VendorChangeDetailsReport_39818_v1_Nov_13_26.pdf

PDF 2 KB Posted

Attached to
Architectural & Engineering Services
Solicitation number
39818
Issued by
Hartford County, Connecticut

About this file

This is a Solicitation Change Details Report for Connecticut's Housing Corporation of East Windsor (HCEW), documenting an amendment to Solicitation 39818 for Architectural & Engineering Services. The solicitation seeks qualifications and proposals for on-call architectural and engineering services to support Phase 1 development of approximately 120 residential units at Park Hill in East Windsor, Connecticut. The original proposal deadline was Friday, November 13, 2026 at 4:00 p.m. ET, though bidders are advised to confirm the controlling deadline against Addendum #1. Interviews are scheduled for the weeks of November 23 and 26, 2026, with contract effectiveness expected in December 2026. The scope encompasses conceptual design and feasibility studies including site-condition and zoning evaluation, three building design concepts, preliminary engineering and site layout, utility and infrastructure analysis, opinions of probable construction cost, and permitting analysis. HCEW may select an architectural firm and engineering firm separately or engage a single multidisciplinary team, with potential for additional task orders or later phases contingent upon funding availability and satisfactory performance.

Funding for this project derives from a 2025 State of Connecticut Community Investment Fund (CIF) planning grant, with the selected firm subject to final approval by the Connecticut Department of Economic and Community Development (DECD) under CIF requirements. Required qualifications include demonstrated experience with non-profit organizations and completed multifamily affordable housing projects, a minimum of three references, and appropriate insurance coverage. Evaluation criteria prioritize experience with affordable housing and similar projects (30%), project team qualifications (20%), understanding of the project and proposed approach (20%), experience with DECD, DOH, CHFA, and HUD-funded developments (10%), references and past performance (10%), and proposed fees and hourly rates (10%). Fee proposals must include hourly rates, staff participation schedules, and Phase 1 expense budgets with rates held constant for the full project duration. The report indicates that one document, "On-Call Architect_Engineering RFQ_RFP Amendment_Submission Requirements.pdf," was added as part of this amendment.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Change Details Report Solicitation no.39818

'Architectural & Engineering Services'

Header Information

There are no changes under this section.

Solicitation Fields

Solicitation Questionnaire

Documents Added

1. Document: 'On-Call Architect_Engineering RFQ_RFP Amendment_Submission

Requirements.pdf' was added.

Solicitation Group Changes

Report Created: Nov 13, 2026 9:58 AM EST Page: 2

Solicitation 39818, Architectural & Engineering Services

Item Specifications and Quantities

File details come from the government source that posted it. Updated .