Summary

This is a Request for Qualifications (RFQ) for Progressive Design-Build services issued by the City of San Diego for the Villa La Jolla Storm Drain System Lining project. The project involves the repair and rehabilitation of approximately 2,450 linear feet of 132-inch and 860 linear feet of 180-inch multi-plate corrugated metal pipe (CMP) storm drain, including subsurface void repairs, installation of access structures, and related appurtenances. The work is located between La Jolla Village Drive and Via Alicante in San Diego, California. Statements of Qualifications are due by 2:00 PM on January 6, 2027, submitted electronically through the City's PlanetBids system. A mandatory online pre-submittal meeting is scheduled for December 1, 2026, at 10:00 AM (PST) via Microsoft Teams, and an optional pre-submittal site visit is scheduled for December 9, 2026, at 1:00 PM at Gilman Drive & Via Alicante. The City will shortlist no more than three qualified Progressive Design-Builders to proceed to Step 2 (RFP). The two-phase approach includes a preconstruction phase (Phase 1) for design development and a construction phase (Phase 2) subject to City approval of a Guaranteed Maximum Price (GMP).

The estimated combined cost for preconstruction and construction is $50,000,000. Contractors must possess a California State Contractor's License with Classification A and must be prequalified with the City at a level equal to or greater than the engineer's estimate. The project is subject to prevailing wage rates (both state and federal), a Project Labor Agreement with the San Diego Building and Construction Trades Council, apprenticeship requirements, and Equal Opportunity Contracting Program (EOCP) provisions. This is a Water Infrastructure Finance and Innovation Act (WIFIA) program funded project through the Environmental Protection Agency (EPA). The work is subject to the City's Nondiscrimination in Contracting Ordinance and Equal Employment Opportunity Outreach Program, with compliance reporting required through the City's web-based Prism compliance application. Contractors must comply with California's In-Use Off-Road Diesel Fueled Fleet Regulation and provide a Jobs Coordinator to assist with achieving local worker goals under the Project Labor Agreement.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of San Diego

CONTRACTOR’S NAME:

ADDRESS:

TELEPHONE NO.: FAX NO.:

CITY CONTACT: Rosa Riego, Senior Contract Specialist, Email: RRiego@sandiego.gov

Phone No. (619) 533-3426 D. Yelsits / J. Limon / R. Sigston

REQUEST FOR QUALIFICATIONS

FOR PROGRESSIVE DESIGN BUILD SERVICES

(Step 1 of 2)

FOR

VILLA LA JOLLA STORM DRAIN

SYSTEM LINING

RFQ NO.: K-27-2496-PDB2-3-C

SAP NO. (WBS/IO/CC): S-26001

CLIENT DEPARTMENT: 2114

COUNCIL DISTRICT: 1

PROJECT TYPE: CA

THIS PROJECT IS SUBJECT TO THE FOLLOWING:

PROJECT LABOR AGREEMENT

FEDERAL EQUAL OPPORTUNITY CONTRACTING REQUIREMENTS

ELIGIBLE FOR JOINT VENTURE PREQUALIFICATION STATUS

PREVAILING WAGE RATES: STATE FEDERAL

APPRENTICESHIP

THIS IS A WIFIA FUNDED CONTRACT THROUGH THE DEPARTMENT OF ENVIRONMENTAL

PROTECTION AGENCY (EPA).

STATEMENT OF QUALIFICATIONS (SOQ) DUE:

2:00 PM

JANUARY 6, 2027

CITY OF SAN DIEGO’S ELECTRONIC BIDDING SITE, PLANETBIDS

http://www.sandiego.gov/cip/bidopps/

TABLE OF CONTENTS

SECTION PAGE NUMBER

1. INTRODUCTION

2. EQUAL OPPORTUNITY CONTRACTING PROGRAM PROVISIONS

3. ESTIMATED PROJECT COST

4. PROJECT DESCRIPTION

5. LICENSE REQUIREMENT

6. PROJECT LABOR AGREEMENT

7. PROJECT SCHEDULE

8. PREQUALIFICATIONS OF CONTRACTORS

9. NOMINATING AND SELECTION PROCESS

10. PRE-SUBMITTAL ACTIVITIES

11. ADDITIONAL TERMS AND CONDITIONS

ATTACHMENTS

A. Project Description, Scope of Work, and Bridging Documents

B. Submittal Requirements - Evaluation Criteria

C. Equal Opportunity Contracting Program…………………………………………………………27

D. In-Use Off-Road Diesel Fueled Fleet Regulation (Off-Road Regulation) Compliance (CARB)

E. Certification of Exceptions To Request For Qualifications

F. Preliminary Risk Matrix

G. (DRAFT) Step-2 Request for Proposal (RFP)

Villa La Jolla Storm Drain System Lining

K-27-2496-PDB2-3-C

3 | Page

REQUEST FOR QUALIFICATIONS

1. INTRODUCTION

1.1 PURPOSE: The City of San Diego (City) is requesting Statements of Qualifications (SOQ) for Progressive Design-Build (PDB) services for the preconstruction and construction phases of Villa La Jolla Storm Drain System Lining (Project). This Request for Qualifications (RFQ) is the first step in the City of San Diego's (City) procurement process for the selection of a qualified Progressive Design-Builder for the Project. The City will not reimburse Progressive Design-Builders for costs incurred in the preparation, submittal and participation in the RFQ process. This RFQ does not commit the City to award a contract, or to procure or contract for work.

1.2 PROGRESSIVE DESIGN BUILD DELIVERY OVERVIEW: In accordance with San Diego Municipal Code §§ 22.3308, the City has selected to utilize a PDB approach for the procurement and delivery of the Project, the Progressive Design-Builder will be selected primarily based on demonstrated competence and on the professional qualifications necessary for the satisfactory performance of the professional services required. This approach does not require a complete project price proposal during the selection process. The selected Progressive Design-Builder will work collaboratively with the City in the complete development and delivery of the project.

The PDB approach requires that the contract will be open book among the City, Progressive Design-Build entity, and subcontractors, and shall require full disclosure of all documents and information to the City by the Progressive Design-Build entity and subcontractors, including estimates, schedules, records of direct and indirect costs, field and home office overhead calculations. subcontracts, records of payment and any other data or document deemed by the City to be relevant to the project.

The PDB approach consists of a preconstruction phase (Phase 1) and, at City’s option, a construction phase (Phase 2). During the preconstruction phase, the Progressive Design-Builder will collaborate with the City on existing conditions, design, constructability, cost, and schedule of the Project and develop a Guaranteed Maximum Price (GMP) for the construction phase of the Project. Upon City’s acceptance of the GMP, the City may exercise its option for the construction phase. If the City and the Progressive Design-Builder do not agree upon a GMP, the City may not exercise its option for the construction phase of the Project to the Progressive Design-Builder.

If the City chooses not to proceed with the construction phase of the project, for any reason, the City may terminate the Progressive Design Build contract for convenience.

If the City subsequently elects to proceed with construction of the project, the City may award a public works contract for construction of the project under any procurement method.

1.3 SUMMARY OF WORK: The City is seeking to establish a shortlist of qualified progressive design build entities for Progressive Design-Build project for the repair and rehabilitation of approximately 2,450 linear feet of 132-inch and 860 linear feet of

Villa La Jolla Storm Drain System Lining

4 | Page

180-inch multi-plate corrugated metal pipe (CMP) storm drain, including repair of subsurface voids, installation of access structures, and all other related work and appurtenances. Work and Services required of the Progressive Design-Builder may include design and construction of the Project. The Progressive Design-Builder shall provide all management, supervision, labor, services, temporary facility, equipment, tools, supplies, and any other item needed to complete the design and construction of the Project as described in Attachment A.

1.4 FORMAT RECEIPT AND OPENING OF SOQs: SOQs will be received in electronic format (eBids) EXCLUSIVELY at the City of San Diego’s electronic bidding (eBidding) site, at:

http://www.sandiego.gov/cip/bidopps/ and are due by the date, and time shown on the cover of this solicitation.

1.5 SUBMITTERS MUST BE PRE-REGISTERED with the City’s bidding system and possess a system-assigned Digital ID in order to submit an electronic proposal.

The City’s bidding system will automatically track information submitted to the site including IP addresses, browsers being used and the URLs from which information was submitted. In addition, the City’s bidding system will keep a history of every login instance including the time of login, and other information about the user's computer configuration such as the operating system, browser type, version, and more.

Because of these security features, Contractors who disable their browsers’ cookies will not be able to log in and use the City’s bidding system.

Upon entry of their SOQ, the system will ensure that all required fields are entered.

The system will not accept an SOQ for which any required information is missing. This includes all necessary pricing, subcontractor listing(s) and any other essential documentation and supporting materials and forms requested or contained in these solicitation documents.

1.6 SOQs REMAIN SEALED UNTIL DUE DATE AND TIME. Electronic submissions are transmitted into the City’s bidding system via hypertext transfer protocol secure (https) mechanism using SSL 128-256 bit security certificates issued from Verisign/Thawte which encrypts data being transferred from client to server. SOQs submitted prior to the Due Date and Time are not available for review by anyone other than the submitter, who will have until the Due Date and Time to change, rescind or retrieve its proposal should they desire to do so.

1.7 SOQs MUST BE SUBMITTED BY DUE DATE AND TIME. Once the deadline is reached, no further submissions are accepted into the system. Once the Due Date and Time has passed, bidders, proposers, the general public, and City staff are able to immediately see the results online. City staff may then begin reviewing the submissions for responsiveness, Equal Opportunity Contracting Program (EOCP) compliance and other issues.

1.8 RECAPITULATION OF THE WORK. SOQs shall not contain any recapitulation of the Work. Conditional SOQs may be rejected as being non-responsive. Alternative SOQs will not be considered unless called for.

Villa La Jolla Storm Drain System Lining

5 | Page

1.9 SOQs MAY BE WITHDRAWN by the Submitter prior to, but not after, the time set as Due Date and Time.

1.9.1 Important Note: Submission of the electronic SOQ into the system may not be instantaneous. Due to the speed and capabilities of the user’s internet service provider (ISP), bandwidth, computer hardware and other variables, it may take time for the proposer’s submission to upload and be received by the City’s eBidding system. It is the proposer’s sole responsibility to ensure their SOQs are received on time by the City’s eBidding system. The City of San Diego is not responsible for SOQs that do not arrive by the required date and time.

1.10 ACCESSIBILITY AND AMERICANS WITH DISABILITIES ACT (ADA) COMPLIANCE: To request a copy of this solicitation in an alternative format, contact the Purchasing & Contracting Department Contract Specialist listed on the cover of this solicitation at least five (5) working days prior to the due date to ensure availability.

1.11 ELECTRONIC SUBMISSIONS CARRY FULL FORCE AND EFFECT

1.11.1 The submitter, by submitting its electronic SOQ, acknowledges that doing so carries the same force and full legal effect as a paper submission with a longhand (wet) signature.

1.11.2 The submitter, by submitting their electronic SOQ, agrees to and certifies under penalty of perjury under the laws of the State of California, that the certification, forms and affidavits submitted as part of this SOQ are true and correct.

1.12 CONTRACTOR REGISTRATION AND ELECTRONIC REPORTING SYSTEM:

1.12.1 Prior to the Award of a Contract or Task Order, you and your Subcontractors and Suppliers must register with the City’s web-based vendor registration and bid management system. For additional information go to:

http://www.sandiego.gov/purchasing/bids-contracts/vendorreg.shtml

1.12.2 The City may not award a contract until registration of all subcontractors and suppliers is complete. In the event this requirement is not met within the time frame specified in the Notice of Intent to Award letter, the City reserves the right to rescind the Notice of Award / Intent to Award and to make the award to the next responsive and responsible bidder

1.13 SOQs ARE PUBLIC RECORD: Upon receipt by the City, SOQs shall become public records subject to public disclosure. It is the responsibility of the respondent to clearly identify any confidential, proprietary, trade secret or otherwise legally privileged information contained within the SOQ. General references to sections of the California Public Records Act (PRA) will not suffice. If the Progressive Design-Builder does not provide applicable case law that clearly establishes that the requested information is exempt from the disclosure requirements of the PRA, the City shall be free to release the information when required in accordance with the PRA, pursuant to any other applicable law, or by order of any court or government agency, and the Progressive Design-Builder will hold the City harmless for release of this information.

1.14 PUBLIC DISCLOSURE: Selection announcements, contract awards, and all data provided by the City shall be protected from public disclosure. Progressive Design-Builder’s

Villa La Jolla Storm Drain System Lining

6 | Page desiring to release information to the public, shall receive prior written approval from the City.

1.15 CONFLICT OF INTEREST: Any architectural firms, engineering firms, specialty consultants, or individuals previously retained by the City to assist in drafting the Project’s preliminary design, General Development Plan or Drawings shall not be eligible to participate in the competition with any Progressive Design-Build Entity without the prior written consent of City. Any architectural firms, engineering firms, specialty consultants, or individuals retained by the City to assist in drafting any Reference Documents or other document that was not prepared specifically for this contract, are considered to be eligible to participate.

2. EQUAL OPPORTUNITY CONTRACTING PROGRAM (EOCP) PROVISIONS

2.1 The City is dedicated to the principles of equal opportunity in the workplace and in subcontracting. It is the City’s expectation that firms doing business with the City have and are able to demonstrate the same level of commitment.

2.2 The Progressive Design-Builders are encouraged to take positive steps to diversify and expand their Subcontractor solicitation base and to offer subcontracting opportunities to all eligible Subcontractors. The Progressive Design-Builder shall comply with requirements of San Diego Municipal Code §§ 22.2701 through 22.2708, Equal Employment Opportunity Outreach Program (EEO Program).

2.2.1 Following the award of the Contract, the Progressive Design-Builder will be required to use the City’s web-based contract compliance application for EOCP reporting purposes e.g., Weekly Certified Payroll, Monthly Employment Utilization, and Monthly Payments. Online tutorials are available at:

http://stage.prismcompliance.com/etc/vendortutorials.htm

2.2.2 The City may retain progress payments if:

2.2.2.1 The non-registered Progressive Design-Builder, Subcontractors, or Suppliers fail to register,

2.2.2.2 EOCP reporting is delinquent or inadequate, or

2.2.2.3 Underpayment has occurred.

2.3 For additional Equal Opportunity Contracting Program requirements, see Attachment C.

3. ESTIMATED PROJECT COST:

3.1 The estimated combined cost of the preconstruction phase (Phase 1) and construction phase (Phase 2) for this project is $50,000,000.00.

4. PROJECT DESCRIPTION: See Attachment A.

5. LICENSE REQUIREMENT:

5.1 To be eligible for award of this contract, Prime contractor must possess the following licensing classification: A

Villa La Jolla Storm Drain System Lining

7 | Page

6. PROJECT LABOR AGREEMENT:

6.1 This work is covered by a Citywide Project Labor Agreement (PLA) entered into by the City of San Diego, the San Diego Building and Construction Trades Council and signatory Craft Unions.

This work will provide many opportunities for local residents and local small business enterprises to participate. It is the City’s policy that contractors will cooperate with all efforts of the City, the Project Labor Coordinator, the Jobs Coordinator, and other organizations retained by the City to encourage and assist in the participation of Local, Targeted and/or Veteran workers.

6.2 LETTER OF ASSENT. The Contractor and all subcontractors agree to be bound by the PLA by submitting a Letter of Assent to the City’s Project Labor Coordinator. The Contractor shall submit its Letter of Assent as a condition of award and all subcontractors shall submit their Letter of Assent before commencing any Work on the Project.

6.3 PRE-JOB CONFERENCE. Each contractor, regardless of tier, is required to conduct a pre-job conference with the Unions not later than ten (10) calendar days prior to commencing work.

The Prime Contractor is responsible for facilitating and scheduling their own pre-job conferences and for facilitating, scheduling, and ensuring that all its subcontractors conduct a pre-job conference.

6.4 JOBS COORDINATOR. The Contractor will be required to hire a Jobs Coordinator, an independent third-party individual, entity or employee with whom the Prime Contractor enters into a contract or employs to assist the Contractor with achieving and exceeding the Local Worker goals set forth in the PLA, Article 4, Section 4.5, to assist with fulfilling the Work Opportunities Program as set forth in Article 22, and to assist with Helmets to Hardhats participation as set forth in Article 23.

Each subcontractor, regardless of tier, shall utilize the Jobs Coordinator retained by the Prime Contractor, pursuant to the PLA, Article 22 Section 22.2 (f). The Contractor shall submit a Jobs Coordinator Designation Form as a condition of award.

7. PROJECT SCHEDULE

7.1 The following milestones are provided for reference only. All dates are tentative and are subject to change.

7.1.1 Advertise and Issue RFQ (Step 1) November 5, 2026

7.1.2 Pre-Submittal Meeting December 1, 2026

7.1.3 Pre-Submittal Site Visit December 9, 2026

7.1.4 SOQ due date January 6, 2027

7.1.5 Shortlist Finalists January 2027

7.1.6 Issue RFP to Shortlist (Step 2) TBD

7.1.7 Pre-proposal Meeting TBD

7.1.8 Proposal Due Date TBD

Villa La Jolla Storm Drain System Lining

8 | Page

7.1.9 Interviews TBD

7.1.10 Proposal Evaluation Complete TBD

7.1.11 Preconstruction Phase Contract Negotiation TBD

7.1.12 Selection and Notification TBD

7.1.13 Receipt of Bonds and Insurance Certifications TBD

7.1.14 Preconstruction Phase Notice to Proceed TBD

7.1.15 Completion of Preconstruction Phase TBD

and Development of GMP

7.1.16 Contract Amendment Authorizing the TBD

Construction Phase upon City’s approval of the GMP

7.1.17 Construction Phase Notice to Proceed TBD

7.1.18 Completion of Construction Phase TBD

8. PREQUALIFICATION OF CONTRACTORS

8.1. GENERAL

8.1.1. Progressive Design-Builders interested in participating on this project must, at the time of SOQ submittal, be pre-qualified at level equal to or greater than the Engineer’s Estimate for the project.

8.1.1.1. All Progressive Design-Builder applicants must submit a complete prequalification application online to the Purchasing & Contracting Department, Prequalification Program no later than 2 weeks prior to the SOQ due date and time. Complete information and links to the online prequalification application are available at:

http://www.sandiego.gov/cip/bidopps/prequalification

8.1.1.2. Due to the City’s responsibility to protect the confidentiality of the contractors’ information, City staff will not be able to provide information regarding contractors’ prequalification status over the telephone.

Contractors may access real-time information about their prequalification status via their vendor profile on PlanetBids™.

8.1.2. The City desires to receive SOQs only from qualified and experienced Progressive Design-Builders who demonstrate significant knowledge of Progressive Design-Build construction projects, extensive experience and successful performance on public works infrastructure projects of comparable size and scope.

9. NOMINATING AND SELECTION PROCESS

9.1. This Progressive Design-Build Program's Nominating and Selection Process is based on the policies, procedures, and guidelines set in the San Diego Municipal Code

Villa La Jolla Storm Drain System Lining

9 | Page

§§22.3301 through 22.3311. A two-step nominating and selection process has been established as follows:

9.2. STEP 1: RFQ

9.2.1 A Nominating Panel (Panel) is established and includes representatives from the City. The Panel may also include other interested parties such as additional participating agencies, representative from the community and other appropriate agencies.

9.2.2 After the City receives the SOQs, the Panel will review the qualifications based on the established evaluation criteria set forth in Attachment B of this RFQ.

9.2.3 The Panel will recommend to the Purchasing & Contracting Department Director (Director) or designee the short-listing of no more than 3 of the most highly qualified Progressive Design-Builders and, upon approval, only those firms will be allowed to participate in the Request for Proposal (RFP) process.

9.2.4 The Director or designee shall have the sole discretion to ratify the short-list submitted by the Panel.

9.2.5. Contents of this Request for Qualifications marked as “DRAFT” are illustrative only, subject to material revision, and not part of the current submittal requirements.

9.3. STEP 2: RFP

9.3.1 Following the Director’s approval of the recommended short-listed Progressive Design-Builders, the City will issue an RFP to the short-listed Progressive Design-Builders.

9.3.2 The Panel will then review the Proposals received and may interview each Progressive Design-Builder. The Panel will rank the Proposals based on the criteria in San Diego Municipal Code section §22.3308 and the criteria set forth in the RFP.

9.3.3 The Panel will forward to the Purchasing & Contracting Department Director (Director) or designee its ranked listing, upon approval, the Purchasing Agent shall negotiate the cost of the preconstruction phase of the Progressive Design-Build contract with the most qualified Progressive Design-Build entity with the highest-ranking proposal, for a price determined to be fair and reasonable to the City.

9.3.4 If the Purchasing Agent is unable to reach agreement with the most qualified

Progressive Design-Build entity with the highest-ranking proposal on the cost of the preconstruction phase, the Purchasing Agent shall reject the proposal of the most qualified Progressive Design-Build entity and may begin negotiations with the next most qualified firm.

10 | Page

9.3.5 The Purchasing Agent will forward to the Director or designee its recommendation to award to the qualified Progressive Design-Build entity, along with the agreed upon not to exceed cost of the preconstruction phase.

The Mayor or designee has final authority for selection.

10. PRE-SUBMITTAL ACTIVITIES

10.1. SUBMISSION OF QUESTIONS

10.1.1 The Director (or Designee) of Purchasing & Contracting Department is the officer responsible for responding to questions and opening, examining, and evaluating the SOQs submitted to the City for the acquisition, construction, and completion of any public improvement except when otherwise set forth in these documents. All questions related to this solicitation shall be submitted to:

Rosa Riego, Senior Contract Specialist at RRiego@sandiego.gov

10.1.2 Questions received less than 14 Days prior to the Statement of Qualifications due date may not be considered.

10.1.3 Clarifications deemed by the City to be material shall be answered via issuance of an addendum and posted to the City’s online bidding service.

10.1.4 Only questions answered by formal written addenda shall be binding. Oral and other interpretations or clarifications shall be without legal effect. It is the Progressive Design-Builder's responsibility to be informed of any Addenda that have been issued and to include all such information in its Bid.

10.2. PRE-SUBMITTAL MEETING AND SITE VISIT

10.2.1 ONLINE PRE-SUBMITTAL MEETING:

Prospective Bidders are required to attend the Pre-Proposal Meeting.

Failure to attend the Pre-Proposal Meeting will result in the Bidder’s Bid being deemed non-responsive.

Bidders will not be admitted after the specified start time of the Meeting.

The Pre-Proposal Meeting will be held on Tuesday, December 1, 2026, at 10:00 AM (PST) at:

Microsoft Teams https://teams.microsoft.com/meet/2358306534475805?p=1vzvbe6wj4X0sSbaKm Meeting ID: 235 830 653 447 580 5 Passcode: oq6MB6AT Need help? | System reference Dial in by phone +1 945-468-5511,,93713809# United States, Dallas Find a local number Phone Conference ID: 937 138 09#

For organizers: Meeting options | Reset dial-in PIN

Villa La Jolla Storm Drain System Lining

K-27-2496-PDB2-3-C

11 | Page https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_NjFmM2MzZjEtNGEzZC00ODMyLWIwNDItYzk5MDAyNWYzMDNl%40thread.v2/0?context=%7b%22Tid%22%3a%22ab26ceb7-278f-4dcb-8df6-4e2363556459%22%2c%22Oid%22%3a%22afd65e18-93fd-4a25-847e-788df90254df%22%7d tel:+19454685511,,93713809 https://dialin.teams.cloud.microsoft/67310406-9fc0-49fb-a885-57cc2f23b004?id=93713809 https://teams.microsoft.com/meetingOptions/?organizerId=afd65e18-93fd-4a25-847e-788df90254df&tenantId=ab26ceb7-278f-4dcb-8df6-4e2363556459&threadId=19_meeting_NjFmM2MzZjEtNGEzZC00ODMyLWIwNDItYzk5MDAyNWYzMDNl@thread.v2&messageId=0&language=en-US https://dialin.teams.cloud.microsoft/usp/pstnconferencing

Please Note: You will need to join the meeting with a computer, tablet or smartphone with the Microsoft Teams in order to sign in via the Chat feature as attendance at the meeting will be evidenced by the Chat sign-in. The Chat feature will also be used for attendees to ask any questions.

The purpose of the meeting is to discuss the scope of the Project, submittal requirements, and any Equal Opportunity Contracting Program requirements and reporting procedures.

Upon entering the meeting, all attendees must use the chat feature to sign in with the following information: Name of firm, Attendee's name, Phone number and Email address.

10.2.2 To request a sign language or oral interpreter for this meeting, call the Purchasing & Contracting Department, Public Works Division at (619) 533-3450 at least 5 Working Days prior to the Pre-Submittal Meeting to ensure availability.

10.2.3 Pre-Submittal Site Visit: Progressive Design-Builders wishing to submit an SOQ are encouraged to visit the Work Site with the Owner. The purpose of the Site Visit is to acquaint Progressive Design-Builders with the Site conditions. To request a sign language or oral interpreter for this visit, call the Purchasing & Contracting Department, Public Works Division at (619) 533-3450 at least 5 Working Days prior to the meeting to ensure availability. A Pre- Submittal Site Visit is scheduled as follows:

Time: 1:00 PM Date: Wednesday, December 9, 2026 Location: Gilman Drive & Via Alicante, San Diego, CA, 92037

10.2.4 REVISION TO THE RFQ: Any changes to the Contract Documents through addendum are made effective as though originally issued with the solicitation.

The Progressive Design-Builders shall acknowledge the receipt of any Addenda at the time of SOQ submission.

11. ADDITIONAL TERMS AND CONDITIONS

11.1 CITY’S RIGHT TO CANCEL: City reserves the right to cancel, in part or in its entirety, this RFQ including, but not limited to, selection schedule, submittal date, and submittal requirements. If the City cancels or revises the RFQ, all potential Progressive Design- Builders will be notified in writing by the City.

11.2 INTERVIEWS: The City reserves the right to interview and request additional information and clarifications from any responders to RFQ.

11.3 ALLOCATION OF RISK:

11.3.1 The selected Progressive Design-Builder shall indemnify and hold harmless the City for claims, suits, losses or damages arising out of the negligent acts, errors, or omissions of the Progressive Design-Builder, Subcontractors, or Subcontractors attributable to the design effort.

Villa La Jolla Storm Drain System Lining

12 | Page

11.3.1.1 The Progressive Design-Builder’s duty to defend, indemnify, protect, and hold harmless shall not include any claims or liabilities arising solely from latent preexisting conditions, including unknown voids or collapses, that could not reasonably have been identified prior to construction and were not caused or exacerbated by active negligence, sole negligence, or willful misconduct by the Progressive Design-Builder, any of its Subcontractors, anyone directly or indirectly employed by you or anyone you control.

11.3.2 This RFQ contains a preliminary risk matrix for the project, which summarizes the anticipated allocation of risk between the City and the selected firm. This preliminary risk matrix is not intended to describe all anticipated risk for the Project. As Project activities progress, the risk allocation may be expanded and revised as necessary to ensure the most efficient allocation of risk between the City and the Progressive Design-Builder.

11.4 PREVAILING WAGE RATES: Prevailing wage rates will apply to this contract.

11.5 FUNDING AGENCY PROVISIONS: This will be a Water Infrastructure Finance and Innovation Act (WIFIA) Program funded project through the Department of Environmental Protection Agency (EPA).

13 | Page

ATTACHMENTS

14 | Page

ATTACHMENT A

PROJECT DESCRIPTION, SCOPE OF WORK, AND PRELIMINARY BRIDGING DOCUMENTS

Villa La Jolla Storm Drain System Lining

15 | Page

PROJECT DESCRIPTION, SCOPE OF WORK, AND BRIDGING DOCUMENTS

1. PROJECT DESCRIPTION: The Villa La Jolla storm drain system includes approximately 5,200 linear feet of existing 132-inch, 144-inch, and 180-inch multi-plate corrugated metal pipe (CMP) storm drain between La Jolla Village Drive and Via Alicante. Several repairs to this system have previously been completed under separate contracts. In 2021 and 2022, approximately 200 linear feet of 180-inch CMP at Gilman Drive & Villa La Jolla Drive was repaired per drawing 0100248-D; in 2023 and 2024, approximately 113 linear feet of 132-inch CMP near 8803 Gilman Drive was repaired per drawing 101013-D; and in 2024 and 2025, approximately 1,530 linear feet of 132-inch and 144-inch CMP was repaired per drawing 101575-D. The purpose of the Villa La Jolla Storm Drain System Lining project is to repair and rehabilitate the remaining length.

Villa La Jolla Storm Drain System Lining consists of the repair and rehabilitation of approximately 2,450 linear feet of 132-inch and 860 linear feet of 180-inch multi-plate CMP storm drain, including repair of subsurface voids, installation of access structures, and all other related work and appurtenances.

The improved storm drain system is expected to be designed and constructed with a service life not less than 50 years and with hydraulic capacity to convey the 100-year frequency storm per the 2017 City of San Diego Drainage Design Manual 4.1.1.

2. SCOPE OF WORK:

2.1. The Scope of Work and Services contained herein is not comprehensive and is intended only to serve this solicitation for qualifications (RFQ). This information may be expanded upon with additional details, terms, and specifications in Step 2 of this selection process (RFP).

2.2. The Work and Services required of the Progressive Design-Builder include those during design and construction of the Project. The Progressive Design-Builder shall provide all management, supervision, labor, services, equipment, tools, supplies, and any other item of every kind and description required for the complete design and construction of the Project.

2.3. As the Engineer of Work, the Progressive Design-Builder shall refer to the City’s preliminary design information for the purpose of preparing a set of Plans and Specifications for the construction. The Progressive Design-Builder shall be responsible to determine the method, priority, order, and schedule of the Work.

Phasing, prioritization, recommendations, and/or details of previous repairs are included for reference only. Designs and methods of previous repairs, or elements thereof, to the Villa La Jolla storm drain system may be considered for this project insofar as they meet the performance criteria, as demonstrated by the Progressive Design-Builder and Engineer of Work.

2.4. The Progressive Design-Builder shall expect Construction Services to be delivered as multiple Construction Packages, as defined in the Progressive Design-Build Agreement (Attachment H). Pre-construction services shall result in one complete design deliverable, which shall be structured for easy definition of Construction Packages and Package GMPs. The City intends to authorize Construction Packages in order of

Villa La Jolla Storm Drain System Lining

16 | Page priority, which will be determined during the pre-construction phase (Phase 1). Per the Progressive Design-Build Agreement, authorization of any Construction Package does not obligate the City to authorize any remaining Construction Package.

2.5. The Scope of Work and Services [Scope] shall also include but is not limited to the following:

2.5.1. Preparing a pre-design preliminary condition assessment and phasing plan of the overall Project, indicating priority repair areas and order of work; providing updates to the condition assessment and phasing plan as deemed necessary by the Progressive Design-Builder or as directed by the Owner; performing condition assessments throughout the Project duration to verify pipe condition and confirm the adequacy of previously identified repair priorities;

2.5.2. Conducting investigations, as-built research, and review of bridging documents and technical studies needed for the completion of design work, including identification of locations and extents of priority repair areas. City-provided information, including as-built drawings, CCTV inspection videos, prior condition assessments, and bridging documents, is furnished for reference only. Therefore, the Progressive Design-Builder shall verify all existing conditions, including the existing condition of the pipe, and is solely responsible for determining the adequacy and accuracy of such information for design and construction purposes.

2.5.3. Preparing and completing Draft Design and Final Design drawings, schematics, exhibits, and/or maps. The Progressive Design-Builder is solely responsible for the preparation and completion of a design package for construction.

2.5.4. Obtaining City plan check approvals at the Draft Design and Final Design stages; providing engineering services during construction;

2.5.5. Developing a Guaranteed Maximum Price;

2.5.6. Construction of storm drain lining, repairs, replacements, access structures, and all related work and appurtenances;

2.5.7. Repair of voids along the storm drain alignment. The Progressive Design- Builder shall determine, submit for approval, and implement an appropriate method to repair subsurface voids surrounding the storm drain system. The City intends to provide preliminary mapping and volume estimation of subsurface voids based on geotechnical investigations. If available, this preliminary information shall be for reference only, and the Progressive Design-Builder shall be responsible for determining the adequacy and accuracy of such information for design and construction purposes.

2.5.8. Monitoring for potential of any hazardous materials and coordination with local resource agencies;

2.5.9. Use of value engineering to analyze the costs of methods and materials with respect to the intended result and function of the Project;

Villa La Jolla Storm Drain System Lining

17 | Page

2.5.10. Additional geotechnical investigation and potholing, as needed. The City intends to provide a report of geotechnical investigation, including soil conditions, groundwater depths, and soil corrosivity.

2.5.11. Design and implementation of a dewatering system and storm water bypass as needed for construction of the Project and protection of the Work during construction, including discharge permitting. Applicable bypass and dewatering design criteria will be established during Phase 1 based on the selected rehabilitation approach and site conditions.

2.5.12. Video inspection for acceptance of the Work;

2.5.13. Performance and implementation of QA/QC for all contract work;

2.5.14. Landscaping, revegetation plan, and Long-term Maintenance and Monitoring, if required;

2.5.15. Traffic control during construction and during pre-construction investigation activities, as needed;

2.5.16. Striping and pavement restoration per the latest Street Preservation Ordinance and City of San Diego Standard Drawings, if required;

2.5.17. Construction storm water pollution prevention permitting and compliance;

2.5.18. Coordinating with the City Project and Construction Managers and other utility owners/contractors; coordinating utility relocations with utility owners;

potholing or other means necessary to identify potential conflicts;

2.5.19. Scheduling and cost estimation;

2.5.20. Community liaison services and community outreach, including presentations at community meetings during design and construction; coordination with City Resident Engineer and Public Information Officer for City review and approval of messaging;

2.5.21. Coordination with property owners for right-of-entry permits and permits to work on private property, as needed; and communicating impacts to private property, including any subsequent changes to the scope, schedule, or duration of access or impacts; coordination with City Resident Engineer and Public Information Officer for City review and approval of messaging. The City will prepare the final permit agreements for execution. The City will make available to the Progressive Design-Builder preliminary title reports for the parcels upon which work will occur. Preliminary title reports shall serve as confirmation of existing easements allowing ingress and egress for construction and maintenance of drainage facilities.

2.5.22. Preparation of redlines and as-built drawings;

Villa La Jolla Storm Drain System Lining

18 | Page

2.5.23. Identifying, preparing, and obtaining all permits and approvals necessary for construction unless specifically noted otherwise.

3. PRELIMINARY BRIDGING DOCUMENTS:

3.1. The Preliminary Bridging Documents contained herein are intended only to serve this solicitation for qualifications, and additional documents may be provided in step 2 of this selection process (RFP).

3.2. For the purpose of preparation of the SOQ, refer to the following list of Preliminary Bridging Documents. Items 1 through 5 are available at:

https://ecpfiles.sandiego.gov/CIP_Contracts/K-27-2496-PDB2-3-C/K-27-2496-PDB2-3- C Original Solicitation Documents.zip

1. Location Map

2. Pre-design Detail Maps

3. As-builts

4. Preliminary Storm Drain Hydraulic Capacity Analysis

5. Pipeline Multi-Sensor Condition Assessment

Including Technical Studies/2026 Multi-Sensor Condition Assessment/Appendix A: https://ecpfiles.sandiego.gov/CIP_Contracts/K-27- 2496-PDB2-3-C Appendix A/2026 Multisensor Condition Assessment AppendixA.zip Including Technical Studies/2026 Multi-Sensor Condition Assessment/Appendix C: https://ecpfiles.sandiego.gov/CIP_Contracts/K-27- 2496-PDB2-3-C Appendix C/2026 Multisensor Condition Assessment AppendixC.zip

19 | Page https://ecpfiles.sandiego.gov/CIP_Contracts/K-27-2496-PDB2-3-C/K-27-2496-PDB2-3-C+Original+Solicitation+Documents.zip https://ecpfiles.sandiego.gov/CIP_Contracts/K-27-2496-PDB2-3-C+Appendix+A/2026+Multisensor+Condition+Assessment+AppendixA.zip https://ecpfiles.sandiego.gov/CIP_Contracts/K-27-2496-PDB2-3-C+Appendix+C/2026+Multisensor+Condition+Assessment+AppendixC.zip

ATTACHMENT B

SUBMITTAL REQUIREMENTS - EVALUATION CRITERIA

20 | Page

ATTACHMENT B

SUBMITTAL REQUIREMENTS - EVALUATION CRITERIA

1. SUBMITTAL REQUIREMENTS

1.1. The SOQ shall be concise, well organized, and demonstrate the Progressive Design- Builder's qualifications and experience applicable to the Project. The SOQ shall be limited to 25 one-sided pages (8 1/2 x 11) - exclusive of resumes, graphics, forms, pictures, photographs, dividers and front/back cover, saved in searchable Portable Document Format (PDF) - that address the RFQ requirements. Font Type shall be Open Sans in a minimum 12 point font size, with a minimum 1” margin for text pages. A cover letter may be submitted but shall not contain any information that is a required element of the RFQ as per Attachment B, Submittal Requirements and Evaluation Criteria. Any SOQ that does not comply with these formatting standards may not be considered.

1.2. Documentation required by Attachment B, Section 2.10.4, Subcontractor Documentation, shall be in addition to the page limit stated above.

1.3. SOQs shall be signed by an individual or individuals authorized to execute legal documents on behalf of the Progressive Design-Builder.

1.4. SOQs shall be received no later than the time and place specified on the cover of this RFQ. SOQs and related materials received after the date and time specified above may not be considered.

1.5. Failure to comply with the requirements of this RFQ may result in disqualification.

1.6. SOQs submitted in response to this RFQ shall be in the following order and shall include:

1.6.1. Identification of the Progressive Design-Builder

1.6.2. Exceptions to this RFQ

1.6.3. Executive Summary

1.6.4. Project Organization and Key Personnel

1.6.5. Past Performance on Relevant Projects

1.6.6. Project Approach

1.6.7. Experience Delivering Design and Preconstruction Services

1.6.8. Knowledge and Understanding of Local Environment

1.6.9. Construction Management and Administration Experience

1.6.10. Equal Employment and Contracting Information

1.6.11. Financial Information and Litigation History

SOQs that do not contain the aforementioned components may not be considered.

Villa La Jolla Storm Drain System Lining

21 | Page

2. EVALUATION CRITERIA

2.1. Identification of the Progressive Design-Builder: Failure to provide the Identification of the Progressive Design-Builder may result in the SOQ being considered non-responsive and ineligible for further consideration.

2.1.1. Legal name and address of company.

2.1.2. Legal form of company (partnership, corporation, joint venture, etc.). If joint venture, identify the members of the joint venture and provide all information required under this section for each member.

2.1.3. Year of establishment of entity.

2.1.4. If company is subsidiary of a parent company, identify the parent company.

2.1.5. Address of main office.

2.1.6. Address of San Diego satellite office if applicable.

2.1.7. Contact information for firm, including name, title, email address and telephone number.

2.1.8. Number of employees in San Diego County.

2.1.9. Applicable License(s):

2.1.9.1. City of San Diego Business License Number, including expiration date.

2.1.9.2. State Contractor’s License Number, including expiration date and all classifications.

2.1.9.3. Professional Engineering/Architect License Number, including expiration date.

2.1.10. Name, title, address and telephone number of person to contact concerning the SOQ.

2.2. Exceptions to this RFQ: The Progressive Design-Builder shall certify that it takes no exceptions to this RFQ and its attachments by signing and submitting with its SOQ the Certification of Exceptions to the Request for Qualifications. If the Progressive Design- Builder does take exception to any portion of the RFQ, the specific portion of the RFQ to which exception is taken shall be submitted to the City in writing prior to the Pre-submittal Meeting. Although the “Exceptions to the RFQ” is an evaluation criterion, an exception may be determined by the City to be of such a material nature that such exception may cause the SOQ to be considered non-responsive.

2.3. Executive Summary (3 Points Max): Include a one- to two-page overview of the entire SOQ describing the highlights of the SOQ.

2.4. Project Organization and Key Personnel (12 Points Max):

Describe proposed project organization and provide an organizational chart, including identification and responsibilities of key personnel. Indicate role and responsibilities of the Progressive Design-Builder. Indicate how local firms are being utilized to ensure a strong understanding of local laws, ordinances, regulations, policies, requirements, permitting, etc. Indicate extent of commitment of key personnel for duration of project and furnish resumes of key personnel. Provide indication of staffing level for the project. The City’s evaluation of the Progressive Design-Builder will consider the

Villa La Jolla Storm Drain System Lining

22 | Page entire team, therefore no changes in team composition will be allowed without prior written approval of the City. Describe Progressive Design-Builder’s capacity to perform the work within the time limitations, considering and identifying Progressive Design- Builder’s current and planned workload and Progressive Design-Builder’s workforce.

2.5. Past Performance on Relevant Projects (15 Points Max):

Describe the Progressive Design-Builder’s, including the Design Team and Prime Contractor, past performance of relevant projects of a similar type and size.

2.5.1. List three (3) successfully completed projects of a similar nature with their respective date of completion, name and phone number of owner’s project manager, project type, and total value of completed construction and identify whether the work was for a public or private client. Relevant projects may include, but not limited to, rehabilitation or repair of in-service large diameter storm water conveyance pipelines, identification and repair of subsurface voids, deep installations, and work within developed urban corridors.

2.5.2. For each project profile, include the executed Guaranteed Maximum Price (GMP) and actual final contract value, executed schedule duration and actual schedule duration, and a description of why project costs or schedule did or did not meet what was the target value and/or baseline scheduled date of substantial completion.

2.5.3. Describe the involvement of key personnel for each identified project and how they successfully managed the relevant project. Include management and communication strategies that integrated a team of design consultants, specialty subcontractors, and trade contractors. Include a description of any issues or problems that arose on the projects and how those issues or problems were resolved.

2.5.4. Projects currently in process may be submitted in lieu of completed projects.

2.6. Project Approach (10 Points Max):

Provide a conceptual description of the Progressive Design-Builder’s approach for managing and performing its services during the Project. Include the involvement of key personnel and at what milestone(s) they will be engaged. The following items should be addressed:

2.6.1. Discuss how a collaborative relationship with the City would be established during Phase One design development, value engineering, cost estimating, and scheduling.

2.6.2. Discuss how the design and construction processes will interface (including how constructability issues will be addressed).

2.6.3. Identify the work components critical to the Project’s success and how these components would be achieved at each milestone.

2.6.4. Describe the process for developing cost estimates at each milestone, preparing value engineering alternatives and ultimately establishing the GMP proposal (including the amount of cost contingency).

Villa La Jolla Storm Drain System Lining

23 | Page

2.6.5. Discuss how key risk factors will be identified and mitigated during both Phase 1 and Phase 2 of the project execution.

2.7. Experience Delivering Design and Preconstruction Services (10 points):

Describe the Progressive Design-Build Team’s experience, general approach, and qualifications to the following on projects of similar scope and complexity:

2.7.1. Leading the project definition phase/validation period.

2.7.2. Establishing and managing target value design process.

2.7.3. Value engineering, budget management/cost control strategies, and risk mitigation plans.

2.7.4. Condition assessment and field investigation of aging large diameter pipelines.

2.7.5. Subconsultant engagement.

2.7.6. Design development from programming through construction documents.

2.7.7. Permitting, especially as it pertains to similar SOW. Include experience in public outreach, and environmental permitting.

2.7.8. Schedule management, phasing, and coordinating investigation during the Design phase.

2.7.9. Transparency in budget and GMP development.

2.8. Knowledge and Understanding of Local “Environment” (10 Points Max):

Describe experience working in the local “environment” and proposed local presence for interfacing with the City’s project management staff. The “environment” includes but is not limited to: Public outreach in support of the environmental and building permitting, City and other local agencies regulations and policies; local environmental documentation and permitting requirements; geotechnical conditions in project area;

local building codes; and other local design criteria and community issues.

2.9. Construction Management and Administration Experience (10 points):

Describe the Progressive Design-Build Team’s experience, general approach, and qualifications to the following on projects of similar scope and complexity:

2.9.1. Leading and implementing innovative approaches during the construction phase.

2.9.2. Developing and maintaining the project schedule.

2.9.3. Risk management and mitigation, including protection of existing public and private improvements and structures.

2.9.4. Quality Control/quality management.

2.9.5. Health and Safety Administration and compliance.

2.9.6. Environmental permit and regulatory compliance.

2.9.7. Commissioning, transitioning, and punchlist/closeout.

Villa La Jolla Storm Drain System Lining

24 | Page

2.10. Equal Employment and Contracting Opportunity (25 Points Max):

2.10.1. Work Force Report

2.10.2. The Progressive Design-Builder shall include in its SOQ either: (1) a completed Work Force Report for its employees located within San Diego County only; or

(2) an Equal Employment Opportunity Plan (see Attachment C), which shall comply with the EEO Plan Requirements which is included in Section 2 of this Request for Qualifications. The selected firm may be required to submit workforce data for a regional office prior to contract award.

2.10.3. Equal Opportunity Assurances. The Progressive Design-Builder shall include in its SOQs the following:

2.10.3.1. Specific actions consistently taken to ensure equal opportunity in their employment and subcontracting practices, including past performance and actions to be taken on this project.

2.10.3.2. Listing of Proposer’s strategies to recruit, hire, train and promote a diverse workforce. These efforts will be considered in conjunction with Progressive Design-Builder’s Workforce Report as compared to the County’s Labor Force Availability.

2.10.3.3. Listing of Progressive Design-Builder’s current community activities such as membership and participation in local organizations, associations, scholarship programs, mentoring, apprenticeships, internships, community projects, charitable contributions and similar endeavors.

2.10.4. Subcontractor Documentation. Documentation submitted in accordance with this section shall be included in an attachment, which shall be titled “Subcontractor Documentation” to the SOQ.

2.10.4.1. Past Participation Levels - Listing of Progressive Design- Builder’s Subcontractor (including constructors and design professionals) and Supplier past participation levels on each project listed in response to Section 2.5. Past Performance on Relevant Projects of this RFQ. The Progressive Design- Builder shall use the Subcontractor Past Participation List (Constructors, Design Professionals, or Suppliers/Vendors) Form AA50, for this purpose (refer to Attachment “C”).