This is a Utility Information Sheet for the Linder Road project (Project #520033, 320026) in Idaho, extending from State Street to Floating Feather Road, coordinated by the Ada County Highway District (ACHD). The project involves landscape planting and irrigation improvements within roadway swales, buffers, medians, roundabouts, and a basin, along with installation of a tubular metal gate and fencing enclosure at the basin. Utility relocations, adjustments, and installations are required and will take approximately five working days from the Notice to Proceed date to complete. The contractor must coordinate with multiple utility companies throughout all project phases, as utility work may impact the critical path schedule and occur during every phase of construction. Project phasing will significantly affect the schedule for utility relocations and adjustments.
Ten utility companies operate within the project area and must be coordinated with by the contractor: Sparklight, Lumen, Eagle Sewer District, Eagle City Water, Idaho Power, Intermountain Gas, Silver Star, Fatbeam, Syringa Networks, Veolia, and Zayo. Each utility has a designated contact representative with specific phone numbers and email addresses provided for coordination purposes. The contractor is required to follow ACHD General Conditions Section 26 and should direct questions to ACHD Utility Coordinator Scott Bennett at (208) 387-6259. The contractor bears responsibility for scheduling required construction windows and accommodating utility company work throughout the project duration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Utility Information
Linder Rd, SH 44 (State St) to Floating Feather Rd Linder Rd & Floating Feather Rd
Project #520033, 320026
Utility Company Work Duration and Contact Information:
Utilities require approx. 5 working days from NTP date to complete their relocations, adjustments, and installations after clearing, grubbing, tree trimming and removal. These utility windows may impact the Contractor’s critical path schedule by that amount of time, and utilities may be working on site for every phase of the project. Project phasing may have a significant effect on the schedule for utility relocations, adjustments, and installations.
Contractor shall coordinate and accommodate work with utility companies and schedule required construction windows throughout the project.
ACHD General Conditions Section 26 applies. Contact ACHD Utility Coordinator, Scott Bennett, at (208) 387-6259, with questions.
Utilities within project:
• Sparklight – Michael Stephen – (208) 615-0338 – Michael.Stephen@sparklight.biz
• Lumen – Cody Hollenback – (208) 207-2346 – cody.hollenback@lumen.com
• Eagle Sewer District – Ben Kinney – (208) 941-0741 – bkinney@eaglesewer.org
• Eagle City Water – Ken Acuff – (208) 859-8214 – kacuff@cityofeagle.org
• Idaho Power – Dan Hammerquist – (208) 388-2629 – dhammerquist@idahopower.com
• Intermountain Gas – Jordan Garcia – (208) 793-1528 – jordan.garcia@intgas.com
• Silver Star – Corrin Warship - (208) 521-8554 - jordan.diaz@fatbeam.com
• Fatbeam – Jordan Diaz - (208) 613 5206 - bmann@marathonpetroleum.com
• Syringa Networks – Michael DeWitt - (208) 803-4000 - mdewitt@syringanetworks.net
• Veolia – Al Christy - (208) 617-9433 - Alan.Christy@veolia.com
• Zayo – Ryan Goins (3C) - (208) 590-6681 - 3c.ryang@gmail.com mailto:Michael.Stephen@sparklight.biz mailto:cody.hollenback@lumen.com mailto:bkinney@eaglesewer.org mailto:kacuff@cityofeagle.org mailto:dhammerquist@idahopower.com mailto:jordan.garcia@intgas.com mailto:jordan.diaz@fatbeam.com mailto:bmann@marathonpetroleum.com mailto:mdewitt@syringanetworks.net mailto:Alan.Christy@veolia.com mailto:3c.ryang@gmail.com