This is an Invitation to Bid issued by the City of Manhattan Beach, California for the Veterans Parkway Fitness Station Replacement Project (D-933). The project involves mobilization, demolition, grading, erosion control, and removal of existing exercise equipment and pad at 1104 N. Valley Drive, followed by construction of a new 36' x 36' stabilized aggregate surfacing, installation of City-provided exercise equipment with reinforced concrete foundations, signage installation, drinking fountain replacement, reconstruction of two ADA parking stalls with permeable concrete, concrete walkway replacement, irrigation and landscaping restoration, and water quality improvements. The bid consists of 27 line items covering mobilization, site preparation, surfacing, equipment installation, concrete work, parking improvements, stormwater control, and related work. The pre-bid meeting is scheduled for November 30, 2026 at 10:00 am at the project site. Questions must be submitted by December 1, 2026, with sealed bids due by 10:00 am on December 10, 2026, submitted electronically through the City's OpenGov e-Procurement Portal. The anticipated award date is January 2027, with a project duration of 60 working days (40 working days construction plus 20 working days preconstruction).

The estimated bid value is $275,000 with a 90-day bid validity period. A Class A contractor license is required. Bidders must provide a 10 percent bid bond, 100 percent payment bond, 100 percent performance bond, and 10 percent warranty bond. Liquidated damages are assessed at $350 per day. Required bid submission documents include completed bid schedule, acceptance of addenda, subcontractor designation form, signed bidder's proposal, references form, notarized bid bond, noncollusion declaration, and evidence of signatory authority. Bianca Cardenas, Senior Civil Engineer, serves as the City contact at (310) 802-5357 or bcardenas@manhattanbeach.gov. The bid documents do not indicate any set-asides for small business or disadvantaged contractor categories.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF MANHATTAN BEACH

INVITATION TO BID

ITB No. E1312-26C

VETERANS PARKWAY FITNESS STATION

REPLACEMENT PROJECT (D-933)

RELEASE DATE: November 12, 2026

Bianca Cardenas

Senior Civil Engineer

(310) 802-5357

DEADLINE FOR QUESTIONS: December 1, 2026

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/citymb https://secure.procurenow.com/portal/%7bproject.government.code%7d

1. Introduction

1.1. Summary

The City of Manhattan Beach (“City”) invites sealed bids on the project described herein to be submitted via the City’s e-Procurement Portal, OpenGov. Proposals will be received until 10:00 am on Thursday, December 10, 2026.

The Veterans Parkway Fitness Equipment Replacement Project consists of mobilization, demolition, grading, and erosion control of the existing exercise equipment and pad at 1104 N. Valley Drive, Manhattan Beach, CA, south of City Parking Lot 7 (near 10th Place and N Valley Drive), and construction of a new 36’x36’ stabilized aggregate surfacing, installation of City-provided exercise equipment, including reinforced PCC foundations, installation of signage, replacement of the drinking fountain, reconstruction of two ADA parking stalls with permeable concrete, replacement of a portion of the concrete walkway, restoration of irrigation and planting, water quality improvements, and related work, all in accordance with the Contract Documents.

Estimated Bid Value: $275,000

Bid Valid: 90 days

Liquidated Damages: $350/day

Anticipated Award Date: January 2027

Project Duration: 60 Working Days (40 Working Days Construction + 20 Working Days Preconstruction)

License Requirements: Class A

Bid Bond: 10%

Payment Bond: 100%

Performance Bond: 100%

Warranty Bond: 10%

1.2. Background

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work performance is to be in strict conformance with the

Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to perform and materials to be furnished are approximations only and is the basis for the comparison of Bids. Actual quantities of Work to perform may vary at the discretion of the City

Engineer.

Please review the attachment section for further bid documents and details regarding the Notice to

Proceed to Fulfill Preconstruction Requirements and Order Materials.

Invitation to Bid #E1312-26C Title: Veterans Parkway Fitness Station Replacement Project (D-933)

1.3. Contact Information

Bianca Cardenas

Senior Civil Engineer

3621 Bell Avenue

Manhattan Beach, CA 90266

Email: bcardenas@manhattanbeach.gov

Phone: (310) 802-5357

Department:

Public Works

1.4. Timeline

Release Project Date November 12, 2026

Pre-Bid Meeting (Non-Mandatory) November 30, 2026, 10:00am

Project Site - City Parking Lot 7 - 1104 N. Valley

Drive, Manhattan Beach, CA (near 10th Place and N

Valley Drive)

Question Submission Deadline December 1, 2026, 10:00am

Bid Submission Deadline December 10, 2026, 10:00am mailto:bcardenas@manhattanbeach.gov tel:(310)802-5357

2. Bidder's Checklist

2.1. TO THE BIDDER

The following information is required of all Bidders at the time of Bid submission:

Online via OpenGov:

1. Online Completed Bid Schedule

2. Online Acceptance of Addenda (if any)

3. Online Completed Subcontractor Designation Form

Scanned copy submitted as attachment in OpenGov:

1. Completed and Signed Bidder's Proposal - Contractor’s Statement

2. Completed References Form (Included with Contractor's Statement)

3. Completed, Signed and Notarized Bid Bond or Other Security Form

4. Signed Noncollusion Declaration Form

5. Evidence satisfactory to the City indicating the capacity of the person(s) signing the Bid to bind the Bidder

Failure of the Bidder to provide all required information in a complete and accurate manner may cause the Bid to be considered non-responsive.

2.2. How to Submit

Bids will be received electronically through OpenGov. A bid received after the time set for the bid opening shall not be considered. Bidders are required to submit (upload) all items listed in the BIDDER’S

CHECKLIST including acknowledgement of all addendums. Bids will be received prior to 10:00 am

Thursday, December 10, 2026, and will be opened online at that time.

3. Bidder's Proposal

To the Honorable Mayor and Members of the City Council:

In compliance with the Notice Inviting Bids, the undersigned hereby agrees to execute the Contract to furnish all labor, materials, equipment and supplies for the Project in accordance with the Contract

Documents to the satisfaction and under the direction of the City Engineer, at the following prices:

BASE BID SCHEDULE

Line Item Description Quantity Unit of

Measure Unit Cost Total Code

1 Mobilization (5% maximum of Total Bid

Price)

1 LS %

2 Clearing and Grubbing, including Demolition and Unclassified

Excavation

1 LS %

3 Site Grading, including

Cut, Fill, Export, Compaction, Fine

Grading and Grade to

Drain

1 LS %

4 Furnish and Install

Organic-Lock Stabilized

Aggregate (or approved equal)

Surfacing Over Crushed

Miscellaneous Base

1,300 SF --

5 Install Owner

Furnished Fitness

Equipment Set with

Signage

1 LS C

6 Furnish and Install

Drinking Fountain, including all appurtenances, concrete pad, potable water connection, and drain

1 LS C

Line Item Description Quantity Unit of

Measure Unit Cost Total Code

7 Construct Concrete

Walkway

510 SF --

8 Construct 12-inch

Pervious Concrete

Pavement over 90%

Compacted Native Soil

1,110 SF --

9 Construct 6-inch

Concrete Curb with 12-inch Gutter

40 LF --

10 Construct Variable

Height Concrete Curb

35 LF --

11 Construct 8-inch Wide

12-inch Deep Concrete

Mow Strip

85 LF --

12 Furnish and Install 2-inch Bollard

4 EA --

13 Furnish and Install 2-inch by 6-inch

Redwood Header

20 LF --

14 Install and Furnish

Accessible Parking Sign, including post and foundation

2 EA C

15 Install and Furnish

Unauthorized Parking

Sign, including post and foundation

1 EA C

16 Adjust to Finished

Surface Existing

Handhole Lid

1 EA C

Unit Cost Total Code

17 Construct Caltrans

Backing No. 3 (D50 = 4-inch) Placement

Method B over

Caltrans Class 8 RSP

Fabric

260 SF --

18 Furnish and Install

Cast-In-Place ADA

Detectable Warning

Surfaces

100 SF --

19 Furnish and Install

Concrete Wheel Stops

2 EA --

20 Install Striping and

Pavement Markings

1 LS C

21 Furnish and Install 4-inch depth of Nitrogen

Stabilized Mulch

685 SF --

22 Landscaping

Modifications

1 LS C

23 Irrigation Modifications 1 LS C

24 Traffic Control & Public

Notification (5%

Maximum of Total Bid)

1 LS S, %

25 Stormwater Control, BMPs, NPDES

Compliance, and

Permit

1 LS %

26 Surveying &

Monument

Preservation

1 LS S, %

TOTAL

BASE BID SCHEDULE CONTINUED - PRESET UNIT COST

Unit Cost Total Code

27 Special Project Site

Maintenance and

Public Convenience and Safety (Only as

Directed By City)

1 LS $2,000.00 %

TOTAL

4. Vendor Questionnaire

4.1. Bidder's Proposal - Contractor's Statement*

Please upload completed Contractor's Statement here:

(Contractor's Statement found in Bid Documents)

*Response required

4.2. Bid Bond*

Please upload all documents pertaining to the bond requirements here:

(Bid Bond template found in Bid Documents)

*Response required

4.3. Noncollusion Declaration Form*

Please upload completed Non-collusion Declaration Form here:

(Non-collusion Declaration Form found in Bid Documents)

*Response required

4.4. Evidence of capacity of the person(s) signing the Bid to bind the Bidder* *Response required

4.5. Designation of Subcontractors*

List all Subcontractors who will perform Work or labor or render service to the Contractor in or about the construction of the Work or improvement, or a Subcontractor licensed by the State of California who, under subcontract to the Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed drawings contained in the Plans and Specifications, in an amount in excess of one-half of one percent of the Contractor’s total Bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one-half of one percent of the

Contractor’s total Bid or $10,000.00, whichever is greater. If all Subcontractors do not fit on this page, attach another page listing all information for all other Subcontractors.

*The percentage of the total Bid shall represent the “portion of the work” for the purposes of Public

Contract Code Section 4104(b).

Name under which

Subcontractor is Licensed and

Registered

CSLB License

Number(s) and Class(es)

DIR

Contractor

Registration

Number

Address and

Phone

Number

Type of Work

(e.g., Electrical)

Percentage of

Total Bid (e.g., 10%)

*Response required

1. Introduction
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Bidder's Checklist
2.1. TO THE BIDDER
2.2. How to Submit
3. Bidder's Proposal
4. Vendor Questionnaire
4.1. Bidder's Proposal - Contractor's Statement*
4.2. Bid Bond*
4.3. Noncollusion Declaration Form*
4.4. Evidence of capacity of the person(s) signing the Bid to bind the Bidder*
4.5. Designation of Subcontractors*

File details come from the government source that posted it. Updated .