALL WORK THIS SHEET
TO BE PROVIDED AS A PART OF
ADDITIVE BID ITEM #2.
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
N
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
PLAN NOTES
GENERAL NOTES
PLAN NORTH
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:43:51 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC College Services Building - STRUC CENTRAL.rvt
LBF
20301.20
CSB ROOF PLAN
S1.2
LBF
1. SEE MECH DRAWINGS FOR EQUIPMENT LOCATION AND
CURB REQUIREMENTS.
2. EXISTING FRAMING TO BE FIELD VERIFIED.
NEW ROOFTOP EQUIPMENT, 1225 LB. SEE
MECHANICAL DRAWINGS. SEE 2/S0.2 FOR FRAMING
UNDER NEW EQUIPMENT ROOF CURBS AND AROUND
NEW DUCT PENETRATION AS REQUIRED IN FIELD.
EXISTING METAL ROOF DECK ON EXISTING OPEN WEB
STEEL JOISTS. PATCH ABANDONED HOLES WITH 1 1/2"
22 GA TYPE B METAL ROOF DECK WITH #8 SCREWS @
12" OC AROUND PERIMETER.
1/8" = 1'-0"S1.2
CSB ROOF FRAMING PLAN1
4'4'00 8'8' 16'16'
SCALE: 1/8" = 1'-0"
KEY PLAN
NORTH
WORK LOCATION:
RECTANGULAR DUCT
DUCTWORK, AIR DISTRIBUTION
ROUND DUCT
FLAT OVAL DUCT
DUCT WITH ACOUSTIC LINING
SUPPLY GRILLE OR REGISTER
RETURN/EXHAUST GRILLE OR REGISTER
CEILING DIFFUSER - SQUARE (ROUND SIMILAR)
(FLOW ARROWS INDICATE DIRECTION OF THROW
FOUR WAY FLOW IF NO ARROWS SHOWN)
RETURN/EXHAUST GRILLE OR REGISTER
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN DUCT UP
DOUBLE
6Ø
12x6
12/6
R
RETURN DUCT DOWN
CHANGE OF ELEVATION RISE (R) DROP (D)
TRANSITION - RECTANGULAR OR ROUND
TRANSITION - RECTANGULAR TO ROUND
BRANCH DUCT - STANDARD (45º ENTRY)
BRANCH DUCT WITH SPLITTER
SD
BRANCH DUCT WITH AIR EXTRACTOR AE
BRANCH DUCT, STRAIGHT LATERAL, ROUND
BRANCH DUCT, STRAIGHT TEE, ROUND
BRANCH DUCT, LO-LOSS TEE, ROUND
BRANCH DUCT, CONICAL TEE, ROUND
BRANCH DUCT, CONICAL TEE, FLEX
TAKE OFF, SPIN-IN COLLAR W/DAMPER
ABBREVIATIONS
AUTOMATIC AIR VENT
ACCESS DOOR
AIR EXTRACTOR
AUTOMATIC FLOW CONTROL VALVE
AIR PRESSURE DROP, IN. WG.
AQUASTAT
AIR TRANSFER DUCT
BOTTOM GRILLE
BRAKE HORSEPOWER
BOTTOM OF DUCT
BOTTOM REGISTER
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT/HOUR
CEILING ACCESS DOOR
CEILING DIFFUSER, CONDENSATE DRAIN
CUBIC FEET PER MINUTE
CEILING GRILLE
CLEANOUT
CEILING REGISTER
CEILING RADIATION DAMPER
COLD WATER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
DUCT ACCESS DOOR
DRY BULB ºF, DECIBEL
DOOR GRILLE
DOUBLE WALLED DUCT
EXHAUST AIR
ENTERING AIR TEMPERATURE
EQUIPMENT SERVICE AREA
ENTERING WATER TEMPERATURE
FLOOR DRAIN
FIRE DAMPER
FLOOR GRILLE
FROM
FIRE/SMOKE DAMPER
GALLON
GALLONS PER DAY
GALLONS PER HOUR
GALLONS PER MINUTE
HOSE BIBB
HORSEPOWER
HIGH PRESSURE STEAM RETURN
HIGH PRESSURE STEAM SUPPLY
HOT WATER
HEATING/HOT WATER RETURN
HEATING WATER SUPPLY
FREQUENCY (CYCLES/SOUND)
KILOWATT
KILOWATT HOUR
LEAVING AIR TEMPERATURE
POUNDS PER HOUR
LINEAR DIFFUSER
LINEAR GRILLE
LINEAR RETURN
LEAVING WATER TEMPERATURE
AAV
AD
AE
AFCV
APD
AQ
ATD
BG
BHP
BOD
BR
BTU
BTUH
CAD
CD
CFM
CG
CO
CR
CRD
CW
CWR
CWS
DAD
DB
DG
DWD
EA
EAT
ESA
EWT
FD
FDR
FG
FR
FSDR
GAL
GPD
GPH
GPM
HB
HP
HPR
HPS
HW
HWR
HWS
HZ
KW
KWH
LAT
LB/HR
LD
LG
LR
LWT
MAV
MBH
MOD
MPR
MPS
MVD
NC
OED
OFD
OA
OBD
OT
OTCP
PIV
PVR
PSI
RA
RC
RD
RH
RPM
SA
SD
SDR
SMD
SP
SS
S/S
SV
SW
TC
TEMP
TD
TG
TR
T'STAT
UC
V
VAC
VAV
VTR
W
WB
WG
WH
WHA
WPD
WS
WTD
WTR
WWM
Z
MANUAL AIR VENT
BTU PER HOUR (THOUSANDS)
MOTOR OPERATED DAMPER
MEDIUM PRESSURE STEAM RETURN
MEDIUM PRESSURE STEAM SUPPLY
MANUAL VOLUME DAMPER
NOISE CRITERIA
OPEN END DUCT
OVERFLOW DRAIN
OUTSIDE AIR
OPPOSED BLADE DAMPER
OVERRIDE TIMER
OPEN TO CEILING PLENUM
POST INDICATOR VALVE
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
RETURN AIR
RAIN CONDUCTOR
ROOF DRAIN
RELATIVE HUMIDITY
REVOLUTIONS PER MINUTE
SUPPLY AIR
SHOWER DRAIN, SPLITTER DAMPER,
STORM DRAIN
SMOKE DAMPER
SMOKE DETECTOR
STATIC PRESSURE
SANITARY SEWER
STAINLESS STEEL
SERVICE VALVE
SWITCH
TIME CLOCK
TEMPERATURE
TEMPERATURE DIFFERENTIAL
TOP GRILLE, TRANSFER GRILLE
TOP REGISTER, TONS OF REFRIGERATION
THERMOSTAT
DOOR UNDERCUT
VOLT, VENT
VACUUM
VARIABLE AIR VOLUME
VENT THROUGH ROOF
WASTE, WATTS
WET BULB, ºF
WATER GAUGE (FEET OR INCHES)
WALL HYDRANT
WATER HAMMER ARRESTOR
WATER PRESSURE DROP, FT. WG
WATER STOP
WATER TEMPERATURE DROP, ºF
WATER TEMPERATURE RISE, ºF
WOVEN WIRE MESH
ZONE
THESE SYMBOLS AND ABBREVIATIONS ARE MECHANICAL DEPARTMENT STANDARDS AND MAY NOT
NECESSARILY BE APPLICABLE TO OR APPEAR ON THESE DRAWINGS. HOWEVER, WHEREVER THESE
SYMBOLS DO OCCUR ON THE DRAWINGS, THE ITEM SHALL BE PROVIDED AND INSTALLED. SEE
ARCHITECTURAL DRAWINGS FOR ADDITIONAL SYMBOLS AND ABBREVIATIONS.
FLEXIBLE DUCT
WATERTIGHT DUCT
CONTROL DAMPER (MOD OR MVD)
SAFETY DAMPER (FDR OR SDR)
SQUARE ELBOW WITH TURNING VANES
FLEXIBLE DUCT CONNECTION
MOD
FDR
PIPING - GENERAL
DIRECTION OF FLOW
DIRECTION OFSLOPE DOWN
PIPE TURNING UP
PIPE TURNING DOWN
BRANCH CONNECTION - TOP
BRANCH CONNECTION - BOTTOM
BRANCH CONNECTION - SIDE
PIPE ANCHOR
PIPE ALIGNMENT GUIDE
SERVICE VALVE (GATE, BALL OR BUTTERFLY)
GLOBE VALVE
CHECK VALVE
BALANCING COCK
UNION
VALVE IN RISER
PIPE CAP OR BLIND FLANGE
OUTLETS (G, A, V, OX, CW, HW)
EXPANSION JOINT
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE
PRESSURE GAUGE
THERMOMETER
FLEXIBLE PIPE CONNECTION OR JOINT
STRAINER
CLEANOUT PLUG
FLOOR CLEANOUT
WALL CLEANOUT
FLOW SWITCH
PRESSURE SWITCH
R
CO
OR
CO
CO
CO
PS
FS
D
CR
C
CWR
CWS
HWR
RS
RD
RL
HPS
HPR
DTS
DTRPIPING - HVAC
STEAM (NUMBER DENOTES PRESSURE)
STEAM CONDENSATE RETURN (SCR)
BOILER BLOWDOWN
PUMPED CONDENSATE
COLD WATER
DRIP STATION
THERMOSTATIC TRAP
FLOAT AND THERMOSTATIC TRAP
BUCKET TRAP
HEATING WATER SUPPLY
DS
T
F
B
HWS
PC
BBD
MISCELLANEOUS
LIMIT OF DEMOLITION
CONNECT NEW TO EXISTING
T
T
ELECTRIC THERMOSTAT (OR SENSOR)
PNEUMATIC THERMOSTAT
ØDIAMETER
HH
SS
HUMIDISTAT
FAN SPEED SWITCH
SMDDUCT - MOUNTED SMOKE DETECTOR
PIPE AND DUCT
RISER REFERENCE
S - SUPPLYING DUCT
R - RETURN DUCT
E - EXHAUST DUCT
H - H/C WATER
PIPING
H
1 RISER NO..
BFP
AQUASTAT
GAS COCK
BACKFLOW PREVENTER
NEW WORK
EXISTING TO REMAIN
EXISTING TO BE REMOVED
PIPING - SPECIAL
COMPRESSED AIR
GAS
FUEL OIL SUPPLY
FUEL OIL RETURN
GLYCOL SUPPLY
GLYCOL RETURN
A
G
FOS
FOR
GS
GR
HEATING WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
CONDENSATE DRAIN
CONTROL VALVE (2-WAY)
CONTROL VALVE (3-WAY)
AUTOMATIC FLOW CONTROL VALVE
CALIBRATED BALANCING VALVE
TRIPLE DUTY VALVE (PUMP DISCHARGE)
PRESSURE/TEMPERATURE FITTING
REFRIGERANT SUCTION
REFRIGERANT DISCHARGE
REFRIGERANT LIQUID
HEAT PUMP WATER SUPPLY
HEAT PUMP WATER RETURN
DUAL TEMP SUPPLY
DUAL TEMP RETURN
EXHAUST DUCT UP
EXHAUST DUCT DOWN
HVAC ABBREVIATIONS AND LEGEND
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
DUCT WORK INSTALLATION, CONNECTIONS AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE LATEST
APPLICABLE SMACNA STANDARDS.
EQUIPMENT INSTALLATIONS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. COPY OF
INSTRUCTIONS SHALL BE ON JOB SITE AT TIME OF BUILDING INSPECTIONS.
DUCT DIMENSIONS INDICATED ARE ACTUAL SHEET METAL SIZES. WHERE ACOUSTIC LINING IS INDICATED (IF
SHOWN), THE DUCT SIZES WERE ADJUSTED TO COMPENSATE FOR THE LINING.
DUCTWORK AND PIPING LAYOUTS ARE SCHEMATIC. ALL DROPS, RISES, OR OFFSETS REQUIRED BUT NOT SHOWN
SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.
DUCT CONNECTIONS TO SIDE WALL OR DUCT MOUNTED REGISTERS AND GRILLES SHALL BE MADE WITH RIGID DUCT. DUCT CONNECTIONS TO CEILING-MOUNTED DIFFUSERS, REGISTERS, AND GRILLES MAY BE WITH RIGID OR FLEXIBLE DUCT (CONTRACTOR OPTION). PROVIDE SMOOTH BENDS IN FLEXIBLE DUCT SECTIONS.
ALL TEMPERATURE AND HUMIDITY SENSORS (NON-SPACE ADJUSTABLE) IN PUBLIC AREAS SHALL BE MOUNTED AT 4'-10" AFF. THERMOSTATS FOR NON-PUBLIC, NON-RESIDENTIAL AREAS SHALL BE MOUNTED AT 4'-10" AFF WITH AN 18" LONG LOOP OF SURPLUS CONTROL WIRE IN WALL CAVITY TO PERMIT THE OWNER TO LOWER THE CONTROL DEVICE IN THE FUTURE IF REQUIRED FOR HANDICAP ACCESS. MOUNT THERMOSTATS AT 48" AFF IN ALL AREAS
DESIGNATED AS "ADA-HANDICAP ACCESSIBLE".
ALL DUCTWORK SHALL BE SEALED ACCORDING TO SMACNA CLASS "A". DUCTWORK SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE FOLLOWING PRESSURE CLASSIFICATIONS:
ROOFTOP AIR HANDLING AND ROOFTOP AC UNITS: ±3" W.G., ALL OTHER SUPPLY, RETURN AND EXHAUST: ±1" W.G.
DUCT CONNECTIONS TO ALL AIR HANDLING UNITS, INCLUDING FAN COIL UNITS, INLINE FANS, ETC. SHALL BE MADE USING FLEXIBLE DUCT CONNECTION. ALSO, PROVIDE FLEXIBLE DUCT CONNECTIONS WHERE DUCTWORK
CROSSES BUILDING EXPANSION JOINTS.
LOCATE CEILING AIR DIFFUSERS, REGISTERS AND GRILLES IN THE CENTER OF 2'x2' AND AT THE QUARTER POINT OF 2'x4' ACOUSTICAL TILE CEILING MODULES UNLESS SPECIFICALLY INDICTED OTHERWISE.
PIPING AND EQUIPMENT HANGERS SHALL BE SPACED IN A SYSTEMATIC RANDOM PATTERN AS REQUIRED TO ELIMINATE OVERLOADING INDIVIDUAL STRUCTURAL MEMBERS, THE ESTIMATED WEIGHT ASSIGNED TO PIPE AND EQUIPMENT HANGERS SHALL BE DETERMINED BY THE MECHANICAL CONTRACTOR AND SUBMITTED TO THE GENERAL CONTRACTOR FOR REVIEW, COORDINATION AND APPROVAL PRIOR TO INSTALLATION. THIS
REQUIREMENT APPLIES TO ALL MECHANICAL WORK, INCLUDING PLUMBING.
HEATING / COOLING DESIGN CONDITIONS: ROANOKE, VA.
WINTER - 10ºF OAT, 75ºF
SUMMER - 95ºF DB / 75ºF WB OAT; 75ºF, 50% RH INDOORS.
WHERE MORE THAN ONE TOP REGISTER IS INSTALLED IN A ROOM, THE CENTERLINE ELEVATION OF EACH
REGISTER SHALL BE THE SAME DISTANCE FROM AND LEVEL TO THE PLANE OF THE CEILING.
CONTRACTOR SHALL VISIT SITE PRIOR TO BIDS TO ACCESS ASSESS EXISTING CONDITIONS AND VERIFY EXTENT OF ABOVE CEILING SPACE FOR DUCT CONNECTIONS AND PATHWAY FOR REPLACEMENT OF EXISTING ROOF
MOUNTED EQUIPMENT.
THE ROUTING OF LARGER SIZE SUPPLY AIR DUCTS SHALL TAKE PRECEDENCE OVER SMALLER DUCTS, AND OVER RETURN AND EXHAUST AIR DUCTS. PROVIDE DUCT OFFSETS, RISES AND DROPS AS REQUIRED TO INSTALL
DUCTWORK AS CLOSELY TO THE LAYOUT SHOWN ON THESE DOCUMENTS AS POSSIBLE.
HVAC GENERAL NOTES
CONTRACTOR NOTE:
THE LISTED MANUFACTURER'S AND EQUIPMENT HAVE BEEN USED AS THE BASIS OF DESIGN OF THIS PROJECT AND ARE LISTED TO ESTABLISH A STANDARD OF QUALITY AND TO DEFINE CONNECTION AND CLEARANCE REQUIREMENTS. ALL OTHER MANUFACTURERS AND EQUIPMENT OF EQUAL OR BETTER QUALITY MAY BE ACCEPTED UPON REVIEW BY THE ENGINEER, HOWEVER, IF THESE SUBSTITUTIONS ARE MADE, THE CONTRACTOR IS REQUIRED TO COMPLY WITH ALL REQUIREMENTS OF DIVISION 1, ASSUME FULL RESPONSIBILITY FOR ALL COORDINATION ISSUES, AND SHALL SUBMIT WITH THE SHOP DRAWINGS A DETAILED DRAWING SHOWING ALL CHANGES IN THE EQUIPMENT SIZE AND LOCATION, DUCTWORK, PIPING, ELECTRICAL WIRING CONNECTIONS, CLEARANCES, ETC. IF ANY REQUIRED CHANGES INVOLVE OTHER TRADES, THE MECHANICAL SUBCONTRACTOR SHALL INCLUDE WITH THE SHOP DRAWINGS A LETTER INDICATING THAT THE OTHER TRADES HAVE BEEN ADVISED OF THE PROPOSED CHANGES AND SHALL ALSO INCLUDE A STATEMENT AS TO HOW, BY WHOM, AND THE ARRANGEMENT WHEREBY THESE CHANGES WILL BE ACCOMPLISHED. ALL ADDITIONAL COSTS AND PERFORMANCE ISSUES RESULTING FROM THE SUBSTITUTION WILL BE THE RESPONSIBILITY OF THE MECHANICAL SUBCONTRACTOR. THE SUBSTITUTED EQUIPMENT WILL NOT BE PERMITTED TO ADD ELECTRICAL
LOAD TO THE PROJECT.
** THE CONTRACTOR SHALL NOT MOVE EQUIPMENT, MATERIALS, OR TOOLS
THROUGH THE MAIN LOBBY/CORRIDOR WHILE THE BUILDING IS OCCUPIED AS
THE MAIN LOBBY/CORRIDOR IS A REQUIRED MEANS OF EGRESS FOR THE
REMAINDER OF THE BUILDING. THE CONTRACTOR SHALL COORDINATE THE
MOVEMENT OF EQUIPMENT MATERIALS OR TOOLS WITH THE OWNER TO ENSURE
THE MAIN LOBBY/CORRIDOR AND ALL EGRESS SPACES REMAIN FREE AND CLEAR
FOR EGRESS OF ALL OCCUPANTS.
NO MATERIALS, TOOLS, OR EQUIPMENT SHALL BE PLACED OR STORED IN THE
CORRIDOR WHILE THE BUIDLING IS OCCUPIED DURING THE REGULAR HOURS.
CONTRACTOR TO COORDINATE ANY REQUIRED WORK IN THE MAIN
LOBBY/CORRIDOR WITH THE BUILDING OWNER AND THE STATE FIRE MARSHAL.
1.
2.
3.
4.
5.
6.
REMARKS:
HEATING AND COOLING CAPACITIES ARE BASED ON ASHRAE'S "MEAN OF ANNUAL EXTREME" OUTDOOR AIR CONDITIONS FOR ROANOKE, VIRGINIA.
COOLING AND HEAT CAPACITY BASED ON 30% BY VOLUME PROPYLENE GLYCOL & WATER SOLUTION.
PROVIDE UNIT WITH UNIT-MOUNTED, LOCAL DISCONNECT SIZED PER NEC
PROVIDE UNIT WITH STAND-ALONE CONTROLS INCLUDING INTERNALLY INSTALLED MICRO-PROCESSOR BASED CONTROLLER WITH BACNET COMMUNICATIONS CARD.
PROVIDE UNIT WITH ROOF CURB. REFER TO STRUCTURAL DRAWINGS AND SPECIFICATIONS FOR SUPPORT DETAILS.
REFER TO SPECIFICATION SECTION 237343.16 FOR ADDITIONAL REQUIREMENTS.
1.
2.
3.
4.
5.
6.
7.
REMARKS:
UNIT(S) SHALL BE BOTTOM SUPPLY OUTLET, BOTTOM RETURN INLET, AND PROVIDED WITH A FULL CHARGE OF REFRIGERANT R-454B.
RTU(S) SHALL OPERATE UNDER THEIR OWN SAFETIES AND CONTROLS. PROVIDE UNIT(S) WITH AN INTERNALLY-MOUNTED AND WIRED, MICRO-PROCESSOR BASED CONTROLLER AND THERMOSTAT TERMINAL STRIP CONNECTOR.
PROVIDE UNIT(S) WITH A ROOF CURB, COMPLETE WITH INSULATION, WOOD NAILER AND 1/2" THICK COMPRESSION GASKET ON THE TOP EDGE OF CURB TO SEAL VOIDS AND PROVIDE MORE UNIFORM LOADING.
COORDINATE EQUIPMENT CURB HEIGHT WITH ROOFING CONTRACTOR SUCH THAT THE BASE OF THE RTU(S) IS A MINIMUM OF 18-INCHES ABOVE FINISHED ROOF SURFACE.
PROVIDE DOWNFLOW LOW LEAK ECONOMIZER WITH COMPARATIVE ENTHALPY, FAULT DETECTION AND DIAGNOSTICS, AND BARAMETRIC RELIEF.
PROVIDE RTU WITH A SINGLE-POINT, POWER DISCONNECT SWITCH SIZED PER NEC REQUIRMENTS.
REFER TO SPECIFICATION SECTION "237416.11 - PACKAGED, SMALL CAPACITY, ROOFTOP AIR-CONDITIONING UNITS" FOR ADDITIONAL REQUIREMENTS.
1.
2.
3.
REMARKS:
WATER HEATER SHALL BE NATURAL GAS-FIRED.
PROVIDE UNIT WITH 4 INCH DRAFT COLLAR AND RE-CONNECT TO EXISTING VENT.
SEE DETAIL ON SHEET M3.0 FOR SPECIFIC CONNECTION REQUIREMENTS.
RAH-D2 DUNCAN HALL, 2ND FLR 9,340 5,900 2,600 1.8 15 8,405 0.75 7 1/2 488.4 340.5 88 / 71 55 / 54.9 117 11.07 45 54.5 430 10.00 44.45 47 4.99 180 160 2 IN.-THROWAWAY MERV 8 230 3 60 76 125 5,542 TRANE CSAA021 RAH-D1 DUNCAN HALL, 1ST FLR 7,545 5,140 2,570 2.0 10 6,790 0.95 7 1/2 420.5 283.7 89 / 72 55 / 54.9 98 8.7 45 54.8 374 10.00 48.75 41 4.28 180 160 2 IN.-THROWAWAY MERV 8 230 3 60 60 90 4,446 TRANE CSAA017
MARK AREA SERVED SUPPLY
CFM
O.A. (HI)
CFM
O.A. (LO)
CFM
EXT. S.P.
(IN. W.G) MAX HP
EXHAUST
CFM
EXT. S.P.
(IN. W.G.) MAX HP TOTAL SENSIBLE
CAPACITY, MBH
E.A.T., °F
(DB / WB)
L.A.T., °F
(DB / WB) GPM MAX W.P.D.,
(FT. H2O) EWT, °F LWT, °F CAPACITY,
(MBH)
E.A.T., °F
(DB)
L.A.T., °F
(DB) GPM MAX W.P.D.,
(FT. H2O)
EWT,
( °F)
LWT,
( °F) TYPE EFFICIENCY V(ac) PH HZ MCA MOCP
SUPPLY FAN RETURN FAN COOLING CAPACITY HEATING CAPACITY FILTER ELECTRICAL
WEIGHT,
(LBS)
BASIS
OF
DESIGN
MODEL
HYDRONIC ROOF-TOP AIR HANDLING UNITS (AHU)
DWH-1 50.0 51 50,000 0.60 175 A.O. SMITH HURT-50L
NOMINAL
STORAGE (GALS)
RECOVERY AT 90
DEG F / HR
MARK
CAPACITY
GROSS INPUT,
MBH GAS UEF DRY WEIGHT, LBS BASIS OF DESIGN MODEL
COMMERCIAL DOMESTIC WATER HEATER - TANK TYPE
DHWRC-1 CSB RM. 104B DOM. HOT-WATER 10 10 CENTRIFUGAL IN-LINE 1/25 115 / 1 / 60 3250 TACO 008-IQSF6 H2O HP VOLT / PH / HZ RPMMARK LOCATION SERVICE GPM HEAD, FT TYPE MOTOR BASIS OF DESIGN MODEL
HYDRONIC PUMPS
1.
2.
REMARKS:
DHW RECIRCULATION PUMP SHALL COMPLY WITH THE ANSI / NSF 61 STANDARD.
DHW RECIRCULATION PUMP SHALL HAVE A MINIMUM 3-YEAR WARRANTY.
RTU-2 COLLEGE SERVICES BLDG. 8.5 3,190 460 1.5 3.0 2.10 -- -- -- -- -- 200.0 162.0 61.3 109.5 2-STAGE 105.1 70.7 77.7 / 66.0 54.6 / 54.2 2-STAGE 16.8 (IEER) 63.6 54 73.5 2-INCH THROWAWAY MERV 8 208 / 230 3 60 46.6 53.00 70.0 1,225 RTU-1 DUNCAN HALL ENTRANCE 3 1,200 100 1.1 3/4 0.54 18.0 61.5 68.0 95.0 2-STAGE -- -- -- -- -- 37.9 29.0 80.0 / 67.0 56.4 / 56.3 2-STAGE 13.4 (SEER2) 61.5 56 87.0 2-INCH THROWAWAY MERV 8 208 / 230 3 60 18.1 75.00 80.0 765
INPUT (kW) OUTPUT (MBH) INPUT (MBH) OUTPUT (MBH) TOTAL SENSIBLE
SUPPLY
CFM
OA
CFM
EXT S.P.
IN H20
MOTOR
HP BHP CAPACITY EAT, °F LAT, °F CONTROL CAPACITY EAT, °F LAT, °F CONTROL NET CAPACITY (MBH) EAT, °F
DB/WB
LAT, °F
DB/WB CONTROL UNIT
EFFICIENCY
CAPACITY
, MBH
EAT, °F
DB
LAT, °F
DB TYPE EFFICIENCY VOLTAGE PHASE HZ FLA MCA MOCPMARK AREA SERVED
NOMINAL
CAPACITY
(TONS)
SUPPLY FAN ELECTRIC HEATING NATURAL GAS HEATING DIRECT EXPANSION COOLING COIL HOT GAS REHEAT COIL FILTERS ELECTRICAL
WEIGHT,
LBS
PACKAGED, ROOFTOP HEAT-PUMP UNIT SCHEDULE (RTU-X)
EF-2 CARPENTRY ROOM 205 0.35 1/6 0.03 5.5 DIRECT ICF 120 1 60 2.8 34 GREENHECK SQ-90-VG EF-1 PAINT ROOM 125 0.35 1/15 0.03 5.0 DIRECT ICF 120 1 60 1.3 27 GREENHECK SQ-70-VG
V (ac) Ph Hz FLA
MARK SERVES CFM ESP
IN WG MOTOR (HP) POWER (W) MAX
SONES DRIVE TYPE
ELECTRICAL WEIGHT
(LBS)
BASIS OF
DESIGN MODEL NO
EXHAUST FANS (EF)
1.
REMARKS:
"ICF" = INLINE CENTRIFUGAL FAN.
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
PLAN NOTES
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:47:02 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC Duncan & Craig Hall - MECH CENTRAL.rvt
MAP
MAP
20301.20
ABBREVIATIONS,
LEGENDS, NOTES AND
SCHEDULES - HVAC
M0.0
MAP
RTU-1 TO BE PROVIDED AS ADDITIVE BID ITEM #1
RTU-2 TO BE PROVIDED AS ADDITIVE BID ITEM #2
NOTE: THIS EQUIPMENT TO BE
PROVIDED AS A PART OF
ADDITIVE BID ITEM #2.
(E) RAH-D2 (E) RAH-D1
(E)
(E) RTU-1
DUNCAN HALL ROOF
FIRST FLOOR ELEVATION = 1,103'-04"
FIRST FLOOR ELEVATION = 1,104'-0"
23 4
5 6
APPROX. ELEV. = 1,129' - 4"
EXISTING ROOF: 0.090" EPDM
FULLY ADHERED OVER 1/4" PER
FT ISO BOARD AND 1/2" GLASS
FACED GYP BOARD.
DUNCAN HALL ROOF
APPROX. ELEV. = 1,116' - 0"
EXISTING ROOF: 0.090" EPDM
FULLY ADHERED OVER 1/4" PER
FT ISO BOARD AND 1/2" GLASS
FACED GYP BOARD.
CRAIG HALL ROOF
RTU-1 REPLACEMENT
WORK TO BE PROVIDED
AS ADDITIVE BID ITEM #1
46/14ø
RAH-D1
38/14ø
32x24
2" HWS & R
3" CWS & R
2" HWS & RRAH-D2
3" CWS & R
"x2
4"
RTU-1 REPLACEMENT
WORK TO BE PROVIDED
AS ADDITIVE BID ITEM #1
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
DEMOLITION NOTES
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:47:06 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC Duncan & Craig Hall - MECH CENTRAL.rvt
MAP
JEB
20301.20
DUNCAN & CRAIG HALLS,
HVAC DEMOLITION PLANS
MD1.1
MAP
1/16" = 1'-0"MD1.1
DUNCAN & CRAIG HALLS, ROOF PLAN - HVAC DEMOLITION3
1 DEMOLISH AND REMOVE TO THE MINIMUM EXTENT NECESSARY THE
EXISTING MEMBRANE ROOFING AND ROOF BOARD INSULATION TO
ALLOW FOR THE REMOVAL OF THE EXISTING ROOFTOP AIR-HANDLER
RAH-D1 AND SUBSEQUENT REPLACEMENT.
DEMOLISH AND REMOVE EXISTING ROOFTOP AIR-HANDLER RAH-D1
COMPLETE. REMOVE ASSOCIATED ROOF CURB AND ATTACHMENTS.
3 DEMOLISH AND REMOVE TO THE MINIMUM EXTENT NECESSARY THE
EXISTING MEMBRANE ROOFING AND ROOF BOARD INSULATION TO
ALLOW FOR THE REMOVAL OF THE EXISTING ROOFTOP AIR-HANDLER
RAH-D2 AND SUBSEQUENT REPLACEMENT.
DEMOLISH AND REMOVE EXISTING ROOFTOP AIR-HANDLER RAH-D2
COMPLETE. REMOVE ASSOCIATED ROOF CURB AND ATTACHMENTS.
5 DEMOLISH AND REMOVE TO THE MINIMUM EXTENT NECESSARY THE
EXISTING MEMBRANE ROOFING AND ROOF BOARD INSULATION TO
ALLOW FOR THE REMOVAL OF THE EXISTING PACKAGED ROOFTOP
UNIT RTU-1 AND SUBSEQUENT REPLACEMENT.
DEMOLISH AND REMOVE EXISTING PACKAGED ROOFTOP UNIT RTU-1
COMPLETE. REMOVE ASSOCIATED ROOF CURB AND ATTACHMENTS.
7 DEMOLISH AND REMOVE TO THE MINIMUM EXTENT NECESSARY THE
EXISTING MEMBRANE ROOFING AND ROOF BOARD INSULATION TO
ALLOW FOR THE REMOVAL OF THE EXISTING ROOFTOP AIR-HANDLER
RAH-CR AND SUBSEQUENT REPLACEMENT.
DEMOLISH AND REMOVE EXISTING ROOFTOP AIR-HANDLER RAH-D2
COMPLETE. REMOVE ASSOCIATED ROOF CURB AND ATTACHMENTS.
1/8" = 1'-0"MD1.1
DUNCAN HALL, SECOND FLOOR PLAN - HVAC DEMOLITION2
9 DEMOLISH AND REMOVE EXISTING 70"x18" RETURN AIR DUCT FROM
BASE OF RAH-CR TO POINT INDICATED.
DEMOLISH AND REMOVE EXISTING CHILLED-WATER SUPPLY &
RETURN (CWS / R) AND HEATING-WATER SUPPLY & RETURN (HWS / R)
PIPING RUNOUTS TO NEAREST BRANCH ISOLATION VALVE.
11 DEMOLISH AND REMOVE EXISTING SUPPLY AIR DUCTWORK FROM
BASE OF RAH-CR TO POINT INDICATED.
13 DEMOLISH AND REMOVE EXISTING VERTICAL DUCTWORK TRANSITION
AND ASSOCIATED SUPPLY AIR DUCT TO POINT INDICATED.
14 DEMOLISH AND REMOVE EXISTING VERTICAL DUCTWORK, ELBOW
FITTING, TRANSITION AND ASSOCIATED RECTANGULAR RETURN AIR
DUCTWORK TO POINT INDICATED.
DEMOLISH AND REMOVE EXISTING CHILLED-WATER SUPPLY &
RETURN (CWS / R) AND HEATING-WATER SUPPLY & RETURN (HWS / R)
PIPING RUNOUTS TO THE MINIMUM EXTENT NECESSARY AND
REQUIRED TO ALLOW THE REMOVAL OF THE EXISTING ROOFTOP
UNIT AND SUBSEQUENT REPLACEMENT.
12 DEMOLISH AND REMOVE EXISTING ACOUSTICAL CEILING TILE AND
ASSOCIATED CEILING GRID TO THE MINIMUM EXTENT NECESSARY AND
REQUIRE TO ALLOW FOR THE REMOVAL OF DUCTWORK AND PIPING.
1/8" = 1'-0"MD1.1
DUNCAN HALL ENTRANCE, 2ND FLR PLAN - HVAC DEMOLITION1
4'4'00 8'8' 16'16'
SCALE: 1/8" = 1'-0"
4'4'00 8'8' 16'16'
SCALE: 1/8" = 1'-0"
8' 16' 32'0
2"0 1/16" = 1'-0"
5 5
4 4
6 7
AC-2
AC-1
EF-4
PAC-1
WATER HEATER VENT (ETR)
Architecture Engineering Planning Interiors
SFCS Inc. 305 South Jefferson Street Roanoke, Virginia 24011.2003
540.344.6664 Fax 540.343.6925
www.sfcs.com
:PROJECT ENGINEER
OF
DRAWING
COMM. NO.
SHEET
DATE
REVISION DESCRIPTION
DRAWING TITLE
APPROVED BY
CHECKED BY
NO.
DRAWN BY
DATE
PROJECT ARCHITECT
PROJECT DESIGNER
PROJECT TITLE
MAY 12, 2026
REPLACE AHU'S AT DUNCAN AND COLLEGE SERVICES
DEMOLITION NOTES
VIRGINIA WESTERN
COMMUNITY
COLLEGE
Project Code: 260-B5260-023 (M24VW131)
5/15/2026
12:45:45 PM
Autodesk Docs://20301.20 - VWCC Replace AHU's At Duncan and College Services/20301.20 - VWCC College Services Building - MECH CENTRAL.rvt
MAP
JEB
20301.20
CSB - ROOF AND FIRST
FLOOR, HVAC DEMOLITION
PLANS
MD1.2
MAP
1/8" =…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .