V21VC-Peninsula RLP_ExhB_ASR.pdf

PDF 4 MB Posted

Attached to
X1AA--CALIFORNIA - PENINSULA VET CENTER - NEW LEASE PROCUREMENT
Solicitation number
36C26119R0054
Issued by

View the file

Other files

File Type Posted
36C26119R0054 0005.docx DOCX document
V21VC RLP Amd05_ 231011_ Signed.pdf PDF
V21PVC RLP_ExhN_TICS v2022 July.xls XLS spreadsheet
V21PVC RLP_ExhG_Form 1217 - Lessor Annual Cost Statement.pdf PDF
RLP 36C26119R0054_V21 mid-Peninsula Vet Center.pdf PDF
V21PVC RLP_ExhM_FAR 52.204-27 Prohibition on a ByteDance Covered Application.pdf PDF
V21PVC RLP_ExhJ_FAR 52.204-24 Reps Rev 10.2020.pdf PDF
V21PVC RLP_ExhH_Form12000_FLS_PartA only_2018_12.docx DOCX document
V21PVC RLP_ExhI_Seismic Offer Forms A - F with instructions.docx DOCX document
V21PVC RLP_ExhD_Form 3516_Jul21.pdf PDF
V21PVC RLP_ExhO_Peninsula Vet Center Sensitive Information Attachment.pdf PDF
36C26119R0054_3.docx DOCX document
V21PVC RLP_ExhF_Form 1364_Global_ProposaltoLeaseSpace_10_18.docx DOCX document
V21VC RLP Amd04-230913 LCO Signed.pdf PDF
V21PVC RLP_ExhK_PAST PERFORMANCE QUESTIONNAIRE.docx DOCX document
V21PVC RLP_ExhE_3517B General Clauses v-Sep22.pdf PDF
V21PVC RLP_ExhA_Lease Form L100 Draft 230831.pdf PDF
V21PVC RLP_ExhL_DB wage 20230831 San Mateo County Palo Alto.pdf PDF
V21PVC RLP_ExhC_FSL2 Security Req.pdf PDF
V21PVC RLP_ExhB_Agency Special Requirements July 2023.pdf PDF
36C26119R0054 0003.docx DOCX document
MENLO PARK CA-VC RLP 36C26119R0054 AMENDMENT 3 (SIGNED).pdf PDF
V21VC RLP Amd02-20210929 (EXECUTED).pdf PDF
36C26119R0054 0002_1.docx DOCX document
V21VC RLP Amd01-20210223 signed.pdf PDF
36C26119R0054 0001.docx DOCX document
V21VC-Peninsula RLP_ExhH_Form12000_FLS_PartsA_B_2018_12.docx DOCX document
V21VC-Peninsula RLP_ExhK_Past Perf Survey Form.docx DOCX document
V21VC-Peninsula RLP_ExhD_Form 3516_20150327.pdf PDF
V21VC-Peninsula RLP_ExhL_DB Wage 20210219_CA20210018.pdf PDF
V21VC-Peninsula RLP_ExhM_Certificate of Current Cost or Pricing Data.doc DOC document
V21VC-Peninsula RLP_ExhA_L100 Draft 20200601.pdf PDF
V21VC-Peninsula RLP_ExhE_Form 3517B_02_2020.pdf PDF
36C26119R0054_2.docx DOCX document
V21VC-Peninsula RLP_ExhN_SmBusSubPlan Guide.doc DOC document
V21VC-Peninsula RLP_ExhF_Form 1364_Global_ProposaltoLeaseSpace_BLANK.docx DOCX document
V21VC-Peninsula RLP_ExhC_FSL2.pdf PDF
V21VC-Peninsula RLP Issue 20200811.pdf PDF
V21VC-Peninsula RLP_ExhG_Form 1217 Lessor Annual Cost_2018_12.doc DOC document
V21VC-Peninsula RLP_ExhJ_TICS Table v20151013.xlsx XLSX spreadsheet
V21VC-Peninsula RLP_ExhI_Seismic Offer Forms A - F with instructions.docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P a g e 1 | 6

Readjustment Counseling Service Vet Center

The Department of Veterans Affairs is interested in leasing a minimum of ___4158_ (contiguous) net usable square feet of clinical space for a Vet Center in the city of _Peninsula, CA________.

Space shall be available for use by Tenant (VA) for personnel, furnishings, and equipment to meet the needs for a Vet Center. Space design will provide maximum co-location of the staff providing services to our patients.

The space shall be of contiguous office space in a professional and aesthetically pleasing Building. Space offered must be in a quality building of sound and substantial construction, either a new, modernized building, or one that has undergone restoration or rehabilitation for the intended use. Space shall be located in a prime commercial office space with attractive, professional surroundings. Streets and public walkways shall be well maintained. Space shall be located on the ground floor.

The lease shall be full serviced and follow the standard specifications and requirements for a New/Replacing Lease as per the GSA Global Lease or Simplified Lease.

SPACE REQUIREMENTS

ROOM REQUIREMENTS

A. WAITING AREA

1. Four (4) quad electrical outlets, location as determined by VA.

2. Two (2) Telecommunication outlets, location as determined by the VA.

3. All walls to have Chair Rail and corner guards, mounted at height determined by VA.

4. Minimum eight (8) foot x thirty (30) inch counter with lockable pass-thru window/security screen; minimum eight (8) foot base and overhead cabinets with counter.

5. Direct window access to waiting area.

6. Restricted access or lockable door to clinic area.

P a g e 2 | 6

7. Front and back entrances to check-in area.

8. Duress alarm.

9. One (1) dimmer light switch.

10. Wall Mounted coat rack.

11. Carpet Squares or laminate wood flooring per Vet Center Director’s selection.

12. Centralized check-in/check-out for efficient utilization of staff.

13. Waiting area shall to be strategically located to give the office manager and/or team leader clear observation of waiting areas.

14. A wall hung stainless Bottle Filling Station & Single ADA Cooler will be provided in the suite waiting room.

15. Lessor shall provide and pay for basic cable at two locations in the leased property. Cable TV audio/video wall jack required backing and mounting materials for connection to a VA furnished television.

B. RESTROOM (MALE AND FEMALE)

1. All bathrooms shall meet handicap accessibility codes and will include grab bars at commode.

2. All bathrooms shall have a power assisted door that is operatized by a push pad.

3. Minimum one (1) accessible wall hung water closet and wall hung lavatory.

4. Toilet paper dispenser shall be provided by the lessor installed within easy reach.

5. Mirror over lavatory, minimum of 24"x 36", with a shelf shall be provided by the lessor shall be installed above each sink.

6. Wall Mounted Soap Dispenser: Sinks shall be equipped with a wall mounted soap dispenser provided by the lessor.

7. Paper Towel Dispenser shall be provided by the lessor shall be installed near the sink.

8. Built-in waste receptacle.

9. Wall mounted coat rack shall be installed on inside face of door.

10. Baby changing station.

11. One (1) GFCI electrical outlet.

12. Duress Alarm.

13. Tile Flooring per Vet Center Director’s selection.

C. GROUP COUNSELING ROOM/ CONFERENCE ROOM

1. Sound Transmission Class (STC) rating of 50 shall be achieved. The sound resistant enclosures shall be designed to assure speech privacy and achieve an STC rating of 50.

2. Eight (8) Electrical outlets.

3. Three (3) Telecommunication outlets.

4. One (1) additional Telecommunication outlet located by COR for conference call system (Possible location: Floor center of room).

5. Vtel Equipped.

6. TV/Cable Outlet and separate electric outlet.

7. Wall mounted TV holder.

8. Duress Alarm.

9. One (1) Dimmer light switch.

10. Carpet Squares or laminate wood flooring per Vet Center Director’s selection.

11. Moveable/operable partition installed to separate the room into two.

12. Lessor shall provide and pay for basic cable at two locations in the leased property. Cable TV audio/video wall jack required backing and mounting materials for connection to a VA furnished television.

D. OFFICES (TEAM LEADER, OFFICE MANAGER, COUNSELORS)

1. Sound Transmission Class (STC) rating of 50 shall be achieved. The sound resistant enclosures shall be designed to assure speech privacy and achieve an STC rating of 50.

2. Eight (8) double electrical outlets – two (2) per wall.

P a g e 3 | 6

3. Two (2) telecommunication outlets.

4. Coat hooks on back of doors.

5. Door window glass panels shall be frosted for privacy (or other method of privacy as accepted by CO).

6. Duress Alarm and duress pendants (portable, remote access, key fob style device).

7. One (1) Dimmer light switch.

8. One (1) 20-amp electrical outlet.

9. Carpet Squares or laminate wood flooring per Vet Center Director’s selection.

10. Shall have glass pane adjacent to door frame, in the door, or in the office with frosted glass for secure view of visitors.

E. EMPLOYEE BREAK ROOM

1. All perimeter walls shall extend from floor slab to six inches above the ceiling grid and filled with fiberglass bat insulation to ensure acoustical privacy.

2. Four (4) GFCI Electrical outlets.

3. Two (2) Telecommunication Outlets.

4. Minimum of ten (10) feet of counter with base and overhead cabinets; double compartment sink.

5. Full size refrigerator.

6. Built-in Convection Microwave Oven.

7. Dishwasher.

8. Tile flooring per Vet Center Director’s selection.

F. Janitorial/Utility Closet

1. Mop Sink.

2. Four (4) Electrical outlets.

3. Adjustable shelving on two walls.

4. Tile flooring per Vet Center Director’s selection.

G. SUPPLY/STORAGE ROOM

1. Four (4) Electrical outlets.

2. One (1) Telecommunication Outlets.

3. Adjustable shelving on two walls of each storage room - 3 shelves per wall with a depth of 15”.

4. Tile flooring per Vet Center Director’s selection.

H. SECURE FILE ROOM

1. Room shall not be accessible through the ceiling to prevent up and over access.

2. Metal frame and door with dead lock pin, automatic locking upon entry and exit using Electronic Physical Access

Control Systems (PACS).

3. Intrusion Detection System with Alarm.

4. Room to have dedicated quad 120 outlets and two CAT 6 data cables required between building demarcation point and data closet, each to be marked with an identifiable number on both ends.

5. Door hinges inside the room door.

6. No windows or other openings.

7. Overhead lighting.

8. Fire Extinguisher required.

9. Four (4) Electrical outlets

10. Two (2) Telecommunication Outlets.

11. Room will be outfit with cabinetry.

12. Tile flooring per Vet Center Director’s selection.

P a g e 4 | 6

I. DATA CLOSET

1. Minimum of 80 square feet.

2. All perimeter walls shall extend from floor slab to structural system (deck) to prevent up and over access.

3. No windows or other openings.

4. Room must be protected from weather.

5. Overhead lighting.

6. Metal frame and door with dead lock pin, automatic locking upon entry and exit for a secure room.

7. The data closet shall be secured to VA access only and not be shared with any other tenant. Core should be locked to the VA OIT closet key (3SKL2)

8. Room shall be temperature controlled and maintained at 69 degrees.

9. Data racks shall have space to mount patch panels, data equipment, PBX and UPS.

10. The contractor shall provide and install 2 relay racks “19 inch” width, with vertical cable management in between the racks. The racks should be seismically bolted to the floor and grounded with wire #6. The contractor shall install all patch panels on one side of the relay rack, leaving the secondary vacant and room for IT equipment.

11. The contractor shall provide and install an APC model UPS with NIC card, that is rack mountable, sufficient to support all OIT equipment.

12. Data racks shall have vertical and horizontal organizers affixed. The contractor will provide and install cable ladder within the Data Closet from the wall to the top of the relay racks, allowing for a pathway to conduits and 110 blocks.

13. The contractor will provide and install conduit pathways from the Data Closet, to connect the building with AT&T or the local telephone company vaults.

14. The contractor will work with AT&T or the local exchange carrier (LEC) to bring in both fiber and copper infrastructure into the Data Closet.

15. Access to the closet will be restricted to include only those persons specifically authorized by VA OI&T, including facility lessors.

16. Please refer to the OIT Enterprise Facility IT Support Infrastructure Standards for details.

VA Enterprise

Facility TI Support In

OIT CABLING NEW

CONSTR

OIT INSIDE PLANT

ITS SPEC

J. DATA JACKS (TO CONNECT INTO THE VHA NETWORK)

1. There must be a minimum of four data location in each room (excluding bathrooms and to be based on tenant furniture layout).

2. Standard Data Outlets: Each data outlet/device location will have four (4) cable runs that terminate on the high density rack mounted patch panel. Each typical data outlet will be on a six port base plate.

3. Wall Mounted Phones: Any jacks for wall mounted phones should have 1 data cable to support VoIP, and be on a 1 port metal plate, and accommodate RJ45.

Jack Conventions (VoIP)

4. Cabling must be installed according to BISCI standards.

5. All cabling shall be continuous runs with no splices and be less than 328’.

6. Patch Panels, jacks and cable shall all be rated at Cat 6A or higher and be tested and certified with a passed rating. A copy of the test results will be provided to the COR as a deliverable.

7. Must have the capability to add additional data locations as determined by occupants to be provided by the lessor within ten days from request.

8. VAMC can suggest a cable contractor if necessary.

9. Location of Data Outlets:

P a g e 5 | 6

a. If the construction at the location of the data outlet is drywall, provide flush-mounted single-gang outlet boxes with six-port base plates and applicable wall device faceplates (cable to be installed behind drywall).

b. If the construction at the location of the data outlet is a solid wall, provide surface-mounted single-gang outlet boxes with six-port base plates and applicable wall device faceplates (cable to be installed in plastic wall mold equipped with protective insulator or sleeve).

c. Where modular furniture is used, the location of the data outlet will be in the baseboard of the furniture, where the networked equipment (computers, printers, etc) will be located. Provide flush-mounted single gang outlet boxes with six-port base plates and applicable wall device faceplates. If flush-mounted single-gang outlet boxes cannot be used, then modular surface mount boxes will be used with six-port inserts. All cable runs in modular furniture will be through furniture wire baseboard ducts/conduit.

10. The contractor shall follow VA naming conventions attached at both the patch panel and wall plate. All labeling shall be easily visible and printed, hand written labeling is prohibited.

K. SECURITY:

Provide a level of security which reasonably deters unauthorized entry during regular and non-duty hours. The Government considers a security alarm reasonable. Overall security shall also include deterring loitering or disruptive acts in and around the space during duty hours. Tenant shall have security within the tenant space, separate from that of the general building security. Keys/cipher locks OR key fob/card reader capability for employee access. No public access to the offices will be allowed.

1. Security Alarm: The Lessor shall provide a security system, (at lessor’s expense) to alarm upon illegal entry or loitering in the leased space and to prevent unauthorized entry 24 hours per day, 7 days per week that alarms locally at the site and to a remote monitoring location. Alarm sensors required on all exterior doors and windows. A motion detector will be provided in the waiting rooms and the main corridor. The remote monitoring company shall be in the business full-time, shall be approved by the LCO, with all monitoring costs borne by the VA for the term of the lease. Updates for codes or names are included in the lease and shall be coordinated with the LCO or authorized representative. The lessor shall install a keypad to disarm the building as directed by the VA COR. The cost of security services will be factored into the lease. The security system will be completely tested at least once per month by the lessor with a copy of the testing report sent to VA.

2. Duress alarm - Button wireless duress / panic button each duress button is to be supplied a mounting clip to be installed by the lessor. Supply and install a wireless receiver to interface with panel. Each duress button is to be an individual zone. Provide and install group rooms with hard-wired duress alarms.

3. Security Closet - Door shall have an automatic closure installed and deadbolt lock according to VA security regulations.

L. OTHER REQUIREMENTS:

1. Fully Serviced Lease.

2. Cable Television Service paid for/provided by the lessor through the annual rent.

3. Suite Security Alarm System and Monitoring paid for/provided by the lessor through the annual rent.

4. Corridors shall be at minimum of 6 feet in clear width.

5. Front entrance door shall have a power assisted door that is operated by a push pad.

6. All rooms (except IT Closet) should be master keyed, locking mechanism should be on the inside of the frame, and locking mechanism must be approved by the VA.

7. DRINKING FOUNTAIN: A wall hung stainless Bottle Filling Station & Single ADA Cooler will be provided in the suite waiting room. Complete cooler and bottle filling station in a consolidated space saving ADA compliant design.

8. EXTERIOR SIGNAGE: Lessor must provide, approved by the VA, an internally lighted sign with VA logo and words "Vet Center" on sign a minimum of 4 ft by 8ft legible from main serving road. Sign shall be a minimum of 24 inches above finished grade. Lessor shall develop and provide a complete exterior signage plan to include identification, directional, informational, and regulatory signage. Signage must comply with local

P a g e 6 | 6 municipality’s codes and specifications. Careful consideration of the location of monument signs shall be taken to avoid sight triangle encroachment. Lessor shall provide signage on the building/ door.

9. INTERIOR SIGNAGE: Lessor shall provide interior signage for and 10 x 2 inch standard aluminum wall sign (holder) for slide in name plates. Signage must state room number only.

10. SITE FLAGPOLE: A flagpole will be provided and installed by the Lessor at a location to be approved by the LCO.

The flagpole will be 25 foot (minimum height). Flagpole shall include adequate lighting to illuminate flag between dusk and dawn. Flagpole shall be protected from vehicular traffic. Lighting shall be controlled by a photocell device. The flag will be provided by the Government.

11. INTERIOR DESIGN: The Lessor shall provide an Interior Designer to coordinate with VA Staff for the configuration, color pallet/finishes, layout and furnishings for the designated space. Once the Government agrees to the configuration, color choices and furniture, the lessor shall include the value of the designed layout to the cost of the tenant improvements.

OFFICE OF

INFORMATION

AND TECHNOLOGY

VA Enterprise Facility IT Support Infrastructure Standards Version 2.0

February 5, 2018 | Solution Delivery Data Center Engineering

OFFICE OF INFORMATION AND TECHNOLOGY

VA Enterprise Facility IT Support Infrastructure Standards | i

Table 1: Version Changes

Date Reason for Changes Version Author 2007 Original 0.0 Michael Julian, RCDD 2009 Revision 0.1 Michael Julian, RCDD 2012 Revision 1.0 Michael Julian, RCDD 12/07/2016 EDICT Revision 1.1 EDICT Team 05/09/2017 Expanded revision including addition of Administrative and Operations Standard.

Name changed to include IT Support Infrastructure to reflect broader scope.

1.2 EDICT Team

1/31/2018 Ratified by SEDR 2.0 SEG 2/05/2018 SD Change Order

Approval

2.0 CAB

VA Enterprise Facility IT Support Infrastructure Standards | ii

Table of Contents VA Enterprise Facility IT Support Infrastructure Standards ................................................. i Table of Contents ............................................................................................................................. ii Figures ............................................................................................................................................ iv Tables .............................................................................................................................................. v 1 Introduction

1.1 Authority of This Standard

1.2 Scope

1.3 Purpose

1.4 Objectives

1.5 Theory of Operation

2 Data Center Classification

2.1 Core Data Centers (CDC)

2.2 Mission Support Centers (MSC)

2.3 Campus Support Centers (CSC)

2.4 Network Support Center (NSC)

3 Standards

3.1 Facility IT Support Infrastructure Standard

Structured Cabling ............................................................................................................................ 9 3.1.1 Unshielded Twisted Pair (UTP) ................................................................................................ 9 3.1.1.1 UTP Patch Panel Standards.................................................................................................... 11 3.1.1.2 UTP Patch Cord ...................................................................................................................... 12 3.1.1.3 Fiber Optic Cable ................................................................................................................... 12 3.1.1.4 Fiber Distribution Cassettes .................................................................................................. 14 3.1.1.5 Fiber Patch Cords ................................................................................................................... 15 3.1.1.6 Fiber Distribution Panel/Cabinet ........................................................................................... 17 3.1.1.7 Cable Support Infrastructure ................................................................................................. 17 3.1.1.8 Work Area Outlets (WAOs) .................................................................................................... 18 3.1.1.9

Horizontal Distribution .......................................................................................................... 20 3.1.1.10 Vertical (Backbone) Distribution ........................................................................................... 20 3.1.1.11

Telecommunications Space Design ................................................................................................. 22 3.1.2 Building Specifications for Common Telecommunications Spaces ....................................... 22 3.1.2.1 Data Center Layout Standard ................................................................................................ 23 3.1.2.2 Data Center Planned Redundancy Levels .............................................................................. 26 3.1.2.3 Telecommunications Room Layout ....................................................................................... 33 3.1.2.4 Entrance Facility .................................................................................................................... 33 3.1.2.5 Network Equipment Racks .................................................................................................... 33 3.1.2.6 Equipment Cabinets .............................................................................................................. 35 3.1.2.7

Telecommunications Space Environment Conditioning ................................................................. 37 3.1.3 Data Center Facility Environment Conditioning Standards (CDC, MSC, and CSC) ................. 39 3.1.3.1 Data Center Facility Environmental Standards – Exceptions ................................................. 41 3.1.3.2 Environmental Control Equipment Requirements ................................................................ 42 3.1.3.3 Airflow Control ...................................................................................................................... 44 3.1.3.4 HVAC Environmental Control Equipment .............................................................................. 48 3.1.3.5 Computer Room Air Conditioners (CRAC) Units .................................................................... 48 3.1.3.6 Split System Air Conditioners ................................................................................................ 49 3.1.3.7 Self-Contained Air Conditioners ............................................................................................ 49 3.1.3.8 Close-Coupled Air-Conditioners ............................................................................................ 49 3.1.3.9

Humidity Control Equipment ................................................................................................. 49 3.1.3.10

VA Enterprise Facility IT Support Infrastructure Standards | iii

Monitoring ............................................................................................................................. 50 3.1.3.11 Facility IT Support Power Distribution ............................................................................................ 55 3.1.4

Topology for Power Distribution Standard (CDC, CSC, MSC)................................................. 55 3.1.4.1 Branch Power Circuit to Rack/Cabinet .................................................................................. 56 3.1.4.2 Zone PDUs ............................................................................................................................. 57 3.1.4.3 Rack Mounted UPS ................................................................................................................ 58 3.1.4.4 Vertical Rack PDUs ................................................................................................................. 59 3.1.4.5 Cable Distribution .................................................................................................................. 60 3.1.4.6 Metering ................................................................................................................................ 62 3.1.4.7

3.2 Facility IT Support Administration Standard

Data Center Position Identification ................................................................................................. 67 3.2.1 Cross-Reference to Other Identification Systems ........................................................................... 70 3.2.2 Standardized Data center Facility Type Identification .................................................................... 70 3.2.3 Standardized Data Center Naming Convention .............................................................................. 72 3.2.4 Color Coded Identification .............................................................................................................. 74 3.2.5

Data Communication Cabling Color Coding .......................................................................... 74 3.2.5.1 Power Distribution Color Coding ........................................................................................... 74 3.2.5.2

ITS Equipment, & Component Labeling ......................................................................................... 75 3.2.6 Label Materials ...................................................................................................................... 75 3.2.6.1 Support Infrastructure Identification .................................................................................... 77 3.2.6.2 IT Equipment Cabinet/Rack Location Identification .............................................................. 80 3.2.6.3 Transport Media and Interface Identification ....................................................................... 80 3.2.6.4 Power Distribution Identification .......................................................................................... 84 3.2.6.5 Data Communications Cabling Labeling ................................................................................ 88 3.2.6.6 IT Equipment Rack/Cabinet Labeling ..................................................................................... 89 3.2.6.7 IT Equipment In-Rack/In-Cabinet Power Distribution Labeling ............................................. 89 3.2.6.8 Power Distribution to Information Technology Labeling ...................................................... 89 3.2.6.9

Physical Label Format ............................................................................................................ 90 3.2.6.10

3.3 Facility IT Support Operations Standard

Facilities Physical Support Equipment Sustainment ....................................................................... 91 3.3.1 Facilities Physical Support Equipment Maintenance & Repair ....................................................... 91 3.3.2 Data Center IT Support Operations Standard ................................................................................. 92 3.3.3

Telecommunications Rooms (TRs) ........................................................................................ 92 3.3.3.1 IT Equipment ......................................................................................................................... 92 3.3.3.2 Management of Telecommunications Cabling ...................................................................... 93 3.3.3.3 Installation Guidance ............................................................................................................. 96 3.3.3.4 Cable Bundling Guidance ....................................................................................................... 97 3.3.3.5 UTP, Fiber, & Power Cabling Guidance .................................................................................. 98 3.3.3.6

Data Center Facility Management Standard ................................................................................... 98 3.3.4 Computer Room Operation Specifications ............................................................................ 98 3.3.4.1 Recommended Tools & Bench Stock for Data Centers ......................................................... 99 3.3.4.2

Data Center Facility Engineering Standard ................................................................................... 102 3.3.5 Appendix A: Definitions Appendix B: References Appendix C: Baseline and Configuration Management Appendix E: Acronyms Appendix F: Contributors

VA Enterprise Facility IT Support Infrastructure Standards | iv

Figures Figure 1: Method A Polarity of Horizontal Pre-terminated MPO-based Fiber Optic Cabling

Figure 2: Polarity of Fiber Optic Patch Cable

Figure 3: Typical Standard-Density WAO

Figure 4: Typical High Density WAO

Figure 5: Hot Aisle/Cold Aisle Approach

Figure 6: Generic Redundancy Level Standards for Physical Plants, Facilities, and Infrastructure Systems

Figure 7: 2011 ASHRAE Environmental Classes for Data Center Applications

Figure 8: Blanking Panel Application

Figure 9: Brushed Floor Grommet

Figure 10: Air Dam Foam

Figure 12: Topology with Site UPS Backup (CDC, CSC, MSC)

Figure 11: Power Utilization Effectiveness (PUE)

Figure 13: Typical Position Identification Examples

Figure 14: Example of Best-Practice Differentiated Power Cord Coloration Implementation

Figure 15: Rack Unit (RU) Identification Example

Figure 16: Example of Communications Cable Labeling

Figure 17: Detailed Example of Communications Cable Labeling

Figure 18: Power Whip Label Example

Figure 19: Equipment-Specific Cable Management Requirements

Figure 20: Acceptable Cable Management Results

Figure 21: Unacceptable Cable Management Results

Figure 22: Cable Labels in Bundles file:///C:%5CUsers%5Cvacowernaj%5CDocuments%5CData%20Center%5CEDICT%20Data%20Center%20Standard%5CData%20Center%20Standard_May%20Drafts%5CVA%20Enterprise%20Facility%20IT%20Support%20Infrastructure%20Standard_SEDR%20Draft%5CVA%20Enterprise%20Facility%20IT%20Support%20Infrastructure%20Standard_Final_31%20Jan%2018.docx%23_Toc505096484

VA Enterprise Facility IT Support Infrastructure Standards | v

Tables Table 1: Version Changes ................................................................................................................. i

Table 2: Data Center Classification Standard

Table 3: UTP Standard

Table 4: UTP Patch Panel Standards

Table 5: UTP Patch Cord Standards

Table 6: Fiber Optic Cable Standards

Table 7: Fiber Distribution Cassettes

Table 8: Fiber Patch Cord Standards

Table 9: Fiber Distribution Panel/Cabinet Standards

Table 10: Cable Support Infrastructure Standards

Table 11: Building Specifications

Table 12: Data Center Floor Layout Standard

Table 13: Data Center Planned Redundancy Levels

Table 14: Core Data Center (CDC) and Campus Support Center (CSC) Planned Redundancy Levels

Table 15: Mission Support Center (MSC) Planned Redundancy Levels

Table 16: Network Support Center (NSC) Planned Redundancy Levels

Table 17: Network Equipment Racks

Table 18: IT Equipment Cabinet Standards

Table 19: ASHRAE Class B Environmental Requirements

Table 20: Data Center Facility Environment Conditioning Standards (CDC, MSC, and CSC)

Table 21: CDC Facility Environmental Requirements (Exceptions)

Table 22: MSC Facility Environmental Requirements (Exceptions)

Table 23: CSC Facility Environmental Requirements (Exceptions)

Table 24: NSC Facility Environmental Requirements (Exceptions)

Table 25: Environmental Control Equipment

VA Enterprise Facility IT Support Infrastructure Standards | vi

Table 26: Monitored Conditions

Table 27: Branch Power Circuit to Rack/Cabinet Standard

Table 28: Zone PDU Standard

Table 29: Rack Mounted UPS Standard

Table 30: Vertical Rack PDU Standard

Table 31: Cable Distribution Standards

Table 32: Metered Energy Consumption Data

Table 33: Energy Consumption Performance Metrics

Table 34: Data center Position Identification Conventions

Table 35: Standard FACILITYTYPE Naming Conventions

Table 36: Color Identification Conventions

Table 37: Support Infrastructure Identification Convention

Table 38: NSC Tool List

Table 39: CSC Tool List

Table 40: CDC Tool List

Table 41: Bench Stock

Table 42: Contributors

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 1

1 Introduction

1.1 Authority of This Standard

The Office of Information and Technology (OIT) VA Enterprise Facility IT Support Infrastructure Standard defines the technical requirements necessary to maintain optimum reliability and efficiency within Department of Veterans Affairs (VA) facilities and computing centers. Primary considerations for the standards are to balance economy, reliability, capacity, sustainability, and redundancy against supported system availability requirements and available resources.

The purpose of this document is to serve as the master reference document for planning and design of facility IT support infrastructure throughout the Department of Veterans Affairs (VA) facilities. IT Support Infrastructure is defined as all passive telecommunications and information technology equipment and supporting rooms and spaces including information transport systems, power distribution, HVAC, grounding, monitoring and metering equipment required to support active IT and telecommunications equipment in data centers/computer rooms, telecommunication rooms, entrance facilities and the necessary pathways, risers and conduits interconnecting them. Specifications and design criteria in this manual are expected to be followed in planning of VA facilities. This standard establishes the common architecture and baseline standards for physical design and engineering for the IT support infrastructure throughout the VA enterprise. The topologies and specifications documented in this standard are to be implemented without modification, except when required by outside Authority Having Jurisdiction (AHJ), in which case, those requirements shall be communicated to the Enterprise Data Center Infrastructure Collaboration Team (EDICT) for consideration of inclusion in a future version of the standard. The authority of this standard derives from approved technical standards and enterprise baselines. Within IT Operations and Services (ITOPS), Solution Delivery (SD) is responsible for the enterprise-wide technical framework and IT architecture services for OIT, VHA, VBA, and NCA systems and projects. SD determines technical standards, also known as configuration baselines, for infrastructure technologies deployed promoting one technology vision across VA, which supports system optimization, integration, and interoperability throughout the enterprise. SD owns the enterprise configuration baselines for the technologies they manage and baselines for infrastructure technologies and architecture for the projects they support.

Approved technical standards and enterprise baselines are communicated through ITOPS bulletins and published to the Security Management and Analytics (SMA) portal under the Baseline and Configuration Management Library.

Requests for variances or changes to this standard are to be submitted to the VA IT EDICT distribution list for consideration. If approved by the committee then the standard will be updated, socialized through the Systems Engineering Design Review (SEDR) process, and submitted to the Enterprise Change Management Datacenter Change Advisory Board for ratification.

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 2

1.2 Scope

IT Support Infrastructure is defined as all passive telecommunications and information technology equipment and supporting rooms and spaces including information transport systems, power distribution, HVAC, grounding, monitoring and metering equipment required to support active IT and telecommunications equipment in facility data centers/computer rooms, telecommunication rooms, entrance facilities and the necessary pathways, risers and conduits interconnecting them. The scope of this document includes design, construction, sustainment, maintenance, repair, upgrade, modernization, administration, and operations of the IT support infrastructure.

The Infrastructure and Administration sections of this standard defines the topologies and specifications for facilities and systems in the VA enterprise, and the Operations section defines the how those facilities and systems shall be operated. The Administration section lists the acceptable and recommended specifications for cable plant and data center naming conventions.

Engineering and Operations are distinct functions that inform and rely on one another to provide a complete solution.

IT Support infrastructure that doesn’t conform to this standard is considered to have a one-time initial variance. However, non-conforming infrastructure will be brought into compliance during routine tech refresh, lifecycle replacement, upgrades, or new installations. Facility managers shall also implement incremental changes to bring telecommunications spaces up to VA sanctioned standards to gain associated efficiencies and cost savings without waiting for required tech refresh periods.

All related projects entering or in the design and implementation phases shall contact EDICT at VAEDICT@va.gov for assistance in ITS, data center, and telecommunications space design and standard compliance.

1.3 Purpose

A standard is a set of rules or requirements that are determined by a consensus opinion of subject matter experts and prescribe criteria for a product, process, test, or procedure. The general benefits of a standard are quality, interchangeability of parts or systems, consistency, and reduction of lifecycle costs. Information Technology (IT) standards are based on business needs provided through or supported by IT Services. IT Services are designed to support business processes and are constructed from software, hardware and infrastructure components. Establishing and enforcing standards for the selection and configuration of these supporting components improves the maintainability, reliability, and availability of IT Services within projected economic constraints in alignment with business needs.

The IT Support Infrastructure standard section describes VA’s facility IT support infrastructure and contain sections necessary to support their standardization. Sections include standard specifications for subject components, decisions supporting the standard specifications, mailto:VAEDICT@va.gov mailto:VAEDICT@va.gov

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 3

guidelines or recommendations for implementing the standard specifications, and supplemental factors to consider when evaluating subject components. Additionally, it provides guidance on procuring components that meet the standard specifications, guidance on integrating them with existing components, and explanation of how the subject components fit into the VA Architecture.

The Facility IT Support Administration standard section lists the acceptable and recommended specifications for Inside Plant naming conventions, including racks, equipment enclosures, fiber and Unshielded Twisted Pair (UTP) transport media, as well as active and passive elements concerning power distribution. Sections include standard specifications for components, decisions supporting the standard specifications, guidelines or recommendations for implementing the standard specifications, and supplemental factors to consider when evaluating subject components. Other supplementary documents will provide guidance on procuring components that meet the standard specifications, guidance on integrating them with existing components, and explanation of how the components fit into the VA architecture.

The Operations standard describes VA’s facility operations and contains sections necessary to support the standardization of those operations. Sections include standard specifications for operations and maintenance work and work results, decisions supporting the standard specifications, guidelines or recommendations for implementing the standard specifications, and supplemental factors to consider when evaluating subject components. Additionally, it provides guidance on procuring services that meet the standard specifications, guidance on integrating them with existing services and organizational responsibilities, and explanation of how the subject components fit into the VA architecture.

1.4 Objectives

This standard provides recommended specifications across all VA facilities to support:

• Solution evaluation

• Requirement evaluation

• Solution design

• Solution procurement and bid evaluation

• Evaluation of architectural specifications

• Standardization of passive Inside Plant infrastructure

• Standardization of design criteria for telecommunications spaces, facilities physical infrastructure systems, and operation and maintenance of systems supporting VA services

• Standardization of naming and identification conventions for VA data centers

• Standardization of Inside Plant and rack power infrastructure naming conventions

• Standardization of labeling and identification conventions for physical plant systems and components

• Standardization of operations

• Operational solution procurement and bid evaluation

• Evaluation of maintenance, repair, and replacement specifications

• Standardization of lifecycle sustainment activities across all VA data centers

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 4

• Standardization of the operational, organizational, and aesthetic results of Sustainment, Maintenance, and Repair (SM&R) activities

1.5 Theory of Operation

These standards are applicable to the planning, designing, and use of telecommunications spaces across all Department components within VA. This includes physical spaces used for operation of IT equipment and systems (servers, storage, network switching and distribution, et cetera), telecommunications equipment and systems (local and wide area network, telephone, cable television, physical security IT systems, et cetera), and the physical infrastructure equipment (power conditioning and distribution, heat rejection and air conditioning, et cetera) necessary to operate the supported IT equipment and systems at the availability and sustainability levels described. Telecommunications spaces include telecommunications rooms, entrance facilities, data centers, horizontal pathways, vertical pathways, etc.

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 5

2 Data Center Classification VA has four segregated data center types to support the enterprise distributed computing environment.

• Core Data Centers (CDC) provide enterprise-level support services for VA-wide and cross-component systems and applications.

• Mission Support Centers (MSC) are highly specialized data centers that provide unique, focused services that are best provided from smaller, mission-focused facilities that cannot or should not be supported by CDCs or CSCs due to MSCs’ association with mission specific infrastructure or equipment.

• Campus Support Centers (CSC) operate local data centers to support VA tenants located on a VA campus and within geographically supported areas. CSCs provide services that cannot be provided (technically or economically) from a CDC. Only one CSC is authorized per VA campus.

• Network Support Centers (NSC) provide lower-level application and IT services distribution across the geographic breadth of the VA’s computing enterprise, enabling special functions and distributed users to satisfy the Agency Department mission.

2.1 Core Data Centers (CDC)

CDCs are facilities that provide shared and distributed enterprise services to supported sites.

CDCs host cloud services (IaaS, PaaS, SaaS) to provide complete end-to-end IT services (including but not limited to application, backup, and storage) to the supported VA sites.

The CDC architecture is considered mission-essential and is designed, operated, and maintained to provide availability consistent with current VA national data center standards for supported IT applications. CDCs are the target architecture component for IT services that span multiple Department components and user groups (services and applications used by many or all users, such as messaging, productivity, and collaboration).

CDCs may be VA-owned, leased, or government or commercial outsourced (external cloud) data centers. CDCs meet (or are planned to meet) all published CDC physical infrastructure requirements to ensure enterprise reliability, redundancy, High Availability (HA), and Disaster Recovery (DR) requirements.

CDCs may also provide services designated to be provided by NSC, if no local NSC to provide those services is available. CDCs may also provide MSC-type application support.

2.2 Mission Support Centers (MSC)

MSCs provide element-specific and single-instance special enterprise services that may be inappropriate for consolidation to CDC facilities. MSCs are the target architecture for specialized-function systems and applications, particularly those that support a specific but limited and distributed user group (services allowing the Department to function but with a

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 6

limited user base such as internal financial management, or applications requiring centralized processing for a small number of user facilities, such as consolidated pharmacies).

MSC physical requirements supporting the computing environment may be more lenient than those for CDCs. Specific requirements will vary based on the supported functions, criticality of the mission, and similar criteria. For example, MSCs designated as enterprise Test/Development (Test/Dev) environments will not require the same level of high-availability physical and network redundancy as a mission-critical production environment that directly supports patient care.

MSCs may also provide services designated to be provided by an NSC, if no local NSC to provide those services is available.

2.3 Campus Support Centers (CSC)

CSCs provide geographically-specific, operational IT services in support of campus services to Veterans and VA employees that cannot be effectively consolidated or provided over cloud architectures to the campus. CSCs may also provide services designated to be provided by an NSC, if no local NSC to provide those services is available.

IT services at CSCs are provided by multiple organizations, including Clinical Engineering (CE a.k.a. biomed), health informatics, Veterans Affairs Medical Centers (VAMC), Veterans Benefits Administration (VBA) Regional Offices, Office of Information Field Office (OIFO), and Research & Development (R&D), etc.

Future data center architecture models for CSCs are intended to provide for collocation of IT equipment and systems from all provider organizations into the minimum number of operational spaces on a campus; that is, consolidated data centers providing environmental and area network support appropriate to all IT equipment needed by tenant organizations on a particular campus to perform their missions.

2.4 Network Support Center (NSC)

NSCs provide local IT services that cannot be effectively consolidated or provided over a network-supported distributed architecture to the local operational site. Local means to the immediate facility and to facilities within the local commuting/networking area for the purposes of this architecture; NSCs may provide application support for all VA facilities in a metropolitan area, for example.

Where application architecture and network requirements require a closer data center point of presence to enable end users effective, efficient system access, an NSC is the appropriate target environment.

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 7

Table 2: Data Center Classification Standard

ID Primary Attribute Secondary Attribute Specification

1 Core Data Center

(CDC)

Description

CDCs are centralized data centers that provide enterprise-level services to geographically-distributed VA organizations to support business functions. CDCs maintain complete High Availability (HA) and Disaster Recovery (DR)

Planned ANSI/TIA 942 Rating 3

Examples Information Technology Center (ITC) Regional Data Center (RDC)

2 Mission Support Center (MSC)

Description MSCs are stand-alone data centers that provide specific enterprise IT functionality to VA organizations and business functions

Planned ANSI/TIA 942 Rating 2 or 3

Examples

• Test/Dev data centers at Rating 2

• Financial Services Center (FSC)

• Centralized Mail Outpatient Pharmacy

(CMOP)

• Consolidated Patient Account Center

(CPAC)

• Health Administration Center (HAC)

3 Campus Support Center (CSC)

Description

CSCs are stand-alone data centers that provide specific IT functionality to a VA campus supporting all VA tenants on that campus and in the geographically supported area

Planned ANSI/TIA 942 Rating 3

Examples VA Medical Center (VAMC)

4 Network Support Center (NSC)

Description NSCs are local data centers that provide local IT application and network support to local operating locations

Planned ANSI/TIA 942 Rating 1

Examples

• Enterprise Test/Development data center

• Telecommunications Room (TR)

• Other small server rooms (not “shallow rooms”)

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 8

Evaluation Factors

• Data center facility appropriately and centrally categorized by function and usage.

• Capability gaps between existing and planned EIA/TIA 942 Rating requirements identified.

VA ENTERPRISE FACILITY IT SUPPORT INFRASTRUCTURE STANDARDS| 9

3 Standards

3.1 Facility IT Support Infrastructure Standard

Structured Cabling 3.1.1 This standard supports structured cabling as a vendor-neutral, extensible approach to information transport system design in VA facilities, not limited to data center applications. The specifications for horizontal cabling for LAN applications and vertical cabling for intra and inter building backbone are laser-enhanced fiber optics and high-bandwidth Unshielded Twisted Pair (UTP). The minimum bandwidth requirement for fiber is 40 Gbe and 10 Gbe on UTP. All local and campus area networks shall be installed in a structured topology with patch panels serving transition points. Individual “home run” cables are not permitted in this standard for LAN applications, including data centers.

The Horizontal and Main Distribution Areas should be located adjacent to switching components within the rack to minimize patch cord length and cable management requirements. This approach is consistent with ITS industry standards, and it supports the SD LAN and data center network design baselines.

Work-area outlets and Equipment Distributions shall support the minimum performance and capacity requirements of this standard.

This standard has been harmonized with OIT LAN Baselines.

Unshielded Twisted Pair (UTP) 3.1.1.1

This standard specifies pre-terminated Category 6A UTP for horizontal distribution. This performance category is applicable to field-terminated or factory pre-terminated applications.

The preferred termination method is factory pre-terminated cabling for UTP with each cable terminating in an individual connector. While pre-terminated cables require that distances between termination points are known this approach results in the rapid installation of horizontal cabling without risks associated with field termination including wire fragments, impaired cabling performance due to poor installation techniques, faulty terminations, etc.

Spiral wrapping pre-terminated bundles is an effective way to maintain the bundle of six cables without impacting ease of installation.

Factory pre-termination is the preferred termination method but field-termination is acceptable for work-area distribution applications and where pre-termination is impractical.

Category 6A cabling is specified in standard ANSI/TIA-1179…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .