This document is a drawing depicting the storm and sanitary sewer system for a Department of Veterans Affairs facility. The drawing identifies over 30 manholes and their locations, with notes on observed conditions such as debris, roots, holes in pipes, and standing water. Confined spaces are categorized as either permit-required, including all underground storm and sanitary sewer manholes, or non-permit-required, such as AHUs. The related federal contract opportunity is solicitation number 36C25023Q0784 to clean the storm and sanitary sewers at a Veterans Integrated Service Network 10 location. The contractor will be required to clean out debris and address noted issues like standing water to restore proper flow and function to the sewer system depicted in the drawing.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P
O
R
T
O
A
L
E
G
R
E
S
T
R
E
E
T
U
ST. MARGARET DRIVE
SAFETY WALK
R A
IL
IN
G
TO & FROM
LOBBY AND
DOORS
ELEVATORS
CONFINED SPACE
ALL MANHOLES ARE CONSIDERED
ALL CONFINED SPACE AREAS FALL INTO ONE OF TWO CATEGORIES:
A. PERMIT REQUIRED.
B. NON-PERMIT REQUIRED.
THE "PERMIT REQUIRED" CONFINED SPACE AREAS THAT WE HAVE IDENTIFIED INCLUDE:
1. ALL U/G STORM SEWER MANHOLE AREAS.
2. ALL U/G SANITARY SEWER MANHOLE AREAS (INCLUDING SEWER PIT BY A-WING PARKING GARAGE).
3. ALL U/G ELECTRICAL MANHOLE AREAS.
4. ALL U/G TELEPHONE/SIGNAL MANHOLE AREAS.
5. ALL U/G STEAM VAULT MANHOLE AREAS.
6. ALL LIFT STATIONS.
7. SALT PIT.
THE "NON-PERMIT REQUIRED" CONFINED SPACE AREAS THAT WE HAVE IDENTIFIED INCLUDE:
1. ALL AHUS (THAT A PERSON CAN PHYSICALLY GET INTO).
Zach Fink Oval
Zach Fink Oval
Zach Fink Oval
Zach Fink Oval
Zach Fink Oval
Zach Fink Text Box
SAN 001
Zach Fink Text Box
SAN 006
Zach Fink Text Box
SAN 005
Zach Fink Text Box
SAN 004
Zach Fink Text Box
SAN 003
Zach Fink Text Box
SAN 002
Zach Fink Text Box
SAN 007
Zach Fink Text Box
SAN 008
Zach Fink Text Box
SAN 009
Zach Fink Text Box
SAN 010
Zach Fink Polygonal Line
Zach Fink Callout 180' Buried MH
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Callout Full of debris needs jetting.116'
Zach Fink Text Box
SAN 011
Zach Fink Text Box
SAN 012
Zach Fink Text Box
SAN 013
Zach Fink Text Box
SAN 014
Zach Fink Text Box
SAN 015
Zach Fink Text Box
SAN 016
Zach Fink Text Box
SAN 017
Zach Fink Text Box
SAN 018
Zach Fink Text Box
SAN 019
Zach Fink Text Box
SAN 020
Zach Fink Text Box
SAN 021
Zach Fink Text Box
SAN 022
Zach Fink Text Box
SAN 023
Zach Fink Text Box
SAN 024
Zach Fink Text Box
SAN 025
Zach Fink Text Box
SAN 026
Zach Fink Text Box
SAN 027
Zach Fink Text Box
SAN 028
Zach Fink Text Box
SAN 029
Zach Fink Text Box
SAN 030
Zach Fink Text Box
SAN 031
Zach Fink Text Box
SAN 032
Zach Fink Text Box
STM
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Text Box
SAN 008A
Zach Fink Polygonal Line
Zach Fink Callout
2 TAPS @ 68', 1@77', 2@101'
Zach Fink Polygonal Line
Zach Fink Text Box
CO
Zach Fink Callout Full of water needs try from upstream MH
Zach Fink Polygonal Line
Zach Fink Callout Full of water
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Callout Hole in the pipe at 32' &40'
Zach Fink Polygonal Line
Zach Fink Text Box
SAN 033
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Callout Root Ball
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Text Box Needs Jetting.
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Callout 4'' Appears to be capped.
Zach Fink Polygonal Line
Zach Fink Callout Debris U/S MH full of water
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Callout
STM
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Polygonal Line
Zach Fink Text Box
SAN LAT 3
Zach Fink Polygonal Line
Zach Fink Text Box
SAN LAT 4
Zach Fink Callout Needs Jetting
Eric Mandery Line singe Line singe Line singe Line singe Polygonal Line singe Line singe Oval
| Sheets and Views |
| Sewer Sanitary |
File details come from the government source that posted it. Updated .