Request for Qualifications and Proposals Summary

This is a Request for Qualifications (RFQ) and Request for Proposals (RFP) issued by the City of Torrington, Connecticut for hazardous building materials abatement services at 245 E. Elm Street, Torrington, CT. The project involves complete removal and abatement of asbestos-containing materials (ACM), lead-based paint (LBP), and other hazardous materials from the second and third floors of a 1.6-acre property. The scope includes six primary tasks: development of an abatement and renovation work plan, project permitting and regulatory notifications, ACM abatement in accordance with approved Alternate Work Practices, lead paint renovation, selective demolition to access hazardous materials, and contract closeout with proper waste documentation and disposal. The base bid includes removal of identified ACM, with two alternate bids for window sash removal (exterior and interior methods). A mandatory pre-bid site walk is scheduled for September 3, 2026 at 11:00 AM at the project location. All questions must be submitted by September 8, 2026 at 12:00 PM, with an addendum to be posted by September 11, 2026. Sealed bid packages are due no later than 11:00 AM on September 17, 2026 at the City of Torrington Purchasing Department, 140 Main Street, Room 206, with a public bid opening scheduled for the same date and time (with a call-in option available). The selected contractor is expected to commence work in October 2026 upon contract award and completion is anticipated by December 31, 2026, with an approximate project duration of 90 days including mobilization and demobilization. The City reserves the right to accept or reject any proposals, waive informalities, and enter into negotiations with selected respondents.

The project is funded through a Connecticut Department of Economic and Community Development (DECD) Municipal Brownfield Remediation Grant in the amount of $346,000. Bidders must provide a bid bond equal to 5% of the project cost, with the selected contractor required to provide 100% Performance and 100% Labor and Material Payment Bonds. The contract is subject to Connecticut prevailing wage requirements per Connecticut General Statute Section 31-53c, with current wage rates available from the Connecticut Department of Labor website. State spending allocation goals include a Small Business Enterprise (SBE) goal of $39,418 (11.4% of total project cost) and a Minority Business Enterprise (MBE) goal of $37,418 (10.8% of total project cost); the selected contractor must demonstrate good faith efforts to meet these goals and comply with Connecticut General Statutes 4a-60, 4a-60g, and 46a-68b through 46a-68f. The contractor must be registered under Connecticut Department of Environmental Protection's (DEEP) General Permit for Registered Existing Release Response Contractors prior to beginning work. Proof of insurance including Worker's Compensation, Commercial General Liability ($1M per occurrence, $2M general aggregate), Umbrella Liability, and Vehicle Insurance must be filed within 10 days of award, naming the City of Torrington and the State of Connecticut as additional insureds. Federal procurement requirements apply, including compliance with 2 CFR 200.322, 200.325, and 200.326. The City may terminate the contract upon thirty (30) days' notice to the contractor. Affirmative Action/Equal Opportunity Employer provisions apply, and Minority/Women's Business Enterprises are encouraged to apply.

View the file

Other files

File Type Posted
VAP-039-091726_Sep_1_26_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Torrington

REQUEST FOR QUALIFICATIONS (RFQ) & PROPOSALS (RFP)

VINNY’S 2ND AND 3RD FLOOR ABATEMENT PROJECT

245 E. ELM STREET

Torrington, CT

RFQ/RFP VAP-039-091726

The City of Torrington is issuing this Request for Qualifications (RFQ) and Request for Proposal (RFP) to retain a contractor that is registered under DEEP’s General Permit for Registered Existing Release Response Contractors to complete the hazardous building materials abatement of the second and third floors of the building located on the 1.6-acre property at 245 E. Elm Street, Torrington, CT (125/006/011).

The City of Torrington was awarded a Brownfield Remediation Grant from the Connecticut Department of Economic and Community Development to complete the abatement of on-site hazardous materials to enable its future use as a banquet facility. The intent of this RFQ/RFP is to solicit bids for this project and select a contractor that is qualified to complete the Hazardous Building Materials Abatement work specified in the Technical Specifications (APPENDIX A).

There will be a public opening of this Bid Contractors may attend or call in on September 17, 2026 at 11:00 am

(605-475-4700, access code: 349779#)

An Affirmative Action/Equal Opportunity Employer. Minority/Women’s Business Enterprises are encouraged to apply. This contract is subject to state spending allocation goals and contract compliance requirements.

VINNY’S 2ND AND 3RD FLOOR ABATEMENT PROJECT

RFQ/RFP VAP-039-091726

Contents

INSTRUCTIONS TO BIDDERS

SUBMITTAL REQUIREMENTS

EVALUATION AND SELECTION CRITERIA

SCOPE OF WORK

TASKS

SITE WALK

PROJECT SCHEDULE

INSTRUCTIONS TO BIDDERS

The Respondent’s submittal shall include:

One (1) original of the entire bid package, One (1) exact copy of the entire bid package, and One (1) thumb drive containing the entire bid package.

Bid packages shall be mailed to the Purchasing Department, 140 Main Street, Room 206, Torrington, CT 06790, during normal office hours by no later than 11:00 AM, September 17, 2026. Submittals received after this date and time will not be accepted. Sealed envelopes should be clearly marked:

“RFQ/RFP VAP-039-091726 Vinny’s 2nd and 3rd Floor Abatement Project”. In the case where City Hall is closed for weather-related or some other emergency-related circumstance, then submittals shall be due the next day when City Hall reopens for business, no later than 11:00 AM on that day.

Fax or email submissions will not be accepted.

All questions must be submitted by September 8, 2026, by 12:00 PM. Questions must be submitted by email to the City of Torrington Purchasing Agent Pennie Zucco (pennie_zucco@torringtonct.org).

All questions determined to be of interest to all prospective firms will be answered in writing by an addendum, which will be posted on the City’s website and the state’s websites. It is the responsibility of potential bidders to check these websites for addendum(s). Interested firms should check the website 48 hours before the closing date.

This RFQ/RFP does not commit the City of Torrington to select any Respondent or enter into any contract agreement. The City of Torrington reserves the right to accept or reject any or all RFQ/RFP to waive any informalities and, if it is deemed to be in the public’s best interest, to enter directly into negotiations with one or more Respondents based on responses to the RFQ/RFP, and to request additional information from some or all Respondents. The City of Torrington reserves the right to accept any proposal deemed in the best interests of the City of Torrington.

The City will not be liable for any costs incurred by a firm in the preparation or submission of a proposal.

The information provided herein is not intended to, and shall not, bind the City of Torrington to any of the statements or assumptions set forth herein.

Responses must set forth accurate and complete information for each item listed below. At the City's discretion, failure to do so could result in disqualification.

The successful bidder will be expected to commence services as soon as possible upon award, as determined by the City. Any contract entered into by the City and the successful bidder shall provide that the City may terminate the contract upon thirty (30) days’ notice to the bidder. The information provided herein is not intended to and shall not bind the City of Torrington to any of the statements or assumptions set forth herein.

The contractor who is selected to perform this State project must comply with CONN. GEN.

STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f.

RFQ/RFP VAP-039-091726

This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. There is $346,000 in state-funding for this project. State law requires project-specific goals be set for this project based on the project’s needs and available Small Business Enterprises (“SBEs”) and Minority Business Enterprises (“MBEs”). The SBE goal for this project is $39,418. The MBE goal for this project is $37,418. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.

FEDERAL PROCUREMENT: Any procurement made pursuant to a federal ward or subject to reimbursement, in whole or in part, with federal funds must comply with the City of Torrington’s purchasing procedures, State law and the applicable Federal Procurement Requirements, including 2 CFR § 200.322 (“Procurement of recovered materials”), 2 CFR § 200.325 (“Bonding requirements”), and 2 CFR § 200.326 (“Contract provisions”). In the event of any conflict between Town, State, or federal requirements, the most stringent requirements must be used (See 2 CFR § 200.318.) City employees must comply with funding agency requests for review of technical specifications or procurement documents as provided in 2 CFR § 200.324.

SUBMITTAL REQUIREMENTS

Qualification packages and sealed Cost Proposals for the 2nd & 3rd Floor Abatement Project are due no later than 11:00 A.M. (EST) on September 17, 2026.

A complete package shall include:

One (1) Original of the Qualification Package and Cost Proposal One (1) Exact Copy of Qualification and Cost Proposal, and One (1) thumb drive containing the entire bid package.

The ORIGINAL Qualification Package and Cost Proposal must be submitted in two (2) sealed envelopes, clearly labeled:

1. ENVELOPE A – “Statement of Qualifications [Bidder Company Name]: RFQ/RFP 039- 091726, Vinny’s 2nd & 3rd Floor Abatement Project”

a. Envelope A shall contain a Thumb Drive with the entire Bid Package, including the Cost Proposal.

2. ENVELOPE B – “Cost Proposal [Bidder Company Name] RFQ/RFP 039-091726, Vinny’s 2nd & 3rd Floor Abatement Project”

ENVELOPE A:

1. Cover letter signed by an officer of the firm, binding the firm to all the commitments made in the proposal. Must include a statement that the proposal remains valid for a period of at least ninety (90) days from the date of its submission

2. Bid Bond in the amount of 5% of the project cost.

3. The Business name(s), business address, phone number, and e-mail address of the prime consultant and all sub-consultants.

4. Description of the project team, including resumes of all key personnel that would be assigned to this project. Include pertinent business and individual licenses, certifications, and other related registrations required to complete this project.

5. Project narrative outlining the proposed approach, methodology, and process to the project, including deliverables based on the Scope of Services and as outlined in the project Technical Specifications (APPENDIX A).

6. Demonstrated ability to meet the Proposed Project Timeline

7. Minimum of 3 References for previous and/or current contracts on projects of similar scope. Include dates of contract/project, services performed and fees for services, contact information for municipality or business, statement on project status or project outcome.

8. ATTACHMENT 1: Proposal Checklist

9. ATTACHMENT 2: Proof of Insurance and Liability

10. ATTACHMENT 3: Acceptance of Terms of this Agreement

11. ATTACHMENT 4: Non-Collusion Affidavit

12. ATTACHMENT 5: CHRO Good Faith Efforts Plan Short Form (all pages)

13. Thumb Drive containing the entire Bid Package, including the Cost Proposal

ENVELOPE B

1. ATTACHMENT 6: Cost Proposal Form

2. Hourly Rates and Expense Schedule.

NOTICES

1. CHRO

The contractor who is selected to perform this State project must comply with CONN. GEN.

STAT. §§ 4a-60, 4a-60g, and 46a-68b through 46a-68f.

This contract is subject to state contract compliance requirements, including nondiscrimination statutes and spending allocation goals. There is $346,000 in state-funding for this project. State law requires project-specific goals be set for this project based on the project’s needs and available Small Business Enterprises (“SBEs”) and Minority Business Enterprises (“MBEs”). The SBE goal for this project is $39,418. The MBE goal for this project is $37,418. The selected contractor must demonstrate good faith effort to meet the spending allocation goals.

2. DAS

Submittals must demonstrate compliance with the State of Connecticut DAS qualification requirements.

3. BID BOND

Each firm submitting a bid proposal must deliver with the proposal a bid bond in the amount of 5% of the project cost.

The selected contractor will be required to provide a 100% Performance Bond and a 100% Labor and Material Payment Bond.

4. PREVAILING WAGE

The Connecticut Department of Labor (CTDOL) has determined that this project is covered by Conn. Gen. Stat. Section 31-53c and is subject to prevailing wage.

The wages paid on an hourly basis to any person performing the work of any mechanic, laborer, or worker on the work herein contracted to be done and the amount of the payment or contribution paid or payable on behalf of each person to any employee, welfare fund, as defined in subsection

(i) of the section 31-53, shall be at a rate equal to the rate customary or prevailing for the same work in the same trade or occupation in the town in which such construction, remodeling, refinishing, refurbishing, rehabilitation, alteration or repair project is being undertaken. Any contractor who is not obligated by agreement to make payment or contribution on behalf of such persons to any such employee welfare fund shall pay to each mechanic, laborer, or worker as part of such person’s wages the amount of payment or contribution for such person’s classification on

RFQ/RFP VAP-039-091726

each payday. The current Prevailing Wage schedule for the City of Torrington can be found at the Connecticut Department of Labor website for Prevailing Wage Information.

SCHEDULE

SITE WALK: September 3, 2026 at 11:00 AM. Potential bidders may park in the parking lot on the southern portion of the Site along East Elm Street.

QUESTIONS: All questions must be submitted by 11:00 AM on September 8, 2026.

ADDENDUM: An Addendum will be posted no later than 48 hours prior to 11:00 AM on

September 11, 2026.

DUE DATE: Applications are to be submitted in response to this request by 11:00 A.M.

(EST), September 17, 2026.

DECISION: A decision is expected in September of 2026, with the project kickoff and mobilization to start in October 2026.

PROJECT COMPLETION: This Project is expected to be completed, with all deliverables submitted by December 31, 2026, and is anticipated to take approximately 90 days, including mobilization and demobilization.

QUESTIONS

Questions must be submitted by email to the Purchasing Agent, Pennie Zucco (pennie_zucco@torringtonct.org). Questions in response to this RFQ/RFP may be accepted until 11:00 AM on QUESTIONS DATE.

SITE WALK

A site walk will be conducted at 11:00 A.M on September 3, 2026. Bidders are encouraged to attend the site walk, but are not required to attend as a prerequisite to submitting a bid.

TERM

The successful Respondent will be expected to commence services as soon as possible upon award, as determined by the City. Any contract between the City and the successful bidder shall provide that the City may terminate the contract upon thirty (30) days’ notice to the bidder. The information provided herein is not intended to and shall not bind the City of Torrington to any of the statements or assumptions set forth herein.

EVALUATION AND SELECTION CRITERIA

A selection committee will evaluate the Respondents based on the following criteria:

The Lowest Responsible and Qualified Bidder will be the basis for contractor selection.

Contractor must be registered under DEEP’s General Permit for Registered Existing Release Response Contractors prior to beginning any remediation work.

Completeness of RFQ/RFP package (ENVELOPE A) and cost estimate of bid

(ENVELOPE B).

Qualification to complete the remediation work and previous experience with state-funded environmental remediation projects.

Responsiveness to the Proposed Scope of Work and the Respondent’s understanding of the

Environmental Assessment project.

Proposed schedule.

Current workload and demonstrated capacity to meet schedule. Ability to provide the services within the proposed project schedule and within time constraints.

Pricing expense schedule and hourly rate schedule (ENVELOPE B).

Ability to meet local, state, and federal requirements.

Personnel to be assigned to the project team, including subcontractors.

Consultants’ awareness of project issues, opportunities, and constraints.

The City of Torrington will choose the contractor for this project.

SCOPE OF WORK

PURPOSE

The City of Torrington is soliciting proposals to retain a contractor to complete the removal of hazardous building materials from the second and third floors of the building on the 1.6-acre property located at 245 E. Elm Street, Torrington, CT (125/006/011). The work included under this RFQ/RFP will be funded through a CT Department of Economic and Community Development (DECD) Municipal Brownfield Remediation Grant awarded to the City of Torrington.

OVERVIEW

Seferi Properties, LLC purchased the 245 E. Elm Street property in 2017 and began renovations to move their restaurant, Vinny’s Pizza, to the second floor. A Certificate of Occupancy (CO) for the initial phase of renovations for the pizza restaurant was issued in October 2019. In 2024, the City of Torrington and Seferi Properties, LLC completed the first phase of Hazardous Building Materials Abatement for the first-floor portion of this project, enabling further environmental assessments within the first-floor interior of the building and around the exterior parking lot areas.

The findings of these environmental assessments determined that the removal of the wood floors, underlying sand bedding, trench drain sediment, and sediment from one exterior catch basin was required. The first-floor demolition and remediation project was completed in October 2025.

DECD awarded the City of Torrington a Municipal Brownfield Remediation Grant for the abatement work on this site in preparation for the proposed redevelopment project. This 2nd and 3rd-floor abatement project will enable the subsequent redevelopment of the property to begin.

TASKS

Task 1: Develop Abatement and Renovation Work Plan and Pre-Construction Meeting

1. Task 1 objective is to attend a pre-construction meeting and develop an Abatement and Renovation Work Plan for the removal of hazardous building materials (i.e., ACM, LBP, etc.) from the site, as defined in Appendix A and the approved Alternate Work Practice

(AWP).

2. Task 1 includes but is not necessarily limited to the following:

a. Attend Pre-construction meeting with City of Torrington, Property Owner, and

Consultant (Eagle Environmental).

b. Develop an Abatement and Renovation work Plan in accordance with the approved

AWP and General Conditions identified in Appendix A.

i. Include a description of the methods for ACM Abatement, LBP Renovation, and removal of other Hazardous Materials as required.

ii. Include limited demolition to reveal unknown or concealed conditions for examination and verification before removal or demolition.

iii. Include a description of the methods for the proper management and segregation of all waste streams.

iv. Plan shall include a description for protecting Site features and structures that are designed to remain and that are not to be disturbed as part of the demolition.

c. Verify proper waste characterization classifications with the Consultant and the Property Owner.

d. Establish a plan for analysis and characterization of non-hazardous and hazardous waste materials for proper transportation and disposal.

e. Identify the equipment to be used for the abatement and renovation activities.

f. Identify all disposal facilities for pre-approval by the Consultant (Eagle

Environmental).

g. Identify all local, State, and federal permits and any notices required to conduct the demolition work.

3. Deliverable: A detailed Abatement and Renovation Plan for the removal, analysis, and characterization of hazardous building materials from the site that also identifies all requirements necessary to complete the work.

Task 2: Project Permitting, Certifications, and Regulatory Notices

1. Task 2 objective is to obtain all necessary local, State, and federal permits required to conduct the work as outlined in Task 1 and to complete all shipping and disposal of hazardous and non-hazardous materials.

2. Task 2 includes, but is not necessarily limited to, the following:

a. File all necessary notices, obtain all permits and licenses, and pay all governmental taxes, fees, and other costs in connection with the work outlined in Task 1.

b. Obtain necessary Hazardous Waste Transporter Permit for the State of Connecticut, the Destination State(s), and all other applicable states for each transporter.

c. Obtain treatment and/or Disposal facilities permits and USEPA ID #s to transport to the accepting destination.

3. Deliverable: Provide copies of all notices, permit applications, and approved permits required to perform the work.

Task 3: Asbestos-Containing Materials Abatement

1. Task 3 objective is to abate and remove all ACM in accordance with APPENDIX A (Section 020800 – Asbestos Abatement), the approved AWP, and all supporting documents.

2. Task 3 includes but is not necessarily limited to the following:

a. Complete ACM Abatement in accordance with the AWP Scenario 1 and Scenario

2, Appendix A, and in accordance with appropriate federal, state, and local regulatory requirements, including requirements set forth in notices and permits to perform the work.

b. Complete the removal and disposal of identified ACM in accordance with APPENDIX A and the AWP.

i. Base Bid includes the removal of all ACM as outlined in Table 1-Base Bid of General Conditions 020800.

ii. Alternate Bid 1 includes removal and disposal of window sashes to the exterior of the buildings with ACM window glazing compound outlined in Alternate Bid 1 – Table of ACM of General Conditions 020800.

1. Disposal as hazardous lead waste and regulated asbestos waste.

iii. Alternate Bid 2 includes removal and disposal of window sashes to the interior of the building with ACM window glazing outlined in Alternate Bid 2 – Table of ACM of General Conditions 020800.

1. Disposal as hazardous lead waste and regulated asbestos waste.

iv. Deduct Alternate Bid includes the disposal of window sashes only as regulated asbestos waste as outlined in General Conditions 020900.

1. Disposal as non-hazardous solid waste (non-hazardous for lead disposal) and regulated asbestos waste only.

c. Complete any additional pertinent activities outlined in Task 1.

3. Deliverable: All ACMs outlined in APPENDIX A and the AWP are removed and properly disposed of in accordance with APPENDIX A and the AWP requirements.

Task 4: Lead Paint Renovation

1. Task 4 objective is to complete the lead-based paint renovation as outlined in APPENDIX A.

2. Task 4 includes but is not necessarily limited to the following:

a. Renovate, remove, and/or stabilize all Lead-Based Paint in accordance with

APPENDIX A (Section 020900 – Lead Paint Renovation), and treat all paint chips generated during the project as assumed to require disposal as hazardous lead waste.

b. Remove leaded window components in accordance with Alternate Bids as outlined in the AWP Scenarios 1 & 2.

c. Complete any additional pertinent activities as outlined in Task 1.

3. Deliverable: All LBPs outlined in APPENDIX A are renovated, removed, and/or stabilized in accordance with the AWP requirements.

Task 5: Selective Demolition for Hazardous Materials Abatement

1. Task 5 objective is to complete necessary demolition to access Hazardous Materials.

2. Task 5 includes but is not necessarily limited to the following:

a. Demolish and remove connections to all electrical, gas, and plumbing fixtures required to remove HBM.

b. Locate and mark areas, equipment, and building components that require selective demolition.

c. Ensure all necessary controls are in place to ensure pollution containment as a result of demolition.

d. Ensure proper characterization and disposal of demolition materials.

3. Deliverable: All selective demolition is complete to enable the complete abatement, renovation, and removal of HBM as required in APPENDIX A and the AWP.

Task 6: Hazardous Materials Contract Closeout

1. Task 6 objective is for the contractor to complete a final cleaning of accessed areas and submit final and completed documents as required in APPENDIX A and the AWP.

2. Task 6 includes, but is not necessarily limited to, the following:

a. Verify the proper waste characterization classification with the Consultant.

b. Transport all disposable waste materials to pre-approved disposal facilities.

c. Retain copies of and submit all copies of the following to the Consultant:

i. Certified/Signed Hazardous Waste Manifests

ii. Waste Shipment Records / Bills of Lading

iii. Certificates of Destruction / Treatment / Disposal

iv. And all other documents required in APPENDIX A and the AWP.

3. Deliverable: All waste materials are properly characterized, and all waste materials are transported off-site to pre-approved disposal facilities in accordance with Task 1, APPENDIX A, and the AWP, and required copies of shipping and disposal manifests (items i., ii., iii., and iv. above) are submitted to the Consultant.

PERMITS AND NOTIFICATIONS

The Contractor shall acquire and maintain all permits and post notifications as required by the Technical Specifications (APPENDIX A) and the AWP. The Contractor's work must adhere to the requirements outlined in APPENDIX A and the AWP.

SITE WORK AND DESCRIPTION

The Contractor shall complete the Hazardous Building Materials abatement and renovation activities and all disposal requirements as outlined in the Scope of Work, APPENDIX A, and the AWP. Special care shall be taken to protect Site features and structures designated to remain and not to be disturbed as part of the demolition. All HBM abatement and disposal work shall comply with all regulations and standards as outlined in APPENDIX A and the AWP.

MANAGEMENT OF SITE HAZARDS

The Contractor shall comply with all requirements in APPENDIX and the AWP, as well as all local, state, and federal regulations and requirements for the management of hazardous materials and regulated materials.

LIABILITY

The Contractor shall perform all work at its own risk and shall take all reasonable precautions to avoid injury to personnel and damage to structures and equipment during the performance of the work. The Contractor shall assume all responsibility for any such injury or damage caused by its actions, including any spills or release of unknown or known hazardous materials.

SUBMITTALS

The Contractor shall provide the submittals required in the Scope of Work, APPENDIX A, and the AWP. In addition to APPENDIX A and the AWP, the Contractor shall provide:

1. A copy (copies) of the Contractor’s Certificate(s) of Insurance (insurance requirements will be provided to the selected Contractor);

2. Copies of results from any laboratory analysis upon receipt;

3. Shipping manifests and disposal documentation for all Hazardous and Non-Hazardous materials

4. All project close-out documents and forms as required in APPENDIX A.

SITE WALK

A site walk-through will be conducted at 11:00 AM on September 3, 2026. Contractors wishing to bid on this work are highly encouraged to attend the site walk-through.

PROJECT SCHEDULE

The Consultant or Consultant Firm should be prepared to enter into a contract with the City of Torrington within one week of formal notification of selection, and to begin work within one week of contract execution. The City’s selection of Consultant or Consultant Firm is subject to review and approval by DECD. The City anticipates that the scope of work, as described in this RFQ/RFP shall be completed within 12 months from the contract date, with the exception of any long-term monitoring and reporting requirements.

- Remainder of page intentionally left blank -

ATTACHMENT 1: PROPOSAL CHECKLIST

PROPOSAL CHECKLIST

By submission of the cover letter signed by an officer of the firm, the following information has been included as part of the firm’s submission for consideration of its qualifications:

ENVLOPE A

1 Original and 1 Copy of Bid Package

1 Thumb Drive of Entire Bid Package, Cost Proposal Form, and Hourly Rates Schedule

Cover Letter signed by an officer of the firm, with a statement of availability, experience to complete the project, ability to meet project requirements, including affirmative action plans

Contact Information for proposed project team and sub-contractors

Description of Project Team

Project Narrative outlining the proposed approach, methodology, and process to the project, including deliverables based on the Scope of Services all tasks outlined in Scope of Work

Proposed schedule and project timeline

References

Proposal Checklist (Attachment 1)

Proof of Insurance and Liability (Attachment 2)

Acceptance of Terms of this Agreement (Attachment 3)

Non-Collusion Affidavit (Attachment 4)

CHRO Good Faith Efforts Short Form (entire packet) (Attachment 5)

Signed Addendum (if applicable)

ENVELOPE B

Cost Proposal Form (Attachment 6)

Hourly Rates and Expense Schedule

ATTACHMENT 2: INSURANCE REQUIREMENTS

ATTACHMENT 2: INSURANCE REQUIREMENTS

INSURANCE REQUIREMENTS

Certificate of Insurance: All insurance policies must include a Waiver of Subrogation whereby the insured waives its right to subrogate against the City, its subsidiaries, employees, volunteers, directors, and officers. Proof of proper insurance coverage, Worker’s Compensation Insurance, Liability and Property damage, and Vehicle Insurance shall be filed with the City of Torrington

Purchasing Agent within 10 days after the award of the bid. The Certificate of Insurance must name the City of Torrington, 140 Main St., Torrington, CT, its subsidiaries, employees, volunteers, directors & officers as the “Additional Insured” and filed with the Purchasing Agent prior to commencement of work. Renewal Certificates of Insurance must be mailed to the Purchasing

Agent 10 days prior to the expiration of the required coverage.

The State of Connecticut shall be listed as additionally insured under the following coverages:

Commercial General Liability - $1M per occurrence

General Aggregate - $2M

Umbrella Liability

NON-DISCRIMINATION

The respondent agrees and warrants that in the performance of the contract pursuant to this solicitation, he/she will not discriminate or permit discrimination against any person or group of persons on the grounds of sex, race, color, religion, age, marital status, ancestry, national origin, past history of mental disorder, mental retardation or physical disability or other basis in any manner prohibited by the laws of the United States, the State of Connecticut or the City of

Torrington.

INDEMNIFICATION

To the fullest extent permitted by law, the Firm shall indemnify and hold harmless the City and their respective consultants, agents, and employees and the State of Connecticut from and against all claims, damages, losses, and expenses, direct, indirect, or consequential (including but not limited to fees and charges of attorneys and other professionals and court and arbitration costs) arising out of or resulting from the performance of the Firm’s work, provided that such claim, damage, loss or expense is caused in whole or in part by any negligent act or omission by the Firm, or breach of its obligations herein or by any person or organization directly or indirectly employed or engaged by the Firm to perform or furnish services, or anyone for whose acts the Firm may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder.

As to any and all claims against the City or any of its consultants, agents or employees by any employee of Firm, by any person or organization directly or indirectly employed by Firm to perform or furnish any of the work, or by anyone for whose acts Firm may be liable, the indemnification obligation under this section shall not be limited in any way by any limitation on the amount of type of damages, compensation or benefits payable by or for Firm under worker’s or workman’s compensation acts, disability benefit acts or other employee benefit acts.

ATTACHMENT 3: ACCEPTANCE OF TERMS OF AGREEMENT

ATTACHMENT 3:

ACCEPTANCE OF TERMS OF THIS AGREEMENT

Name of Bidder:

Contact Person:

Address:

City / State / Zip

Telephone:

Email:

Authorized Signer: Date:

Printed Name:

Title:

Federal Tax Identification Number (FEIN):

It is agreed by the above signed bidder that the signature and submission of this proposal represents the proposer’s acceptance of all terms, conditions, and requirements of the proposal specifications, and, if awarded, the proposal will represent the agreement between the parties.

The proposer agrees that the cost of any work performed, materials furnished, services provided, or expenses incurred, which are not specifically delineated in the proposal documents, but which are incidental to the scope, intent, and completion of this contract, shall be deemed to have been included in the prices for the various items scheduled.

ATTACHMENT 4: NON-COLLUSION AFFIDAVIT

ATTACHMENT 4:

NON-COLLUSION AFFIDAVIT

STATE OF ___________________COUNTY OF ____________________________

I, ____________________________________________, being first duly sworn, deposes and says that:

1. I am ____________________________________________

2.

of____________________________________________, the

Bidder that has submitted the attached Bid for

I am fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such bid.

3. Such Bid is genuine and is not a collusive or sham Bid.

4. Neither the said Bidder nor any of its officers, partners, owners, agents, representatives, employees or parties of interest, including this affiant, has in any way colluded, conspired, connived or agreed directly or indirectly with any other Bidder, firm or person to submit a collusive or sham Bid in connection with such Contract, for which the attached Bid has been submitted nor has it in any manner, directly or indirectly, sought by agreement or collusion or communication or conference with any other Bidder, firm or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit or cost element of the Bid price or the price of any Bidder, or to secure through any collusion, conspiracy, connivance or unlawful agreement any advantage against the City of Torrington or any person interested in the proposed Contract; and

5. The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance or unlawful agreement on the part of the Bidder or any of its agents, representatives, owners, employees, or parties in interest, including this affiant.

- Signature Page Follows -

___________________________________ (Printed)

__________________________________ (Signed)

__________________________________(Title)

Subscribed and sworn to before this________ day of ______________, 20__________.

Notary Public Printed Notary Public Signature

My Commission Expires _______________________________

(Notary Seal)

NOTE: Documents must be signed before and sealed by a Notary Public. Only documents bearing a notary seal will be accepted.

ATTACHMENT 5: COMMISSION ON HUMAN RIGHTS AND

OPPORTUNTIES (CHRO)

For information on the CHRO Contract Compliance Program, please visit the homepage here:

• CHRO Contract Compliance Program

Bidders may download the required form for Construction Contractor by using the link below:

• Good Faith Efforts Short Form Plan

Note (New as of July 1, 2026): This plan is for use by contractors working on a public works project whose state-funding is between $150,000 but less than $1,000,000. This applies whether the awarding authority is a state agency, a quasi-public agency, a municipality, or a grantee of state-funding.

• Good Faith Efforts Long Form Plan

Note (New as of July 1, 2026): This plan is for use by contractors working on a public works project whose state-funding is $1,000,000 or more or by Construction Managers on projects with more than $150,000 in state-funding.

• Bid Tabulation Worksheet

For use as part of both the Short and Long Form Good Faith Efforts Plans https://portal.ct.gov/chro/contract-compliance/contract-compliance/contract-compliance-forms-and-reports https://portal.ct.gov/-/media/chro/cc-documents/good-faith-efforts-short-form-plan-70126.docx?rev=aa9753dceb0340b4b43889f17bfff0bb&hash=9954AB6F99215676C970D68116889CD8 https://portal.ct.gov/-/media/chro/cc-documents/good-faith-efforts-long-form-plan-7026.docx?rev=6040fab4ff104337b2ed163https://portal.ct.gov/-/media/chro/cc-documents/good-faith-efforts-long-form-plan-7026.docx?rev=6040fab4ff104337b2ed1634c664250f&hash=84207EA8652D3857E5F59C8C7DACD8424c664250f&hash=84207EA8652D3857E5F59C8C7DACD842 https://portal.ct.gov/-/media/chro/cc-documents/bid-tabulation-worksheet-103.xlsx?rev=d144be63c1eb441a9e1e9693f4350374&hash=32E3A5B6A785E165DBC6005C7453B0EC

ATTACHMENT 6: COST PROPOSAL FORM

- Remainder of page left intentionally blank -

Torrington, CT

ATTACHMENT 6:

COST PROPOSAL FORM

The undersigned, having verified the quantities and conditions affecting the cost of the work, having reviewed in detail the specifications, including this Bid Form, the General Conditions, the General Scope of Work, the Plans and Drawings, prepared by the Owner’s Consultant, and all Addenda, and having understood that the work may have to be performed in phases, hereby proposes to furnish all labor, materials, equipment and services, and disposal, required for the Hazardous Materials Abatement at 245 E. Elm Street in Torrington, CT in accordance therewith, for the Contract Price specified below, subject to deductions according to the terms of the Specifications.

Item Description Amount

Base Bid

Alternate Bid 1 Removal of window sashes to the exterior of the building in accordance with the approved AWP and disposal as hazardous lead waste and regulated asbestos waste:

Alternate Bid 2 Removal of window sashes to the interior of the building and disposal as hazardous lead waste and regulated asbestos waste:

Deduct Alternate Bid Disposal of window sashes (base bid and alternate bids 1 and 2) as non-hazardous solid waste (nonhazardous for lead disposal) and regulated asbestos waste only:

Total Bid Include all Alternate Bid (if any)

Total Cost Proposal

The HMAC shall agree to hold their Bid price for sixty (90) days. The undersigned agrees that, if selected as the HMAC, it will execute a contract in accordance with the terms of this bid.

Company:

Signature: Date:

Title:

- BID FORM MUST BE ACCOMPANIED WITH AN HOURLY-RATE SHEET -

PLACE BID FORM IN SEPARATE SEALED ENVELOPE B

APPENDIX A

- Remainder of page left intentionally blank -

011001 HAZARDOUS MATERIALS

GENERAL CONDITIONS

245 EAST ELM STREET,

TORRINGTON, CT

011001 - Page 1

SECTION 011001 – HAZARDOUS MATERIALS GENERAL CONDITIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

B. Related Sections:

1. Section 011600: Hazardous Materials Scheduling and Phasing

2. Section 017701: Hazardous Materials Contract Closeout

3. Section 012200: Hazardous Materials Unit Prices

4. Section 020750: Selective Demolition for Hazardous Materials Abatement

5. Section 020800: Asbestos Abatement

6. Section 020900: Lead Paint Renovation

1.2 GENERAL REQUIREMENTS

A. Portions of the second floor and the entire third floor of the property located at 245 East Elm Street, Torrington, CT (the “Site”) shall undergo abatement of hazardous and regulated materials to support renovations to interior renovation to the second and third floors of the Site building.

B. The Hazardous Materials Abatement Contractor (HMAC) shall comply with all provisions and requirements of the Contract Documents including but not limited, to the technical specifications, hazardous materials abatement plans, the Owner’s and Owner’s Consultant’s requirements, and the project phasing and scheduling.

C. Where the project specifications, hazardous materials abatement plans, or requirements or directives from the Owner or Owner’s Consultant are contradictory or ambiguous, the more stringent requirement in all cases shall apply.

D. Where required, the HMAC shall submit as part of their Bid, including but not limited to, qualifications, licenses, training certifications, insurance, written statements, acknowledgement of addenda, fees to perform the work as required by the Contract Documents and/or requests, directives or additional requirements by the Owner or Owner’s Consultant. Failure to provide any and all aforementioned information may result in an unresponsive Bid.

E. The HMAC shall be bound to all general conditions and supplemental general conditions provided in the Contract Documents.

F. The HMAC shall perform their own quantity verification for the purpose of submitting their Bid and establishing actual material quantities for abatement included in their

011600 HAZARDOUS MATERIALS

SCHEDULING AND

PHASING

011600 - Page 1

SECTION 011600 – HAZARDOUS MATERIALS SCHEDULING AND PHASING

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

B. Related Sections:

1. Section 011001: Hazardous Materials General Conditions

2. Section 012200: Hazardous Materials Unit Pricing

3. Section 017701: Hazardous Materials Contract Closeout

4. Section 020750: Selective Demolition For Hazardous Materials Abatement

5. Section 020800: Asbestos Abatement

6. Section 020900: Lead Paint Renovation

1.2 GENERAL REQUIREMENTS

A. The abatement work for this project may be conducted in phases. The work of this project shall begin upon receipt of the “Notice to Proceed” from the Owner. A Pre- Construction Meeting shall be scheduled by the Owner and Owner’s Consultant and must be attended by the Hazardous Materials Abatement Contractor (HMAC) and any Sub-Contractors. The assigned Site Supervisor(s) must also attend this meeting.

B. A working schedule for each phase of work shall be presented by the HMAC at the Pre-Construction Meeting. Variations, amendments, and corrections to the presented schedule will be discussed and the Owner and Owner’s Consultant will inform the HMAC of additions or changes in the scheduling requirements for the project.

C. As a result of the Pre-Construction Meeting, the HMAC shall submit a revised schedule no later than three (3) business days from the Pre-Construction Meeting. Upon approval from the Owner and Owner’s Consultant, the HMAC will receive a “Notice to Proceed” with the work of the Contract.

D. Refer to all other applicable sections of the specification for coordination with other trades. The abatement HMAC shall coordinate work with all other activities at this occupied site.

1.3 TIME FOR COMPLETION AND WORKING HOURS

A. Upon award of contract from the Owner, the HMAC shall immediately submit state and federal notifications, order materials, supplies, and components for the work of this

011600 HAZARDOUS MATERIALS

SCHEDULING AND

PHASING

011600 - Page 2 project.

B. The HMAC shall begin the work immediately upon receipt of the written “Notice to Proceed” from the Owner. The date of the commencement of the work is termed the “Construction Start Date.” The HMAC will be required to complete all work of this Contract within the time period stipulated in the finalized schedule. The last day in the schedule is termed as “Contract Completion Date.”

C. If conditions arise that are beyond the control of the HMAC and force delays in the performance of the Work, the Owner and Owner’s Consultant shall be immediately notified. The HMAC shall state the reason for the delay and shall estimate the expected duration of the delay. Any application for an extension of the Contract completion date shall be made under proper change order procedures. The acceptance of the cause for delay and change order is subject to the Owner's review and approval.

D. Work hours will be established in coordination with the Owner and Owner’s Consultant.

E. Any extra hours or days per week worked by the HMAC or Sub-Contractors shall be at no extra cost to the Owner. Denial of extra hours or days per week by the Owner shall not be grounds for extra time allotted to the overall Contract time. The HMAC shall be responsible for all overtime payment to cover Consultant’s overtime fees for work performed above and beyond normal working hours.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 0111600

011001 - Page 2 scope of abatement work. Quantities provided in the Hazardous Materials Abatement Specifications (Specifications) and on the Hazardous Materials Abatement Plans (Plans) are estimates to provide an order of magnitude for the work to be completed.

No change orders will be approved for quantity or location discrepancies between the Specifications, Plans and actual field conditions.

G. The HMAC shall complete the work of this project in accordance with the overall phasing and scheduling plan(s) developed by the Owner. The HMAC shall provide adequate staffing, materials, equipment and resources to complete the work in accordance with the Owner’s phasing and scheduling plan(s). Overtime work incumbered by the Owner’s Consultant as a result of the HMAC’s ability to maintain the schedule shall be paid for by the HMAC.

H. The building will be partially occupied at the time of the abatement work.

1.3 HAZARDOUS MATERIALS ABATEMENT CONTRACTOR (HMAC) QUALIFICATIONS

A. All bidders shall submit a record of prior experience in asbestos abatement and/or lead paint renovation projects listing no less than three (3) completed jobs in the past five

(5) years, with all projects of similar size and scope. The Hazardous Materials Abatement Contractor (HMAC) shall list the experience and training of the site supervisor and all on-site workers. The information that shall be included as follows:

1. Project Name and Address

2. Owner’s Name and Address

3. Contract Amount

4. Date of Completion

5. Extras and Change Orders

B. The HMAC selected must appear on the approved list of Asbestos Abatement contractors on file at the State of Connecticut Department of Public Health (CTDPH).

C. Submit a written statement regarding whether the HMAC has ever been found out-of-compliance with federal or state asbestos and/or lead regulations pertaining to worker protection, removal, transport, or disposal.

D. Award of this Contract will be to the lowest responsible bidder who best meets all qualifications.

1.4 HMAC USE OF SITE AND PREMISES

A. The HMAC shall coordinate use of the premises under the direction of the Owner and Owner’s Consultant.

B. The HMAC shall not interfere with general Site operations. The HMAC shall coordinate parking for employees with the Owner.

C. The HMAC shall coordinate location of waste container(s) with the Owner’s operations.

D. Power and water shall be available at the Site for use by the HMAC.

011001 - Page 3

1.5 WORK PHASING

A. Work under this project may be performed in phases to accommodate the Owner’s requirements and remaining construction phases. Coordinate abatement schedule and operations with the Owner and Owner’s Consultant.

B. The HMAC shall become familiar with the phasing of this work and shall include the required mobilization and re-mobilization as necessary to support the work phasing.

1.6 OWNER’S OPERATIONS

A. Schedule the Work to accommodate this requirement.

B. Maintain means of egress.

C. Coordinate Work with the Owner and the Owner’s Consultant.

D. Maintain the fire alarm and fire detection systems active at all time during construction.

E. Maintain permanent means of egress during construction. Provide and maintain temporary means of egress as required by Fire Marshall.

1.7 CLOSEOUT AND PUNCH LIST

A. The HMAC shall carefully check his/her own work and that of any Subcontractor as the work is being performed. Unsatisfactory work shall be corrected immediately.

B. When the HMAC determines that he is substantially complete, that is, has less than one percent of his Contract remaining to be completed, he shall prepare for submission to the Owner’s Consultant, a list of items to be completed or corrected. The failure to include any items on such list does not alter the responsibility of the HMAC to complete all work in accordance with the Contract Documents.

C. Upon receipt of the HMAC’s list of items to be completed or corrected, the Owner’s Consultant will promptly make a thorough inspection and prepare a “punch list” setting forth in accurate detail any items on the HMAC’s list and any additional items that are not acceptable.

D. When the “punch list” has been prepared, the Owner’s Consultant will arrange a meeting with the HMAC to identify and explain all punch list items and answer questions on the work that must be completed before final acceptance.

E. The HMAC shall correct all “punch list” items or shall cause the correction of the “punch list” items within a time frame to be established when the “punch list” is made.

The time frame for the completion of the “punch list” shall not exceed the completion date of the Contract. Should the “punch list” not be completed within the specified time frame, the Owner may invoke the rights given under the General Conditions.

F. The Owner’s Consultant shall not be expected to inspect any area more than once for the preparation of the “punch list” items. If, during an inspection, the Owner’s

011001 - Page 4

Consultant discovers five (5) or more deficient conditions, then the area shall be declared “Not Ready” for Inspection.

G. All inspections and sampling required for hazardous materials abatement compliance will be performed by the Owner’s Consultant.

1.8 CLEANING

A. Throughout the construction period, the HMAC shall maintain the building and the site free of rubbish, debris, surplus materials, and other items not required for the Work.

Remove such material from the site daily to prevent accumulations. Remove all construction debris from work areas, and remove all hazardous waste and asbestos waste as required by the most current federal, state, and local regulations and the requirements of the specifications.

1.9 ADDITIONAL GENERAL REQUIREMENTS

A. The HMAC shall employ a competent and English-speaking Asbestos Abatement Supervisor with at least three (3) years of experience on projects of similar scope and magnitude. The Supervisor shall be responsible for all work involving hazardous materials abatement as described in the specifications and defined in the applicable regulations, and have full time daily supervision of the same. The Supervisor shall be the “Competent Person” as defined by OSHA regulations.

B. The HMAC shall allow the work of this contract to be inspected, if required, by local, state, federal, and any other authorities having jurisdiction over such work. The HMAC shall immediately notify the Owner and Owner’s Consultant and shall maintain written evidence of such inspection for review by the Owner and Owner’s Consultant.

C. The HMAC shall incur the cost of all fines resulting from regulatory non-compliance as issued by federal, state, and local agencies. The HMAC shall incur the cost of all work requirements mandated by federal, state, and local agencies as a result of regulatory non-compliance or negligence.

D. The HMAC shall immediately notify the Owner and Owner’s Consultant of the delivery of all permits, licenses, certificates of inspection, of approval or occupancy, etc., and any other such instruments required under codes by authorities having jurisdiction, regardless to who issued, and shall cause them to be displayed to the Owner and Owner’s Consultant for verification and recording.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

017701 HAZARDOUS MATERIALS

CONTRACT CLOSEOUT

017701 - Page 1

SECTION 017701 – HAZARDOUS MATERIALS CONTRACT CLOSEOUT

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

B. Related Sections:

1. Section 011001: Hazardous Materials General Requirements

2. Section 011600: Hazardous Materials Scheduling and Phasing

3. Section 012200: Hazardous Materials Unit Prices

4. Section 020750: Selective Demolition For Hazardous Materials Abatement

5. Section 020800: Asbestos Abatement

6. Section 020900: Lead Paint Renovation

1.2 FINAL CLEANING

A. Unless otherwise specified under Sections of this Specification, the Hazardous Materials Abatement Contractor (HMAC) shall perform final cleaning operations as herein specified prior to final inspection.

B. Maintain the project site free from accumulations of waste, debris and rubbish caused by operations. At the completion of the work, remove waste materials, rubbish, tools, equipment, machinery and surplus materials, and clean all sight-exposed surfaces;

leave the project clean and ready for work of other trades.

C. Cleaning shall include all surfaces, interior and exterior, in which the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .