VPR CTR060474_28828734_MPD0086-21.pdf

PDF 173 KB Posted

Attached to
Master Agreement AZ|CTR060474
Contract number
CTR060474
Issued by
Arizona

About this file

This document is a Vendor Performance Report from the Arizona Department of Transportation (ADOT), specifically the Multimodal Planning Division, issued for a contract with Kimley-Horn and Associates, Inc. The report is associated with Contract No. CTR060474 and Purchase Order #0000597650, with an invoice date of 7/31/2024. The report is tracking the performance of Kimley-Horn for the State Highway Rail Grade Crossing Action Plan project.

The report indicates that the vendor's performance is within expected standards, with project delivery occurring within the agreed-upon schedule and project objectives being met. The report notes compliance with invoicing requirements and is marked as an "Interim VPR" (Vendor Performance Report). The document is primarily an internal tracking mechanism for ADOT to document the contractor's performance, with no specific corrective actions requested. The ADOT contact is Heidi Yaqub, located at 1611 W Jackson St, Phoenix, AZ 85007, and the vendor contact is Michael Grandy from Kimley-Horn.

View the file

Other files

File Type Posted
APPROVED CTR060474 GL,AL,WC,PROFESSIONAL 04.01.23-04.01.24.pdf PDF
CTR060474 VPR Completed Kimley-Horn MPD0021-21 PO613378 inv#27483447 billing 020124 - 022924.pdf PDF
KIMLEY-HORN_INVOICE_28318649_MPD0086-21 H80_6272024.pdf PDF
KIMLEY-HORN_INVOICE_28828737_MPD0437-24_H80_DBEO July(Climb & Pass Lane Study).pdf PDF
KIMLEY-HORN_INVOICE_29328139_MPD0437-24_H80_DBEO August(Climb & Pass Lane Study) (1).pdf PDF
KIMLEY-HORN_INVOICE_30222754_MPD_0021-21_H80_November(HISTORICAL CPS).pdf PDF
KIMLEY-HORN_INVOICE_30304685_MPD0545-24_H94.3 November(CPS SR287_SR87).pdf PDF
Kimley-Horn and Associates November Inv 30264473-MPD0562-24.pdf PDF
VPR CTR060474 2 (1).pdf PDF
VPR CTR060474 2.pdf PDF
VPR CTR060474 INV27856687.pdf PDF
VPR CTR060474 INV28164916.pdf PDF
VPR CTR060474_29101518_MPD0021-21.pdf PDF
VPR Kimley-Horn Invoice 27223110 MPD0437-24 H80 DBE 0 Jan(Climp and Pass Lane Study).pdf PDF
VPR ctr060474.pdf PDF
CTR060474-Quarterly_Report-Q4_2022 (1).xlsx XLSX spreadsheet
CTR060474_Usage Report - Task Order-Q1_2025.pdf PDF
Q1 2024_Usage_Report_Task_Order_CTR060474.pdf PDF
Q2_Usage Report - Task Order_CTR060474.xlsx XLSX spreadsheet
Q3 2024_Usage_Report_Task_Order_CTR060474.pdf PDF
ACCEPTED CTR060474 GL,AL,WC,PROF LIAB 04.01.25-04.01.26.pdf PDF
CTR060474 VPR KIMLEY-HORN_INVOICE_27340393_MPD0086-21 H80_3182024 (1).pdf PDF
CTR060474_Contract_Amendment_Summary_Nine__9_.pdf PDF
CTR060474_Contract_Amendment_Summary_Seven__7_.pdf PDF
CTR060474_Contract_Amendment_Summary_Three__3_.pdf PDF
KIMLEY-HORN_INVOICE_28318707_MPD_0021-21_H80_May(CPS STATEWIDE).pdf PDF
KIMLEY-HORN_INVOICE_29486820_MPD0086-21 H80_10142024.pdf PDF
KIMLEY-HORN_INVOICE_30115422_MPD0437-24_H80_DBEO November(Climb & Pass Lane Study).pdf PDF
KIMLEY-HORN_INVOICE_30305607_MPD0555-24_H80 November(SR 264 Corridor Study ).pdf PDF
KIMLEY-HORN_INVOICE_30378580_MPD0554-24_H94.3 November(PV Shared-Use Path ) (1).pdf PDF
KIMLEY-HORN_INVOICE_30834178_MPD0555-24_H80 January(SR 264 Corridor Study ).pdf PDF
VPR CTR060474 1.pdf PDF
VPR CTR060474 3 (1).pdf PDF
VPR CTR060474 7.pdf PDF
VPR CTR060474 PO0000597650.pdf PDF
VPR CTR060474-29101599 MPD0371-23.pdf PDF
VPR Invoice 27082257 MPD0086-21 PO0000597650.pdf PDF
VPR Kimley-Horn Invoice 27223109 MPD0371-23.pdf PDF
CTR060474-Usage Report - Services (2).xlsx XLSX spreadsheet
CTR060474_Contract_Amendment_Summary_Twelve__12_.pdf PDF
CTR060474_Usage Report - Task Order-Q4_2024.pdf PDF
CTR060474 VPR KIMLEY-HORN_INVOICE_27483449_MPD0437-24_H80_DBEO Feb(Climb & Pass Lane Study) (1).pdf PDF
CTR060474_Contract_Amendment_Summary_Four__4_.pdf PDF
CTR060474_Contract_Amendment_Summary_Six__6_.pdf PDF
CTR060474_SPO_205_Forced_Labor_of_Ethnic_Uyghurs_Ban.pdf PDF
KIMLEY-HORN_INVOICE_29486823_MPD0437-24_H80_DBEO September(Climb & Pass Lane Study).pdf PDF
KIMLEY-HORN_INVOICE_29749179_MPD0545-24_H94.3 September(CPS SR287_SR87).pdf PDF
KIMLEY-HORN_INVOICE_29749626_MPD0371-23_H94.7 September(SHSP & ATSAP).pdf PDF
KIMLEY-HORN_INVOICE_30222756_MPD0541-24_H94.3 November(NHFN,CUFC,CRFC).pdf PDF
KIMLEY-HORN_INVOICE_30834176_MPD0545-24_H94.3 January(CPS SR287_SR87).pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency/ORG Agency Address

ADOT Contact Telephone Contact Address

Vendor Vendor Contact

Contract No. Date Invoice 28828734 Date 7/31/2024

Project Title Interim VPR

Action Taken:

Vendor Performance Report This document should be used to document positive or negative performance by a contractor and to state whether corrective action is required.

Please complete & return to ADOT Procurement.

Mail Drop 310B, 206 S. 17th Avenue, Phoenix, AZ 85007

GRANDY, MICHAEL/MIKE.DAYTON@KIMLEY-HORN.COM

Arizona Department of Transportation Procurement Group

1739 W. Jackson Street, 100P Phoenix, AZ 85007

Facsimile: 602.712.3717

Contract Officer Date

Signature of Agency Representative Date

Date of Action

PART 2 – ADOT PROCUREMENT ACTION

MPD Tracking Number MPD0086-21 H80

AGENCY REPORT

Arizona Department of Transportation / Multimodal Planning Division

KIMLEY-HORN AND ASSOCIATES, INC

CTR060474 PO Number PO#0000597650

PART 1

Describe the performance issue. Be accurate, complete and factual. Use an attachment if necessary.

STATE HIGHWAY RAIL GRADE CROSSING ACTION PLAN

Describe Project Delivery Compared with Schedule:

Describe Project Outcomes Compared with Objectives:

Describe Compliance with Invoicing Requirements:

Describe Vendor Performance

Reporting incident, no action requested.

Specific action requested:

Docusign Envelope ID: EAF6A948-4131-437B-86FF-1CC18AA67C24

Performance is within expected standards.

Project Delivery was within the agreed upon schedule.

Heidi Yaqub

NA

1611 W Jackson St, Phoenix, AZ 85007602-712-7644

X

Project Objectives have been met.

9/11/2024

Invoicing requirements were met.

File details come from the government source that posted it. Updated .