VPCC 260-18341-002 Project Drawings-Volume 1-File 1 (General) Bid Set 2026-07-17.pdf
PDF 10 MB Posted
- Attached to
- Replace Diggs-Moore-Harrison Complex at Virginia Peninsula Community College, Hampton Campus
- Solicitation number
- DBB-124968
- Issued by
- Chesapeake City, Virginia
About this file
This is a project drawings document (Volume 1, File 1 - General Bid Set) for the Virginia Peninsula Community College (VPCC) in Hampton, Virginia, prepared by RRMM Architects, PC in collaboration with the Virginia Community College System. The project involves the replacement of the Diggs-Moore-Harrison Building Complex at 99 Thomas Nelson Drive on the Hampton Campus, comprising approximately 70,656 square feet across three floors plus penthouse and high roof areas, with a total building volume of 1,167,325 cubic feet and capital outlay area of 75,005 square feet. The new building will contain a large multi-function space, classrooms, and administrative offices including a Security Suite, Student Services, the President's Suite, and Vice President's Suites. The building is classified as Type IIB construction with mixed-use occupancies (Group B Business and Group A-3 Assembly), serving a total occupancy load of 1,920 persons across the three floors. Construction must comply with the 2021 Virginia Uniform Statewide Building Code, 2021 Virginia Construction Code, ADA accessibility standards, and multiple fire protection codes including NFPA 13 for sprinkler systems and NFPA 72 for fire alarm systems. The sealed bid deadline is 2:00 P.M. on Wednesday, August 26, 2026, with bids to be opened publicly on Thursday, August 27, 2026, at the Virginia Community College System office in Richmond, Virginia. A Standard Commonwealth Bid Bond (form CO-10.2) and Contract Security are required for all bids.
The project includes comprehensive civil, structural, architectural, mechanical, electrical, plumbing, fire protection, and technology infrastructure work across two volumes of drawings. The site is located in Hampton, Virginia on the VPCC campus adjacent to Interstate 64 and includes site utility work, grading, drainage, erosion and sediment control, and landscaping. Building design incorporates compliance with the Virginia Energy Conservation Code (VECC) with enhanced efficiency measures including efficient HVAC equipment, on-site renewable energy via a photovoltaic solar array on the roof, and efficient fossil fuel water heating systems. The project includes structural observations for concrete reinforcing, cast-in-place concrete, concrete masonry units, structural steel, steel joists, steel decking, cold-formed metal framing, and rammed aggregate piers. Lightning protection is required based on NFPA 780 risk assessment calculations. No asbestos-containing materials are permitted on the project. The design team includes RRMM Architects as the lead architect; Vanasse Hangen Brustlin, Inc. for civil engineering; Thompson Consulting Engineers for mechanical, electrical, and plumbing; IMEG (Lynch Mykins) for structural engineering; Rhino Fire Protection Engineering for fire protection systems; and NV5 Technology Consultants for additional consulting services.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING CODE DESIGN DATA
FUNCTION OF FACILITY
THE PROJECT CONSISTS OF THE REPLACEMENT OF THE REMOVED DIGGS MOORE HARRISION BUILDING ON THE HAMPTON CAMPUS OF VIRGINIA PENINSULA COMMUNITY COLLEGE. THE NEW BUILDING WILL INCLUDE A LARGE MULTI-FUNCTION SPACE, CLASSROOMS, AND OFFICES (INCLUDING A SECURITY SUITE, STUDENT SERVICES, THE PRESIDENTS SUITE, AND VICE PRESIDENTS SUITES) TO
SUPPORT THE CAMPUS.
APPLICABLE CODES
• COMMONWEALTH OF VIRGINIA CONSTRUCTION AND PROFESSIONAL SERVICES MANUAL 2025 REV 0 - EFFECTIVE MARCH 17, 2025
• 2021 VIRGINIA UNIFORM STATEWIDE BUILDING CODE (VUSBC)
• 2021 VIRGINIA CONSTRUCTION CODE (VCC)
• ADA90-TITLE II
1. CHAPTER 2 SCOPING REQUIREMENTS OF THE DEPARTMENT OF JUSTICE’S 2010 ADA STANDARDS FOR ACCESSIBLE DESIGN, DATED SEPTEMBER 15, 2010
2. CHAPTERS 1 & 3 THRU 11 OF STANDARDS FOR ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES (ICC A117.1-2017)
APPROVED MARCH 28, 2017
• VIRGINIA PLUMBING CODE, 2021 EDITION
• VIRGINIA MECHANICAL CODE, 2021 EDITION
• NFPA 70, NATIONAL ELECTRICAL CODE, 2020 EDITION
• 2021 VIRGINIA STATEWIDE FIRE PREVENTION CODE (VSFPC)
• 2021 INTERNATIONAL FIRE CODE (IFC)
• VIRGINIA ENERGY CONSERVATION CODE, 2021 EDITION
• VIRGINIA FUEL GAS CODE (VFGC) – 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS - ASME A17.1-2019
• STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS - NFPA 13-2019
• STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEMS - NFPA 14-2019
• STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND APPURTENANCES - NFPA 24-2019
• NATIONAL FIRE ALARM AND SIGNALING CODE - NFPA 72-2019
• STANDARD FOR THE INSTALLATION AND USE OF STATIONARY COMBUSTION ENGINES AND GAS TURBINES – NFPA 37-2018
• STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES - NFPA 80-2019
• STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS - NFPA 110-2019
• STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS - NFPA 241-2019
• VIRGINIA ENERGY CONSERVATION AND ENVIRONMENTAL STANDARDS (VEES)
• FIRE PROTECTION SPRINKLER AND FIRE SUBMITTAL REVIEW BY BOTH A/E AND DEB IS REQUIRED
BUILDING AREAS
• FIRST FLOOR BUILDING AREA: 25,959 SF
• SECOND FLOOR BUILDING AREA: 22,122 SF
• THIRD FLOOR BUILDING AREA: 22,575 SF
TOTAL BUILDING AREA: 70,656 SF
TOTAL BUILDING VOLUME: 1,167,325 CUBIC FEET
CAPITAL OUTLAY AREA (PER DGS-30-219): 75,005 SF
BUILDING OCCUPANCY AND CONSTRUCTION TYPE
1. PER VCC 302.1 MIXED USE NONSEPARATED CLASSIFICATION: GROUP "B" BUSINESS AND GROUP "A-3" ASSEMBLY. MOST
RESTRICTIVE OCCUPANCY CLASSIFICATION APPLIES.
2. PER VCC 508.2.3 AGGREGATE ACCESSORY OCCUPANCIES SHALL NOT OCCUPY MORE THAN 10 PERCENT OF THE FLOOR AREA OF
THE STORY IN WHICH THEY ARE LOCATED (REFERENCE SHEET LS101 FOR FIRST FLOOR AGGREGATE AREA OCCUPANCY OF S-1
AND LS102 FOR SECOND FLOOR AGGREGATE AREA OCCUPANCY OF A-3)
3. PER VCC 303.1.2.1 ROOMS USED FOR ASSEMBLY PURPOSES WITH AN OCCUPANT LOAD OF LESS THAN 50 PERSONS CAN BE
CLASSIFIED AS GROUP B
4. PER VCC 303.1.2.2 ROOMS USED FOR ASSEMBLY PURPOSES THAT IS LESS THAN 750 SQ. FT. CAN BE CLASSIFIED AS GROUP B
5. PER VCC 602.1 CONSTRUCTION TYPE: TYPE IIB UNPROTECTED (SPRINKLED THROUGHOUT)
6. SEISMIC DESIGN CATEGORY A.
OCCUPANCY
• FIRST FLOOR OCCUPANCY: 670
• SECOND FLOOR OCCUPANCY: 558
• THIRD FLOOR OCCUPANCY: 692
TOTAL BUILDING OCCUPANCY: 1,920
LIGHTNING RISK ASSESSMENT (NFPA 780)
CALCULATED RISK (R) = .45 X 10-4 VS TOLERABLE RISK (Rt) = 1.0 X 10-5. LPS IS REQUIRED.
VIRGINIA ENERGY CONSERVATION CODE COMPLIANCE STATEMENT
IN ACCORDANCE WITH THE VIRGINIA ENERGY CONSERVATION CODE (VECC), THE BUILDING WILL COMPLY WITH VECC SECTIONS C402 THROUGH C405 WITH AND C408. SECTION C406 ADDITIONAL ENERGY EFFICIENCY CREDITS WILL BE
VIA
i. C406.2 – MORE EFFICIENT HVAC EQUIPMENT PERFORMANCE
4. C406.2.4 – TEN (10) PERCENT COOLING EFFICIENCY IMPROVEMENT
iv. C406.5 – ON-SITE RENEWABLE ENERGY
1. C406.5.1 – BASIC RENEWABLE CREDIT
vi. C406.7 – REDUCED ENERGY USE IN SERVICE WATER HEATING
1. C406.7.3 – EFFICIENT FOSSIL FUEL WATER HEATER
PARKING SUMMARY CHART
ASBESTOS DISCLOSURE STATEMENT
NO ASBESTOS CONTAINING MATERIALS SHALL BE USED ON THE PROJECT
SPECIFICATION SECTIONS THAT REQUIRE STRUCTURAL OBSERVATIONS
032000 CONCRETE REINFORCING
033000 CAST-IN-PLACE CONCRETE
042000 CMU
051200 STRUCTURAL STEEL
052100 STEEL JOISTS
053100 STEEL DECKING
054000 CFMF
316613 RAMMED AGGREGATE PIERS
EMERGENCY PUBLIC SAFETY
LOCAL EMERGENCY PUBLIC SAFETY PERSONNEL UTILIZES A VOICE/ALARM COMMUNICATION SYSTEM (EVAC).
MASS NOTIFICATION SYSTEM IS NOT REQUIRED FOR THIS PROJECT.
HIGH PERFORMANCE BUILDINGS ACT - COMPLIANCE STATEMENT
IN ACCORD WITH THE HIGH PERFORMANCE BUILDINGS ACT, THE BUILDING SHALL COMPLY WITH THE VIRGINIA ENERGY CONSERVATION AND ENVIRONMENTAL STANDARDS (VEES) AS DETAILED IN APPENDIX V OF THE CONSTRUCTION &
PROFESSIONAL SERVICES MANUAL.
VEES SECTION 401.2 COMPLIANCE: THE REQUIREMENTS OF IGCC CHAPTERS 5 THROUGH 11 AS AMENDED AND APPLIED IN ACCORD WITH IgCC SECTION 101.4 APPLICATION.
LIST OF DELEGATED DESIGN ITEMS:
• 051200 STRUCTURAL STEEL FRAMING CONNECTIONS
• 052100 SPECIAL JOISTS
• 054000 COLD-FORMED METAL FRAMING
• 055113 METAL PAN STAIRS
• 055213 PIPE AND TUBE RAILINGS
• 070543 COMPOSITE METAL HYBRID (CMH) CONTINUOUS INSULATION
CLADDING SUPPORT SYSTEMS
• 084113 ALUMINUM FRAMED ENTRANCES AND STOREFRONTS
• 084413 GLAZED ALUMINUM CURTAIN WALLS
• 105300 ALUMINUM CANOPY SYSTEM
• 118129 FALL PROTECTION
• 211313 WET PIPE SPRINKLER SYSTEM
• 260573 ELECTRICAL COORDINATION STUDIES
• 260573 FAULT AND ARC FLASH STUDIES
• 260573 SHORT CIRCUIT STUDIES
• 260670 LIGHTNING PROTECTION SYSTEM FOR CONCRETE-MASONRY STRUCTURES
• 283111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM
• 316200 RAMMED AGGREGATE PIERS
LIST OF STRUCTURAL OBSERVATIONS:
• RAMMED AGGREGATE PIERS
• CONCRETE FOUNDATIONS
• CONCRETE MASONRY
• STEEL FRAMING
• JOIST FRAMING
• COLD-FORMED METAL FRAMING
REPLACE DIGGS MOORE HARRISON
BUILDING COMPLEX
VIRGINIA PENINSULA COMMUNITY COLLEGE
RRMM ARCHITECTS, PC
ARCHITECTURE / PLANNING / INTERIORS
STATE PROJECT NUMBER: 260-18341-002
VICINITY MAP CONSULTANTS OWNER LOCATION MAP
VANASSE HANGEN BRUSTLIN, INC (VHB)
CIVIL ENGINEERING
TWO COLUMBUS CENTER
VIRGINIA BEACH, VA 23462
757-490-0132 757-490-0136 (Fax)
THOMPSON CONSULTING ENGINEERS
MECHANICAL ELECTRICAL PLUMBING
22 ENTERPRISE PARKWAY, SUITE 200
HAMPTON, VA 23666
757-599-4415
757-599-4113 (Fax)
IMEG (LYNCH MYKINS)
STRUCTURAL ENGINEERING
400 GRANBY STREET, SUITE 401
NORFOLK, VA 23510
919-782-1833
VIRGINIA COMMUNITY COLLEGE SYSTEM
300 ARBORETUM PLACE, SUITE 200
RICHMOND, VA 23236
P: 804-819-4914
SITE
SITE
1317 Executive Boulevard, Suite 200
Chesapeake, VA 23320
(757) 622-2828
115 South 15th Street, Suite 502 Richmond, VA 23219
(804) 277-8987
28 Church Avenue SW
Roanoke, VA 24011
(540) 344-1212
3700 Koppers Street, Suite 300
Baltimore, MD 21227
Phone (410) 234-8444
2900 South Quincy Street, Suite 710
Arlington, VA 22206
(703) 998-0101
4500 MAIN STREET, SUITE 400
NV5
TECHNOLOGY CONSULTANTS
1501 REEDSDALE STREET, SUITE 300
PITTSBURGH, PENNSYLVANIA 15233
412-323-8580
TRUE
NORTH
TRUE
NORTH
APPROPRIATION: 2016 CHAPTER 759-769
GRIFFIN DRIVE
THOMAS NELSON DRIVE
BUTLER FARM ROAD
HASTING DRIVE
I-64
BUTLER FARM RDHAMPTON ROADS
CENTER PARKWAY
NEIL ARMSTRONG
PARKWAY
RHINO FIRE PROTECTION ENGINEERING
FIRE PROTECTION
12359 SUNRISE VALLEY DRIVE SUITE 350
RESTON, VA 20191
703-476-5034 703-476-5038 (Fax)
PROFESSIONAL SEALS
ARCHITECTURAL STRUCTURAL ELECTRICAL
CIVIL PLUMBING/
MECHANICAL
FIRE PROTECTION
Lic. No. 014521
KATHERINE O'NEAL
T
T E C
IH
C
R
A
C
T
O M M O
N W E
A L FO
H
A N I
G I
R
I V
RRMM
ARCHITECTS, PC
1317 Executive Blvd, Suite 200
D A
T E
D R
A W
N
P R
O J E
C T
D E
S
IG
N E
D
C H
E C
K E
D
Chesapeake, Virginia 23320 (757)622-2828
M A
R K
R E
V
IS
IO
N
S
D A
T E
B Y
D E
S C
R
IP
T
IO
N
0' 16' 32' 48'
1/32" = 1'-0"
0' 8' 16' 24'
1/16" = 1'-0"
4' 0' 4' 8' 16'
3/32 = 1'-0"
0' 4' 8' 12'
1/8" = 1'-0"
0' 2' 4' 6'
1/4" = 1'-0"
0' 1' 2' 4'
3/8" = 1'-0"
3' 0' 1' 2' 3'
1/2" = 1'-0"
6" 0' 1' 2'
3/4" = 1'-0"
6" 0' 6" 1' 1.5'
1" = 1'-0"
3" 9" 0' 3" 6" 1'
1 1/2" = 1'-0"
9" 0' 2" 4" 6"
3" = 1'-0"
5"3"1" 0' 1" 2" 3"
6" = 1'-0"
0' 1" 1.5"
12" = 1'-0"
D
C
B
A
E
D
C
B
A
E
SHEET
P R
O J E
C T
D R
A W
IN
G
1 2 3 4 5 6
1 2 3 4 5 6
/1
/2
:4
:1
A
M A u to d e s k D o c s /1
-0
V
P C
C D ig g s M o o re H a rr is o n /1
-0 v
V P
C C
D ig g s M o o re H a rr is o n B ld g
A
R C
H .r v t
G-101
/1
/2
-0
R R
M M
R R
M M
K A
O
S T
A T
E P
R O
J E
C T
N U
M B
E R
-1
-0
T
IT
L E
S H
E E
T
V O
L U
M E
V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
S Y
S T
E M
R E
P L
A C
E D
IG
G
S M
O O
R E
H A
R R
IS
O
N B
U
IL
D
IN
G C
O M
P L
E X
T
H O
M A
S N
E L S
O N
D R
IV
E
H A
M P
T O
N
V
IR
G
IN
IA
V
IR
G
IN
IA
P
E N
IN
S
U L A
C O
M M
U N
IT
Y
C O
L L
E G
E
VOLUME 1 OF 2
07/17/26
Lic. No. 014521
KATHERINE O'NEAL
T
T E C
IH
C
R
A
C
T
O M M O
N W E
A L FO
H
A N I
G I
R
I V
07/17/26
Lic. No. 068141
DYLAN R. HONARDOUSTCO
MM
ONWEALTH OF VIRGINIA
PROFESSIONAL ENGIN
EE
R
N
A0R
TH
CAR0L IN
E RNG I NE E
P
LR
OF
ESS I NA
O
SEAL
044996
S C
O
TT M. FRA
NC
IS07/17/2026
07/17/2026
NIGNELANO
IS
S E
F O
R P
R E
E
Lic. No. 052245
GREGORY J ALLEN III A
I
N I
LTH OF
V
IR
G
C O M M O N
W E A
07.17.2026
E E R
P R O F
E
SSIONAL ENGI
N
A E
W
N O
M M
O C
G
RI
V
FO
HTL
I N I
AKENZIE CAMBAR
Lic. No.049752
07.17.2026
Lic. No. 014521
KATHERINE O'NEAL
T
T E C
IH
C
R
A
C
T
O M M O
N W E
A L FO
H
A N I
G I
R
I V
RRMM
ARCHITECTS, PC
1317 Executive Blvd, Suite 200
D A
T E
D R
A W
N
P R
O J E
C T
D E
S
IG
N E
D
C H
E C
K E
D
Chesapeake, Virginia 23320 (757)622-2828
M A
R K
R E
V
IS
IO
N
S
D A
T E
B Y
D E
S C
R
IP
T
IO
N
0' 16' 32' 48'
1/32" = 1'-0"
0' 8' 16' 24'
1/16" = 1'-0"
4' 0' 4' 8' 16'
3/32 = 1'-0"
0' 4' 8' 12'
1/8" = 1'-0"
0' 2' 4' 6'
1/4" = 1'-0"
0' 1' 2' 4'
3/8" = 1'-0"
3' 0' 1' 2' 3'
1/2" = 1'-0"
6" 0' 1' 2'
3/4" = 1'-0"
6" 0' 6" 1' 1.5'
1" = 1'-0"
3" 9" 0' 3" 6" 1'
1 1/2" = 1'-0"
9" 0' 2" 4" 6"
3" = 1'-0"
5"3"1" 0' 1" 2" 3"
6" = 1'-0"
0' 1" 1.5"
12" = 1'-0"
D
C
B
A
E
D
C
B
A
E
SHEET
P R
O J E
C T
D R
A W
IN
G
1 2 3 4 5 6
1 2 3 4 5 6
/1
/2
:4
:1
A
M A u to d e s k D o c s /1
-0
V
P C
C D ig g s M o o re H a rr is o n /1
-0 v
V P
C C
D ig g s M o o re H a rr is o n B ld g
A
R C
H .r v t
G-102
/1
/2
-0
R R
M M
R R
M M
K A
O
S T
A T
E P
R O
J E
C T
N U
M B
E R
-1
-0
D R
A W
IN
G
I N
D E
X S
H E
E T
V
O L U
M E
V
IR
G
IN
IA
C
O M
M U
N
IT
Y C
O L
L E
G E
S Y
S T
E M
R E
P L
A C
E D
IG
G
S M
O O
R E
H A
R R
IS
O
N B
U
IL
D
IN
G C
O M
P L
E X
T
H O
M A
S N
E L S
O N
D R
IV
E
H A
M P
T O
N
V
IR
G
IN
IA
V
IR
G
IN
IA
P
E N
IN
S
U L A
C O
M M
U N
IT
Y
C O
L L
E G
E
SHEET INDEX
Sheet Number Sheet Title
TITLE SHEET
G-101 TITLE SHEET - VOLUME 1
G-102 DRAWING INDEX SHEET - VOLUME 1
CIVIL
C1.01 LEGEND AND GENERAL NOTES
C1.02 EROSION AND SEDIMENT CONTROL NOTES
C1.03 EXISTING CONDITIONS PLAN
C2.01 DEMOLITION PLAN
C3.01 EROSION AND SEDIMENT CONTROL PHASE 1
C3.02 EROSION AND SEDIMENT CONTROL PHASE 2
C4.01 LAYOUT AND MATERIALS PLAN
C4.02 EMERGENCY ACCESS PLAN
C4.03 ADA ACCESS PLAN
C4.04 ACCESSIBLE PARKING ENLARGEMENT
C5.01 GRADING AND DRAINAGE PLAN
C5.02 GRADING AND DRAINAGE PLAN ENLARGEMENT
C6.01 UTILITY PLAN
C6.02 UTILITY PROFILES
C6.03 UTILITY PROFILES
C7.01 EROSION AND SEDIMENT CONTROL DETAILS
C7.02 SITE DETAILS
C7.03 SITE DETAILS
C7.04 UTILITY DETAILS
C7.05 UTILITY DETAILS
C7.06 UTILITY DETAILS
C7.07 STORMWATER DETAILS
C8.01 WATER CALCULATIONS
C9.01 PREDEVELOPMENT DRAINAGE MAP
C9.02 POSTDEVELOPMENT DRAINAGE MAP
C9.03 POSTDEVELOPMENT INLET DRAINAGE MAP
C9.04 OFFSITE DRAINAGE AREA MAP
L-1.00 LANDSCAPE PLAN
SV-1 TOPOGRAPHIC SURVEY
B1.00 BORING PLAN
B1.01 BORING LOGS
B1.02 BORING LOGS
B1.03 BORING LOGS
B1.04 BORING LOGS
STRUCTURAL
S-001 GENERAL NOTES
S-002 GENERAL NOTES / ABBREVIATIONS / LEGEND
S-100 SNOW DRIFT / WIND LOADING PLANS
S-110 FIRST FLOOR FOUNDATION PLAN
S-111 FIRST FLOOR SLAB PLAN
S-112 MASONRY WALL REINFORCING PLAN
S-120 SECOND FLOOR FRAMING PLAN
S-121 SECOND FLOOR SLAB PLAN
S-130 THIRD FLOOR FRAMING PLAN
S-131 THIRD FLOOR SLAB PLAN
S-140 ROOF FRAMING PLAN
S-141 ROOF DECK PLAN
S-150 HIGH ROOF FRAMING PLAN
S-201 BRACED FRAME ELEVATIONS
S-202 BRACED FRAME ELEVATIONS
S-203 BRACED FRAME DETAILS
S-301 FOUNDATION SECTIONS
S-321 FLOOR FRAMING SECTIONS
S-322 FLOOR FRAMING SECTIONS
S-331 ROOF FRAMING SECTIONS
S-332 ROOF FRAMING SECTIONS
S-333 ROOF FRAMING SECTIONS
S-334 FRAMING SECTIONS
S-401 ENLARGED PLANS
S-402 ENLARGED PLANS
S-501 TYPICAL FOUNDATION DETAILS
S-502 TYPICAL SLAB ON GRADE DETAILS
S-503 TYPICAL MASONRY DETAILS
S-504 TYPICAL STEEL FRAMING DETAILS
S-505 TYPICAL STEEL FRAMING DETAILS
S-506 TYPICAL COMPOSITE SLAB DETAILS
S-507 TYPICAL CFMF DETAILS
S-601 COLUMN SCHEDULE
S-602 COLUMN SCHEDULE
S-603 COLUMN SCHEDULE
LIFE SAFETY
LS100 LIFE SAFETY
LS101 FIRST FLOOR FIRE AND LIFE SAFETY PLAN
LS102 SECOND FLOOR FIRE AND LIFE SAFETY PLAN
LS103 THIRD FLOOR & PENTHOUSE FIRE AND LIFE SAFETY PLAN
LS104 FIRE PROTECTION PLANS
ARCHITECTURAL
A-001 ARCHITECTURAL GENERAL INFORMATION
A-002 PARTITION TYPES
A-003 GENERAL WORK NOTES AND FLOOR PLAN KEY NOTES
A-004 MOCK-UP PLANS AND DETAILS
A-101 FIRST FLOOR OVERALL PLAN
A-102 SECOND FLOOR OVERALL PLAN
A-103 THIRD FLOOR OVERALL PLAN
A-104 PENTHOUSE AND CLERESTORY PLANS
A-105 FIRST FLOOR REFLECTED CEILING PLAN
A-106 SECOND FLOOR REFLECTED CEILING PLAN
A-107 THIRD FLOOR REFLECTED CEILING PLAN
A-108 THIRD FLOOR REFLECTED CEILING PLAN AT HIGH ROOF
A-109 ROOF PLAN
A-110 HIGH ROOF PLAN AND SOLAR ARRAY ROOF PLAN
A-201 ELEVATIONS
A-202 ELEVATIONS
A-203 ELEVATIONS - METAL PANEL DIMENSIONS
A-204 ELEVATIONS - METAL PANEL DIMENSIONS
A-301 BUILDING SECTIONS
A-302 BUILDING SECTIONS
A-303 WALL SECTIONS
A-304 WALL SECTIONS
A-305 WALL SECTIONS
A-306 WALL SECTIONS
A-307 WALL SECTIONS
A-308 WALL SECTIONS
A-309 WALL SECTIONS
SHEET INDEX
Sheet Number Sheet Title
A-310 WALL SECTIONS
A-311 WALL SECTIONS
A-312 MECHANICAL SHAFT SECTIONS
A-401 ENLARGED TOILET PLANS
A-402 ENLARGED STAIR PLANS
A-403 STAIR SECTIONS
A-404 STAIR AND RAILING DETAILS
A-405 STAIR AND RAILING DETAILS
A-406 ELEVATOR PLANS AND SECTIONS
A-407 ELEVATOR DETAILS
A-408 ENLARGED PLANS
A-409 ENLARGED PLANS
A-410 ENLARGED PLANS
A-411 MAIN ENTRY ENLARGED PLAN, ELEVATIONS, SECTIONS AND DETAILS
A-412 SCREENED ENCLOSURE PLANS, ELEVATIONS & DETAILS
A-413 GROUND MOUNTED SIGN - PLAN, ELEVATIONS, SECTION & DETAILS
A-501 PLAN DETAILS
A-502 PLAN DETAILS
A-503 FOUNDATION DETAILS
A-504 MISCELLANEOUS DETAILS
A-505 SECTION DETAILS
A-506 SECTION DETAILS
A-507 ROOF DETAILS
A-508 ROOF DETAILS
A-509 ROOF DETAILS
A-510 CEILING DETAILS
A-601 FINISH SCHEDULE
A-602 FINISH LEGEND AND NOTES
A-603 SIGNAGE LEGEND & SCHEDULE
A-604A SIGNAGE LEGEND & SCHEDULE
A-604B EXTERIOR SIGNAGE LEGEND & SCHEDULE
A-605 DOOR SCHEDULE FIRST AND SECOND FLOOR
A-606 DOOR SCHEDULES THIRD FLOOR, PENTHOUSE AND DETAILS
A-607 INTERIOR DOOR DETAILS
A-608 EXTERIOR DOOR DETAILS
A-609 STOREFRONT ELEVATIONS
A-610 STOREFRONT ELEVATIONS
A-611 INTERIOR STOREFRONT ELEVATIONS
A-612 CURTAINWALL ELEVATIONS AND DETAILS
A-613 STOREFRONT DETAILS
A-614 STOREFRONT DETAILS
A-615 STOREFRONT DETAILS
A-616 INTERIOR STOREFRONT DETAILS
A-701 FIRST FLOOR FINISH PLAN
A-702 SECOND FLOOR FINISH PLAN
A-703 THIRD FLOOR FINISH PLAN
A-704 FIRST FLOOR SIGNAGE PLAN
A-705 SECOND FLOOR SIGNAGE PLAN
A-706 THIRD FLOOR SIGNAGE PLAN
A-801 INTERIOR ELEVATIONS
A-802 INTERIOR ELEVATIONS
A-803 CASEWORK ELEVATIONS
A-804 CASEWORK ELEVATIONS
A-805 CASEWORK SECTIONS AND DETAILS
A-806 CASEWORK SECTIONS AND DETAILS
A-901 FIRST FLOOR FURNITURE PLAN - FOR REFERENCE ONLY
A-902 SECOND FLOOR FURNITURE PLAN - FOR REFERENCE ONLY
A-903 THIRD FLOOR FURNITURE PLAN - FOR REFERENCE ONLY
SHEET INDEX
Sheet Number Sheet Title
TITLE SHEET
G-201 TITLE SHEET - VOLUME 2
G-202 DRAWING INDEX SHEET - VOLUME 2
FIRE PROTECTION
FA0.1 LEGEND, ABBREVIATIONS, AND FIRE ALARM GENERAL NOTES
FA1.1 FIRST FLOOR FIRE ALARM PLAN
FA1.2 SECOND FLOOR FIRE ALARM PLAN
FA1.3 THIRD FLOOR FIRE ALARM PLAN
FA1.4 PENTHOUSE FIRE ALARM PLAN
FA5.1 FIRE ALARM DETAILS
FA5.2 FIRE ALARM MATRIX AND RISER
FP0.1 LEGEND, ABBREVIATIONS, AND SPRINKLER GENERAL NOTES
FP1.1 FIRST FLOOR FIRE PROTECTION PLAN
FP1.2 SECOND FLOOR FIRE PROTECTION PLAN
FP1.3 THIRD FLOOR FIRE PROTECTION PLAN
FP1.4 ROOF FIRE PROTECTION PLAN
FP5.1 FIRE PROTECTION SECTION VIEWS
FP5.2 FIRE PROTECTION DETAILS
FP5.3 RISER DIAGRAM
PLUMBING
P-001 LEGEND, NOTES AND ABBREVIATIONS
P-002 PLUMBING SCHEDULES
P-101 FIRST FLOOR PLAN - DWV
P-102 SECOND FLOOR PLAN - DWV
P-103 THIRD FLOOR PLAN - DWV
P-201 FIRST FLOOR PLAN - DOMESTIC WATER AND GAS
P-202 SECOND FLOOR PLAN - DOMESTIC WATER AND GAS
P-203 THIRD FLOOR PLAN - DOMESTIC WATER AND GAS
P-301 ROOF PLAN AND DETAIL - PLUMBING
P-401 SANITARY WASTE PIPING ISOMETRICS
P-402 RAIN LEADER PIPING ISOMETRIC
P-403 DOMESTIC WATER PIPING ISOMETRICS
P-404 GAS PIPING ISOMETRIC
P-405 PLUMBING DETAILS
P-406 INFRASTRUCTURE PENETRATION DETAILS (ACOUSTIC)
MECHANICAL
M-001 GENERAL NOTES AND ABBREVIATIONS
M-002 MECHANICAL SCHEDULES
M-003 MECHANICAL SCHEDULES
M-004 MECHANICAL SCHEDULES
M-005 MECHANICAL SCHEDULES
M-006 MECHANICAL SCHEDULES
M-101A FIRST FLOOR PLAN - MECHANICAL - SUPPLY
M-101B FIRST FLOOR PLAN - MECHANICAL - RETURN, TRANSFER, AND EXHAUST
M-102A SECOND FLOOR PLAN - MECHANICAL - SUPPLY
M-102B SECOND FLOOR PLAN - MECHANICAL - RETURN, TRANSFER, AND EXHAUST
M-103A THIRD FLOOR PLAN - MECHANICAL - SUPPLY
M-103B THIRD FLOOR PLAN - MECHANICAL - RETURN, TRANSFER AND EXHAUST
M-104 ROOF PLAN - MECHANICAL
M-201 FIRST FLOOR PLAN - PIPING
M-202 SECOND FLOOR PLAN - PIPING
M-203 THIRD FLOOR PLAN - PIPING
M-301 VFR PIPING SCHEMATICS
M-401 MECHANICAL DETAILS
M-402 MECHANICAL DETAILS
M-403 MECHANICAL DETAILS
M-404 MECHANICAL DETAILS
M-405 ACOUSTICAL PENETRATION DETAILS
M-501 AUTOMATIC TEMPERATURE CONTROLS
M-502 AUTOMATIC TEMPERATURE CONTROLS
M-503 AUTOMATIC TEMPERATURE CONTROLS
M-504 AUTOMATIC TEMPERATURE CONTROLS
M-505 AUTOMATIC TEMPERATURE CONTROLS
M-506 AUTOMATIC TEMPERATURE CONTROLS
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
E-002 LIGHT FIXTURE SCHEDULE, DETAILS AND NOTES
E-003 ELECTRICAL DETAILS
E-004 ELECTRICAL DETAILS
E-005 INFASTRUCTURE PENETRATION DETAILS
E-101 FIRST FLOOR PLAN - LIGHTING
E-102 SECOND FLOOR PLAN - LIGHTING
E-103 THIRD FLOOR PLAN - LIGHTING
E-104 NORTH AND SOUTH ELEVATION PLANS - LIGHTING
E-105 EAST AND WEST ELEVATION PLANS - LIGHTING
E-201 FIRST FLOOR PLAN - POWER
E-202 SECOND FLOOR PLAN - POWER
E-203 THIRD FLOOR PLAN - POWER
E-301 FIRST FLOOR PLAN - HVAC POWER
E-302 SECOND FLOOR PLAN - HVAC POWER
E-303 THIRD FLOOR PLAN - HVAC POWER
E-304 ROOF PLAN - HVAC POWER
E-305 POWER PEDESTAL DETAILS
E-401 FIRST FLOOR PLAN - INTRUSION DETECTION SYSTEM
E-501 ROOF PLAN - PHOTOVOLTAIC ARRAY
E-502 AC AND DC RISER DIAGRAM
E-503 PHOTOVOLTAIC SYSTEM LABLES AND DETAILS
E-601 RISER DIAGRAM
E-602 PANELBOARD SCHEDULES
E-603 PANELBOARD SCHEDULES
E-604 PANELBOARD SCHEDULES
E-605 PANELBOARD SCHEDULES
E-606 LIGHTING CONTACTOR SCHEDULES AND ELECTRICAL EQUIPMENT LABELS
E-701 ELECTRICAL SITE PLAN
E-702 DETAILS
E-801 EMERGENCY LIGHTING CALCULATIONS
E-802 EMERGENCY LIGHTING CALCULATIONS
E-803 EMERGENCY LIGHTING CALCULATIONS
E-804 ELECTRICAL SITE PLAN - LIGHTING CALCULATIONS
TELECOM / AUDIOVISUAL
T0.1 TECHNOLOGY INFRASTRUCTURE LEGENDS, SCHEDULES AND NOTES
T0.2 TECHNOLOGY INFRASTRUCTURE LEGENDS, SCHEDULES AND NOTES
T1.0 TECHNOLOGY INFRASTRUCTURE SITE PLAN
T1.1 TECHNOLOGY INFRASTRUCTURE FIRST FLOOR PLAN
T1.2 TECHNOLOGY INFRASTRUCTURE SECOND FLOOR PLAN
T1.3 TECHNOLOGY INFRASTRUCTURE THIRD FLOOR PLAN
T1.4 TECHNOLOGY INFRASTRUCTURE PLAN - PENTHOUSE
VOLUME 1 VOLUME 2
SHEET INDEX
Sheet Number Sheet Title
T2.1 TECHNOLOGY INFRASTRUCTURE FIRST FLOOR REFLECTED CEILING PLAN
T2.2 TECHNOLOGY INFRASTRUCTURE SECOND FLOOR REFLECTED CEILING PLAN
T2.3 TECHNOLOGY INFRASTRUCTURE THIRD FLOOR REFLECTED CEILING PLAN
T2.4 TECHNOLOGY INFRASTRUCTURE REFLECTED CEILING PLAN - PENTHOUSE
T3.1 TELECOM FIRST FLOOR PLAN
T3.2 TELECOM SECOND FLOOR PLAN
T3.3 TELECOM THIRD FLOOR PLAN
T3.4 TELECOM PLAN - PENTHOUSE
T4.1 TELECOM ENLARGED PLANS AND ELEVATIONS
T5.1 AUDIOVISUAL INFRASTRUCTURE ROOM RISERS
T5.2 AUDIOVISUAL INFRASTRUCTURE ROOM RISERS
T5.3 AUDIOVISUAL INFRASTRUCTURE ROOM RISERS
T6.1 TELECOM BUILDING RISER
T6.2 TELECOM TYPICAL CONDUIT RISER
T7.1 TECHNOLOGY INFRASTRUCTURE ELEVATIONS
T7.2 TECHNOLOGY INFRASTRUCTURE ELEVATIONS
T7.3 TECHNOLOGY INFRASTRUCTURE ELEVATIONS
T7.4 TECHNOLOGY INFRASTRUCTURE ELEVATIONS
T7.5 TECHNOLOGY INFRASTRUCTURE ELEVATIONS
T8.1 TECHNOLOGY INFRASTRUCTURE DETAILS
T9.1 TELECOM DETAILS
T10.1 CELLULAR DISTRIBUTED ANTENNAE SYSTEM FIRST FLOOR REFLECTED CEILING PLAN
T10.2 CELLULAR DISTRIBUTED ANTENNAE SYSTEM SECOND FLOOR REFLECTED CEILING PLAN
T10.3 CELLULAR DISTRIBUTED ANTENNAE SYSTEM THIRD FLOOR REFLECTED CEILING PLAN
T10.4 CELLULAR DISTRIBUTED ANTENNAE SYSTEM ROOF PLAN
T10.5 CELLULAR DISTRIBUTED ANTENNAE SYSTEM BUILDING RISER
T11.1 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEM FIRST FLOOR REFLECTED CEILING PLAN T11.2 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEM SECOND FLOOR REFLECTED CEILING PLAN T11.3 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEM THIRD FLOOR REFLECTED CEILING PLAN
T11.4 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEM ROOF PLAN
T11.5 FIRST RESPONDER DISTRIBUTED ANTENNAE SYSTEM BUILDING RISER
TELECOM / AUDIOVISUAL
AVS00 AUDIOVISUAL SYSTEMS COVER SHEET
AVS01 AUDIOVISUAL SYSTEMS SY01
AVS02 AUDIOVISUAL SYSTEMS SY02, SY03
AVS03 AUDIOVISUAL SYSTEMS SY04, SY05
AVS04 AUDIOVISUAL SYSTEMS SY06,SY07
AVS05 AUDIOVISUAL SYSTEMS SY08,SY09
AVS06 AUDIOVISUAL SYSTEMS SY10
AVS07 AUDIOVISUAL SYSTEMS SY11, SY12
AVS08 AUDIOVISUAL SYSTEMS SY13, SY14
AVS09 AUDIOVISUAL SYSTEMS SY15
SECURITY
Y0.1 SECURITY SYMBOLS LEGEND, NOTES AND SCHEDULES
Y1.1 SECURITY FIRST FLOOR PLAN
Y1.2 SECURITY SECOND FLOOR PLAN
Y1.3 SECURITY THIRD FLOOR PLAN
Y1.4 SECURITY PLAN - PENTHOUSE
Y8.1 SECURITY DETAILS
Y8.2 SECURITY DETAILS
Y8.2 SECURITY DETAILS
07/17/26
File details come from the government source that posted it. Updated .