This document is a Modification of Specification for work on the Number One and Number Two Main Propulsion Diesel Engines (MPDE) aboard the USS GABRIELLE GIFFORDS (LCS 10). The work is located in Engine Room Number 2 and involves repair services for two MTU 20V8000M91 diesel engines, each rated at 9,100 KW, 1,150 RPM, with 20 cylinders.
The contractor must provide authorized original equipment manufacturer (OEM) service through an authorized MTU service provider for removal, inspection, repair, installation, testing, and provision of special tools and drawings. Key work requirements include: removal and replacement of specified materials per the parts list; removal and disposal of system fluids; cleaning and flushing to Level II standards using Delvac 1640 engine oil; torque verification per specification section 8; replenishment of lube oil (Delvac 1640) and jacket water (Inhibitor Corrosion Liquid Cooling Formula A216 with distilled deionized water); performance of diesel engine cold and hot checks; and engine run-in per MTU procedures with laptop data logging, to be completed no later than dock trials with zero allowable leakage or malfunction. The contractor must submit technical representative qualifications for approval 15 days prior to work commencement and provide software, laptops, and special tooling. Government-furnished materials include 40 cylinder units, 80 studs, two engine coolant pumps, and one air starter. The specification references multiple technical documents including General Specifications for Overhaul of Surface Ships (Rev 12), MTU 20V8000M91 functional descriptions, NSTM 233, maintenance requirement cards, and MTU running-in procedures. The known source for technical representation is MTU America Inc. in Novi, Michigan, with point of contact Christopher Currie.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RCC: 319N
Ship: USS GABRIELLE GIFFORDS LCS 10 J.O.: Work Spec#: 233-11-007
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
(A)1. SCOPE:
(A)1.1 Title: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
(A)1.2 Location of Work:
(A)1.2.1 Engine Room Number 2 (3-74-0-E)
(A)1.3 Identification:
(A)1.3.1 Quantity (One EA), Number One MPDE, Mfr: MTU Friedrichshafen GmbH, Mfr ID: 20V8000M91, 20 Cylinders, Rating:
9,100 KW, Speed: 1,150 RPM, Brake Horsepower: 12,203, Temperature: 25 Degrees Celsius, Bore: 265 Millimeter, Stroke: 315 Millimeter, Displacement: 347.4 Liters Total, APL 66A090006
(A)1.3.1.1 Quantity (20 EA), Cylinder Head, Number A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, B1, B2, B3, B4, B5, B6, B7, B8, B9, B10, Page 551 and 552, Figure 04100306a and 04100307a of 2.3
(A)1.3.2 Quantity (One EA), Number 2 Main Propulsion Diesel Engine, 20 Cylinders, 9100 KW Rating, 1150 RPM, 12203 Brake
Horsepower, 265 Millimeter Bore, 315 Millimeter Stroke, 347.4 Liters Total Displacement, MFR ID: 20V8000M91, MFR:
MTU Friedrichshafen GMBH, APL: 66A090006
(A)1.3.2.1 Quantity (20 EA), Cylinder Head, Number A1, A2, A3, A4, A5, A6, A7, A8, A9, A10, B1, B2, B3, B4, B5, B6, B7, B8, B9, B10, Page 551 and 552, Figure 04100306a and 04100307a of 2.3
(A)2. REFERENCES:
(A)2.1 (FY25)
(A)2.2 Rev 12 General Specifications for Overhaul of Surface Ships (GSO)
Price
Contractor Signature Date Page 1 of 9 Author Printed Date
01-Jun-26
For Pricing Only
VERGARA, CHRISTOPHER
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
(A)2.3 Rev 2 Main Propulsion Diesel Engine, MTU 20V 8000 M91; Functional Description, Operating Instructions, Instructions for General Overhaul; LCS-2 Variant; LCS 6 Through LCS 26
(A)2.4 Rev - MTU Diesel Engine Plant Description
(A)2.5 Rev - MTU 8V 396 TE54 and 20V 8000 M91 Diesel Engine, Spare Parts Catalog; LCS-2 Variant; LCS-4 and Follow
(A)2.6 Rev 7 NSTM 233 Diesel Engines
(A)2.7 Rev 8 Diesel Jacket Water
(A)2.8 Rev N LCS Piping Standards Booklet
(A)2.9 Maintenance Requirement Card MRC Control Number: 63 J5AW N Replace Main Diesel Propulsion Engine Lube Oil
(A)2.10 Maintenance Requirement Card G5H3 Card Perform Diesel Engine Cold Checks
(A)2.11 Maintenance Requirement Card G5H4 Perform Diesel Engine Hot Checks.
(A)2.12 Maintenance Requirement Card, MRC Control Number: 43 J3QL N, Conduct Main Propulsion Diesel Engine (MPDE)
Performance Test
(A)2.13 MTU 8000 Procedure for Running-In Overhauled Engine
(A)3. REQUIREMENTS:
(A)3.1 Provide the service of an authorized original equipment manufacturer (OEM) service provider for removal, inspection, repair, installation, testing and provide each special tool and drawing for each equipment listed in 1.3 and located in 1.2.
Price
Contractor Signature Date Page 2 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
(A)3.1.1 Submit one legible copy, in approved transferrable media, of the name and each qualification of the Technical
Representative to the SUPERVISOR for approval a minimum of 15 days prior to commencement of work.
(A)3.1.2 Technical representatives are to provide the software, laptop and special tooling required for accomplishment of this work item.
(A)3.2 Accomplish the requirements of 009-09 of 2.1 for the removal and replacement of materials provided in 5.1. and 3.4 for equipment listed in 1.3.1 and 1.3.2, located in 1.2, using 2.2 through 2.8 for guidance.
(A)3.3 Remove and dispose of each system fluid from the equipment listed in 1.3.1 and 1.3.2.
Price
Contractor Signature Date Page 3 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
(A)3.4 Procure, remove existing, fit and install with new material listed below.
Price
Contractor Signature Date Page 4 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
DESCRIPTION PART NUMBER QUANITTY
O-RING 700429056001 128 EA
O-RING 700429435000 40 EA
WASHER 5680160076 120 EA
O-RING 700429045000 160 EA
O-RING 700429015000 80 EA
COPPER SEALING RING 7603016105 160 EA
HEX SCREW 000000001710 160 EA
O-RING 700429120002 8 EA
O-RING 700429085002 72 EA
O-RING 700429115002 8 EA
O-RING 700429113000 72 EA
O-RING 700429040003 40 EA
O-RING 700429132000 80 EA
GASKET 5680110280 40 EA
GASKET X00023198 40 EA
STUD X56999100273 80 EA
NUT X00043195 160 EA
GASKET (PIPE TO CYLINDER HEAD) X56914100044 40 EA
O-RING 700429040003 40 EA
O-RING 700429113000 76 EA
O-RING 700429085002 80 EA
SEALING RING 7603015101 2 EA
O-RING 700429045000 4 EA
SCREWS 000000001710 80 EA
ASSEMBLY COMPOUND (MOLYKOTE P37) 50564 2 EA
ASSEMBLY COMPOUND (ULTRA THERM MTU) 50547 2 EA
ASSEMBLY COMPOUND (KLUTHE HAKUFORM) X00067260 2 EA
O-RING 700429028003 12 EA
Price
Contractor Signature Date Page 5 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
O-RING 700429028000 2 EA
O-RING 700429057001 16 EA
O-RING 700429063000 4 EA
O-RING 700429115002 6 EA
GASKET 202690125000 4 EA
HEX SCREW 204014012009 10 EA
O-RING 700429085002 4 EA
O-RING 700429090000 2 EA
O-RING 700429090003 4 EA
O-RING 700429095004 2 EA
O-RING 700429113000 2 EA
O-RING 700429120002 6 EA
O-RING 700429126000 4 EA
O-RING 700429230000 2 EA
THERMOSTAT X00018961 2 EA
FIELD GASKET M15B-NBRP-C/PEAK 3233018196 496 EA
RING GASKET 3233018246 8 EA
FIELD GASKET M15M-NBRP-C/PEAK 3233018046 136 EA
RING GASKET M15M-NBRP-PEAK 3233018096 8 EA
TRANSITION PLATE GASKET M15M 3233084502 8 EA
TRANSITION PLATE GASKET M15B 3233084622 8 EA
TAPE GC1 TRANSFER TAPE 33m/ REAL 3233084071 8 EA
RUBBER PAINT SGP192322 4 EA
STARTER EX56917300063 2 EA
AIR STARTER X569173000011 1 EA
PUMP, RAW WATER X56920700005/87 2 EA
Price
Contractor Signature Date Page 6 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
(A)3.4.1 Remove existing, fit and install with new material provided in 5.1.
(Q)(G) "TORQUE VERIFICATION"
(A)3.5 Torque each bolt in accordance with Section 8, Appendix A of 2.3.
(A)3.6 Accomplish the requirements of 009-107 of 2.1 for cleaning and flushing equipment listed in 1.3.1 and 1.3.2 and using
OEM as guidance.
(A)3.6.1 Ensure General Cleaning must be Level II in accordance with Section 505j2 of 2.2.
(A)3.6.2 Install each temporary closure over each opening caused by each removal. Remove each temporary closure upon completion of work.
(A)3.6.3 Engine Oil, Delvac 1640 shall be used to accomplish 3.6.
(A)3.7 Replenish Main Diesel Propulsion Engine Oil using Delvac 1640 Lube Oil in accordance with 2.9, using 2.3 for guidance for equipment listed in 1.3.1 and 1.3.2.
(A)3.7.1 Ensure MAX level on dipstick is verified upon completion of 2.9 and completion of initial operation of engine. Fill oil as needed to ensure level is at MAX level upon completion of this work item.
(A)3.7.2 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the result of the requirements of
3.7.1 to the SUPERVISOR.
(A)3.8 Replenish jacket water using Inhibitor, Corrosion, Liquid Cooling Formula A216 and Distilled Deionized Water using 2.3 and 2.7 for guidance.
(A)3.8.1 Ensure Jacket Water level is verified upon completion of initial operation of engine. Fill jacket water as needed to ensure level is at full mark upon completion of this work item.
(A)3.8.2 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the result of the requirements of
3.8.1 to the SUPERVISOR.
Price
Contractor Signature Date Page 7 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
(A)3.9 Perform Diesel Engine Cold and Hot Checks in accordance with reference 2.10 and 2.11 using 2.3 for guidance.
(A)3.9.1 This requirement is a separate event from Light Off Assessment (LOA)
(A)3.9.2 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the result of the requirements of
3.9 to the SUPERVISOR.
(Q)(G) "RUNNING–IN OVERHAULED ENGINE"
(A)3.10 Accomplish engine run-in of equipment identified in 1.3.1 and 1.3.2 in accordance with 2.12 and 2.13, using approved ship's operating procedure and 2.3 for guidance. Allowable leakage or malfunction: None.
(A)3.10.1 The requirement of 3.10 to be accomplished No Later Than completion of Dock Trials.
(A)3.10.2 Entire process of running engine shall have a laptop connected to log all engine data during run-in operation.
(A)3.11 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
(A)4. NOTES:
(A)4.1 Known Source of Technical Representative:
MTU America Inc.
Large Engine Service group
39525 McKenzie Drive
Novi, MI 48377
POC: Christopher Currie, P.E.
Phone: (317) 677-6293
Email: Christopher.currie@ps.rolls-royce.com
(A)5. GOVERNMENT FURNISHED MATERIAL(GFM):
(A)5.1 LLTM:
Price
Contractor Signature Date Page 8 of 9 Author Printed Date
01-Jun-26
COAR: 16 SSP: TPPC-LCS10-SSSD24-CN01 Contractor:
Authority: Not Authorized
Contractor Gap: Government Gap: G10z
Reports:
Modification of Specification Item: Number One and Number 2 Main Propulsion Diesel Engine (MPDE); repair
The following changes and/or additions apply to the work requirements of the original specification:
PARA NO.
TOTAL
QUANTITY
PROVIDED
REQ
PARA
NO.
NATIONAL
STOCK
NO.
REF
NO.
PIECE
NO.NAME OF PART
5.1.1 40.00 EA EX56901300002Cylinder Unit 2.5 3.2
5.1.2 80.00 EA X56999100273Stud 2.5 3.2
5.1.3 2.00 EA X000013504/87Pump, Engine Coolant 2.5 3.2
5.1.4 1.00 EA X569173000011Air Starter 2.5 3.2
(A)5.1.5 Air Starter
(A)5.1.6 Not Applicable
(A)5.1.7 None.
(A)5.2 PUSH MATERIAL:
(A)5.2.1 None.
(A)5.3 KITTED MATERIAL:
(A)5.3.1 None.
Price
Contractor Signature Date Page 9 of 9 Author Printed Date