Vineyard Drive Corridor East Enhancements.pdf

PDF 58 MB Posted

Attached to
Vineyard Drive Corridor East Enhancements
Solicitation number
300725
Issued by
San Luis Obispo County, San Francisco City, California

About this file

This is a Project Description document for the Vineyard Drive Corridor East Enhancements project administered by the State of California. The project encompasses new construction of sidewalks, curb ramps, extension of a right turn lane from Vineyard Drive to South Main Street, striping upgrades, and various corridor improvements along Vineyard Drive extending from Bennett Way to Main Street. The scope of work includes infrastructure enhancements designed to improve pedestrian accessibility, traffic flow, and overall corridor functionality in the project area.

The document establishes the framework for the proposed improvements to the Vineyard Drive corridor, detailing the specific infrastructure upgrades and construction activities required for project completion. Contractors bidding on this opportunity should review the comprehensive project specifications, site conditions, and technical requirements outlined in the document to prepare accurate proposals and cost estimates for the corridor enhancement work.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .