This document is a Vendor Performance Report issued by the Arizona Department of Transportation (ADOT), specifically the Multimodal Planning Division, for a contract with Kimley-Horn and Associates, Inc. The report is associated with Contract No. ADOT17-171963 and Purchase Order Number PO#0000597650, with an invoice dated 1/31/2024. The report tracks the vendor's performance for the State Highway Rail Grade Crossing Action Plan project.

The performance report indicates that Kimley-Horn and Associates, Inc. has met all key performance metrics, including project delivery within the agreed-upon schedule, achievement of project objectives, and compliance with invoicing requirements. The MPD Tracking Number is MPD0086-21 H80, and the project is labeled as an Interim VPR (Vendor Performance Report). The document notes that the performance is within expected standards, with no specific actions requested or issues highlighted. The report was completed and signed by an ADOT representative on 3/1/2024.

View the file

Other files

File Type Posted
KIMLEY-HORN_INVOICE_28318649_MPD0086-21 H80_6272024.pdf PDF
KIMLEY-HORN_INVOICE_29328139_MPD0437-24_H80_DBEO August(Climb & Pass Lane Study) (1).pdf PDF
VPR CTR060474 PO0000613378.pdf PDF
KIMLEY-HORN_INVOICE_30834176_MPD0545-24_H94.3 January(CPS SR287_SR87).pdf PDF
CTR060474_Contract_Amendment_Summary_Four__4_.pdf PDF
Q1_Usage Report - Task Order_CTR060474.xlsx XLSX spreadsheet
Q3 2024_Usage_Report_Task_Order_CTR060474.pdf PDF
APPROVED CTR060474 GL,AL,WC,PROFESSIONAL 04.01.23-04.01.24.pdf PDF
KIMLEY-HORN_INVOICE_28828737_MPD0437-24_H80_DBEO July(Climb & Pass Lane Study).pdf PDF
VPR CTR060474-29101599 MPD0371-23.pdf PDF
CTR060474_Contract_Amendment_Summary_Nine__9_.pdf PDF
VPR CTR060474 INV27856687.pdf PDF
VPR CTR060474 2.pdf PDF
VPR CTR060474 Kimley-Horn & Assoc MPD0371-23 Inv#27483448 billing period 2124-22924.pdf PDF
CTR060474_Contract_Amendment_Summary_Twelve__12_.pdf PDF
CTR060474-Usage Report - Services (2).xlsx XLSX spreadsheet
VPR CTR060474 4.pdf PDF
KIMLEY-HORN_INVOICE_30068144_MPD_0021-21_H80_October(HISTORICAL CPS).pdf PDF
VPR CTR060474 (2).pdf PDF
CTR060474 VPR KIMLEY-HORN_INVOICE_27483449_MPD0437-24_H80_DBEO Feb(Climb & Pass Lane Study).pdf PDF
KIMLEY-HORN_INVOICE_28318787_MPD0437-24_H80_DBEO May(Climb & Pass Lane Study) (1).pdf PDF
VPR CTR060474_29101518_MPD0021-21.pdf PDF
VPR Kimley-Horn Invoice 27223110 MPD0437-24 H80 DBE 0 Jan(Climp and Pass Lane Study).pdf PDF
CTR060474_Contract_Amendment_Summary_Five__5_.pdf PDF
CTR060474_Contract_Amendment_Summary_Eleven__11_.pdf PDF
KIMLEY-HORN_INVOICE_30424346_MPD0086-21 H80_01142025 (1).pdf PDF
KIMLEY-HORN_INVOICE_29798293_MPD0371-23_H94.7 October(SHSP & ATSAP) (1).pdf PDF
Q2 2024_Usage_Report_Task_Order_CTR060474.pdf PDF
Q2 2025_Usage_Report_Task_Order_CTR060474.pdf PDF
ACCEPTED CTR060474 GL,AL,WC,PROFESSIONAL LIABILITY 04.01.24-04.01.25.pdf PDF
KIMLEY-HORN_INVOICE_29444971_MPD0371-23_H94.7 August(SHSP & ATSAP).pdf PDF
CTR060474 VPR KIMLEY-HORN_INVOICE_27340393_MPD0086-21 H80_3182024 (1).pdf PDF
VPR CTR060474 PO0000597650.pdf PDF
CTR060474-Quarterly_Report-Q4_2022 (1).xlsx XLSX spreadsheet
ACCEPTED CTR060474 GL,AL,WC,PROF LIAB 04.01.25-04.01.26.pdf PDF
KIMLEY-HORN_INVOICE_30378580_MPD0554-24_H94.3 November(PV Shared-Use Path ) (1).pdf PDF
KIMLEY-HORN_INVOICE_29486820_MPD0086-21 H80_10142024.pdf PDF
VPR CTR060474 3 (1).pdf PDF
VPR CTR060474_28828734_MPD0086-21.pdf PDF
VPR CTR060474 1 (2).pdf PDF
VPR CTR060474 (3).pdf PDF
CTR060474_Contract_Amendment_Summary_Ten__10_.pdf PDF
CTR060474_Contract_Amendment_Summary_Eight__8_.pdf PDF
KIMLEY-HORN_INVOICE_30990817_MPD0554-24_H94.3 January(PV Shared-Use Path ).pdf PDF
CTR060474_Contract_Amendment_Summary_Two__2_.pdf PDF
VPR CTR060474 1 (1).pdf PDF
CTR060474-Quarterly_Report-Q3_2023.pdf PDF
Kimley-Horn and Associates December Inv 30605623-MPD0562-24.pdf PDF
Q2_Usage Report - Task Order_CTR060474.xlsx XLSX spreadsheet
CTR060474 VPR Completed Kimley-Horn MPD0021-21 PO613378 inv#27483447 billing 020124 - 022924.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency/ORG Agency Address

ADOT Contact Telephone Contact Address

Vendor Vendor Contact

Contract No. Date Invoice 27082257 Date 1/31/2024

Project Title Interim VPR

Action Taken:

Describe Vendor Performance

Reporting incident, no action requested.

Specific action requested:

Describe Project Delivery Compared with Schedule:

Describe Project Outcomes Compared with Objectives:

Describe Compliance with Invoicing Requirements:

MPD Tracking Number MPD0086-21 H80

AGENCY REPORT

Arizona Department of Transportation / Multimodal Planning Division

KIMLEY-HORN AND ASSOCIATES, INC

ADOT17-171963 PO Number PO#0000597650

PART 1

Describe the performance issue. Be accurate, complete and factual. Use an attachment if necessary.

STATE HIGHWAY RAIL GRADE CROSSING ACTION PLAN

Signature of Agency Representative Date

Date of Action

PART 2 – ADOT PROCUREMENT ACTION

Contract Officer Date

Vendor Performance Report This document should be used to document positive or negative performance by a contractor and to state whether corrective action is required.

Please complete & return to ADOT Procurement.

Mail Drop 310B, 206 S. 17th Avenue, Phoenix, AZ 85007

GRANDY, MICHAEL/LYNDEE.WALBORN@KIMLEY-HORN.COM

Arizona Department of Transportation Procurement Group

1739 W. Jackson Street, 100P Phoenix, AZ 85007

Facsimile: 602.712.3717

DocuSign Envelope ID: CB084C5E-079B-4A3E-8DBA-09656AA4D084

Performance is within expected standards.

Project Delivery was within the agreed upon schedule.

3/1/2024

Project Objectives have been met.

Invoicing requirements were met.

X

File details come from the government source that posted it. Updated .