This is a Bid Proposal document for the City of Los Angeles, Department of Public Works, Bureau of Engineering, for Vision Zero Phase 2H, Backlog Reduction Phase 3, and REAP 2.0 Traffic Signal Improvements (Work Order E1909558). The project consists of traffic signal installations, pedestrian improvements, street lighting modifications, and associated street construction across multiple City intersections designed to enhance traffic safety and reduce the backlog of needed signal improvements. The bid proposal encompasses three plan sets with 212 line items covering street removals, street construction, utility adjustments, traffic signal installations, street lighting, signing and striping work. Bidders must submit proposals by 10:00 a.m. on December 16, 2026, at Los Angeles City Hall, Room 355. The completion time is 360 working days with liquidated damages of $3,000 per calendar day. A pre-bid meeting is scheduled for November 17, 2026, at 10:00 a.m. via Google Meet, and the written technical question deadline is November 25, 2026. The City's anticipated participation levels include 4% Minority-owned Business Enterprises (MBE), 2% Women-owned Business Enterprises (WBE), 25% Small Business Enterprises (SBE), 8% Emerging Business Enterprises (EBE), and 3% Disabled Veteran Business Enterprises (DVBE).
Bidders must meet a Mandatory Subcontracting Minimum (MSM) requirement of 25% of the total bid amount (excluding fixed cost items), and the prime contractor must perform at least 50% of contract work with its own organization. A valid State of California Contractor's License Classification "A" or combination of "C" licenses is required. Bidders must be registered with the California Department of Industrial Relations per Senate Bill 854. The document includes fixed cost allowances totaling $581,000 for items such as permits, field office, special foundations, differing site conditions, potholing, TCTMC fees, fire hydrant relocation, and clearing and grubbing. The Local Business Preference Program provides bid reductions up to 10% for Local Business Enterprises and up to 12% for City Business Enterprises, with additional reductions available based on subcontractor participation. Bidders must submit Part II (Non-Discrimination/Equal Employment Practices Certification and Affirmative Action Plan Affidavit) on the City's RAMP platform and must complete mandatory Business Inclusion Program (BIP) Outreach documentation on RAMP by 4:30 p.m. the following City working day after bids are received. The Iran Contracting Act of 2010 Compliance Affidavit is required for contracts valued at $1,000,000 or more. A bid bond equal to 10% of the total bid amount must accompany the proposal.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID PROPOSAL
In and for the
City of Los Angeles, California Department of Public Works
Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG
REDUCTION PHASE 3 & REAP 2.0
TRAFFIC SIGNAL IMPROVEMENTS
W.O. E1909558
Rev. 9/13/2017 i
TABLE OF CONTENTS
PAGE
Table of Contents…………………………………..……………..………… 2 pages
Important Notice……………………………………………………………. 5 pages
PART I
Bid Proposal ………………………………………………………………… 1-1
Schedule of Work and Prices……………………………………………… 1-2a thru 1-2k
Responsibility Questionnaire……………………………………………… 1-3a thru 1-3m
Bidder Certification Form 50………………………………..……………… 1-3n
Signature Sheet and Affidavit…………………………………………… 1-4
Bid Bond……………………………………………………………………… 1-5
List of Subcontractors………………………………………………………. 1-6 and 1-7
Vendor and/or Supplier and Broker Participation Recognition………… 1-8
Certification of Compliance with Child Support Obligations…………… 1-9
Equal Benefits Ordinance/First Source Hiring Ordinance …………… 1-10
Iran Contracting Act of 2010 Compliance Affidavit or NOT USED…. 1-11a thru 1-11c
PART II
City of Los Angeles Non-Discrimination, Equal Employment Practices, Affirmative Action Requirements for Construction Contractors………… 2-1 and 2-2
PART III
Board of Public Works Business Inclusion Program (BIP) Outreach… 3-1 thru 3-22
PART IV
General Instructions and Information for Bidders……..………….…… 4-1 thru 4-7
Senate Bill 854…………………………………………………………… 1 page
Required Insurance and Minimum Limits………………………….…… 1 page
Stipulated Unit Prices (2021)………………………………….…………… 13 pages
Department of Water & Power Standard Drawing……………………… 6 pages
Holiday Season Street Closure Restrictions…………………………… 9 pages
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Rev. 9/13/2017 ii
PART IV (Cont.)
Board of Public Works Mandatory Subcontracting Minimum………… 2 pages
Board of Public Works “Zero Sanitary Sewer Overflows” Policy…….… 3 pages
City of Los Angeles Labor Compliance Manual………………………… 13 pages
Important Notice Section…………………………………………………… 1 page
Equal Benefits Ordinance………………………………………………… 4 pages
Municipal Lobbying Ordinance……………………………………..……… 24 pages
Disclosure Ordinances Affidavit…………………………………….…… 1 page
Local Business Preference Program……………………………………… 7 pages
Construction & Demolition Waste Recycling Ordinance Compliance Packet (supersedes General Conditions, Article 00221 and General Requirements, Section 01572) …………………………………………… 12 pages
Contractors' Use of Criminal History for Consideration of Employment Applications Ordinance…………………….…………………………….. 1 page
Contractor Evaluation Program…………….. …………………….……… 1 page
Contractor Special Recognition Program.. …………………….………
1 page
Buy Clean California Act Implementation……………………………… 2 pages
Executive Directive 35 Equitable Access to Contracting Opportunities...1 page
ATTACHMENTS
1. Plan Drawings, Index No. D-35993 (182 sheets)
2. Specifications
a. General Conditions
b. General Requirements
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Rev. 02/22/2022 Page 1 of 5
IMPORTANT NOTICE
A. BIDDER’S SUBMITTALS
Part I - Must be properly completed and submitted to the Board of Public Works no later than the time and date designated on Page 1-1 of the Proposal at Los Angeles City Hall, 200 N. Spring Street, Room 355, Los Angeles, California 90012, Attention: Contract Section.
Changes have been made to the documentation and submittal procedures for the Equal Benefits Ordinance. Refer to the Ordinance in the Table of Contents for additional information.
Part II - Bidders are required to complete and upload the Non-Discrimination/Equal Employment Practices Certification and Affirmative Action Plan Affidavit on the City’s Regional Alliance Marketplace for Procurement (RAMP) at the time of registration on RAMP, but no later than the bid date designated on Page 1-1 of the Proposal. However, Bidders with current OCC approval for their Non- Discrimination/Equal Employment Practices Certification and Affirmative Action Plan Affidavit do not need to re-submit unless the approval is 30 days or less from expiration. In lieu of the Los Angeles City Affirmative Action Plan, the bidder may submit its own Affirmative Action Plan by uploading it onto the City’s RAMP. A bidder’s compliance with the aforementioned Non- Discrimination/Equal Employment Practices and Affirmative Action filing requirements will be a factor in determining the responsiveness of their bid/proposal.
The Non-Discrimination/Equal Employment Practices Certification and the City of Los Angeles Affirmative Action Plan Affidavit shall be effective for a period of twelve months from the date it was approved by the Office of Contract Compliance (OCC) or when it was uploaded onto the City’s RAMP.
Note that significant changes have been made to the documentation and submittal procedures for the Non-Discrimination/Equal Employment Practices and Affirmative Action Plan. Refer to the appropriate Ordinances in the Table of Contents for the instructions and forms. For questions regarding the documents and/or submission procedures, call (213) 847-2625. For technical questions regarding RAMP, use the support link located at the bottom of the web page.
Part III - Submission of the Business Inclusion Program (BIP) Outreach Documentation is mandatory. All bidders must perform their BIP Outreach Documentation on the City’s Regional Alliance Marketplace for Procurement (RAMP) as described in Part III of the Bid Proposal. All bidders must submit this documentation on the City’s RAMP. All BIP outreach documentation including the summary sheet must be submitted on the RAMP’s BIP Outreach Reports System and must be submitted by 4:30 p.m. of the following City working day from the date bids are received by the Board of Public Works.
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Rev. 02/22/2022 Page 2 of 5
NOTE: THE BIDDER’S FAILURE TO PASS THE BIP OUTREACH
DOCUMENTATION PROCESS WILL RENDER THE BID NON-
RESPONSIVE.
B. PRE-BID MEETING - BUSINESS INCLUSION PROGRAM (BIP) OUTREACH
(See Part III of the Proposal)
A pre-bid meeting has been scheduled for November 17, 2026 at 10:00 a.m. via Google Meet. Join by Phone: (US) +1 402-523-0234 PIN: 929 073 225# or via Video Link: meet.google.com/iry-yeip-jww.
The City highly recommends all bidders to attend the pre-bid meeting. The purposes of this meeting are to inform prospective bidders of the scope of work, discuss the submittal requirements, answer any related technical and non-technical questions, explain the provisions relative to the utilization of MBEs, WBEs, OBEs, Small Business Enterprises (SBE), Emerging Business Enterprises (EBE), and Disabled Veteran Business Enterprises (DVBE) and describe how to submit the BIP Outreach Documentation using the City’s RAMP and explain how to obtain a complete set of bid documents, including all addenda, for this project through the City’s RAMP.
The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% (See Part III of the Proposal).
C. BIDDER INFORMATION AND ASSISTANCE
Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to:
Adam Driscoll LADOT Design 100 S. Main St., 9th Floor Los Angeles CA, 90012 E-MAIL: adam.driscoll@lacity.org
The deadline for receipt of written technical questions is November 25, 2026.
D. MANDATORY SUBCONTRACTING MINIMUM (MSM) REQUIREMENT
(See Part IV of the Proposal)
To be eligible for award of this project, the Board of Public Works requires the bidder to subcontract a minimum of 25% of the Total Bid Amount (excluding the Fixed Cost Items designated in the Schedule of Work and Prices) to any qualified, available subcontractor. FAILURE BY THE BIDDER TO SUBCONTRACT THE MINIMUM
PERCENTAGE SPECIFIED HEREIN MAY RESULT IN THE BOARD OF PUBLIC
WORKS DECLARING THE BID NON-RESPONSIVE.
E. CONTRACTOR PARTICIPATION
The Prime Contractor shall perform, with its own organization, contract work amounting to at least 50% of the contract price. Any items designated as specialty items by the City
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Rev. 02/22/2022 Page 3 of 5 and performed by Subcontractors shall be deducted from the contract price before computing the amount of the work required to be performed by the Prime Contractor with its own forces. This percentage shall be based upon the original contract price, exclusive of specialty items performed by Subcontractors, but include the cost of materials and manufactured products purchased or produced by the Prime Contractor.
F. CONTRACTOR’S LICENSE CLASSIFICATION REQUIRED TO BID
At the time of bid, the contractor must possess a valid State of California Contractor's License Classification of "A" or a combination of “C” licenses.
G. CALIFORNIA STATE SENATE BILL 854:
I. Contractors are advised of the following changes made by California State
Senate Bill 854 to the State of California Department of Industrial Relations:
1. No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the California Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].
2. No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the DIR pursuant to Labor Code section 1725.5.
3. DIR maintains a current list of registered contractors.
https://efiling.dir.ca.gov/PWCR/Search.action
II. Please see the one-page section, “Senate Bill 854” in Part IV of the Bid
Proposal for more information about Senate Bill 854.
H. PLANHOLDERS LIST
The Planholders List is available 24 hours a day and can be obtained via the Bureau of Engineering’s web site at http://eng.lacity.org. Click on Contractors tab; and then click on PLANHOLDERS LIST link.
I. LOCAL BUSINESS PREFERENCE PROGRAM
This project is subject to the provisions of the City’s Local Business Preference Program. Los Angeles Administrative Code Division 10, Chapter 1, Article 4, Section
10.25 adopted the Local Business Preference (LBP) Program which was designed to increase local employment and expenditures in the local private sector. All Bidders are eligible to participate in the LBP Program. The City shall grant a six percent (6%) bid reduction of their Bid amount solely for Bid evaluation purposes to those bidders who are certified as a Local Business Enterprise (LBE) firm. If the LBE is also a Local Small Business (LSB) and/or Local Transitional Employer (LTE), they may be granted an additional two percent (2%) reduction for each of those certifications, up to a total of ten percent (10%). The City shall grant a ten percent (10%) bid reduction of their Bid
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558 https://efiling.dir.ca.gov/PWCR/Search.action http://eng.lacity.org/
Rev. 02/22/2022 Page 4 of 5 amount solely for Bid evaluation purposes to those Bidders who are certified as a City Business Enterprise (CBE) firm. If the CBE is also a LSB and/or LTE, they may be granted an additional two percent (2%) reduction for each of those certifications, up to a maximum of twelve percent (12%). Additionally, all non-LBE/CBE Bidders may be granted a one percent (1%) bid reduction of their Bid amount solely for Bid evaluation purposes, up to a maximum of five percent (5%), for every ten percent (10%) of their bid that is to be performed by a LBE, CBE, LSB and/or LTE subcontractor.
J. IRAN CONTRACTING ACT OF 2010
In accordance with California Public Contract Code Sections 2200-2208, all bidders submitting proposals for entering into or renewing contracts with the City of Los Angeles for goods and services estimated at $1,000,000 or more are required to complete, sign and submit the “Iran Contracting Act of 2010 Compliance Affidavit.”
K. ELECTRONIC SIGNATURE POLICY
(Types of Documents Permitted for Electronic and Scanned Signature)
This Policy is intended to broadly support the use of electronic signatures.
Departments are encouraged to consult with the City Attorney’s Office if Departments are uncertain if the electronic/scanned signature is acceptable for a document.
However, below are examples of the types of documents where electronic/scanned signatures are allowed:
1. Memos, forms, board letters and other correspondence Electronic/Scanned
2. Contracts Electronic/Scanned
3. Certificates and Permits Electronic/Scanned
4. Notarized Document Scanned
Please note that Ethics Form 50 and 55 must be signed via a software that is accepted by the Ethics Commission (i.e. DocuSign, Adobe). (Issued March 19, 2020)
L. BUY CLEAN CALIFORNIA ACT (BCCA)
I. For projects with a bid due date on or after July 1, 2021 that include eligible materials as part of the permanent work, the successful bidder shall be required to provide current facility-specific Environmental Product Declaration (EPD) for the materials and meet the State of California maximum limits for Global Warming Potential as listed by California's Department of General Services with the applicable submittal.
https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division- Resources-List-Folder/Buy-Clean-California-Act
II. Please see the two-page section, “Buy Clean California Act Implementation” in Part IV of the Bid Proposal for more information about Buy Clean California Act.
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558 https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act https://www.dgs.ca.gov/PD/Resources/Page-Content/Procurement-Division-%20%20%20%20%20%20%20%20%20%20%20Resources-List-Folder/Buy-Clean-California-Act
Rev. 02/22/2022 Page 5 of 5
THE DOCUMENTS CONTAINED HEREIN HAVE BEEN APPROVED BY:
Arsen Voskerchyan, P.E.
Division Engineer Project Award and Control Division Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
PART I
Print and submit with your bid Part I single-sided only except for the “Equal Benefits Ordinance Affidavit” which will be submitted on RAMP.
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
1-1 Rev. 9/20/2017
PART I OF IV
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP
2.0 TRAFFIC SIGNAL IMPROVEMENTS
In and for the City of Los Angeles
California
TYPE OF CONTRACT CASH
PROPOSAL ATTACHMENTS Plan Drawings: Index No. D-35993 (182 sheets)
SPECIFICATIONS General Conditions, General Requirements, Standard Specifications for Public Works Construction (Greenbook) 2012, 2014, 2017, and 2021 Edition* as amended by the City's Brown Book, May 4, 2022 Edition*.
PROJECT LOCATION See Plan Drawings
COMPLETION TIME 360 Working Days
LIQUIDATED DAMAGES $3,000 per Calendar Day
BID DATE
Bids must be received no later than 10:00 a.m. on December 16, 2026 at Los Angeles City Hall, 200 North Spring Street, Room 355; Los Angeles, California 90012. Call the Board Office at (213) 978-0262 if you have difficulties gaining access to City Hall.
Firm Name:
Address:
Telephone Number: ( ) Fax Number: ( )
Email Address:
Contractor's License Number: Classification: Expiration Date:
Business Tax Registration Certificate (BTRC) No.:
* Part 1 of the Greenbook and Brown Book are not a part of the Specifications.
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
1 Allowance for Payment for Permits (GR Section 01292) 48,000.00$
Allowance for Field Office and Field Communications (Special
Provisions 1-4.1 & 1-4.2) 100,000.00$
3 Allowance for Special Foundations (Special Provisions 2-17.1) 50,000.00$
4 Allowance for Differing Site Conditions (GR Section 01253) 114,000.00$
Allowance for Potholing Unknown Substructures (GR Section 01253 &
01732) 63,000.00$
6 Allowance for Payment for TCTMC Fees (Special Provisions Section 1-8) 50,000.00$
7 Allowance for Relocation of Fire Hydrants 56,000.00$
8 Allowance for Clearing and Grubbing per SPPWC Section 300-1 150,000.00$
9 Allowance for Construction Surveying (GR Section 01722) 100,000.00$
Mobilization for Street Removals / Street Construction (GR Sections 01292 and 01721)
LS
11 Sawcut Pavement & Concrete (per linear ft) LF 1,974
Remove AC Pavement (Full Depth Pavement Section Replacement, Curb and
Gutter, Driveway, Alley Slot Cut Area, Alley Intersection, Longitudinal Gutter), Remove Concrete Curb Ramp & Base (per square ft)
SF 11,871
13 Remove Concrete Pavement (per square ft) SF 728
14 Remove Concrete Pavement (t=8in.) (per square ft) SF 9,149
15 Remove Type A Concrete Curb (per linear ft) LF 364
16 Remove Concrete Curb & Gutter (per linear ft) LF 1,531
17 Remove Concrete Integral Curb and Gutter (Type C) (per linear ft) LF 792
18 Remove Concrete Cross Gutter (per square ft) SF 480
19 Remove Concrete Sidewalk including Curb Ramp (t=4in.) (per square ft) SF 8,816
STREET REMOVALS
W.O. E1909558
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
SUBTOTAL (Items #1 to #9):
PLAN SET #1: VISION ZERO PHASE 2H
GENERAL
1-2a
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
SCHEDULE OF WORK AND PRICES
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
20 Roadway Excavation (per cubic yd) CY 54
21 Construct Aggregate Base 6" (per cubic yd) CY 69
22 Construct Asphalt Concrete Pavement Incl. Base (per SF) SF 5,008
23 Construct Asphalt Concrete Pavement 6" min (per ton) TON 141
24 Construct Asphalt Pavement (per Ton) SF 106
Construct Concrete Pavement Incl. Base (t=6in.min. or equal to existing) (per square ft)
SF 3,015
26 Construct Concrete Curb Ramp (t=4") (each) LF 22
Construct Curb Ramp (include: Ramp, Wings, Detectable Warning Surface
(truncated domes), Grooves & 'Q') (C&G or Retaining Curb NIC.) (per square ft)
LF 4,847
28 Construct Concrete Curb Type A (per LF) LF 789
29 Construct Concrete Curb (per linear ft) LF 390
30 Construct Concrete Curb & Gutter (per linear ft) LF 1,641
31 Construct Type C Concrete Integral Curb and Gutter (a=2ft., b=8in.) (per LF) LF 466
32 Construct Type C Concrete Integral Curb and Gutter (a=4ft., b=8in.) (per LF) SF 533
33 Construct Concrete Gutter - Longitudinal or Cross Gutter (per square ft) SF 548
34 Construct Concrete Retaining Curb (per linear ft) EA 423
35 Construct Concrete Driveway (Flare Reconstruction) (per square ft) SF 41
36 Construct Concrete Sidewalk (t=4") (per square ft) EA 3,800
37 Construct Concrete Sidewalk (Non-Decorative) (per square ft) LF 3,284
38 Construct Concrete Sidewalk Incl. Base (t=4in.) (per SF) SF 6,234
39 Install Pipe Handrail (per linear ft) LF 38
40 Remove and Construct 4in Dia. CIP Under Drain (each) EA 1
STREET CONSTRUCTION
UTILITY CONSTRUCTION
1-2b
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
41 Construct Warped Gutter at Catch Basin (per linear ft) LF 10
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
42 Adjust Pull Box to Grade (each) EA 14
43 Relocate Pull Box (each) EA 3
44 Adjust Street Lighting Pull box to Grade (each) EA 13
45 Relocate Street Lighting Pull Box (each) EA 2
46 Adjust Traffic Signal Pullbox to Grade (each) EA 8
47 Relocate Traffic Signal Pullbox to Grade (each) EA 3
48 Adjust Street Light Pole to Grade (lower adjacent grade less than 2in.) (each) EA 6
49 Adjust Street Light Pole to Grade (lower adjacent grade more than 2in.) (each) EA 1
50 Adjust Street Light Pole to Grade (raise adjacent grade less than 1/2in.) (each) EA 2
Adjust Street Light Pole to Grade (raise adjacent grade more than 1/2in.)
(each)
EA 1
52 Adjust Street Light to Grade (each) EA 8
53 Relocate Street Light (each) EA 1
54 Remove and Reinstall Sign (each) EA 26
55 Adjust Communications Vault to Grade (each) EA 1
56 Adjust Electric Vault to Grade (each) EA 1
57 Adjust Gas Valve to Grade (each) EA 1
58 Adjust Water Valve to Grade (each) EA 6
59 Adjust Water Meter to Grade (each) EA 5
60 Relocate Water Meter (each) EA 3
61 Adjust Fire Hydrant to Grade (each) EA 4
62 Adjust Maintenance Hole to Grade (each) EA 2
63 Adjust Sewer Maintenance Hole to Grade (each) EA 1
1-2c
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
64 Adjust Storm Drain Manhole (each) EA 1
65 Adjust Guy Wire to Grade (each) EA 2
66 Reestablish Survey Monument (each) EA 4
67 Remove and Reconstruct Bollard (each) EA 1
Traffic Signal Installation, Geometric Striping, and Signage on 91st St & Main
St per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Temple St &
Silverlake Blvd (Ramp) per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 103rd St & San
Pedro St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 103rd St & San Pedro St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 107th St &
Wilmington Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 107th St & Wilmington Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 10th St &
Pacific Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 10th St & Pacific Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 113th St &
Wilmington Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 113th St & Wilmington Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 118th Pl & San
Pedro St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 118th Pl & San Pedro St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 49th Pl, 50th St
& Hoover St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 49th Pl, 50th St & Hoover St per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 49th St &
Compton Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 49th St & Compton Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 49th St &
Vermont Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 49th St & Vermont Ave per
Approved Plans and Specifications
LS
TRAFFIC SIGNAL, STREET LIGHTING, SIGNING & STRIPING
1-2d
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
Traffic Signal Installation, Geometric Striping, and Signage on 53rd St &
Normandie Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 53rd St & Normandie Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 56th St &
Compton Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 56th St & Compton Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 75th St &
Central Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 75th St & Central Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 82nd St & San
Pedro St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 82nd St & San Pedro St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 8th St &
Carondelet St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 8th St & Carondelet St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 8th St & Santee
St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 8th St & Santee St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 95th St & Main
St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 95th St & Main St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Edinburgh Ave
& Beverly Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Edinburgh Ave & Beverly
Blvd per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Halldale Ave &
Vernon Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Halldale Ave & Vernon Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Lanark St &
Reseda Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Lanark St & Reseda Blvd per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Lawrence St &
Olympic Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Lawrence St & Olympic Blvd per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Roscoe Blvd &
Wakefield Ave per Approved Plans and Specifications
LS
1-2e
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
Street Lighting Installation and Modification on Roscoe Blvd & Wakefield Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 108th St, Santa
Ana Blvd & Wilmington Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 108th St, Santa Ana Blvd &
Wilmington Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 60th St, 61st St and Main St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 60th St, 61st St and Main St per Approved Plans and Specifications
LS
Traffic Signal Interconnect Installation on 107th St & Wilmington Ave per
Approved Plans and Specifications
LS
Mobilization for Street Removals / Street Construction (GR Sections 01292 and 01721)
LS
116 Remove & Haul Away Asphalt Concrete pavement (t=8 in.) (per square ft) SF 1,442
117 Remove Concrete Bus Pad (t= 8 in.) (per square ft) SF 330
118 Remove Concrete Curb (per linear ft) LF 94
119 Remove Concrete Integral Curb and Gutter (Type C) (per linear ft) LF 263
120 Remove Concrete Sidewalk including Curb Ramp (t=4in.) (per square ft) SF 2,481
121 Unclassified Excavation, including haul away (per cubic yd) CY 91
122 Construct Crushed Miscellaneous Base 4 in. (per square ft) SF 3,049
123 Construct Crushed Miscellaneous Base 8 in. (per square ft) SF 2,051
Plan Set #1 SUBTOTAL (Items #10 to #114):
Backlog Reduction Phase 3
W.O. E1909558
PLAN SET #2: Backlog Reduction Phase 3
GENERAL
STREET REMOVALS
STREET CONSTRUCTION
1-2f
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
124 Construct Asphalt Concrete Pavement (t=8") (per square ft) SF 1,636
125 Install Broom Finish Surface (per square ft) SF 47
126 Construct Concrete Curb Ramp (per square ft) SF 1,420
127 Construct Concrete Curb Type A (per LF) EA 43
128 Construct CALTRANS Type A-2 Concrete Curb & Gutter (per linear ft) LF 282
Construct Type C Concrete Integral Curb and Gutter (a= 1 ft., b= 6 in.) (per linear ft)
LF 68
130 Construct Type C Concrete Integral Curb and Gutter (a=2ft., b=8in.) (per LF) EA 36
131 Construct Concrete Intersection Gutter (per square ft) SF 108
132 Construct Concrete Retaining Curb (per linear ft) LF 69
133 Construct Concrete Sidewalk (t=4") (per square ft) SF 1,630
134 Install Pipe Handrail (per linear ft) LF 6
135 Adjust Street Lighting Pull box to Grade (each) EA 5
136 Adjust Traffic Signal Pullbox to Grade (each) EA 5
137 Relocate Traffic Signal Pullbox to Grade (each) EA 2
138 Adjust Water Valve to Grade (each) EA 1
139 Adjust Maintenance Hole to Grade (each) EA 2
Traffic Signal Installation, Geometric Striping, and Signage on Plummer St &
White Oak Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Plummer St & White Oak Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Valerio St &
Woodley Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Valerio St & Woodley Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Arleta Ave, Devonshire St & Filmore St per Approved Plans and Specifications
LS
UTILITY CONSTRUCTION
TRAFFIC SIGNAL, SIGNS, & STRIPING, STREET LIGHTING
1-2g
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
Street Lighting Installation and Modification on Arleta Ave, Devonshire St &
Filmore St per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on 6th St &
Rampart Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on 6th St & Rampart Blvd per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Arleta Ave &
Osborne per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Arleta Ave & Osborne per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Colfax Ave &
Magnolia Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Colfax Ave & Magnolia Blvd per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Fletcher Dr &
Larga Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Fletcher Dr & Larga Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Fulton Ave &
Vanowen St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Fulton Ave & Vanowen St per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Magnolia &
Hollywood Fwy NB per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Magnolia &
Hollywood Fwy SB per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Magnolia & Hollywood Fwy
SB per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Oxnard St &
Van Nuys Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Oxnard St & Van Nuys Blvd per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Pico Blvd &
Robertson Blvd per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Pico Blvd & Robertson Blvd per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Pico Blvd &
Westmoreland Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Pico Blvd & Westmoreland
Ave per Approved Plans and Specifications
LS
Plan Set #2 SUBTOTAL (Items #115 to #164):
REAP 2.0
1-2h
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
Mobilization for Street Removals / Street Construction (GR Sections 01292 and 01721)
LS
166 Sawcut Pavement & Concrete (per linear ft) LF 1,276
Remove AC Pavement (Full Depth Pavement Section Replacement, Curb and
Gutter, Driveway, Alley Slot Cut Area, Alley Intersection, Longitudinal Gutter), Remove Concrete Curb Ramp & Base (per square ft)
SF 3,877
168 Remove Concrete Pavement (per square ft) SF 1,120
169 Remove Concrete Pavement (t=8in.) (per square ft) SF 2,306
170 Remove Concrete Curb & Gutter (per linear ft) LF 599
171 Remove Concrete Integral Curb and Gutter (Type C) (per linear ft) LF 165
172 Remove Concrete Longitudinal Gutter (per square ft) SF 350
173 Remove Concrete Sidewalk including Curb Ramp (t=4in.) (per square ft) SF 3,906
174 Roadway Excavation (per cubic yd) CY 35
175 Construct Asphalt Concrete Pavement Incl. Base (per SF) EA 3,511
176 Construct Asphalt Pavement (per Ton) TON 59
Construct Concrete Pavement Incl. Base (t=6in.min. or equal to existing) (per square ft)
SF 1,140
Construct Curb Ramp (include: Ramp, Wings, Detectable Warning Surface
(truncated domes), Grooves & 'Q') (C&G or Retaining Curb NIC.) (per square ft)
SF 1,724
179 Construct Concrete Curb Type A (per LF) EA 126
180 Construct Concrete Curb (per linear ft) LF 257
181 Construct Concrete Curb & Gutter (per linear ft) LF 475
W.O. E1909558
PLAN SET #3: REAP 2.0
GENERAL
STREET REMOVALS
STREET CONSTRUCTION
1-2i
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
182 Construct Type C Concrete Integral Curb and Gutter (a=2ft., b=8in.) (per LF) EA 176
183 Construct Type C Concrete Integral Curb and Gutter (a=4ft., b=8in.) (per LF) EA 133
184 Construct Concrete Gutter - Longitudinal or Cross Gutter (per square ft) SF 215
185 Construct Concrete Retaining Curb (per linear ft) LF 197
186 Construct Concrete Driveway Incl. Base and Adjacent Curb, Gutter, & Swlk EA 55
187 Construct Concrete Driveway (Flare Reconstruction) (per square ft) SF 171
188 Construct Concrete Sidewalk (Non-Decorative) (per square ft) SF 3,484
189 Construct Concrete Sidewalk Incl. Base (t=4in.) (per SF) EA 1,301
190 Adjust Pull Box to Grade (each) EA 5
191 Relocate Pull Box (each) EA 3
192 Adjust Street Lighting Pull box to Grade (each) EA 4
193 Adjust Traffic Signal Pullbox to Grade (each) EA 5
Adjust Street Light Pole to Grade (raise adjacent grade more than 1/2in.)
(each)
EA 1
195 Adjust Street Light to Grade (each) EA 5
196 Remove and Reinstall Sign (each) EA 3
197 Adjust Gas Valve to Grade (each) EA 3
198 Adjust Water Valve to Grade (each) EA 5
199 Adjust Water Meter to Grade (each) EA 2
200 Adjust Fire Hydrant to Grade (each) EA 2
201 Adjust Maintenance Hole to Grade (each) EA 1
202 Adjust Guy Wire to Grade (each) EA 1
203 Reestablish Survey Monument (each) EA 1
UTILITY CONSTRUCTION
1-2j
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
City of Los Angeles - Department of Public Works - Bureau of Engineering
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 &
REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS
ITEM DESCRIPTION UNIT QTY. UNIT PRICE ITEM TOTAL
204 Adjust DOT Vault (each) EA 1
Traffic Signal Installation, Geometric Striping, and Signage on Beverly Blvd &
Vendome St per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Beverly Blvd & Vendome St per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Cahuenga Blvd
& Lexington Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Cahuenga Blvd & Lexington
Ave per Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Fairfax Ave &
Waring Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Fairfax Ave & Waring Ave per
Approved Plans and Specifications
LS
Traffic Signal Installation, Geometric Striping, and Signage on Gower St &
Lexington Ave per Approved Plans and Specifications
LS
Street Lighting Installation and Modification on Gower St & Lexington Ave per Approved Plans and Specifications
LS
NOTES
A. MOBILIZATION: If the successful bidder shows an amount in excess of $115,638.00 for Mobilization (Bid Item No. 10), the bidder will be paid $115,638.00 per Specification Section 01292 of the General Requirements. The difference between the
Contractor’s bid amount for Bid Item No. 1 and $115,638.00 will be paid after the Statement of Completion has been issued.
B. FIXED COST ITEMS: Bid Item Nos. 1 through 9 are considered Fixed Cost Items at the time of bid. The pre-printed dollar amounts in figures listed in the SCHEDULE OF WORK AND PRICES shall not be changed or deleted.
C. SPECIALTY ITEMS: Bid Items Nos. 40-114, 135-164, and 190-212 are designated as "Specialty Items."
TOTAL BID AMOUNT:
Unit abbreviation: LF=linear foot, SF=square foot, CY=cubic yard, TON=ton, EA=each, LS=lump sum
TRAFFIC SIGNAL, SIGNS, & STRIPING, STREET LIGHTING
Plan Set #3 SUBTOTAL (Items #165 to #212):
1-2k
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
C O N S T R U C T I O N
Responsibility Questionnaire (rev 1/23/2020) 1
CITY OF LOS ANGELES
CONTRACTOR RESPONSIBILITY ORDINANCE (CRO) QUESTIONNAIRE
Unless otherwise exempt from the Contractor Responsibility Ordinance (Los Angeles Administrative Code Section 10.40, et. seq.), a Company/Firm bidding with the City of Los Angeles must complete this Questionnaire. If no bid is required, the prospective contractor still must submit a Questionnaire.
The signatory for this Questionnaire must be authorized to respond to these questions on behalf of the Company/Firm. Any false or misleading statement(s), the failure to answer any of the required questions, or the failure to submit the completed Questionnaire with its bid may render the bid/proposal non-responsive. If a response does not fit in the space provided, then you may submit an attachment with your questionnaire.
The Company is responsible for keeping the Questionnaire responses current. If any changes have occurred that would render any of the responses inaccurate in any way, this document must be updated within thirty
(30) days of the change(s).
A. BIDDER / PROPOSER / PROSPECTIVE CONTRACTOR CONTACT INFORMATION
Business Name Contractor’s License Number
Street Address City State Zip
Contact Person, Title Phone Fax
TYPE OF SUBMISSION:
The Questionnaire being submitted is:
An initial submission of a completed Questionnaire.
An update of a prior Questionnaire dated ______/______/______.
No change. I certify under penalty of perjury under the laws of the State of California that there has been no change to any of the responses since the last Questionnaire dated ____/______/____ was submitted by the firm.
B. BUSINESS ORGANIZATION / STRUCTURE
Indicate the organizational structure of your firm. “Firm” includes a sole proprietorship, corporation, joint venture, consortium, association, or any combination thereof.
Corporation: Date incorporated: _____/_____/_____ State of incorporation:
List the corporation’s current officers.
President: __________________________________________________________________________ Vice President: ______________________________________________________________________ Secretary: __________________________________________________________________________ Treasurer:
1-3a
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Responsibility Questionnaire (rev 1/23/2020) 2
List all the stock owners who own 5% or more of the corporation’s stock. Publicly traded corporations do not need to list its stock owners.
(Use this space. If you need additional space, you can attach a document)
Partnership: Date formed: _____/_____/_____ State of formation: ____________ List all partners in your firm.
(Use this space. If you need additional space, you can attach a document)
Sole Proprietorship: Date started: _____/_____/_____ List any firm(s) that you have been associated with as an owner, partner, or officer for the last five years. Do not include ownership of stock in a publicly traded company in your response to this question.
(Use this space. If you need additional space, you can attach a document)
Joint Venture: Date formed: _____/_____/_____
(1) List each firm that is a member of the joint venture and (2) List the percentage of ownership the firm will have in the joint venture. NOTE: Each member of the Joint Venture must complete a separate Questionnaire for the Joint Venture’s submission to be considered a responsive bid.
(Use this space. If you need additional space, you can attach a document)
C. OWNERSHIP AND NAME CHANGES
1. Is your firm a subsidiary, parent, holding company, or affiliate of another firm?
Yes No
If Yes, explain the relationship between your firm and the associated firm(s). Include information about an affiliated firm only if one firm owns 50% or more of another firm, or if an owner, partner or officer of your firm holds a similar position in another firm.
(Use this space. If you need additional space, you can attach a document)
1-3b
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Responsibility Questionnaire (rev 1/23/2020) 3
2. Have any of your firm’s owners, partners, or officers operated a similar business in the past five years?
Yes No
If Yes, list the names and addresses of all such businesses, and the person who operated the business. Include information about a similar business only if an owner, partner or officer of your firm holds a similar position in another firm.
(Use this space. If you need additional space, you can attach a document)
3. Has your firm changed names in the past five years?
Yes No
If Yes, list all prior names, addresses, and the dates they were used. Explain the reason for each name change in the last five years.
(Use this space. If you need additional space, you can attach a document)
4. Are any of your firm’s contractor licenses held in the name of a corporation or partnership?
Yes No
If Yes, list the name of the corporation or partnership that actually holds the license.
(Use this space. If you need additional space, you can attach a document)
D. FINANCIAL RESOURCES AND RESPONSIBILITY
5. In the past five years, has your firm ever been denied construction bonding?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
1-3c
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Responsibility Questionnaire (rev 1/23/2020) 4
6. Is your firm now, or has it been at any time in the last five years, the debtor in a bankruptcy case?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
7. Is your firm in the process of, or in negotiations toward, being sold or dissolved?
Yes No
If Yes, explain the circumstances.
(Use this space. If you need additional space, you can attach a document)
E. INSURANCE
8. In the past five years, has any bonding company made any payments to satisfy any claims made against a bond issued on your firm’s behalf?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
9. Indicate the status of your firm’s current workers’ compensation insurance policy (check one):
Workers’ Compensation Insurance Policy Currently in Effect Legally Self-Insured No Workers’ Compensation Policy Currently in Effect*
*If you do not have a worker’s compensation insurance policy currently in effect, and you are not legally self-insured, provide an explanation.
(Use this space. If you need additional space, you can attach a document)
1-3d
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Responsibility Questionnaire (rev 1/23/2020) 5
10. List the Experience Modification Rate (EMR) issued to your firm annually by your workers’ compensation insurance carrier for the last three years. Begin with the most recent year (YR 1) that an EMR rate was issued (EMR -1). If any of the rates for the three years is or was 1.00 or higher, provide an explanation below.
YR. 1: EMR-1: YR 2: EMR-2: YR. 3: EMR-3:
(Use this space. If you need additional space, you can attach a document)
11. Within the past five years, has your firm employed workers that were not covered under workers’ compensation insurance or state approved self-insurance?
Yes No
If Yes, explain each instance. If No, attach a statement from your workers’ compensation insurance provider that you have been continuously insured for the past five years.
(Use this space. If you need additional space, you can attach a document)
F. PERFORMANCE HISTORY
12. How many years has your firm been in operation? _______ Years.
13. Has your firm ever entered into any contract with the City of Los Angeles or any of its departments?
Yes No
If, Yes, list all contracts your firm has had with the City of Los Angeles for the last five (5) years. If your firm has had more than 10 contracts with the City of Los Angeles, then use the 10 most recent (and most similar) contracts. For each contract listed in response to this question, include: (a) entity name; (b) name of a contact and phone number; (c) purpose of contract; (d) total cost; (e) starting date; and (f) ending date.
(Use this space. If you need additional space, you can attach a document)
14. List all contracts that require similar work as the current bid/proposal in which your firm has had with any private or governmental entity (other than the City of Los Angeles) over the last five years. If your firm has had more than 10 contracts with similar work with any private or other governmental entities, then use the 10 more recent (and most similar) contracts. For each contract listed in response to this question, 1-3e
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Responsibility Questionnaire (rev 1/23/2020) 6 include: (a) entity name; (b) name of a contact and phone number; (c) purpose of contract; (d) total cost;
(e) starting date; and (f) ending date.
(Use this space. If you need additional space, you can attach a document)
15. In the past five years, has a governmental or private entity or individual terminated your firm’s contract prior to its completion?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
16. In the past five years, has your firm previously hired a debarred subcontractor to perform work on a government contract?
Yes No If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
17A. In the past five years, has your firm been debarred or determined to be a non-responsible bidder or contractor?
Yes No
If Yes, explain the circumstances surrounding each instance.
(Use this space. If you need additional space, you can attach a document)
17B.. Has your firm ever received a Notice of Unsatisfactory Performance by the Bureau of Contract Administration pursuant to the City Contractor’s Performance Evaluation Ordinance (LAAC Section 10.39)?
Yes No
If Yes, please enter the date of the Notice(s).
1-3f
VISION ZERO PHASE 2H, BACKLOG REDUCTION PHASE 3 & REAP 2.0 TRAFFIC SIGNAL IMPROVEMENTS - W.O. E1909558
Responsibility Questionnaire (rev 1/23/2020) 7
G. DISPUTES
18A. In the past five years, has your firm been a defendant in a court case or other legal proceeding on a matter related to any of the following issues? For parts (a) and (b) below, check Yes even if the matter only proceeded to arbitration, mediation or other dispute resolution process. For part (c), check Yes only if the matter proceeded to court litigation, even if the case was later settled or dismissed.
(a) Payment to subcontractors?
Yes No
(b) Work performance on a contract?
Yes No
(c) Employment-related litigation brought by an employee?
Yes No
18B. If you answer Yes to any of the questions below, explain the circumstances surrounding each instance.
For each instance, you must include the following in your response: the name of the plaintiff(s), the specific cause(s) of action or claim(s), the original…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .