Vendor Questions RFP 26 2264.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Heavy Equipment Simulator System
Solicitation number
RFP 171 260000002264 2
Issued by
Michigan

About this file

This document is a vendor questions and state responses sheet for Michigan Department of Corrections (MDOC) RFP 26-2264 concerning a Heavy Equipment Simulator System procurement. MDOC anticipates purchasing two initial simulator units, possibly from different vendors, with potential expansion to additional facilities beyond the currently identified location at Handlon Correctional in Ionia, Michigan. The system must simulate common construction equipment such as excavators, skid steer loaders, and wheel loaders, with vendors required to provide their complete equipment simulation module options. The procurement calls for a multi-equipment simulator platform with common hardware and multiple software modules rather than separate stations for each equipment type. Two physical simulator stations are expected to operate simultaneously at each facility, managed by one instructor station. Bidders must provide detailed specifications regarding display capabilities, physical controls for immersive training, and equipment dimensions for standard doorway and electrical installation. The state requires vendors to deliver complete timelines for hardware delivery, assembly, installation, and commissioning, with software configuration expected within 120 calendar days of contract execution. Instructor training using train-the-trainer methodology is required, which may be delivered in-person or remotely, though vendor staff must be present onsite for final installation and initial setup.

The state does not disclose budget information for this RFP. Training curriculum should ideally follow industry standards such as NCCER or OSHA but is not mandatory. The simulator systems will not access Criminal Justice Information (CJIS) systems; however, all contractor and subcontractor staff with potential CJIS access must sign the CJIS Security Addendum. Security Officer qualifications require a bachelor's degree in a related field with relevant certifications noted, though specialized certifications such as CISSP or CISM are not mandatory requirements. FedRamp compliance is only applicable if the system is hosted outside the State of Michigan network. Vendors must provide onsite installation and initial setup services and cannot rely solely on remote cellular connections for system deployment. The state reserves the right to add additional facility locations during the contract term.

View the file

Other files

File Type Posted
Schedule G1 G2 G3.pdf PDF
MDOC Heavy Equip Simulation Combined RFP - Software 2 2026.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

State of Michigan RFP 26*2264 MDOC - Heavy Equipment Simulation System
Vendor QuestionsState Responses
1A. What quantity of physical simulator systems does MDOC anticipate purchasing under the initial delivery order? B. Are estimated quantities available for the initial contract term and renewal periods?A. 2 initial simulators, possibly from different vendors. B. TBD
2How many MDOC facilities are expected to receive the systems, and can the anticipated installation locations be provided?Currently, Handlon Correctional in Ionia, MI. The State reserves the right to add locations during the term of the Contract.
3Which specific heavy equipment types must be included in the proposed solution?Common construction equipment such as excavators, skid steer, wheel loaders, etc. would be considered.

The bidders should list their full equipment options.

4 Is there a minimum number of equipment simulation modules required for each simulator? No The bidders should list their full list of simulation models for each simulator.

5Is one multi-equipment simulator platform using common hardware and multiple software modules acceptable, or are separate simulator stations required for each equipment type?One multi-equipment simulator with common components is acceptable.
6What minimum physical controls are required, such as steering wheel, joysticks, pedals, transmission controls, stabilizer controls, or other machine-specific controls?The most immersive experience to simulate what operating would feel like is preferred.
7How many physical simulator stations are expected to operate simultaneously at each facility, and how many stations should one instructor station be capable of managing?2
8Are there minimum requirements for the number, size, resolution, or field of view of the simulator displays?The most immersive experience to simulate what operating would feel like is preferred. The bidders should list their full display capabilities.
9Is the training curriculum expected to follow a specific vocational or industry standard, such as NCCER, OSHA, or another equipment-operator training standard?Desired but not required. The bidder must list their complete training curriculum.
10Will the simulator systems process or access Criminal Justice Information, or connect to any system subject to CJIS requirements?CJIS is included in all MDOC related RFPs. No, simulators will not have access to the CJIS.
11Are there installation-site constraints that bidders should consider, including room dimensions, doorway clearances, floor-load limits, available electrical service, network availability, or equipment-access restrictions?Standard doorway and standard electrical. The bidders should provide a spec sheet with dimensions for set up.
12Does the “Installation and Configuration of Software – Contract Execution + 120 calendar days” milestone also include delivery, assembly, installation, and commissioning of the physical simulator hardware? If not, what delivery and installation schedule should bidders use for the hardware?The bidders should provide their expected milestones for MDOC to consider.
13Ask them would they interested in a lab setup because it’s 40-50 trainees instead of 1 simulatorNo.
14What kind of training would MDOC need for forklifts, bulldozers, or Crain what specifically heavy equipment training are they looking forInstructor training would be required. (Train the trainer)

The bidders should provide MDOC with their usual training methods, can be in person or remote.

15What is the budget ?The State does not disclose the budget for our RFP's.
16Our simulator does not require internet or network access necessarily. It can be allowed if you want to enable certain features but we don't have to do that. We can set the simulator up on it's own private network that only allows it to communicate between the machines we install and needs no outside network access. Considering this, I believe the G-3 form CJIS Security Addendum should not apply? Please confirm this.Contractors and subcontractor staff with access to CJIS must sign the CJIS Security Addendum.
17Our staff can come to the prison and setup the equipment and provide training for you if you like. However, we can also facilitate the installation and initial setup and training remotely over a private wireless cell signal if that would be easier.They must come onsite for installation and initial set up.
18Regarding the Project Manager and Security Officer requirements. We're working through these and just wanted to confirm if the Security Officer certifications are a hard requirement as we're not sure if we have all the CISSP or CISM certifications you are mentioning, however it is unlikely any heavy equipment simulator will have a security officer with those high level certifications. However, we do not need to connect the simulator to your network or the internet if that would allow us to circumvent these requirements.We do not have specific Security certifications that we look for; we do expect the Security Officer to have a bachelors degrees in that field and any certifications in that field should be pointed out.
19It is possible for us to have the simulator delivered to you and allow your internal team to unbox it and roll it into the location it will be setup. We can then remote into the machine over a cellular connection (provided cell signals are not being blocked) and walk you through the training and initial setup fully remotely. This would circumvent the need to send a person to physically install the system in the prison and any connections to your internal network. If this setup option would be preferred would it allow us to meet and or alleviate many of these issues?We can accept delivery and get it to the final location, but the vendor would need to come onsite for installation and initial set up. We cannot depend on cellular or remote work.
20Do you know- is the FedRamp a requirement or was this just pulled from possibly past RFP's?FedRamp is only applicable if the system is hosted outside of the State of Michigan network.

File details come from the government source that posted it. Updated .