USNS NARRAGANSETT Specifications.pdf
PDF 88 KB Posted
- Attached to
- USNS NARRAGANSETT (TSV-4) FY22 DPMA
- Solicitation number
- N50054-22-R-0001
About this file
This document contains a sources sought announcement and draft specifications for the USNS NARRAGANSETT (TSV-4) FY22 DPMA contract opportunity. The Mid-Atlantic Regional Maintenance Center is seeking information from potential offerors to complete drydocking and pier-side maintenance for the USNS NARRAGANSETT from July 2022 to April 2023. Interested parties must have the capability to perform work in categories including hull preservation and repair, propulsion and steering systems overhaul, and electrical and habitability upgrades. Responses are requested by October 21, 2021 to provide company information, relevant experience, and confirmation of ability to meet requirements such as availability of a NAVSEA-certified drydock and pier suitable for the vessel. The anticipated solicitation release is December 20, 2021 for a firm-fixed price contract award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USNS NARRAGANSETT Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT-USNS NARRAGANSETT (TSV-4)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SHIP
CHARACTERISTICS
CATEGORY I. FY-22 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER
REFERENCE.
ITEM_NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 10/01/2019 Original 009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original 009-03 Toxic and Hazardous Substance; control 10/01/2019 Original 009-04 Quality Management System; provide 10/01/2019 Original 009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 03/06/2020 Original 009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 10/01/2020 Original 009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original 009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original 009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original 009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original 009-20 Government Property; control 10/01/2017 Original 009-21 Logistics and Technical Data; provide 10/01/2018 Original 009-23 Interference; remove and install 10/01/2018 Original 009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 10/01/2019 Original
009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original 009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; Accomplish 10/01/2018 Original 009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide 10/01/2019 Original 009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage 01/14/2020 Original 009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original 009-67 Integrated Total Ship Testing; manage 04/30/2018 Original 009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original 009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish 10/01/2019 Original 009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original 009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair 10/01/2018 Original 009-74 Occupational, Safety and Health Plan; accomplish 10/01/2020 Original 009-80 Ship Facilities; maintain 11/18/2016 Original 009-81 Compartment Closeout; accomplish 10/01/2019 Original 009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original 009-84 Threaded Fastener Requirements; accomplish 03/06/2020 Original
LENGTH OVERALL 226 FEET 0 INCHES
MAX. BEAM AT DESIGN WATERLINE 42 FEET 0 INCHES
EXTREME BEAM INCLUDING APPENDAGES 0 FEET 0 INCHES
DRAFT (MAX. NAVIGABLE) (FWD.) 12 FEET 0 INCHES
DRAFT (MAX. NAVIGABLE) (AFT.) 12 FEET 0 INCHES
LIGHT DISPLACEMENT 2,260 LONG TON
FULL LOAD DISPLACEMENT 1097 GRT
HEIGHT OF MAST ABOVE DESIGN WATERLINE 95 FEET 0 INCHES
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide 03/06/2018 Original 009-99 Ship Departure Report; provide 07/18/2014 Original 009-100 Ship's Stability; maintain 03/06/2018 Original 009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original 009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original 009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original 009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original 009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage 04/30/2018 Original 009-117 Combat Systems, Light-Off Suport; provide 10/01/2019 Original 009-118 CG Deck Loading; accomplish 07/18/2014 Original 009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original 009-122 Temporary Padeye; install and remove 10/01/2018 Original 009-125 Boats Less Than 65 Feet Long; accomplish 07/11/2020 Original
WORK PACKAGE DRAFT WORK ITEMS
USNS NARRAGANSETT
ITEM NO. TITLE
042-13-001 Accountability of Manhour and Material Reservation; accomplish
042-66-001 Work Completion Certification Data for Chief of Naval Operations
(CNO)
Availability; provide
110-21-001 American Bureau of Shipping (ABS) 5 Year Hull Gauging
Inspection (Exterior); accomplish
110-21-002 American Bureau of Shipping (ABS) 5 Year Hull Gauging
Inspection (Interior) and Repair; accomplish
110-21-003 American Bureau of Shipping (ABS) 5 Year Main Deck, Superstructure, Masts, and Stack Gauging Inspection and Repair; accomplish
123-11-001 Tanks and Voids Preservation; accomplish
163-11-001 Sea Chest and Waster Sleeve; inspect and install
167-11-001 Watertight Scuttle; install
243-11-001 Propulsion Shafting; repair
245-11-001 Propeller; repair
311-80-001 ShipAlt 226NS/4B, Ship Service Diesel Generator (SSDG);
accomplish
437-21-001 Tank Level Indicating (TLI) Systems Inspection, repair, calibrate and test; accomplish
520-11-002 Sea Valve; repair/install
562-11-001 Rudder (Port and Starboard) and Steering Gear; inspect and repair
568-11-001 Bow Thruster and Gear Box; Inspect and Repair
581-11-001 Anchor, Anchor Handling Assembly, chain locker and sump;
repair and preserve
593-11-001 Collecting, Holding and Transfer (CHT) Tank and Lift Station;
repair
624-11-001 Windows; repair
631-11-001 Environmental Hazardous Material Abatement Service;
accomplish
631-31-001 Underwater Hull and Freeboard Repair and Preserve with Paint Company Original Equipment Manufacturers' (OEM) Technical Representative; accomplish
633-21-001 Impressed Current Cathodic Protection (ICCP) System; inspect and repair
643-80-001 Berthing Habitability Installation, Boatalt 226NS/3C; accomplish
980-11-001 Light Off Assistance (LOA); provide
980-31-001 Office Space Without Computer for In-Plant Availability; provide
982-31-001 Dock Trial, Fast Cruise, and Sea Trial; accomplish
992-11-001 Fuel Assistance and Towboat Service for Fuel Barge; provide
992-11-003 Temporary Service; provide
992-12-001 Heavy Weather Plan (Remobilization); accomplish
992-12-002 Heavy Weather Plan (Demobilization); accomplish
992-31-001 Cleaning and Pumping; accomplish
993-21-001 Crane, Rigging, Forklift, High Reach and Transportation Service; provide
993-31-001 Temporary Deck Covering; install
997-11-001 Drydocking and Undocking; accomplish
998-41-001 Hazardous Waste Produced on Naval Vessel; control
File details come from the government source that posted it. Updated .