KIMLEY-HORN_INVOICE_30834178_MPD0555-24_H80 January(SR 264 Corridor Study ).pdf

PDF 892 KB Posted

Attached to
Master Agreement AZ|CTR060474
Contract number
CTR060474
Issued by
Arizona

About this file

This document is a billing summary and reimbursement request from Kimley-Horn and Associates, Inc. for the Arizona Department of Transportation (ADOT) Multimodal Planning Division, specifically for the SR 264 Corridor Planning Study. The project is tracked under MPD0555-24 and funded by the Federal Highway Administration (FHWA). The prime contractor is Kimley-Horn and Associates, Inc., and the ADOT Project Manager is Don Sneed. The contract does not involve an Arizona Certified Disadvantaged Business Enterprise (DBE).

The total awarded budget for the project is $354,642.59, with the current invoice requesting $12,884.34 for work completed through January 31, 2025. The project involves a corridor planning study with nine primary tasks, including project kick-off, monthly progress reporting, identifying current and future conditions, deficiency evaluation, improvement planning, public outreach, and report development. The current progress report indicates work on subconsultant coordination, project website content, traffic count coordination, and Limited English Proficiency (LEP) analysis. The next anticipated activities include developing Working Paper 1, coordinating with the Technical Working Group on data needs, and processing Hopi Tribe crash data.

View the file

Other files

File Type Posted
KIMLEY-HORN_INVOICE_28318649_MPD0086-21 H80_6272024.pdf PDF
KIMLEY-HORN_INVOICE_29328139_MPD0437-24_H80_DBEO August(Climb & Pass Lane Study) (1).pdf PDF
VPR CTR060474 PO0000613378.pdf PDF
KIMLEY-HORN_INVOICE_30834176_MPD0545-24_H94.3 January(CPS SR287_SR87).pdf PDF
CTR060474_Contract_Amendment_Summary_Four__4_.pdf PDF
Q1_Usage Report - Task Order_CTR060474.xlsx XLSX spreadsheet
Q3 2024_Usage_Report_Task_Order_CTR060474.pdf PDF
APPROVED CTR060474 GL,AL,WC,PROFESSIONAL 04.01.23-04.01.24.pdf PDF
KIMLEY-HORN_INVOICE_28828737_MPD0437-24_H80_DBEO July(Climb & Pass Lane Study).pdf PDF
VPR CTR060474-29101599 MPD0371-23.pdf PDF
CTR060474_Contract_Amendment_Summary_Nine__9_.pdf PDF
VPR CTR060474 INV27856687.pdf PDF
VPR CTR060474 2.pdf PDF
VPR CTR060474 Kimley-Horn & Assoc MPD0371-23 Inv#27483448 billing period 2124-22924.pdf PDF
CTR060474_Contract_Amendment_Summary_Twelve__12_.pdf PDF
CTR060474-Usage Report - Services (2).xlsx XLSX spreadsheet
VPR CTR060474 4.pdf PDF
KIMLEY-HORN_INVOICE_30068144_MPD_0021-21_H80_October(HISTORICAL CPS).pdf PDF
VPR CTR060474 (2).pdf PDF
CTR060474 VPR KIMLEY-HORN_INVOICE_27483449_MPD0437-24_H80_DBEO Feb(Climb & Pass Lane Study).pdf PDF
KIMLEY-HORN_INVOICE_28318787_MPD0437-24_H80_DBEO May(Climb & Pass Lane Study) (1).pdf PDF
VPR CTR060474_29101518_MPD0021-21.pdf PDF
VPR Kimley-Horn Invoice 27223110 MPD0437-24 H80 DBE 0 Jan(Climp and Pass Lane Study).pdf PDF
CTR060474_Contract_Amendment_Summary_Five__5_.pdf PDF
CTR060474_Contract_Amendment_Summary_Eleven__11_.pdf PDF
KIMLEY-HORN_INVOICE_30424346_MPD0086-21 H80_01142025 (1).pdf PDF
KIMLEY-HORN_INVOICE_29798293_MPD0371-23_H94.7 October(SHSP & ATSAP) (1).pdf PDF
Q2 2024_Usage_Report_Task_Order_CTR060474.pdf PDF
Q2 2025_Usage_Report_Task_Order_CTR060474.pdf PDF
ACCEPTED CTR060474 GL,AL,WC,PROFESSIONAL LIABILITY 04.01.24-04.01.25.pdf PDF
KIMLEY-HORN_INVOICE_29444971_MPD0371-23_H94.7 August(SHSP & ATSAP).pdf PDF
CTR060474 VPR KIMLEY-HORN_INVOICE_27340393_MPD0086-21 H80_3182024 (1).pdf PDF
VPR CTR060474 PO0000597650.pdf PDF
CTR060474-Quarterly_Report-Q4_2022 (1).xlsx XLSX spreadsheet
ACCEPTED CTR060474 GL,AL,WC,PROF LIAB 04.01.25-04.01.26.pdf PDF
KIMLEY-HORN_INVOICE_30378580_MPD0554-24_H94.3 November(PV Shared-Use Path ) (1).pdf PDF
KIMLEY-HORN_INVOICE_29486820_MPD0086-21 H80_10142024.pdf PDF
VPR CTR060474 3 (1).pdf PDF
VPR CTR060474_28828734_MPD0086-21.pdf PDF
VPR CTR060474 1 (2).pdf PDF
VPR CTR060474 (3).pdf PDF
CTR060474_Contract_Amendment_Summary_Ten__10_.pdf PDF
CTR060474_Contract_Amendment_Summary_Eight__8_.pdf PDF
KIMLEY-HORN_INVOICE_30990817_MPD0554-24_H94.3 January(PV Shared-Use Path ).pdf PDF
CTR060474_Contract_Amendment_Summary_Two__2_.pdf PDF
VPR CTR060474 1 (1).pdf PDF
CTR060474-Quarterly_Report-Q3_2023.pdf PDF
Kimley-Horn and Associates December Inv 30605623-MPD0562-24.pdf PDF
Q2_Usage Report - Task Order_CTR060474.xlsx XLSX spreadsheet
CTR060474 VPR Completed Kimley-Horn MPD0021-21 PO613378 inv#27483447 billing 020124 - 022924.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No Partial - In Progress

0.00% 0

Billing Start Date

1/1/2025 Billing

End Date 1/31/2025

Originally Awarded

Budget Amount

Approved Modifications

Amount

Total Awarded Budget

$ Invoiced Previously

$ Rejected or Disallowed on

Previous Invoices

$ Remaining Project Budget (Total

Awarded - $ Invoiced Previously + $

Rejected on Prev.

Invoices)

$ Paid by ADOT Previously

Purchase Order Balance Prior to

This Invoice (Total Awarded -

$ Paid)

$ Invoiced Today

$ Disallowed ($ Invoiced

Exceeds Remaining

Budget)

Net Amount Due for

This Invoice

Balance After This Invoice

350,026.80$ 350,026.80$ 26,727.31$ 323,299.49$ 27,463.92$ 322,562.88$ 12,884.34$ -$ $ 12,884.34 $ 309,678.54

4,615.79$ 4,615.79$ 736.61$ 3,879.18$ 4,615.79$ -$ $ - $ 4,615.79

TOTALS 354,642.59$ -$ 354,642.59$ 27,463.92$ -$ 327,178.67$ 27,463.92$ 327,178.67$ 12,884.34$ -$ 12,884.34$ 314,294.33$

Date Signed / Invoice Date

2/17/2025

Date Signed / Invoice Date

Phone Number Phone

Number

Please leave blank

Submitter: I hereby certify / confirm the above statements Optional 2nd Submitter: I hereby certify / confirm the above statements

This section is only applicable to the FINAL reimbursement request submission - Please leave blank.

Pursuant to 2 CFR 200.415: By signing this report, I certify to the best of my knowledge and belief that the report is true, complete, and accurate, and the expenditures, disbursements and cash receipts are for the purposes and objectives set forth in the terms and conditions of the Federal award. I am aware that any false, fictitious, or fraudulent information, or the omission of any material fact, may subject me to criminal, civil or administrative penalties for fraud, false statements, false claims or otherwise. (U.S.

Code Title 18, Section 1001 and Title 31, Sections 3729-3730 and 3801-3812).

I Confirm DBE Goal Committment was made for the Project and No AZ DBE Firms Participated.

I certify that my typed in signature below is a legally-binding signature.

Please Leave Blank

Chris Joannes SignatureSignature

Chris.Joannes@kimley-horn.com 480-485-5244 Email AddressEmail Address

ADOT PROGRAM/PROJECT MANAGER REVIEW

Invoicing aligns with Progress and Awarded Budget / Pricing

Support Documents align to Invoice and adequately supports costs

Status Reason for Rejection

Progress toward Scope aligns with Awarded Requirements Invoice Approved

Invoice Rejected

Confirmed - Zero DBE SubContractors performed work on the Project

Please Leave Blank

ADOT PM Signature RequiredTravel charges are in accordance with State/ADOT Policy

White Field with RED Text =

Urgent Information

Pink with Red Text = Entry/Correction Required Pale Orange = Form Calculated field

Teal = Label Only - Do not Enter Text

Grey = Disregard Field

FMS PROCESSING - SECTION RESERVED FOR FMS PROCESSING

Invoice Received for Processing Please Leave Blank

Date Received by Optional Comment Optional NoteDate Received by

Billing Summary / Reimbursement Request For use by: Vendors / Contractors / Suppliers of MPD

(Version 07/01/2023)

Don Sneed Project Title

(For Research Project add SPR Number)

SR 264 Corridor Planning Study MPD Tracking Number

{Use Format: MPDnnnn-yy};

{RTAP use " MPDRTAP-yy"}

MPD0555-24ADOT PM Name

Prime Contractor Firm Name Kimley-Horn and Associates, Inc.

Is the Prime an AZ Certified

DBE?

Project Status

(Select from Drop Down) Purchase Order Number PO0000707300

Chris.Joannes@Kimley-horn.com Please Leave Blank

Prime PM Name (Notify if Unaccepted / Rejected / Paid)

Chris Joannes DBE Commitment % How many DBE Subcontractors performed on the Project?

Invoice Number 30834178

Please Leave BlankPrime PM Email

Federal Funding for this Project (Locate in PO Reference/Description text)

FHWA

Submitter Certification (Required with Every Invoice)

The ADOT Project Manager is required to review for each of these items.

By approving this invoice, you certify these requirements are met

White Field = Entry in Field Permitted

Pink Field = Mandatory Field

SUMMARY OF WORK FOR WHICH PAYMENT IS REQUESTED

Task or Deliverable Description from PO Line (Identifies which PO line(s) should be received for this submission) Additional Optional Information

Task 1 Project Kick-Off and Tech Memo 1 Project Work Plan and Schedule Review

Task 2 Travel

Area Reserved Color Key

Docusign Envelope ID: 8B2D9F05-1681-44A7-A945-91838C79A693

X

REC #

Enter Date Received by MPD and Receipt Number

02/17/2025

AP RECEIVED 2/20/252/20/2025 Accounts Payable DocuSign mailto:Chris.Joannes@Kimley-horn.com mailto:Chris.Joannes@Kimley-horn.com mailto:Chris.Joannes@kimley-horn.com mailto:Chris.Joannes@kimley-horn.com mailto:Chris.Joannes@Kimley-horn.com

Prime Firm Name DBE % 0.00%

Task No

Awarded $ Functional Role Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual

Michael Grandy* Principal 6.0 0.0 8.0 12.0 6.0 4.0 4.0 4.0 0.0 Chris Joannes* Project Manager 81.0 3.5 2.0 23.0 1.0 38.0 20.0 66.0 8.0 5.0 1.0 Kristen Faltz Planner 129.0 16.0 12.0 2.0 50.0 49.0 31.0 67.0 10.0 5.0 1.0 Jennifer Simpkins Technical Expert 0.0 0.0 10.0 5.0 0.0 0.0 0.0 0.0 0.0 Taylor Ehrick Technical Expert 14.0 0.0 2.0 20.0 14.0 0.0 16.0 8.0 0.0 Anita Johari Technical Expert 2.0 0.0 2.0 8.0 0.0 0.0 8.0 0.0 0.0 Joe Cuffari Planner 4.0 0.0 0.0 0.0 0.0 62.0 5.0 5.0 0.0 Greg Honiotes Analyst 2.0 1.0 0.0 168.0 50.0 48.0 45.0 30.0 10.0 4.0 Ajdin Spahic Analyst 0.0 0.0 70.0 30.0 50.0 0.0 30.0 10.0 0.0 Logan Lowery Analyst 0.0 0.0 90.0 48.5 30.0 42.0 0.0 10.5 30.0 10.0 0.0 Rachel Haughton Analyst 0.0 0.0 70.0 0.0 0.0 0.0 0.0 0.0 0.0 Giovanni Catanzaro Analyst 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Emma Luken Graphic Designer 10.0 0.0 4.0 4.0 8.0 73.0 20.0 10.0 0.0 Mike Dayton Administrative/Financial 12.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 1.0 Melissa Alvarez Graphic Designer 0.0 0.0 5.0 5.0 0.0 0.0 5.0 0.0 0.0

$ 37,136.88

Purchase Order Number PO0000707300

Vendor Hours Contribution Table & DBE Compliance Report MPD Tracking Number MPD0555-24

The hours reported on this table are provided to enable visual assessment by the ADOT Project Manager of progress on work tasks. Race Conscious DBE Goal Commitment 0.00%

This information will also be used to verify that the level of team member and/or individual designated for the task is actually performing the work.

$ 12,149.72 $ 1,120.15

This information will also be used if auditing the project for DBE Commercially Useful Function. Vendor's Invoice Number 30834178

Decreases in DBE Firm Participation or Removal MUST be Authorized by the BECO Office in Advance. Total Project Award 354,642.59$

Please update Actual Hours

Task 3 - Working Paper

1 - Identify Current and

Future Conditions

Task 4 - Identify

Deficencies and Evaluation

Criteria

Task 5 - Develop

Recommended Plan for

Improvements

Task 6 - Public and

Stakeholder Outreach

Task 7 - Draft Final Report

Task 8 - Final Report

Task 9 - GIS Data and

Study Closeout File

10 11

AZ Certified

DBE?

$ of Contract Award $ 321,521.68

Task 1 - Project Kick-

Off and Technical

Memorandum 1 - Project

Work Plan and Schedule Review

Task 2 - Monthly Progress Reports

Staff Name

$ 57,964.12 $ 55,465.02 $ 2,625.84 $ 78,238.50 $ 47,952.84 $ 28,868.61

Docusign Envelope ID: 8B2D9F05-1681-44A7-A945-91838C79A693

SubContractor Firm

DBE % 0.00%

Task No Awarded $

Functional Role Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Plan Actual Sarah Herr Principal Patricia Castalia Project Manager Meghann Vance Analyst Katie Bubnekovich Analyst Stephanie Sherwood Geographic Information Brent Kober Geographic Information

Staff Name 1 2

$ 512.27 6 7 8 9 11

Desert Archaeology, Inc.

AZ Certified

DBE?

$ of Contract Award $ 33,120.91

3 104 5 $ 32,608.64

Notes, Comments

Contact Division/Unit

Title Location Address

Email Telephone

Supplier Name Supplier Contact

Contract No. Purchase Order #

Date Invoice #

Project Title Interim VPR

Email Date

DateSignature of Agency Representative

MPD Contracts will submit an electronic copy of the completed form to the ADOT Procurement Office at Procurement@azdot.gov.

Reporting incident, no action requested.

Requesting action:

Procurement Officer

PO0000707300

30834178

Reporting Contact Information

Kimley-Horn and Associates, Inc. Chris Joannes

Vendor Performance Report Procurement Office 1739 W. Jackson St., Ste. A, MD 100P

Phoenix, AZ 85007

Email: Procurement@azdot.gov

Documenting positive or negative performance and procurement actions, as requested

Reporting Contact Information

Describe details of the action taken:

based on, {with MPD revisions to performance section}:

ADOT Vendor Performance Report (11/21)

45705

Describe Compliance with Invoicing Requirements:

Describe Project Delivery Compared with Schedule:

Describe Project Outcomes Compared with Objectives:

Describe Vendor Performance

Services, Goods or Equipment:

Describe the performance issue. Be accurate, complete and factual. Use an attachment if necessary.

MPD Tracking Number MPD0555-24 SR 264 Corridor Planning Study

PROCUREMENT ACTION

Docusign Envelope ID: 8B2D9F05-1681-44A7-A945-91838C79A693

Donald Sneed, Sr.

Performance is within expected standards.

Although our project schedule will need to be revised by several weeks due to a delay with obtaining additional crash data, it is expected that the Working Paper 1

Existing Conditions Analysis will be completed in March. It is noted that the project consultant initiated communication to the Technical Working Group members on

12/18/24 and 1/14/25 outlining the Data Needs for the study project and requesting available data they can share. This item is not directly related to the vendor's performance. Adjustment to the project schedule is expected to be reflected in the next month's progress report.

MPD /4210

Please process payment for this month's invoice and reimbursement request.

dsneed@azdot.gov

Planning Program Manager - Tribal Planning

Technical Planning Services

Invoicing requirements were met.

2/19/2025

X

Project Delivery is ongoing and there is a delay in obtaining required data for Task 3 Working Paper 1. Due to this the project schedule will need to revised.

X

1611 W Jackson St, Phoenix, AZ 85007

480.271.0483

Project outcomes are still underway but are in line with the expected objectives.

Please remit payment electronically to: If paying by check, please remit to:

Account Name: KIMLEY-HORN AND ASSOCIATES, INC. KIMLEY-HORN AND ASSOCIATES, INC.

Bank Name and Address: WELLS FARGO BANK, N.A., SAN FRANCISCO, CA 94104 P.O. BOX 848376 Account Number:

ABA#:

2073089159554 121000248

LOS ANGELES, CA 90084-8376

Please send remittance information to: payments@kimley-horn.com

10pt blank space

ARIZONA DEPARTMENT OF TRANSPORTATION

206 S. 17TH AVENUE, MD 310B

ATTN: DON SNEED

PHOENIX, AZ 85007

Federal Tax Id: 56-0885615 For Services Rendered through Jan 31, 2025

Invoice Amount: $12,884.34

Invoice No: 30834178 Invoice Date: Jan 31, 2025

Project No: 291199020.3 Project Name: ADOT SR 264 STUDY Project Manager: FALTZ, KRISTEN

Client Reference: MPD0555-24 H80

PO0000707300

Description Contract Value Amount Earned to Date Previous Amount

Billed Current Amount

Due

SERVICES RENDERED 354,642.59 40,348.26 27,463.92 12,884.34

291199020.3 Total Invoice: $12,884.34

If you have questions, please contact Mike Dayton at (602) 789-3848, or Mike.Dayton@kimley-horn.com 81MRD

ARIZONA DEPARTMENT OF TRANSPORTATION

206 S. 17TH AVENUE, MD 310B

ATTN: DON SNEED

PHOENIX, AZ 85007

Invoice No: 30834178 Invoice Date: Jan 31, 2025

Project No: 291199020.3 Project Name: ADOT SR 264 STUDY Project Manager: FALTZ, KRISTEN

HOURLY NOT TO EXCEED 190368291199020.3W10563291199020.3CPM-1DTCPM

Task Category Description/Name Hrs/Qty Rate Current Amount

Due

PROJECT MANAGEMENT ANALYST HONIOTES, GREG 1.0 140.67 140.67

PROJECT MANAGER JOANNES, CHRIS 3.5 250.08 875.28

PLANNER FALTZ, KRISTEN 16.0 177.14 2,834.24

TOTAL PROJECT MANAGEMENT3T 20.5 3,850.19

PROGRESS REPORTS PLANNER FALTZ, KRISTEN 2.0 177.14 354.28

TOTAL PROGRESS REPORTS1T 2.0 354.28

EXISTING CONDITIONS ANALYST LOWERY, LOGAN 48.5 140.67 6,822.50

PROJECT MANAGER JOANNES, CHRIS 1.0 250.08 250.08

TOTAL EXISTING CONDITIONS2T 49.5 7,072.58

PUBLIC OUTREACH ADMIN/FINANCIAL SUPPORT DAYTON, MIKE 1.0 130.25 130.25

ANALYST LOWERY, LOGAN 10.5 140.67 1,477.04

TOTAL PUBLIC OUTREACH2T 11.5 1,607.29

TOTAL LABOR AND EXPENSE DETAIL 12,884.34

This page is for informational purposes only. Please pay amount shown on cover page.

81MRD

2/17/2025 ADOT MPD_0555-24_H80_Progress Report_Jan 2024(SR264 Corridor Study).docx 1 of 2

PROGRESS REPORT NO. 3

Arizona Department of Transportation

Task Assignment: MPD0555-24 H80 ADOT SR 264 Corridor Planning Study

Contract # CTR060474 Kimley-Horn Project No. 291199020

Reporting Period: Through January 31, 2025

Key Project Staff

Chris Joannes, Project Manager Kristen Faltz, Deputy Project Manager Logan Lowery, Planning Analyst Greg Honiotes, Planning Analyst

Progress and Accomplishments during the Reporting Period

Task 1 – Project Kick-off & Tech Memo 1 – Project Work Plan & Schedule Review Subconsultant contract coordination Project website content coordination Traffic count coordination Coordination on data needs

Task 2 – Monthly Progress Reports December progress report development

Task 3 – Working Paper 1 – Identify Current and Future Conditions Working Paper 1 development Corridor evaluation task development and documentation Coordination on existing conditions discussion with Navajo Nation

Task 4 – Identify Deficiencies and Evaluation Criteria No activity during invoice period

Task 5 – Develop Recommended Plan for Improvements

Task 6 – Public and Stakeholder Outreach Limited English Proficiency analysis and document development

Task 7 – Draft Final Report

Task 8 – Final Report

2/17/2025 ADOT MPD_0555-24_H80_Progress Report_Jan 2024(SR264 Corridor Study).docx 2 of 2

No activity during invoice period

Task 9 – GIS Data and Study Closeout File

Contacts Made

ADOT PMT

Navajo Nation DOT

Information Generated

LEP Four-Factor Analysis

Next Month Anticipated Activities

Develop Working Paper 1 Coordinate with TWG on data needs Process Hopi Tribe crash data

BillingReport
VendorHoursContribution
Vendor Performance Report
2025-02-20T12:29:33-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .