VIGILANT (WMEC 210A) DS FQ3 SPEC REV-0.doc
DOC document 10 MB Posted
- Solicitation number
- 70Z080-20-Q-P4592200
About this file
This is a solicitation for a dockside availability for the USCGC Vigilant (WMEC 617). The Coast Guard seeks a contractor to perform cleaning, inspection, and repair services from 30 July 2020 to 26 August 2020 at the pier located at 9235 Grouper Road Cape Canaveral, FL 32920-4402. The small business size standard is 1,250 employees, and the solicitation is set aside for small businesses. Quotes are due by 23 April 2020. The Coast Guard anticipates awarding a firm fixed price contract and providing the contract award date on or about 8 May 2020. Drawings can be requested until 7 April 2020 and questions accepted until 10 April 2020.
The solicitation includes a blank price schedule and statement of work specifying the scope of services. Services include cleaning and inspecting fuel, potable water, waste, and oily water tanks. Other tasks involve inspecting ventilation ducts, shafting, anchors and ground tackle, and performing preservation work. The Coast Guard contact information and a description of the period of performance are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment of Solicitation (001).pdf | ||
| TAB 12 Combined Synopsis Solicitation DOCKSIDE greater than SAT.pdf | ||
| VIGILANT (WMEC 210A) DS FQ3 CNJ 20ER0_BLANK.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC VIGILANT (WMEC 617)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: Celestin Jules (Rev-0, 16 January 2020)
TABLE OF CONTENTS
iii
Revisions Record iv
Consolidated List of References viii
Consolidated List of Government-furnished Property x
Consolidated List of Critical Inspection Items xi
Principal Characteristics
General Requirements
WORK ITEM 1: Tanks (Aviation Fuel Service), Clean and Inspect
WORK ITEM 2: Chain Locker(s), Clean and Inspect
WORK ITEM 3: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect
WORK ITEM 4: Tanks (MP Fuel Service), Clean and Inspect
WORK ITEM 5: Tanks (Potable Water), Clean and Inspect
WORK ITEM 6: Tanks (Dirty Oil and Waste), Clean and Inspect
WORK ITEM 7: Propulsion Shafting, Strain Gage Alignment, Inspect
WORK ITEM 8: Vent Ducts (Engine And Motor Room All), Commercial Cleaning
WORK ITEM 9: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning
WORK ITEM 10: Vent Ducts (Laundry Exhaust), Commercial Cleaning
WORK ITEM 11: Vent Ducts (All Other), Commercial Cleaning
WORK ITEM 12: Anchor Chain(s) and Ground Tackle, Inspect and Repair
WORK ITEM 13: Anchor Windlass, Overhaul
WORK ITEM 14: Towing Bitts, Chocks, and Fairleads; Inspect and Test
WORK ITEM 15: Warping Capstan, Overhaul
WORK ITEM 16: Ammunition Elevator, Service and Inspect
WORK ITEM 17: Oily Water Separator, Replace
WORK ITEM 18: Ballast Tank Striker Plate, Renew
WORK ITEM 19: Watertight Doors (Internal, DC Deck and Below), Renew
WORK ITEM 20: Bulkhead Plating (Uptake), Renew
WORK ITEM 21: Fuel Tank Remote Ballast Valve, Renew
WORK ITEM 22: Watertight Scuttle (Internal, DC Deck and Below), Renew
WORK ITEM 23: Controller Foundation and Pedestals (Anchor Windlass), Renew
WORK ITEM 24: Deck Plating and Bulkhead (Stack Space), Renew
WORK ITEM 25: Bulkhead Plating (Crew Mess), Renew
WORK ITEM 26: 03 Deck Plating, Renew
WORK ITEM 27: Portlights, Inspect & Renew
WORK ITEM 28: Fire Pumps, Replace
WORK ITEM 29: Inclined Ladder and Handrail, Renew
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Bill of Material 618 WMEC 327, Rev M, Watertight Door Hatches & Scuttles Coast Guard Bill of Materials 618 WMEC 11, Rev J, 3rd Dk, 2nd Dk, Main Dk 02 Dk & Bridge Dk Pltg & Supports Coast Guard Bill of Materials 618 WMEC 13, Rev L, Arrangement of Fuel Oil System Coast Guard Bill of Materials 618 WMEC 136, Rev B, Rails, Stanchions & Lifelines Coast Guard Bill of Materials 618 WMEC 49, Rev J, Arrgt. of Sounding Tubes & Air Escapes Coast Guard Bill of Materials 618 WMEC 68, Rev F, Pilothouse & Bridge Deck Fdns Coast Guard Drawing 618 WMEC 111-001, Rev G, Shell Expansion Framing & CVK Coast Guard Drawing 618 WMEC 116-001, Rev-, Forepeak Framing, Chain Locker & Transverse Bulkheads Coast Guard Drawing 618 WMEC 120-002, Rev E, Misc Bulkheads Main Deck Coast Guard Drawing 618 WMEC 122-001, Rev J, Transverse Watertight Bulkhead Forward & Aft Coast Guard Drawing 618 WMEC 123-002, Rev G, New Double Bottom Fuel Tk Structural Dets Coast Guard Drawing 618 WMEC 123-003, Rev G, Lube Oil, Dirty Oil, & Diesel Oil Overflow Tanks Structural Details Coast Guard Drawing 618 WMEC 123-007, Rev A, Structural Modification for GEA Westfalia OWS Installation Coast Guard Drawing 618 WMEC 131-001, Rev M, 2nd & Main Deck Plating & Supports Coast Guard Drawing 618 WMEC 136-001, Rev L, 01 & 02 Level & Bridge Deck Plating & Support Coast Guard Drawing 618 WMEC 152-001, Rev N, Superstructure Aircastle, 01, 02 Deckhouse Coast Guard Drawing 618 WMEC 167-001, Rev M, Schedule of Steel Doors, Hatches, Scuttles & Manholes Coast Guard Drawing 618 WMEC 182-002, Rev W, Foundations for Engine Room Coast Guard Drawing 618 WMEC 182-005, Rev B, Foundations for Oily Water Separator System Coast Guard Drawing 618 WMEC 184-001, Rev W, Pilothouse & Bridge Fdns Coast Guard Drawing 618 WMEC 185-002, Rev F, Auxiliary Machinery Space Misc Foundations Coast Guard Drawing 618 WMEC 186-006, Rev -, Installation of Jared Anchor Windlass and Warping Capstan “A” Class MEP Coast Guard Drawing 618 WMEC 244-001, Rev B, Shafting Alignment Coast Guard Drawing 618 WMEC 261-001, Rev G, Diagram - Fuel Oil Coast Guard Drawing 618 WMEC 261-001, Rev G, Diagram - Fuel Oil Coast Guard Drawing 618 WMEC 261-002, Rev M, Arrangement - Fuel Oil Coast Guard Drawing 618 WMEC 320-001, Rev AZ, Major Maintenance Availability 440 & 115 Power One Line Wiring Diagram and Details Coast Guard Drawing 618 WMEC 320-011, Rev A, Power Sys Mod GEA Westfalia OWS Install Coast Guard Drawing 618 WMEC 320-060, Rev -, OWS Booster Pump and Cooling Fan Install Coast Guard Drawing 618 WMEC 401-004, Rev AV, Pilothouse Arrangement Coast Guard Drawing 618 WMEC 506-001, Rev H, Diagram Sounding Tubes & Air Escapes Coast Guard Drawing 618 WMEC 506-002, Rev K, Arrgt – Sounding Tubes & Air Escapes Coast Guard Drawing 618 WMEC 512-004, Rev J, Fan Rooms 01-99-0-Q & 02-81-2-Q Coast Guard Drawing 618 WMEC 512-005, Rev C, Ventilation Diagram – Third Deck Coast Guard Drawing 618 WMEC 512-006, Rev D, Ventilation Diagram Second Deck Coast Guard Drawing 618 WMEC 512-007, Rev D, Ventilation Diagram Main Deck Coast Guard Drawing 618 WMEC 512-008, Rev C, Ventilation Diagram 01 Deck & Above Coast Guard Drawing 618 WMEC 512-009, Rev J, Arrangement Ventilation & AC Third Deck Coast Guard Drawing 618 WMEC 512-010, Rev H, Arrgt Vent & AC 2nd Deck Coast Guard Drawing 618 WMEC 512-011, Rev J, Arrgt Ventilation & AC Main Deck Coast Guard Drawing 618 WMEC 512-012, Rev K, Arrgt Vent & AC 01 Deck Coast Guard Drawing 618 WMEC 512-013, Rev H, Arrgt Ventilation & AC 02 Dk & Above Coast Guard Drawing 618 WMEC 512-019, Rev A, Ventilation Mods Incid to DC Shop and Steering Gr Rm Coast Guard Drawing 618 WMEC 521-001, Rev H, Diag-Fire Main Sprinkling & Wshdwn Coast Guard Drawing 618 WMEC 529-011, Rev A, Piping Mods GEA Westfalia OWS Install Coast Guard Drawing 618 WMEC 533-001, Rev P, Diag. Hot & Cold Potable Water Coast Guard Drawing 618 WMEC 533-002, Rev N, Arr of Hot & Cold Potable Water Coast Guard Drawing 618 WMEC 535-001, Rev K, Diagram Steam, Feed & Condensate System Piping Coast Guard Drawing 618 WMEC 535-002, Rev K, Arr. Stm, Feed & Condensate System Piping Coast Guard Drawing 618 WMEC 551-003, Rev E, Arrangement Compressed Air Piping Outside Machinery Space Coast Guard Drawing 618 WMEC 581-001, Rev D, Anchor Handling Coast Guard Drawing 618 WMEC 581-006, Rev-, Anchor Windlass Locking Ring Mod Coast Guard Drawing 618 WMEC 581-052, Rev A, Windlass Reducer and Motor Capstan Assembly Coast Guard Drawing 618 WMEC 581-053, Rev A, Warping Capstan Assembly Dwg Coast Guard Drawing 618 WMEC 581-055, Rev 6, Windlass Capstan Arrg Coast Guard Drawing 618 WMEC 582-002, Rev-, Mooring Bitts & Chocks Coast Guard Drawing 618 WMEC 582-003, Rev-, Towing Bitt Construction and Foundation Dt Coast Guard Drawing 618 WMEC 601-002, Rev B, Inboard Profile Coast Guard Drawing 618 WMEC 601-003, Rev K, General Arrangement – Second and Third Decks Coast Guard Drawing 618 WMEC 601-004, Rev K, General Arrangement Main & 01 Deck Coast Guard Drawing 618 WMEC 601-005, Rev J, General Arrangement 02 Dk, Bridge Dk & House Top Coast Guard Drawing 618 WMEC 612-001, Rev F, Rails, Stanchions & Lifelines Coast Guard Drawing 618 WMEC 621-002, Rev J, Joiner General Arrgt Main Deck Coast Guard Drawing 618 WMEC 621-003, Rev J, Joiner General Arrgt 01 Dk, 02 Dk & Bridge Dk Coast Guard Drawing 618 WMEC 623-002, Rev B, Inclined Ladders Coast Guard Drawing 618 WMEC 625-052, Rev 3, 16” Diameter Fixed Light with Cover Coast Guard Drawing 618 WMEC 625-056, Rev -, Type K-225 & K-225 FA Fixed Window Coast Guard Drawing 618 WMEC 635-002, Rev J, Sheathing & Insulation Coast Guard Drawing 618 WMEC 651-001, Rev H, Arrgt Crews Galley, Mess & Scullery Coast Guard Drawing 618 WMEC 651-002, Rev -, Scullery Detail Coast Guard Drawing 618 WMEC 712-051, Rev -, General Arrg of 500 Lb Ammo Hoist NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINS) M10360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (TP) 3240A, SWBS 581, Section B, Mar 2016, Anchor Windlass, 20/10 HP Coast Guard Technical Publication (TP) 3240A, SWBS 582, Oct 2011, Warping Capstan Coast Guard Technical Publication (TP) 3241B, Jan 2006, Manufacturers Instruction Book, SWBS Group(s) 651-712 Coast Guard Technical Publication (TP) 4035, SWBD 521, Aug 2018, Fire Pump Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2018, Overhaul AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary Hull Accesses
OTHER REFERENCES
American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016 American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves Flanged, Threaded, and Welding End ASTM International (ASTM) F1387, 2012, Standard Specification for Performance of Piping and Tubing Mechanically Attached Fittings ASTM International (ASTM) F683, 2010, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery ASTM International (ASTM) F992, 2011, Standard Specification for Valve Label Plates Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting Federal Specification (Fed Spec) QQ-N-281D(2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and Alloy Steel Flowserve 71569102, Feb 2002, User Instructions Manual GEA Westfalia Installation Instructions No. 2058-9601-020 Edition 0211 GEA Westfalia Separator Device list CP, P1451546584-9913-DVL000A Rev A dated 2015-10-19 GEA Westfalia Separator Drawing 8106-2021-029 Rev. 02, dated 2016-01-20 GEA Westfalia Separator Drawing P1451546584-9913-LAY000B dated 2015-10-19 GEA Westfalia Separator Drawing P1451546584-9913-PID000A dated 2015-10-19 GEA Westfalia Separator Operating Data Sheet P1451546584-9913-PDS000 dated 2015-10-19 Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-58, 2009, Pipe Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required MIL-DTL-23549, Sep 2016, Grease, General Purpose MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound MIL-S-22698, Aug 2002; Steel Plate, Shapes and Bars, Weldable Ordinary Strength and Higher Strength: Structural Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2013, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2015, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC)/NACE International (NACE) 2006, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 13 |
| N |
| **Shaft, Main |
| NSN: 3040-01-662-6266 PN: JC-8109-1 |
| 2 ea. |
| $3,637.00 |
| 13 |
| N |
| **Wild Cat, 1 3/8 DI LOK CHAIN CAST STL |
| NSN: 3950-01-662-6869 PN: JB-826600 |
| 2 ea. |
| $42,084.00 |
| 13 |
| N |
| **Gypsy Head Casting, 18 GYPSY HD |
| NSN: 3950-01-662-6879 PN: JB0805902 |
| 2 ea. |
| $36,537.00 |
| 13 |
| N |
| **Brake Band Ass. w/Brake lining, 3/8 X 2 3/4 X 36-11/16 LG |
| NSN: 2530-01-662-9884 PN: JB811200 |
| 2 set |
| $10,258.00 |
| 13 |
| N |
| **Internal Gear or Bull, AISI 1040 |
| NSN: 3020-01-664-3248 PN: JB-8070-1 |
| 2 ea. |
| $26,697.00 |
| 13 |
| N |
| X-1039 Overhaul Kit |
| NSN: 3110-01-668-9516 PN: J213472 |
| 2 kt. |
| $10,908.00 |
| 15 |
| N |
| **Shaft, Main, Steel Alloy |
| NSN: 3040-01-664-3180 |
| 1 ea. |
| $5,233.00 |
| 15 |
| N |
| **Shaft, Intermediate (Only), Steel Alloy |
| NSN: 3040-01-664-3175 |
| 1 ea. |
| $4,038.00 |
| 15 |
| N |
| **Capstan Head, 18" DIA |
| PN: JB805900A |
| 1 ea. |
| $5,000.00 |
| 15 |
| N |
| **Gear, Spur Drive, Steel 1040 |
| NSN: 3020-01-664-3249 |
| 1 ea. |
| $9,486.00 |
| 15 |
| N |
| **Internal Gear or Bull |
| NSN: 3020-01-664-3248 |
| 1 ea. |
| $800.00 |
| 15 |
| N |
| **Gear, Spur Primary |
| NSN:3020-01-662-5907 |
| 1 ea. |
| $3,450.00 |
| 15 |
| N |
| X-1040 Overhaul Kit |
| NSN: 3110-01-668-9494 |
| 1 kt |
| $10,500.00 |
| 17 |
| N |
| GEA Westfalia BilgeMaster-E 500 Clean Design |
| PN: WSE 5-01-037 |
| 1 ea |
| $76,640.00 |
| 17 |
| N |
| Booster Pump Control Panel |
| PN: BCP11-0.5-D-L1-E2-POL-PRL-DSP |
| 1 ea |
| $2,950.00 |
| 19 |
| N |
| 26 inch x 54 inch Quick-Acting Watertight Tight Door, Medium steel, 10 Dogs, Left Hand swing |
| NSN: 2040-00-554-6210 |
| 1 ea. |
| $4,355.00 |
| 22 |
| N |
| 21 inches Diameter Quick-Acting Watertight Flush Scuttle, Steel, 3-Dog, Aft Hinge |
| NSN: 2040-00-554-6911 |
| 2 ea. |
| $2,093.00 |
| 28 |
| Y |
| Fire Pump |
| NSN: 4320-01-674-4640 PN: 71569102 |
| 2 ea. |
| $21,750.00 |
| 28 |
| N |
| Fire Pump Controller |
| NSN: 6110-01-F19-5820 |
| 2 ea |
| $4,492.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 12 |
| Anchor Chain(s) and Ground Tackle, Inspect and Repair |
| 13 |
| Anchor Windlass, Overhaul |
| 15 |
| Warping Capstan, Overhaul |
| 17 |
| Oily Water Separator, Replace |
| 26 |
| 03 Deck Plating, Renew |
Principal Characteristics 210' WMEC (A-Class)
Physical
| Length overall |
| 210' 6" |
| Length between perpendiculars |
| 200' 0" |
| Beam molded |
| 34' 0" |
| Depth molded, main deck amidships |
| 19' 6" |
| Full load displacement |
| 1,170 long tons |
Draft, full load to baseline amidships *Baseline is 9” below keel amidships 12' 0"
| Design drag between perpendiculars |
| 1' 6" |
Highest projection above baseline *VHF-FM ADF antenna 90' 0"
| Shore tie voltage requirements |
| 400A / 440V |
| Frame spacing |
| 1' 0" |
Machinery
| Main propulsion |
| 2 ALCO Model 16-251-CE Diesel Engines, |
5,000 BHP total
| Ship's service generators |
| 2 Caterpillar Model 3406B Diesel-driven SR4, |
250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle
| Emergency generator |
| Caterpillar Model 3306B Diesel-driven SR4, |
180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle
| Number of propellers |
| 2 |
| Propeller diameter |
| 7' 6" |
| Number of blades, Each |
| 4 |
| Pitch |
| Controllable |
| Shaft RPM |
| 300 |
| Shaft diameter |
| 8.25" at exit of hull |
| Anchor & chain |
| Two 2,800 lb Navy Stockless Anchors, |
7 shots of chain each
Tank Capacities
| Diesel fuel total (95%) |
| 47,140 gal. |
| Fresh water total (100%) |
| 11,135 gal. |
| JP-5 fuel total (95%) |
| 4,717 gal. |
| Lube oil total (95%) |
| 2,331 gal. |
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212) General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINS) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures Other References None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to four Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is Small Quantity Generator (SQG).
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
· Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
· National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
· Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
| SSPC-SP-10/NACE No. 2 |
| ( |
| SSPC-SP WJ-1/NACE WJ-1 |
| ( |
| SSPC-SP WJ-2/NACE WJ-2 |
| ( |
| SSPC-SP WJ-3/NACE WJ-3 |
| ( |
| SSPC-SP WJ-4/NACE WJ-4 |
| ( |
| SSPC-SP-3 |
| ( |
| SSPC-SP-11 |
| ( |
| SSPC-SP-11 (inaccessible area) |
| ( |
| Brush-blasting (non-metallic substrate) |
| ( |
Abrasive Manufacturer:
Abrasive Sieve Size:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Place Surface Profile
Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
| SSPC-SP-10/NACE No. 2 |
| ( |
| SSPC-SP WJ-1/NACE WJ-1 |
| ( |
| SSPC-SP WJ-2/NACE WJ-2 |
| ( |
| SSPC-SP WJ-3/NACE WJ-3 |
| ( |
| SSPC-SP WJ-4/NACE WJ-4 |
| ( |
| SSPC-SP-3 |
| ( |
| SSPC-SP-11 |
| ( |
| SSPC-SP-11 (inaccessible area) |
| ( |
| Brush-blasting (non-metallic substrate) |
| ( |
Abrasive Manufacturer:
Abrasive Sieve Size:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
| Date |
| Test Locations |
| Conductivity (Microsiemens/CM) |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Location (Frame Reference):
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
12300_0617_FLT
REC_12311_FLT_210’ WMEC ‘A’ Class (ALL) (0819) WORK ITEM 1: Tanks (Aviation Fuel Service), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
| TYPE OF TANK |
| LOCATION |
| CAPACITY - 95% |
(gallons) LOW SUCTION (gallons)
| JP-5 Fuel Service |
| 4-164-1-J |
| 820 |
| 26 |
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 618 WMEC 123-002, Rev G, New Double Bottom Fuel Tk Structural Dets Coast Guard Drawing 618 WMEC 261-001, Rev G, Diagram - Fuel Oil Coast Guard Drawing 618 WMEC 261-002, Rev M, Arrangement - Fuel Oil Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Other References Federal Specification (Fed Spec) QQ-N-281D(2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2013, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard drawings 618 WMEC 123-002, 618 WMEC 261-001 and 618 WMEC 261-002 for guidance in accomplishing this work.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel’s components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
· Tank access cover
NOTE
Vessel may come in with less tank fluid contents than specified above.
3.1.4.1 The Contractor shall remove up to a total of 820 gallons of JP-5 fuel. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations (see 4.2 (Tank content restoration)).
note Coast Guard personnel will operate all shipboard machinery and equipment.
3.1.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.2 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual water, sediment, sludge, rust, and bacterial growth, taking care not to damage the coating system (if applicable).
3.2.1 Remove cleaning media and residues continuously during the washing process. Wash the tank with high-pressure cold fresh water before it has a chance to dry after emptying. Do not use steam; it can damage the tank’s coating.
3.2.2 Drain and dry the tank using a portable air-driven pump. When dry, and after final visual inspection, close the tank. Submit a CFR.
WARNING
Do not use the Fuel Service or Transfer systems to drain water from the tank. Excessive fuel contamination will result.
3.3 Tank content and waste disposal. The Contractor shall dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
· Tank structural condition.
· Inaccessible areas.
· Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
· Tank level indicator (TLI) and/or float switch condition.
· Sounding/vent tube and striker plate condition.
· Suction and discharge piping condition.
· Fastener material and condition.
3.4.1 Pit measurement. Measure up to 10 “pits” within each tank as designated by the Coast Guard Inspector using a Contractor supplied ‘Pit Gauge’. The results of these measurements shall be included in the inspection report showing location of pit measurements and depth of pit(s).
3.5 Ultrasonic thickness (UT) measurement. The Contractor shall take a total of 50 UT measurements of tank plating in accordance with SFLC Std Spec 0740, Appendix C in locations designated by the Coast Guard Inspector and using drawings in Section 2 (References) as guidance. Submit a CFR.
3.6 Tank closing. The Contractor shall ensure that the tank(s) remain open for approximately 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183. Chase threads on studs to ensure even installation of the access covers. Renew any damaged or non-monel nuts with Nickel-Copper alloy (monel) nuts meeting QQ-N-281, Class A or B. The nuts and bolts shall be of different classes to prevent galling. Existing undamaged fasteners meeting this specification may be reused. For purpose of bid, assume 10% of existing fasteners will require renewal.
3.7 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
4. NOTES
4.1 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.
4.2 Tank inspection. The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.
4.3 Refilling. After final visual inspection and tank closure, Ship’s force will refill tank with JP-5 fuel. Recirculate the fuel until it is clear and bright and passes the MK I and MK III detector kit tests. Flush all lines, pipes, and fittings before placing the JP-5 system back in service.
12300_1118_FLT
REC_63110_FLT_CHNLKR_210 WMEC ‘A’ Class (ALL) (1215) WORK ITEM 2: Chain Locker(s), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the Chain Locker(s).
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 618 WMEC 116-001, Rev-, Forepeak Framing, Chain Locker & Transverse Bulkheads Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Other References None
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard Drawing 618 WMEC 116-001 for guidance in accomplishing this work item.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Anchors and chains.
· Fluid contents of chain locker(s).
· Deck grating.
· Eductor strainer
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.
3.3 Cleaning tasks. The Contractor shall refer to Coast Guard Drawing 618 WMEC 116-001 for guidance and clean all interior surfaces free of all foreign materials, such as sediment or sludge. Remove all persistent residues, taking care not to damage the coating system. Remove cleaning media and residues continuously during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.4 Inspection. The Contractor shall visually inspect sounding tubes and the port and starboard chain locker surfaces, including the sump, bellmouths, chain pipes and all structural members. Submit a CFR including the following, as applicable:
· Structural condition
· Inaccessible areas
· Condition of coating system, including measurements taken, percentage, location, and type of coating failure.
3.5 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
12300_0316_FLT
REC_12311_FLT_210’ WMEC ‘A’ Class (ALL) (0819) WORK ITEM 3: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 - FUEL STORAGE TANKS
| TYPE OF TANK |
| LOCATION |
| CAPACITY - 95% |
(gallons) LOW SUCTION (gallons)
| Diesel Fuel Storage |
| 4-62-0-F |
| 6078 |
| 192 |
| Diesel Fuel Storage |
| 4-72-1-F |
| 1754 |
| 55 |
| Diesel Fuel Storage |
| 4-72-2-F |
| 1754 |
| 55 |
| Diesel Fuel Storage |
| 4-84-1-F |
| 1938 |
| 61 |
| Diesel Fuel Storage |
| 4-84-2-F |
| 1938 |
| 61 |
| Diesel Fuel Storage |
| 4-96-4-F |
| 6313 |
| 199 |
| Diesel Fuel Storage |
| 4-96-5-F |
| 6313 |
| 199 |
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 618 WMEC 123-002, Rev G, New Double Bottom Fuel Tk Structural Dets Coast Guard Drawing 618 WMEC 261-001, Rev G, Diagram - Fuel Oil Coast Guard Drawing 618 WMEC 261-002, Rev M, Arrangement - Fuel Oil Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes Other References Federal Specification (Fed Spec) QQ-N-281D(2), Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183A, 2013, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General. The Contractor shall use the Coast Guard drawings listed under Section 2 (References) as guidance in accomplishing this work item.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Piping
· Tank access cover
· Fuel
3.1.4.1 Remove up to a total of 26,088 gallons of fuel. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
NOTE
Vessel may come in with less tank fluid contents than specified above.
3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations (see 4.2 (Tank content restoration)).
3.1.4.3 Provide the following to support Coast Guard personnel to refuel equipment:
· boom around cutter
· tagout crane way equipment
· Oil transfer supervisor.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
NOTE
Initial and post repair operational tests apply only to tanks that possess TLIs.
3.1.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform…
This is the start of the file's text. The full file is on GovTribe.