This notice solicits expressions of interest for a new land lease to support restoration efforts of the Whitebark Pine tree. The U.S. Forest Service, Pacific Northwest Region, has a need to lease between 0.2 to 0.3 acres of land in the Cottage Grove, Oregon area to establish an offsite garden in support of restoration efforts for the Whitebark Pine, which was recently listed under the Endangered Species Act. The offered space must meet government requirements for fire safety, accessibility, seismic standards, and sustainability. A fully serviced lease is not required and the space shall not be located in a 100-year flood plain. The delineated area is bounded by Lynx Hollow Road to the north, the eastern edge of Cottage Grove city limits to the east, the intersection of Latham and London roads to the south, and the western edge of Cottage Grove city limits to the west. The lease term is for 20 years with a firm term of 5 years. Expressions of interest must be received by March 18, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT

USFS Dorena GRC Offsite Garden Specifications

USFS Dorena Gene�c Resource Center - Offsite Garden Specifica�ons for Site

1. Parcel requirements

a. 0.25 acres

b. flat (<2% slope)

c. na�ve surface

d. Fenced with full government access.

e. Not located in remote lands where vandalism is more likely.

(i.e. within 4 miles north, south or east of Cotage Grove Center or 2 miles west)

2. Power availability – Standard 120V

a. Power use expected - ~ 50 wats for Irritrol (irriga�on �mer) and associated valve opening/closing.

3. Water – (for 500 plants (5-gallon pots) at 2 gallons per plant per irriga�on)

a. Irriga�on water available at minimum sustained 30 PSI.

i. Assume standard hose spicket.

ii. If pressure at site is too low, we could support well source with larger pump.

b. Can be flexible in �me of day or night for irriga�on.

c. Can adjust length of irriga�on �me within the following range:

i. 4 sta�ons at 250 gallons/hour for 4 hours

ii. 8 sta�ons at 125 gallons/hour for 8 hours

d. Seasonality

i. Spring (es�mated mid-March through mid-May)

1. 2-3 days per week at 1000 gallons per day

2. (OR) 4-6 days per week at 500 gallons per day

ii. Summer (es�mated mid-May through early Oct)

1. 3-4 days per week at 1000 gallons per day

2. (OR) 7 days per week at 500 gallons per day

Project Proposal (USFS to purchase and install materials and conduct all related site work)

The site would house 500 plants in 5-gallon pots. Pots would be placed on 4� x 3.5� pallets set in rows (180-200 pallets) on top of weed barrier. A shade structure would be constructed over the plants to reduce summer radia�on. Shade structure would consist of 10 � tall steel posts with support posts and guide cables (~29 holes) with concrete foo�ngs installed 20 � apart. Steel cable would be stretched between posts holding up shade cloth over the pallets and plants.

USFS staff would purchase materials and conduct all site development (weed barrier, pallets, plants, irriga�on system, and shade structure). USFS staff would visit site to establish and monitor plants during irriga�on season (2-3 �mes/week), in late summer for leaf harvest, and in fall to prune. Addi�onal visits may be needed for upgrades and repairs.

USFS Dorena Genetic Resource Center - Offsite Garden
Specifications for Site
Project Proposal (USFS to purchase and install materials and conduct all related site work)

File details come from the government source that posted it. Updated .