Video Management System Bid Schedule Amended 3.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
Category 4C Snow and Ice Control Chemicals
Solicitation number
7
Issued by
Kootenai County, Idaho

About this file

This document is an amendment to the bid schedule for a Video Management System contract opportunity. The contract is for the design, installation, and support of the Video Management System, including cameras, racks, and other associated equipment. Bidders must provide fully burdened unit costs for the various components and services, including overhead, salaries, administrative expenses, travel, profit, and supplies. Award will be based on the lowest total cost across the three bid tables covering professional services, equipment, and ongoing costs.

The contract opportunity is for state and local agencies in Idaho, specifically Boundary County, Idaho County, and Kootenai County. Bidders must utilize the provided bid schedule format and cannot alter the format. Failure to comply will result in the bid being found non-responsive. The contract term and any renewal options are not specified.

View the file

Other files

File Type Posted
Attachment 6 Mandatory Technical Proposal Response.docx DOCX document
Standard-Terms-and-Conditions_May-2021.pdf PDF
Exhibit 1 - Fuel Surcharge Calculator.xlsx XLSX spreadsheet
Insurance Requirements.docx DOCX document
Standard-Terms-and-Conditions_May-2021 (6).pdf PDF
ATTACHMENT 4 COVER FORM.docx DOCX document
Attachment 7 - Contract Template.docx DOCX document
RFQ_Event 189 Admin Documents Elevator Maintenance.docx DOCX document
Signature Page ITB RFP August 2020.pdf PDF
Standard Terms and Conditions_May 2021.pdf PDF
solicitation_instructions Jan 2017.pdf PDF
ITB Event 251 Administrative Document Amended 1.docx DOCX document
Signature+Page.pdf PDF
solicitation_instructions+Jan+2017.pdf PDF
ATTACHMENT 1 PREPROPOSAL CONFERENCE.docx DOCX document
ATTACHMENT 3 MODIFICATIONS AND EXCEPTIONS.docx DOCX document
Event 106 Administrative Document Amended 1.docx DOCX document
RFQ_Event 134 Password Vault Software V3.docx DOCX document
RFQ_Event 206 Microsoft eLearning Tools.docx DOCX document
Administration Document - Category 4C Ice and Snow Chemicals (1).docx DOCX document
Attachment 2- Bid Schedule.xlsx XLSX spreadsheet
Insurance Requirements 2023.docx DOCX document
ATTACHMENT 2 BIDDERS QUESTIONS ANSWERED.docx DOCX document
ATTACHMENT 5 COST PROPOSAL.xlsx XLSX spreadsheet
Amendment 1.docx DOCX document
Signature-Page-RFQ.docx DOCX document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment 2 - Bid Schedule Amended 1
(ME) Attachment 2, Bid Schedule must be completed and submitted with your bid. The Bidders must provide a fully burdened rate which must include, but not be limited to, all operating and personnel expenses, such as: overhead, salaries, administrative expenses, travel, profit, and supplies. All Offerors must utilize the Tables below to submit their bid. Bidders must not alter or change the format of Attachment 2, Bid Schedule. Bidders not complying with this requirement shall be found non-responsive and shall receive no further consideration for award. Percentage markup is calculated using Contractors Selling Price per Unit subtracted by Contract Cost Per Unit and divided by Contractors Cost per Unit. Award will be made based off the lowest fully burdened total cost for Table One, Table Two, and Table Three.
Bidding on Location(s):
Table One - Professional Services
DescriptionUnit CostQuantityUnit of MeasureTotal Cost
Design1HOUR$0.00
Installation1COST PER CAMERA (FULLY BURDENED, TO INCLUDE RUNNING CABLE NO MORE THAN 350 FEET$0.00
Support1YEAR$0.00
FULLY BURDENED TOTAL COST$0.00
Table Two - Cameras, Racks, Video Management System
DescriptionContractors Sellering Price per UnitContractors Cost Per UnitQuantity
for Evaluation Purposes OnlyUnit of MeasureTotal CostPercentage Markup
Video Management System (Brand Name Only)1EA$0.00ERROR:#DIV/0!
Cameras including 5 Year Care+ Licesing and 2 mount kits per model- Please list make and model below1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
1EA$0.00ERROR:#DIV/0!
Racking Server1EA$0.00ERROR:#DIV/0!
Fully Burdened Total Cost$0.00
Table Three - Ongoing Costs
DescriptionUnit CostQuantityUnit of MeasureTotal Cost
Professional+ License1EA$0.00
Corporate License1EA$0.00
Expert License1EA$0.00
Kite License1CAMERA (60 DAY STORAGE/30FPS)$0.00
Maintenance and Service1YR$0.00
Maintenance and Service for Existing Systems1YR$0.00
Fully Burdened Total Cost$0.00
FULLY BURDENED TOTAL COST FOR TABLE ONE, TABLE TWO, AND TABLE THREE:$0.00

File details come from the government source that posted it. Updated .