This document is a project manual and specifications for the new construction of the Nantucket Municipal Fueling Facility located at 4 Fairgrounds Road in Nantucket, Massachusetts. The Town of Nantucket is soliciting sealed bids for this project, which includes site work, utilities, paving, fencing, and landscaping. The project is being designed by Kaestle Boos Associates, Inc.
The bid submission deadline is 3:00 PM on Thursday, June 7, 2018. Each general bid must be accompanied by a 5% bid deposit in the form of a certified check or bid bond. The successful bidder will be required to provide 50% performance and payment bonds. The project is subject to prevailing wage requirements. The project must be substantially completed within 90 calendar days from the commencement date. No renewals are specified.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NMFF-Bid_dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual and Specifications
Nantucket Municipal Fueling
Facility
Nantucket, MA
Issued for Bid and Construction
Divisions 00—33
Volume I of I
May 4, 2018
NANTUCKET MUNICIPAL FUELING FACILITY NEW CONSTRUCTION
NANTUCKET, MA KBA #17025
TOC – Page 1 of 2
TABLE OF CONTENTS
May 4, 2018 - BID
PROJECT MANUAL AND SPECIFICATIONS
VOLUME I OF II
00 01 10 TABLE OF CONTENTS
00 01 12 PROJECT TEAM DIRECTORY
00 01 15 LIST OF DRAWINGS
PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 16 ADVERTISEMENT FOR BID
00 21 13 INSTRUCTIONS TO BIDDERS
00 43 13 BID BOND (AIA-A310)
00 41 13 FORM OF GENERAL BID
00 41 14 STATEMENT_NON-COLLUSION_GENERAL
00 45 44 CERTIFICATE BY CORP SIGN CONTRACT
00 45 48 TAX COMPLIANCE CERTIFICATION
00 45 50 FOREIGN CORP CERTIFICATION
00 52 15 A101-2007 STANDARD FORM OF AGREEMENT
00 61 13 CONSTRUCTION PAYMENT BOND
00 61 13.13 PERFORMANCE BOND
00 72 00 GENERAL CONDITIONS (AIA-A201 1997 EDITION)
00 73 43.01 WAGE RATE SCHEDULES AND FEDERAL REGULATIONS
00 73 43.02 MASSACHUSETTS PREVAILING WAGE RATES
00 73 43.03 PREVAILING WAGE WEEKLY PAYROLL REPORT FORM
00 73 43.04 PAYROLL STATEMENT OF COMPLIANCE FORM
00 73 43.05 EXCERPTS FROM APPLICABLE STATE LAW
00 74 41.00 AIA_G702_APPLICATION AND CERTIFICATE FOR PAYMENT
00 74 41.01 AIA_G703_CONTINUATION SHEET
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 22 00 UNIT PRICES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 26 00.01 ASI 001_01
01 26 00.02 PR 001_01
01 26 00.03 RRFI 001_01
01 26 00.04 RCOP 001_01
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 31 00.01 CADD LETTER
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 33 00.01 SHOP DRAWING REVIEW STAMP
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 60 00.01 SUBSTITUTION REQUEST FORM
01 73 00 EXECUTION
01 73 29 CUTTING AND PATCHING
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 39 PROJECT RECORD DOCUMENTS
TOC – Page 2 of 2
TABLE OF CONTENTS
DIVISION 31 – EARTHWORK
31 10 00 SITE CLEARING
31 20 00 EARTH MOVING
31 25 00 EROSION AND SEDIMENTATION CONTROL
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 00 00 EXTERIOR IMPROVEMENTS
32 13 13 CONCRETE PAVING
32 31 13 CHAIN LINK FENCES AND GATES
32 91 01 TOPSOIL
32 92 00 TURF AND GRASSES
32 93 00 PLANTS
DIVISION 33 – SITE UTILITIES
33 00 00 SITE UTILITIES
P R O J E C T T E A M A N D
L O C A L O F F I C I A L S L I S T
Nantucket Municipal Fueling Facility
Nantucket, MA
KBA #17025 Page: 1 of 2
CONNECTICUT OFFICE
416 Slater Road, P.O. Box 2590, New Britain, CT 06050-2590 V: (860) 229-0361 | F: (860) 229-5303
MASSACHUSETTS OFFICE
325 Foxborough Boulevard, Suite 100, Foxborough, MA 02035
V: (508) 549-9906 | F: (508) 549-9907
TOWN OF NANTUCKET
16 Broad Street, 1st Floor
Nantucket, MA 02554
P: (508) 228-7255| F: (508) 228-7272
Town Administrator
C. Elizabeth (Libby) Gibson lgibson@nantucket-ma.gov
Chief Procurement Officer
Brian E. Turbitt, Director of Municipal Finance
T: (508) 228-7200 ext 7031 | F: (508) 228-7218 bturbitt@nantucket-ma.gov
BUILDING COMMITTEE
16 Broad Street, 1st Floor
Chief Procurement Officer
Brian E. Turbitt, Director of Municipal Finance
T: (508) 228-7200 ext 7031 | F: (508) 228-7218 bturbitt@nantucket-ma.gov
Deputy Chief of Police
Charles Gibson cgibson@police.Nantucket-MA.gov
Fire Chief
Chief Steven Murphy smurphy@fire.nantucket-ma.gov
NANTUCKET POLICE DEPARTMENT
4 Fairgrounds Road
P: (508) 228-1212| F: (508) 228-7246
Police Chief
Chief William Pittman wpittman@nantucketpolice.com
Deputy Chief of Police
Charles Gibson cgibson@police.Nantucket-MA.gov
IT Administrator
Jennifer Erichsen jerichsen@police.Nantucket-MA.gov
NANTUCKET FIRE DEPARTMENT
131 Pleasant Street
P: (508) 228-2324 | F: (508) 228-7500
Fire Chief
Chief Steven Murphy smurphy@fire.nantucket-ma.gov mailto:lgibson@nantucket-ma.gov mailto:bturbitt@nantucket-ma.gov mailto:bturbitt@nantucket-ma.gov mailto:cgibson@nantucketpolice.com mailto:cgibson@police.Nantucket-MA.gov mailto:smurphy@fire.nantucket-ma.gov mailto:wpittman@nantucketpolice.com mailto:wpittman@nantucketpolice.com mailto:cgibson@nantucketpolice.com mailto:cgibson@police.Nantucket-MA.gov mailto:je@nantucketpolice.com mailto:smurphy@fire.nantucket-ma.gov
P R O J E C T T E A M A N D
L O C A L O F F I C I A L S L I S T
Nantucket Municipal Fueling Facility
KBA #17025 Page: 2 of 2
CONNECTICUT OFFICE
416 Slater Road, P.O. Box 2590, New Britain, CT 06050-2590 V: (860) 229-0361 | F: (860) 229-5303
MASSACHUSETTS OFFICE
325 Foxborough Boulevard, Suite 100, Foxborough, MA 02035
V: (508) 549-9906 | F: (508) 549-9907
LANDSCAPE ARCHITECT,
Kaestle Boos Associates, Inc.
325 Foxborough Blvd, Suite 100
Foxborough, MA 02035
P: 508-549-9906 | F: 508-549-9907
Principal in Charge – Michael McKeon – AIA
Landscape Architect – David McKinley – RLA dmckinley@kba-architects.com
CIVIL ENGINEER
Garcia Galuska DeSousa Consulting Engineers Inc.
370 Faunce Corner Road
N. Dartmouth, MA 02747-1217
P: 508-998-5700 | F: 508-998-0883
Project Manager
Christopher M. Garcia, P.E., chris_garcia@g-g-d.com
Nathan Ketchel, EIT
Nathan_ketchel@g-g-d.com
ELECTRICAL ENGINEER
Garcia Galuska DeSousa Consulting Engineers Inc.
370 Faunce Corner Road
N. Dartmouth, MA 02747-1217
P: 508-998-5700 | F: 508-998-0883
Project Manager
Carlos DeSousa – Principal Engineer (Elec) carlos_desousa@g-g-d.com
Jason Rioux
Jason_rioux@g-g-d.com mailto:dmckinley@kba-architects.com mailto:chris_garcia@g-g-d.com mailto:carlos_desousa@g-g-d.com mailto:Jason_rioux@g-g-d.com
SECTION 00 01 15 – Page 1 of 1
LIST OF DRAWINGS
May 4, 2018 – Bid
PROJECT COVER
C1.01 SITE LEGEND, NOTES & DETAILS & PLANS
L1.01 SITE PLANS
L2.01 SITE DETAILS
E0.02 ELECTRICAL SITE PLAN
E0.03 ELECTRICAL SITE DETAILS
ITB – Page 1 of 2
ADVERTISEMENT FOR BID
May 01, 2018 - BID
The Town of Nantucket, Massachusetts, acting through its Projects Administrator, the Awarding Authority, invites sealed bids for the construction of the Nantucket Municipal Fueling Facility to be located at 4 Fairgrounds Road, Nantucket, MA, in accordance with Contract Documents prepared by Kaestle Boos Associates, Inc. 325 Foxborough
Boulevard Suite 100, Foxborough, MA 02035.
All bids for this Project are subject to the provisions of Massachusetts General Laws, M.G.L., c.30, § 39M, as amended.
Sealed bids shall be submitted on a form furnished by the Awarding Authority and clearly identified as a bid, endorsed with the name and address of the bidder, and the name of the project, and submitted to:
Maria Davis, Office Administrator Nantucket Police Department 4 Fairgrounds Road, Second Floor Nantucket, Massachusetts 02554 and received no later than the times set forth below, when they will forthwith be publicly opened and read aloud at this location.
Sealed bids for the General Contract will be received until 3:00 PM, on Thursday, June 7, 2018.
All bids may be mailed or hand-delivered to the above specified receiving address prior to the time specified hereunder, in accordance with the procedures set forth in the INSTRUCTIONS TO BIDDERS.
Every General Bid shall be accompanied by a bid deposit, in an amount not less than five percent (5%) of the bid amount, in the form of a certified check; or a treasurer's check; or a cashier's check; issued by a responsible bank or trust company, made payable to the Town of Nantucket; or a bid bond in a form satisfactory to the Town of
Nantucket, with a surety company qualified to do business in the Commonwealth of Massachusetts, and conditioned upon the faithful performance by the principal of the agreements contained in the respective sub-bids and general bid.
Each General Bidder may obtain complete sets of the Bidding Documents, including Bid Forms, after 2:00 PM., local time, on May 8, 2018, online at http://www.nantucket-ma.gov/199/Procurement, for a downloadable set of the
Bidding Documents. Addenda, if any, will be issued online.
General Bid opening, will be refunded their deposit. Deposits will not be refunded after that date. No refund will be allowed for partial or otherwise damaged sets.
Each bidder is advised to visit the site of the proposed work, become fully acquainted with conditions as they exist, and thoroughly examine the Contract Documents. Failure of any bidder to visit the site and to examine the Contract
Documents shall in no way relieve the bidder from any obligation with regard to the bid as submitted. Arrangements for site visitation, during the bidding period, may be made in the manner set forth in the INSTRUCTIONS TO
BIDDERS.
The successful Bidder will be required to provide a performance bond, and a labor and materials payment bond, issued by a company authorized to do business in Massachusetts and satisfactory to the Awarding Authority, each bond being in the amount of fifty percent (50%) of the Contract Amount.
The minimum wages to be paid for all labor on the project are established in a schedule issued by the Commissioner of Labor and Industries, in accordance with Section 26A - 27D inclusive, of Chapter 149 of the M.G.L., as amended, said schedule being made a part of the Contract Documents and is included therein.
ITB – Page 2 of 2
ADVERTISEMENT FOR BID
May 01, 2018 - BID
Materials, equipment and supplies to be used on this project are exempt from sales tax to the extent provided by
M.G.L. Chapter 64H, Section 6(f).
The bidder agrees that its bid shall be good and may not be withdrawn for a period of 45 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids.
The Town of Nantucket reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.
The Town of Nantucket is an affirmative action/equal opportunity employer, and encourages participation from certified minority and women-owned businesses.
TOWN OF NANTUCKET, MASSACHUSETTS
By: Charles Gibson, Project Manager
Date: May 2, 2018
FORM FOR GENERAL BID
Nantucket Municipal Fueling Facility
NAME OF BIDDER: __________________________________________________________________
The Bidder, in compliance with the Advertisement for Bid for the construction of the new Nantucket Municipal
Fueling Facility, having examined the Drawings and Specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and the construct the project in accordance with the Contract Documents within the time set forth below, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the Contract
Documents, of which this proposal is a part.
To the Awarding Authority:
A. The undersigned proposes to furnish all labor and materials required for construction, in accordance with the hereinafter described drawings, specifications and addenda, all the work specified below, subject to addition and deductions according to the terms of the Specifications and in any drawings specified in such section, prepared by Kaestle Boos Associates, Inc., 325 Foxborough Boulevard, Suite 100, Foxborough, MA 02035, new Nantucket Municipal Fueling Facility, 4 Fairgrounds Road, Nantucket, MA for the proposed contract price of:
Dollars ($ )
B. This General Bid includes Addenda numbered
The undersigned agrees that, if he is selected as General Contractor, he will within five days, Saturdays Sundays and legal holidays excluded, after presentation thereof by the Awarding Authority execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the commonwealth and satisfactory to the Awarding Authority and each in the sum of the contract price, the premiums for which are to be paid by the
General Contract and are included in the Contract price.
E. The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States
Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section 44A.
The undersigned further certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection, the work "person" shall mean any natural person joint venture, partnership, corporation or other business or legal entity.
The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.
Date:
(Name of General Bidder)
BY:
(Signature and Title of Person Signing Bid)
(Business Address)
(City, State and Zip)
(Telephone No.)
STATEMENT OF NON-COLLUSION – GENERAL BIDDER
STATEMENT OF NON-COLLUSION – GENERAL BIDDER
I, , of
(Name) (Title)
(General Bidder) whose principal place of business is located at ______________________________________________________
(Address) do hereby certify that:
1. The proposed bid price has been arrived at independently, without collusion, consultation communication as to any other contractor or with any competitor.
2. The said bid price was not disclosed by the Contractor and was not knowingly discussed prior to the submission, directly or indirectly, to any other contractor or to any competitor.
3. No attempt was made by the Contractor to induce any other person, partnership or corporation to submit or note to submit a proposal for the purpose of restricting competition.
4. This bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this section the word
"person" shall mean any natural person, joint venture, partnership, corporation, or other business or legal entity.
Signed under the pains of perjury this day of , ,20
Name of General Bidder
By:
Title:
Personally appeared the above named and being duly sworn, deposed and says that he/she is the person named therein, and who signed the foregoing, and that the statements therein are true.
Notary Public
My commission expires:
END STATEMENT OF NON-COLLUSION
CERTIFICATE BY CORPORATION TO SIGN CONTRACT
Certificate by Corporation to Sign Contract
At a duly authorized meeting of the Board of Directors of the
_______________________________________________________________ held on _______________________
(Name of Corporation) (Date) at which all the Directors were present or waived notice, it was voted that, (Name) (Officer of this Company, be and he hereby is authorized to execute contracts and bonds in the name and behalf of said company, and affix its Corporate Seal thereto, and such execution of any Contract or obligation in this Company’s name on its behalf by such
__________________________________________________________________under seal of the company, shall
(Officer) be valid and binding upon this Company.
A TRUE COPY,
ATTEST: ________________________________________________
(Clerk)
DATE OF THIS CONTRACT ___________________________________
I hereby certify that I am the clerk of the
_____________________________ that _________________________________________________________ is the duly elected __________________________________________of said company, and the above vote has not been amended or rescinded and remains in full force and effect as of the date of this Contract.
(Clerk) (Corporate Seal)
TAX COMPLIANCE CERTIFICATE
Tax Compliance Certification
Pursuant to M.G.L. Chapter 62C, Section 49A, I certify under the penalties of perjury that I have, to my best knowledge and belief, complied with the law of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.
Social Security Number or Signature of Individual or
Federal Identification Number Corporate Name
By: _____________________________________________
Corporate Officer
(if applicable)
FOREIGN CORPORATION CERTIFICATION
Foreign Corporation Certification
AFFIDAVIT OF COMPLIANCE
Form AF-4A 1/78
EXECUTIVE OFFICE FOR
ADMINISTRATION AND FINANCE
The Commonwealth of Massachusetts
_________ MASSACHUSETTS BUSINESS CORPORATION
_________ NON PROFIT CORPORATION
_________ FOREIGN (non-Massachusetts) Corporation
1. ____________________________________________________, ____ President ____ Clerk of
__________________________________________________________________ whose principal office is
(Name of Corporation located at_____________________________________________________________________________________ do hereby certify that the above named Corporation has filed with the State Secretary all certificates and annual reports required by Chapter 156B, Section 109 (Business Corporation), by Chapter 181, Section 4 (Foreign
Corporation), or by Chapter 180, Section 26A (non-profit Corporation) of the Massachusetts General Laws.
SIGNED UNDER THE PENALTIES OF PERJURY THIS _________ day of ________________,. 20_____.
Signature of responsible Corporate Officer ____________________________________________________
AIA
Document A101 TM – 2007
Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on 09/19/2017 under Order No.5992967110_1 which expire s on 12/01/2017, and is not for resale.
User Notes: (1281961835)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion.
The author may also have revised the text of the original AIA standard form.
An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
AIA Document A201™–2007, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unless this document is modified.
ELECTRONIC COPYING of any portion of this AIA ® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
AGREEMENT made as of the « » day of « » in the year « » (In words, indicate day, month and year.)
BETWEEN the Owner:
(Name, legal status, address and other information)
Town of Nantucket 16 Broad Street, Floor Nantucket, MA 02554 and the Contractor:
for the following Project:
(Name, location and detailed description)
Nantucket Municipal Fueling Facility 4 Fairgrounds Road Nantucket, MA 02554
The Architect:
325 Foxborough Boulevard Suite 100 Foxborough, MA, 02035
The Owner and Contractor agree as follows.
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on
TABLE OF ARTICLES
1 THE CONTRACT DOCUMENTS
2 THE WORK OF THIS CONTRACT
3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
4 CONTRACT SUM
5 PAYMENTS
6 DISPUTE RESOLUTION
7 TERMINATION OR SUSPENSION
8 MISCELLANEOUS PROVISIONS
9 ENUMERATION OF CONTRACT DOCUMENTS
10 INSURANCE AND BONDS
ARTICLE 1 THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, Addenda issued prior to execution of this Agreement, other documents listed in this Agreement and Modifications issued after execution of this Agreement, all of which form the Contract, and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations, representations or agreements, either written or oral. An enumeration of the Contract Documents, other than a Modification, appears in Article 9.
ARTICLE 2 THE WORK OF THIS CONTRACT
The Contractor shall fully execute the Work described in the Contract Documents, except as specifically indicated in the Contract Documents to be the responsibility of others.
ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
§ 3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner.
(Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.)
If, prior to the commencement of the Work, the Owner requires time to file mortgages and other security interests, the Owner’s time requirement shall be as follows:
§ 3.2 The Contract Time shall be measured from the date of commencement.
§ 3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than 90 ( 3 months) days from the date of commencement, or as follows:
(Insert number of calendar days. Alternatively, a calendar date may be used when coordinated with the date of commencement. If appropriate, insert requirements for earlier Substantial Completion of certain portions of the
Work.)
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on
Portion of Work Substantial Completion Date
, subject to adjustments of this Contract Time as provided in the Contract Documents.
(Insert provisions, if any, for liquidated damages relating to failure to achieve Substantial Completion on time or for bonus payments for early completion of the Work.)
ARTICLE 4 CONTRACT SUM
§ 4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor’s performance of the Contract. The Contract Sum shall be « » ($ « » ), subject to additions and deductions as provided in the Contract Documents.
§ 4.2 The Contract Sum is based upon the following alternates, if any, which are described in the Contract Documents and are hereby accepted by the Owner:
(State the numbers or other identification of accepted alternates. If the bidding or proposal documents permit the
Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.)
§ 4.3 Unit prices, if any:
(Identify and state the unit price; state quantity limitations, if any, to which the unit price will be applicable.)
Item Units and Limitations Price Per Unit ($0.00) Incorporated by Reference
§ 4.4 Allowances included in the Contract Sum, if any:
(Identify allowance and state exclusions, if any, from the allowance price.)
Item Price Incorporated by Reference
ARTICLE 5 PAYMENTS
§ 5.1 PROGRESS PAYMENTS
§ 5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents, and in accordance with G.L. c. 30, section 39K .
§ 5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month, or as follows:
§ 5.1.3 Provided that an Application for Payment is received by the Architect not later than the 25th day of a month, the Owner shall make payment of the certified amount to the Contractor not later than the 25th day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment shall be made by the Owner not later than thirty ( 30 ) days after the Architect receives the Application for Payment.
(Federal, state or local laws may require payment within a certain period of time.)
§ 5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents. The schedule of values shall allocate the entire Contract Sum among the various portions of the Work. The schedule of values shall be prepared in such form and supported
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on by such data to substantiate its accuracy as the Architect may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Contractor’s Applications for Payment.
§ 5.1.5 Applications for Payment shall show the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment.
§ 5.1.6 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as follows:
.1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values, less retainage of five percent ( 5 %);
.2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction (or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing), less retainage of five percent ( 5 %);
.3 Subtract the aggregate of previous payments made by the Owner; and
.4 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201–2007.
§ 5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances:
.1 Add, upon Substantial Completion of the Work, a sum sufficient to increase the total payments to the full amount of the Contract Sum, less such amounts as the Architect shall determine for incomplete Work, retainage applicable to such work and unsettled claims.;
§ 5.1.8 Reduction or limitation of retainage, if any, shall be in accordance with the Contract Documents and G.L. c.
30, Section 39K.
§ 5.1.9 Except with the Owner’s prior approval, the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site.
§ 5.2 FINAL PAYMENT
§ 5.2.1 Final payment, constituting the entire unpaid balance of the Contract Sum, shall be made by the Owner to the Contractor when
.1 the Contractor has fully performed the Contract except for the Contractor’s responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201–2007, and to satisfy other requirements, if any, which extend beyond final payment; and
.2 a final Certificate for Payment has been issued by the Architect.
§ 5.2.2 The Owner’s final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect’s final Certificate for Payment, or as follows:
ARTICLE 6 DISPUTE RESOLUTION
§ 6.1 INITIAL DECISION MAKER
The Architect will serve as Initial Decision Maker pursuant to Section 15.2 of AIA Document A201–2007, unless the parties appoint below another individual, not a party to this Agreement, to serve as Initial Decision Maker.
(If the parties mutually agree, insert the name, address and other contact information of the Initial Decision Maker, if other than the Architect.)
325 Foxborough Blvd., Suite 100
Mr. Kevin Witzell - PM
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on
P: 508-549-9906
§ 6.2 BINDING DISPUTE RESOLUTION
For any Claim subject to, but not resolved by, mediation pursuant to Section 15.3 of AIA Document A201–2007, the method of binding dispute resolution shall be as follows:
(Check the appropriate box. If the Owner and Contractor do not select a method of binding dispute resolution below, or do not subsequently agree in writing to a binding dispute resolution method other than litigation, Claims will be resolved by litigation in a court of competent jurisdiction.)
[ « » ] Arbitration pursuant to Section 15.4 of AIA Document A201–2007
[ « X » ] Litigation in a court of competent jurisdiction
[ « » ] Other (Specify)
ARTICLE 7 TERMINATION OR SUSPENSION
§ 7.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201–2007.
§ 7.2 The Work may be suspended by the Owner as provided in Article 14 of AIA Document A201–2007.
ARTICLE 8 MISCELLANEOUS PROVISIONS
§ 8.1 Where reference is made in this Agreement to a provision of AIA Document A201–2007 or another Contract Document, the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents.
§ 8.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the legal rate prevailing from time to time at the place where the Project is located and in accordance with G.L. c. 30, 39K.
(Insert rate of interest agreed upon, if any.)
§ 8.3 The Owner’s representative:
(Name, address and other information)
Charles Gibson – Deputy Chief of Police 20 South Water Street Nantucket, MA 02554
§ 8.4 The Contractor’s representative:
(Name, address and other information)
§ 8.5 Neither the Owner’s nor the Contractor’s representative shall be changed without ten days written notice to the other party.
§ 8.6 Other provisions:
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on
ARTICLE 9 ENUMERATION OF CONTRACT DOCUMENTS
§ 9.1 The Contract Documents, except for Modifications issued after execution of this Agreement, are enumerated in the sections below.
§ 9.1.1 The Agreement is this executed AIA Document A101–2007, Standard Form of Agreement Between Owner and Contractor.
§ 9.1.2 The General Conditions are AIA Document A201–2007, General Conditions of the Contract for Construction.
§ 9.1.3 The Supplementary and other Conditions of the Contract:
Document Title Date Pages
§ 9.1.4 The Specifications:
(Either list the Specifications here or refer to an exhibit attached to this Agreement.)
Section Title Date Pages
§ 9.1.5 The Drawings:
(Either list the Drawings here or refer to an exhibit attached to this Agreement.)
Number Title Date
§ 9.1.6 The Addenda, if any:
Number Date Pages
Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 9.
§ 9.1.7 Additional documents, if any, forming part of the Contract Documents:
.1 AIA Document E201™–2007, Digital Data Protocol Exhibit, if completed by the parties, or the following:
.2 Other documents, if any, listed below:
(List here any additional documents that are intended to form part of the Contract Documents. AIA
Document A201–2007 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor’s bid are not part of the Contract
Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.)
« Instructions to Bidders, Contractor’s Bid, Payment Bond and Performance Bond »
ARTICLE 10 INSURANCE AND BONDS
The Contractor shall purchase and maintain insurance and provide bonds as set forth in Article 11 of AIA Document A201–2007.
AIA Document A101™ – 2007. Copyright © 1915, 1918, 1925, 1937, 1951, 1958, 19 61, 1963, 1967, 1974, 1977, 1987, 1991, 1997 and 20 07 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 09:53:1 1 on
(State bonding requirements, if any, and limits of liability for insurance required in Article 11 of AIA Document
A201–2007.)
Type of insurance or bond Limit of liability or bond amount ($0.00)
This Agreement entered into as of the day and year first written above.
OWNER (Signature) CONTRACTOR (Signature)
(Printed name and title) (Printed name and title)
I hereby certify that an appropriation in the amount of this contract is available therefor and that the ____________________ of the Town of Nantucket (authorized signatory) has been authorized to execute said contract on behalf of the Owner and approve all requisitions and change orders.
Town Accountant
PAYMENT BOND
March 01, 2011 - BID
SECTION 00620
KNOW ALL MEN BY THESE PRESENTS: That we ___________________________________
________________________________ a___________________________________________
(Name of Contractor) (Corporation, Partnership, Joint Venture or Individual) hereinafter called "Principal" and ______________________________ of _________________, (Surety)
State of ________________________ hereinafter called the “Surety” and licensed by the State
(City and State)
Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the Town of Nantucket, Massachusetts, hereinafter called "Owner", in the penal sum of
_________________________________________ Dollars($___________________) in lawful money of the United
States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the Owner, dated the ______________ day of __________________, 2018, a copy of which is hereto attached and made a part hereof for the construction described as follows:
Nantucket Municipal Fueling Facility for the Town of Nantucket, MA
NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such work, and all insurance premiums on said work, and for all labor, performed in such work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of this contract or to the work or to the specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.
March 01, 2011 - BID
IN WITNESS WHEREOF, this instrument is executed in ____ ( ) counterparts, each one of which shall be deemed an original, this the _________ day of _____________________, 2011.
ATTEST:
Surety
______________________________ By ______________________________
(Attorney-in-Fact)
(Address-Zip Code)
______________________________ (SEAL)
Witness as to Surety
NOTE: Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners should execute Bond.
PERFORMANCE BOND
SECTION 00610
KNOW ALL MEN BY THESE PRESENTS: That we ___________________________
(Name of Contractor) a ___________________________________________ hereinafter called “Principal” and
(Corporation, Partnership, Joint Venture or Individual)
______________________________of ______________, State of ______________________
(Surety) (City)
_________________________ hereinafter called the "Surety" and licensed by the State Division of
Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the Town of Nantucket, Massachusetts, hereinafter called "Owner", in the penal sum of
______________________________________________________ Dollars ($_________________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.
THE CONDITION OF THIS OBLIGATION is such that whereas the Principal has entered into a certain contract with the Owner (the “Construction Contract”), dated the __________ day of
_________________, 2018, for the construction described as follows:
Nantucket Municipal Fueling Facility for the Town of Nantucket, MA
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions, and agreements of the Construction Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without notice to the Surety, and if he shall satisfy all claims and demands incurred under the
Construction Contract, and shall fully indemnify and save harmless the Owner from all costs and damages which it may suffer by reason of failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, then this obligation shall be void; otherwise, this obligation shall remain in full force and effect.
PROVIDED, FURTHER, that the Surety’s obligation under this Bond shall arise after
(1) the Owner has declared the Principal in default of the Construction Contract or any provision thereof, or (2) has declared that the Principal has failed, or is otherwise unable or unwilling, to execute the work consistent with, and in conformance to, the Construction Contract (collectively referred to as a “Contractor Default”). The determination of a Contractor Default shall be made solely by the Owner. The Owner need not terminate the Construction Contract to declare a
Contractor Default or to invoke its rights under this Bond.
When the Surety’s obligation under this Bond arises, the Surety, at its sole expense and at the consent and election of the Owner, shall immediately take one of following steps: (1) arrange for the
Principal to perform and complete the work of the Construction Contract; (2) arrange for a contractor other than the Principal to perform and complete the work of the Construction Contract;
(3) reimburse the Owner, in a manner and at such time as the Owner shall decide, for all costs and expenses incurred by the Owner in performing and completing the work of the Construction
Contract. Surety will keep Owner reasonably informed of the progress, status and results of its investigation of any claim of the Owner.
If the Surety does not proceed as provided in this Bond with due diligence and all deliberate speed, the Surety shall be deemed to be in default of this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner.
After the Surety’s obligation under this Bond arises, the Surety is obligated, to the limit of the amounts of this Bond, for (1) the correction of defective work and completion of the
Construction Contract; (2) additional design, professional services, and legal costs, including attorney’s fees, resulting from the Contractor Default or from the default of the Surety under this
Bond; (3) any additional work beyond the Construction Contract made necessary by the Contractor
Default or default of the Surety under this Bond; and (4) liquidated damages as provided in the
Construction Contract, or if none are so specified, actual damages and consequential damages resulting from the Contractor Default or any default of the Surety under this Bond.
Any proceeding, legal or equitable, under this Bond shall be instituted in any court of competent jurisdiction in the Commonwealth of Massachusetts.
The Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Construction Contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Construction Contract or to the work or to the specifications.
IN WITNESS WHEREOF, this instrument is executed in _____ ( ) counterparts, each one of which shall be deemed an original, this the __________ day of ____________________, 2018.
Principal
(Principal Secretary)
Witness as to Principal
Surety
(Attorney-in-Fact)
Witness as to Surety
NOTE: Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners should execute Bond.
180484
AIA
Document A201 TM – 1997
General Conditions of the Contract for Construction
AIA Document A201™ – 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 16:05:4 3 on 02/12/2009 under Order No.1000350949_1 which expire s on 4/6/2009, and is not for resale.
User Notes: (3464252729)
ADDITIONS AND DELETIONS:
The author of this document has added information needed for its completion.
The author may also have revised the text of the original AIA standard form.
An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.
This document has important legal consequences.
Consultation with an attorney is encouraged with respect to its completion or modification.
This document has been approved and endorsed by The Associated General Contractors of America
ELECTRONIC COPYING of any portion of this AIA ® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.
for the following PROJECT:
(Name and location or address):
Nantucket Municipal Fueling Facility 4 Fairgrounds Road Nantucket, MA 02554
THE OWNER:
(Name and address):
Town of Nantucket 16 Broad Street, First Floor Nantucket, MA 02554
THE ARCHITECT:
(Name and address):
Kaestle Boos Associates, Inc.
325 Foxborough Boulevard Suite 100
TABLE OF ARTICLES
1 GENERAL PROVISIONS
2 OWNER
3 CONTRACTOR
4 ADMINISTRATION OF THE CONTRACT
5 SUBCONTRACTORS
6 CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS
7 CHANGES IN THE WORK
8 TIME
9 PAYMENTS AND COMPLETION
10 PROTECTION OF PERSONS AND PROPERTY
11 INSURANCE AND BONDS
12 UNCOVERING AND CORRECTION OF WORK
13 MISCELLANEOUS PROVISIONS
14 TERMINATION OR SUSPENSION OF THE CONTRACT
AIA Document A201 ™ – 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1 963, 1966, 1970, 1976, 1987 and 1997 by The American Institute of Architects . All rights reserved. WARNING: This AIA ® Document is protected by U.S. Copyright Law and In ternational Treaties. Unauthorized reproduction or distribution of this AIA ® Document, or any portion of it, may result in seve re civil and criminal penalties, and will be prosecuted to the maximum ex tent possible under the law. This draft was produced by AIA software at 16:05:4 3 on
INDEX
(Numbers and Topics in Bold are Section Headings)
Acceptance of Nonconforming Work
9.6.6, 9.9.3, 12.3
Acceptance of Work 9.6.6, 9.8.2, 9.9.3, 9.10.1, 9.10.3, 12.3 Access to Work
3.16, 6.2.1, 12.1
Accident Prevention 4.2.3, 10 Acts and Omissions 3.2, 3.3.2, 3.12.8, 3.18, 4.2.3, 4.3.8, 4.4.1, 8.3.1, 9.5.1, 10.2.5, 13.4.2, 13.7, 14.1 Addenda 1.1.1, 3.11 Additional Costs, Claims for 4.3.4, 4.3.5, 4.3.6, 6.1.1, 10.3 Additional Inspections and Testing 9.8.3, 12.2.1, 13.5 Additional Time, Claims for 4.3.4, 4.3.7, 8.3.2
ADMINISTRATION OF THE CONTRACT
3.1.3, 4, 9.4, 9.5 Advertisement or Invitation to Bid 1.1.1 Aesthetic Effect 4.2.13, 4.5.1 Allowances
3.8
All-risk Insurance 11.4.1.1 Applications for Payment
4.2.5, 7.3.8, 9.2, 9.3, 9.4, 9.5.1, 9.6.3, 9.7.1, 9.8.5, 9.10, 11.1.3, 14.2.4, 14.4.3 Approvals 2.4, 3.1.3, 3.5, 3.10.2, 3.12, 4.2.7, 9.3.2, 13.4.2, 13.5 Arbitration
4.3.3, 4.4, 4.5.1, 4.5.2, 4.6, 8.3.1, 9.7.1, 11.4.9, 11.4.10 Architect
4.1
Architect, Definition of 4.1.1 Architect, Extent of Authority 2.4, 3.12.7, 4.2, 4.3.6, 4.4, 5.2, 6.3, 7.1.2, 7.3.6, 7.4, 9.2, 9.3.1, 9.4, 9.5, 9.8.3, 9.10.1, 9.10.3, 12.1, 12.2.1, 13.5.1, 13.5.2, 14.2.2, 14.2.4 Architect, Limitations of Authority and Responsibility 2.1.1, 3.3.3, 3.12.4, 3.12.8, 3.12.10, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 4.2.6, 4.2.7, 4.2.10, 4.2.12, 4.2.13, 4.4, 5.2.1, 7.4, 9.4.2, 9.6.4, 9.6.6 Architect's Additional Services and Expenses 2.4, 11.4.1.1, 12.2.1, 13.5.2, 13.5.3, 14.2.4 Architect's Administration of the Contract
3.1.3, 4.2, 4.3.4, 4.4, 9.4, 9.5 Architect's Approvals 2.4, 3.1.3, 3.5.1, 3.10.2, 4.2.7 Architect's Authority to Reject Work 3.5.1, 4.2.6, 12.1.2, 12.2.1 Architect's Copyright 1.6 Architect's Decisions 4.2.6, 4.2.7, 4.2.11, 4.2.12, 4.2.13, 4.3.4, 4.4.1, 4.4.5, 4.4.6, 4.5, 6.3, 7.3.6, 7.3.8, 8.1.3, 8.3.1, 9.2, 9.4, 9.5.1, 9.8.4, 9.9.1, 13.5.2, 14.2.2, 14.2.4 Architect's Inspections 4.2.2, 4.2.9, 4.3.4, 9.4.2, 9.8.3, 9.9.2, 9.10.1, 13.5 Architect's Instructions 3.2.3, 3.3.1, 4.2.6, 4.2.7, 4.2.8, 7.4.1, 12.1, 13.5.2 Architect's Interpretations 4.2.11, 4.2.12, 4.3.6 Architect's Project Representative 4.2.10 Architect's Relationship with Contractor 1.1.2, 1.6, 3.1.3, 3.2.1, 3.2.2, 3.2.3, 3.3.1, 3.4.2, 3.5.1, 3.7.3, 3.10, 3.11, 3.12, 3.16, 3.18, 4.1.2, 4.1.3, 4.2, 4.3.4, 4.4.1, 4.4.7, 5.2, 6.2.2, 7, 8.3.1, 9.2, 9.3, 9.4, 9.5, 9.7, 9.8, 9.9, 10.2.6, 10.3, 11.3, 11.4.7, 12, 13.4.2, 13.5 Architect's Relationship with Subcontractors 1.1.2, 4.2.3, 4.2.4, 4.2.6, 9.6.3, 9.6.4, 11.4.7 Architect's Representations 9.4.2, 9.5.1, 9.10.1 Architect's Site Visits 4.2.2, 4.2.5, 4.2.9, 4.3.4, 9.4.2, 9.5.1, 9.9.2, 9.10.1, 13.5 Asbestos 10.3.1 Attorneys' Fees 3.18.1, 9.10.2, 10.3.3 Award of Separate Contracts 6.1.1, 6.1.2 Award of Subcontracts and Other Contracts for
Portions of the Work
5.2
Basic Definitions
1.1
Bidding Requirements 1.1.1, 1.1.7, 5.2.1, 11.5.1 Boiler and Machinery Insurance
11.4.2 Bonds, Lien 9.10.2 Bonds, Performance, and Payment 7.3.6.4, 9.6.7, 9.10.3, 11.4.9, 11.5 Building Permit 3.7.1 Capitalization
1.3
Certificate of Substantial Completion
AIA Document A201 ™ – 1997. Copyright © 1911, 1915, 1918, 1925, 1937, 1951, 1958, 1961, 1 963, 1966, 1970, 1976,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .