This is a site improvement plan document for the City of Santa Cruz, California, prepared by CG/Civil Consultants Group, Inc., for the construction of a new storage building at Santa Cruz Fire Station #3, located at 3335 Young Love Avenue. The project scope includes demolition of existing asphalt pavement, installation of a concrete pad designed to support fire apparatus weighing approximately 55,000 pounds each, utility trenching for electrical and fire sprinkler systems, subgrade preparation, formwork, rebar installation, concrete finishing, building anchorage installation, and reconfiguration of storm drain infrastructure with a new bio-retention area. The project has been approved by the City of Santa Cruz in compliance with the 2022 California Building Codes, and all work must adhere to the provided architectural, civil, and electrical plans. Bidders are required to coordinate with pre-selected electrical, fire sprinkler, and building installation vendors and must schedule and complete all required City inspections for their scope of work.
The project budget is capped at $200,000, and all bids must remain within this maximum amount. A bid bond is required at submission, with labor, performance, and materials bonds required following project award. All construction activities must comply with Chapter 6.12 of the Santa Cruz Municipal Code regarding waste management and recycling, and bidders must adhere to Green Building Standards including site management, best management practices, construction waste reduction and disposal, product global warming potential compliance, and finish material pollutant control. The project is subject to California state and local codes and building permit requirements, with no specific response dates or award timeline indicated in the document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(E) STORAGE
BUILDING
(N) STORAGE BUILDING
FF=64.5'
SI
TE
IM
PR
O
VE
M
EN
T
PL
AN
1" = 10'
C2.0
Date:
Scale:
Drawn:
Job:
Of Sheets
Sheet:
REVISIONS BY
05.08.25
TC/RK
5002.02
C
G
C
IV
IL
C
O N
SU
L T
A N
T S
G R
O U
P , I
N C
En gi ne er s/ Pl an ne rs Sc ot ts
V al le y, C A
S co tts
V al le y
Dr iv e / S ui te
1.
8.
N
EW
S
TO
RA
G
E
BU
IL
D
IN
G
A
1 2 3 4 5 6 7 8
S.
C.
F.
D
F
IR
E
ST
AT
IO
N
YO
UN
G
LO
VE
A
VE
N
UE
1 2 3 4 5 6 7 8
B
C
D
E
F
A
B
C
D
E
F
SA
N
TA
C
RU
Z, C A
LEGEND
EXISTING AC PAVEMENT
EXISTING CONCRETE
NEW AC PAVEMENT
NEW CONCRETE
CONCRETE FLUSH CURB
BIO-RETENTION AREA
HTTPS://WWW.YOUTUBE.COM/WATCH?V=PO2AHZUZIEW&INDEX=4&LIST=RDEMTZWQ9PH1A_JFG1KY9ULMNW
APPROVED
CITY OF SANTA CRUZ
These plans and details have been reviewed for compliance with the 2022 California building codes. The approval of these plans shall not be construed to be a permit for any violation of any code or ordinance. These plans shall be on the job for all requested inspections rdericco Line rdericco Callout Approx. Electrical Trench Location rdericco Line rdericco Callout Approx. Fire Sprinkler Trench Location rdericco Line
| Architectural |
| A1.1 - VICINITY MAP, PROJECT DATA, SHEET INDEX |
| A1.2 - CAL GREEN MANDATORY MEASURES |
| A1.3 - CAL GREEN MANDATORY MEASURES |
| A1.4 - CAL GREEN MANDATORY MEASURES |
| A1.5 - CAL GREEN MANDATORY MEASURES |
| A2.1 - SITE PLAN |
| MB1 - Metal Building Drawings |
| MB2 - Metal Building Drawings |
| MB3 - Metal Building Drawings |
| Civil |
| C1.0 - EXISTING SITE & DEMOLITION |
| C2.0 - SITE IMPROVEMENT PLAN |
| C2.1 - SECTIONS |
| C3.0 - EROSION CONTROL PLAN |
| C3.1 - EROSION CONTROL DETAILS |
| C5.1 - DETAILS |
| Electrical |
| E1.01 - ELECTRICAL LAYOUT |
| E2.01 - PB SCHEDULES, LOAD CALCS &SLD |
| T01 - T24 COMPLIANCE REPOR |
File details come from the government source that posted it. Updated .