V-22 ATTACH 04 OSHE Safety Provisions (2020-01-23).docx

DOCX document 22 KB Posted

Attached to
J015 Maintenance and Repair Service for V-22 Aircraft
Solicitation number
N6264920R0032_RFP
Issued by

About this file

This attachment to a solicitation outlines occupational safety, health and environmental provisions for V-22 aircraft maintenance. The contractor must develop an industrial safety, health and environmental program including policies, responsibilities, training, fire protection, emergency response and compliance with technical manuals. Plans are required for hazard control in lifting, jacking, gas cylinders, parked aircraft, towing, fueling, cleaning, painting, flammable liquids, housekeeping, foreign object damage prevention, welding, personal protective equipment, respiratory protection, lockout/tagout, waste storage and disposal, material spills and fall protection. The contractor must report incidents within an hour and investigate with a written report within 24 days. Safety councils will promote prevention and address trends.

View the file

Other files

File Type Posted
V-22 ATTACH 01 PWS (2020-06-30).docx DOCX document
N6264920R0032 AMD 0005.docx DOCX document
N6264920R0032 AMD 0005 Conforming Copy.docx DOCX document
N6264920R0032 AMD 0004 CONFORMED.docx DOCX document
V-22 ATTACH 01 PWS (2020-06-16).docx DOCX document
N6264920R0032 AMD 0004.docx DOCX document
N6264920R0032 AMD 0003 Conformed.docx DOCX document
V-22 ATTACH 14_Price_Summary_Spreadsheet AMD 3.xlsx XLSX spreadsheet
N6264920R0032 AMD 0003.docx DOCX document
V-22 ATTACH 01 PWS (2020-06-04).docx DOCX document
V-22 ATTACH 03 QASP (2020-06-04).docx DOCX document
N6264920R0032 AMD 0002.docx DOCX document
V-22 ATTACH 14_Price_Summary_Spreadsheet (2020-06-08).xlsx XLSX spreadsheet
N6264920R032 AMD 0002 CONFORMED.docx DOCX document
N6264920R0032 AMD 0001 CONFORMED.docx DOCX document
N6264920R0032 AMD 0001.docx DOCX document
CDRL A015 SPECIAL WORK REQUEST REPORT V-22 v1.pdf PDF
CDRL B009 DAILY REQUISITION REPORT (DRR) V-22 v1.pdf PDF
CDRL A014 NOTED AND CORRECTED (NAC) REPORT V-22 v-1.pdf PDF
CDRL L001 TECHNICAL DATA INVENTORY LISTING V-22 v1.pdf PDF
CDRL F001 INTEGRATED MASTER SCHEDULE V-22 v2.pdf PDF
CDRL B008 ACTIVE ITEM REPORT V-22 v1.pdf PDF
CDRL B004 EXCESS MATERIAL REPORT V-22 v1.pdf PDF
CDRL A013 NON-DESTRUCTIVE INSPECTION (NDI) REPORT V-22 v1.pdf PDF
CDRL D004 TRAINING PLAN_V-22 v1.pdf PDF
CDRL D003 TRANSITION INVENTORY PLAN (SHUT-DOWN) V-22 v1.pdf PDF
CDRL B002 AIRCRAFT AWAITING PARTS REPORT (AWP) V-22 v1.pdf PDF
CDRL C002 PRESENTATION DOCUMENTATION V-22 v3.pdf PDF
CDRL B007 RECEIPT REPORT V-22 v1.pdf PDF
CDRL B011 SUPPORT EQUIPMENT (SE) MAINTENANCE AND CALIBRATION REPORT V-22 v1.pdf PDF
CDRL G001 MATERIAL EXPENSE REPORT V-22 v1.pdf PDF
CDRL B006 SUPPLY EFFECTIVENESS REPORT V-22 v1.pdf PDF
CDRL D002 TRANSITION STATUS REPORT V-22 v1.pdf PDF
CDRL A016 PMI MAN-HOURS per MATERIAL COST REPORT V-22 v1.pdf PDF
CDRL B005 ANNUAL PHYSICAL INVENTORY V-22 v1.pdf PDF
CDRL D001 PHASE-IN TRANSITION PLAN V-22 v1.pdf PDF
CDRL B010 SUPPORT EQUIPMENT (SE) MAINTENANCE HISTORY RECORD REPORT V-22 v1.pdf PDF
CDRL B003 FINAL MATERIAL CONSUMPTION REPORT V-22 v1.pdf PDF
CDRL C001 MEETING MINUTES V-22 v2.pdf PDF
CDRL B001 AVDLR TRACKER V-22 v1.pdf PDF
CDRL A012 Maintenance History Summary (MHS) Report V-22 v1.pdf PDF
N6264920R0032 V-22 RFP.docx DOCX document
CDRL A008 SITUATION SUMMARY REPORT V-22 v1.pdf PDF
V-22 ATTACH 03 QASP (2020-05-06).docx DOCX document
V-22 ATTACH 08 TEI Process at Contractor Facilities (2020-01-23).docx DOCX document
CDRL A005 PRODUCTION PLAN V-22 v1.pdf PDF
CDRL A001 TECHNICAL DIRECTIVES REPORT 10 DAY REPORT Sample Format.docx DOCX document
V-22 ATTACH 02 GOV REL (2020-01-23).docx DOCX document
CDRL A009 EXAMINER and EVALUATOR DISCREPANCY REPORT V-22 v1.pdf PDF
CDRL A011 WEIGHT AND BALANCE REPORTS V-22 v1.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N62649-20-R-00312 Attachment (4) 23 January 2020

Attachment (4): Occupational Safety, Health and Environmental Provisions For V-22 Integrated Maintenance Concept (IMC) Planned Maintenance Interval (PMI)

SECTION I - GENERAL SAFETY, HEALTH, AND ENVIRONMENTAL REQUIREMENTS

1. The Contractor, and its sub-contractors, shall comply with the provisions as set forth in the instructions of the U.S. Government in the performance of this contract as specified within the SOW, its attachments, and its references.

1.1 The Contractor shall be responsible for developing and maintaining a detailed Industrial Safety, Health, and Environmental Program that includes:

1.1.1. Policy, organization, responsibilities, surveillance, enforcement, and training.

1.1.2. Fire protection/prevention and emergency response. The contractor shall identify specific plans for fire protection/prevention along with coordination of external activities that support these requirements for response to emergencies to include fire, chemical spill, accident, terrorist threat, adverse weather, natural disaster, etc. This item includes joint participation with external agencies in emergency response drills and training exercises.

1.1.3. Specific methods of compliance with the requirements of this section.

1.1.4. Compliance with applicable technical manual for each type, model, series aircraft.

2. The Contractor shall submit to the Administrative Contracting Officer (ACO), Government Flight Representative (GFR), and Contracting Officer’s Representative (COR) a copy of his Industrial Safety, Health and Environmental (ISHE) plan for review prior to execution, when changed and annually thereafter as part of this contract. The plan submitted shall be in English and provide a detailed description of the Contractor’s ISHE program.

3. In addition to the Mishap/Incident Reporting and Investigation requirements of DCMA INST 8210.1, Contractor's Flight and Ground Procedures, the Contractor shall comply with the following:

3.1. The Contractor shall report, to the GFR and PMTR Government representative by telephone, any hazardous material spill, occupational injury and/or illness(es) to contractor personnel, and/or damage to Government property as well as aircraft and/or explosive-related incidents within one (1) hour of its identification/occurrence.

3.2. The contractor shall submit a written investigation report detailing all available facts relating to each case of material spill, personnel injury or damage to Government property to the GFR and PMTR within 24 hours of the incident.

4. The contractor’s Aviation Safety Council shall promote a program of accident prevention, accept action items, provide safety expertise, implement changes as required, and address company mishaps for trend analysis and recommendations and operate as a focal point for ISHE within the company. These meetings shall be held on a regular basis (minimum 10 times per contract year).

SECTION II - INDUSTRIAL SAFETY REQUIREMENTS

1. The contractor shall document program specific plans for hazard control that ensures for compliance identified by specific standards within the following operations:

1.1. Lifting Devices

1.2. Aircraft Jacking Operations

1.3. Handling, Storing, and Transporting Compressed Gas Cylinders

1.4. Parked Aircraft

1.5. Moving or Tie-Down of Aircraft

1.6. Emergency Procedures to Safeguard Parked Aircraft During Severe Weather Conditions

1.7. Storage of Work Stands, Loose Aircraft Parts and Materials not Required for In-Progress Work

1.8. Aircraft Towing, Parking, Mooring

1.9. Fuel/Defuel, Fuel Tank/Cell Repair Operations

1.10. Removal of Hangared Fueled Aircraft

1.11. Aircraft Cleaning/Paint Removal/Painting

1.12. Handling, Storage and Use of Flammable Liquids

1.13. Housekeeping

1.14. Foreign Object Damage (FOD) Prevention

1.15. Welding

1.16. Fire Protection/Prevention

1.17. Personal Protective Equipment

1.18. Respiratory Protection

1.19. Lockout/Tagout (Energy Control)

1.20. Storage and Disposal of Hazardous Waste

1.21. Material Spills and Spill Response Procedures

1.22. Fall Protection

SECTION III - ADDITIONAL REQUIREMENTS –

None

BIBLIOGRAPHY

The Contractor shall be responsible for compliance with all applicable portions of the documents listed below:

NUMBER TITLE

DCMA 8210.1C Change 1 Contractor’s Flight and Ground Operations /NAVAIRINST 3710.1 (Series)

NAS 3306 version 3 (current) Facility Requirements for Aircraft Operations

NAVAIR 01-1A-35Aircraft Fuel Cells and Tanks
NAVAIR 17-1-114Inspection and Proofload Testing of Lifting Slings for Aircraft and Related Components
NAVAIR 19-70-521Operation and Intermediate Maintenance with Illustrated Parts Breakdown, Aircraft Jacks
NAVAIR 19-600-135-6-1Preoperational Checklist Aircraft Hydraulic Jacks, All Types GLCA
NAVAIR 19-600-135-6-2Periodic Maintenance Requirements Manuals Hydraulic Aircraft Jacks
NAVSUPINST 4440.128 (Series)Storage and Handling of Liquefied and Gaseous
Compressed Gasses and Their Full and Empty
Cylinders

DOD 4145.19 (Series) Storage and Material Handling

NFPA 407 (Series) Standard for Aircraft Fuel Servicing

File details come from the government source that posted it. Updated .