USNS HUNTER Specifications.pdf

PDF 39 KB Posted

Attached to
USNS HUNTER (TSV-3) Docking Phased Maintenance Availability (DPMA) Federal contract opportunity
Solicitation number
420-21-085
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a sources sought announcement and draft specifications for the FY21 Docking Phased Maintenance Availability on the USNS HUNTER (TSV-3). The Mid-Atlantic Regional Maintenance Center is seeking information from potential offerors to determine capability and interest in performing dry-docking and pier-side maintenance, repair, and alterations work anticipated to begin in August 2021. The draft specifications outline work items including hull gauging inspections and repairs, tank and void preservation, main propulsion diesel engine overhaul, propulsion shafting inspection and repair, and other systems work. Responses from interested sources are requested by December 31, 2021 to provide company information, capabilities, experience, and plans to submit a proposal for the anticipated firm-fixed price solicitation.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TSV-3 HUNTER DRAFT

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SHIP CHARACTERISTICS

LENGTH OVERALL 224 FEET 0 INCHES

MAX. BEAM AT DESIGN WATERLINE 0 FEET 0 INCHES

EXTREME BEAM INCLUDING APPENDAGES FEET INCHES

DRAFT (MAX. NAVIGABLE) (FWD.) 0 FEET 0 INCHES

DRAFT (MAX. NAVIGABLE) (AFT.) 0 FEET 0 INCHES

LIGHT DISPLACEMENT 1,489 LONG TON

FULL LOAD DISPLACEMENT 0 LONG TON

HEIGHT OF MAST ABOVE DESIGN WATERLINE 0 FEET 0 INCHES

CATEGORY I. FY-21 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER

REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2019 Original 009-02 Environmental Compliance Report for Material Usage; accomplish 10/01/2019 Original 009-03 Toxic and Hazardous Substance; control 10/01/2019 Original 009-04 Quality Management System; provide 10/01/2019 Original 009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations; accomplish 03/06/2020 CH-2 009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/24/2019 Original 009-08 Shipboard Fire Protection and Fire Prevention; accomplish 10/01/2019 Original 009-10 Asbestos-Containing Material (ACM); control 10/01/2019 Original 009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original 009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original 009-20 Government Property; control 10/01/2017 Original 009-21 Logistics and Technical Data; provide 10/01/2018 Original 009-23 Interference; remove and install 10/01/2018 Original 009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 10/01/2019 Original 009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial equipment/Component; accomplish10/01/2018 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration; provide and manage

01/14/2020 CH-1

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original 009-67 Integrated Total Ship Testing; manage 04/30/2018 Original 009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 10/01/2019 Original 009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair 10/01/2018 Original 009-74 Occupational, Safety and Health Plan; accomplish 01/14/2020 CH-1 009-80 Ship Facilities; maintain 11/18/2016 Original 009-81 Compartment Closeout; accomplish 10/01/2019 Original 009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original 009-84 Threaded Fastener Requirements; accomplish 03/06/2020 CH-2 009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide 03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original 009-100 Ship's Stability; maintain 03/06/2018 Original 009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original 009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original 009-122 Temporary Padeye; install and remove 10/01/2018 Original

CATEGORY II. FY-21 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

CHANGE

009-05 Temporary Access; accomplish 10/01/2018 Original 009-09 Process Control Procedure (PCP); provide and accomplish 10/01/2019 Original 009-12 Weld, Fabricate, and Inspect; accomplish 10/01/2019 Original 009-13 Meter, Gauge, Switch, and Thermometer; repair 04/09/2019 Original 009-15 Rotating Machinery; balance 10/01/2019 Original 009-17 Rotating Electrical Equipment; repair 10/01/2019 Original 009-25 Structural Boundary Test; accomplish 03/06/2020 CH-2 009-26 Deck Covering; accomplish 03/06/2020 CH-2 009-32 Cleaning and Painting Requirements; accomplish 03/06/2020 CH-2 009-36 Controller; repair 08/31/2018 Original 009-46 Butterfly Valve, Synthetic and Metal Seated; repair 08/31/2018 Original 009-47 Gate Valve; repair 03/06/2020 CH-2 009-50 Horizontal Swing Check Valve; repair 08/31/2018 Original 009-53 Bolted Bonnet, Globe, Globe Angle, and Globe Stop Check Valve Shop Repair; accomplish

03/06/2020 CH-2

009-57 Reduction Gear Security; accomplish 11/18/2016 Original 009-58 Pump and Driver Shaft Alignment; accomplish 03/06/2020 CH-2 009-63 Lubricating Oil and Hydraulic Fluid; analyze 04/30/2018 Original 009-65 Polychlorinated Biphenyls (PCBs); control 03/26/2018 Original 009-71 Piping System; test 03/06/2020 CH-2 009-83 Wire Rope Assembly; Fabricate 03/26/2018 Original 009-87 Chemical disinfection Procedures; accomplish 10/01/2017 Original 009-88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify 11/18/2016 Original 009-89 Contractor Furnished Anode Purchase and Inspection; accomplish 03/06/2018 Original 009-91 Propeller In-Place Inspection; accomplish 10/01/2017 Original 009-104 Vibration Testing and Analysis; accomplish 03/06/2020 CH-2 009-107 Piping System Cleanliness Restoration and Flushing (Non-Nuclear); accomplish 10/01/2019 Original

WORK PACKAGE DRAFT WORK ITEMS

TSV-3 HUNTER

042-00-001 Work Completion Certification Data for Chief of Naval Operations (CNO) Availability; provide]

042-11-001 Accountability of Manhour and Material Reservation; accomplish

077-11-001 Hazardous Waste Produced on Naval Vessel; control

110-21-001 American Bureau of Shipping (ABS) 5 Year Gauging Inspection and repair; accomplish

110-21-002 American Bureau of Shipping (ABS) 5 Year Hull Gauging Inspection and repair; accomplish

123-11-001 American Bureau of Shipping (ABS) Survey and Repair of Tanks and Voids; accomplish

123-11-002 Tank and Void Preservation; accomplish

167-11-001 Main Deck Hatch; repair

171-11-001 Main Mast; install and preserve

233-11-001 Main Propulsion Diesel Engine 10,000 Hour Top End overhaul; accomplish

243-11-001 Propulsion Shafting; inspect and repair

245-11-001 Propeller; inspect and repair

324-11-001 Main Switchboard and Motor Controllers; clean and inspect

520-11-001 Sea Valve; repair

529-11-001 Ballast Valve; install

561-11-001 Rudder and Steering Gear; repair

568-11-001 Bow Thruster; inspect and repair

581-11-001 Anchor Windlass; repair

581-11-002 Anchor and Anchor Chain Inspection and Preservation; accomplish

583-11-001 Target Recovery Ramp; repair

589-11-001 Hydro Pro Marine Crane; repair

593-11-001 Marine Sanitation Device (MSD) ORCA IIA-36; repair

623-11-001 Inclined Ladder; repair and preserve

631-31-001 Underwater Hull and Freeboard; preserve

634-11-001 Cosmetic Polymeric Deck Covering System; install

651-11-002 Galley Sink; install

980-11-001 Light-Off Assistance (LOA); provide

980-11-002 Ship's Force Office Space; provide

982-31-001 Dock Trial, Fast Cruise, and Sea Trial; accomplish

992-11-001 Temporary Service; provide

992-11-002 Heavy Weather Plan (Demobilization); accomplish

992-12-002 Heavy Weather Plan (Remobilization); accomplish

992-31-002 Cleaning and Pumping; accomplish

993-11-001 Temporary Deck Covering; install

993-21-001 Rigging, Crane, Forklift, Transportation and High Reach Service; provide

997-11-001 Drydock, Fleet and Undock; accomplish

File details come from the government source that posted it. Updated .