USNS SIOUX SYNOPSIS FY21 MTA.pdf

PDF 122 KB Posted

Attached to
USNS SIOUX (T-ATF 171) FY21 Mid-Term Availability (MTA) SYNOPSIS
Solicitation number
N3220520R4085
Issued by

View the file

Other files

File Type Posted
WI Index for MTA 2020 Sioux.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V1.1 (17 June 2014)

MILITARY SEALIFT COMMAND

N10 - CONTRACTS AND BUSINESS MANAGEMENT DIRECTORATE

PRESOLICITATION SYNOPSIS TEMPLATE

Military Sealift Command Synopsis

USNS SIOUX (T-ATF 171) FY21 Mid-Term Availability

1. Action Code: Presolicitation

2. Date: April 23, 2020

3. Fiscal Year: 2021

4. Contracting Office Zip Code: 23511

5. Classification Code: J999

6. Contracting Office Address: 471 East C Street, Norfolk VA 23511-2419

7. Subject: USNS SIOUX (T-ATF 171) FY21 Mid-Term Availability

8. Proposed Solicitation Number: N3220520R4085

9. Closing Response Date: May 8, 2020

10. Contact Point or Contracting Officer: Tyshawn Neals (757)443-5962;

tyshawn.neals@navy.mil

11. Contract Award and Solicitation Number: TBD

12. Contract Award Dollar Amount: TBD

13. Contract Line Item Number(s): TBD

14. Contract Award Date: TBD

15. Contractor: TBD

16. Description: Military Sealift Command (MSC) has a requirement for the USNS SIOUX’s

Mid-Term Availability (MTA). The place of performance will be at a Contractor’s facility on the

West Coast, Gulf Coast or Hawaii. A draft work item list is separately attached to this notice and a list of the noteworthy work is as follows:

1) Replace #5 and #7 Fuel Oil Tank Vent Piping

2) Port and Starboard MRG Pinion Seal Replacement

3) Port and Starboard Main Propulsion Diesel Engine Turbocharger and Turbo-Drive Gear

Replacement

4) Starboard Main Propulsion Diesel Engine Strainer Box Repair and Over-speed Housing

Gasket Replacement

5) Propeller Clean and Polish

6) Bridge Window Replacement

7) #1 and #2 Off Ship Fire Pump Engine Service

8) Aft Electric Capstan Removal and Preservation

9) Automation and Propulsion Control Inspect and Test

10) Fire and Smoke Damper Service

a. Unit of issue: Each

b. Performance location information: West Coast/Gulf Coast/Hawaii

c. Delivery Schedule: Period of performance to commence on 5 October 2020 for approximately 61 days

d. Procedures: FAR Part 15

e. Anticipated Award Date: August 21, 2020

f. The solicitation will be made available on beta.sam.gov on or about May 17, 2020

g. Set-aside Status: Small business set-aside mailto:tyshawn.neals@navy.mil

V1.1 (17 June 2014)

17. The decision to solicit as a small business set-aside was based on market research. MSC received interest from multiple small-business concerns under NAICS 336611, which has a size standard of 1,250 employees. The MSC Small Business Representative concurs with decision to solicit as a small business set aside.

File details come from the government source that posted it. Updated .