This is a Memorandum for the Record documenting a contracting officer's justification to use other than full and open competition for a simplified acquisition threshold purchase.

The acquisition involves a Fuel Flow Meter, Promass E 300, 8E3B50, DN50 2 8E3B50-1MM19/0 (8E3B50-AAIMABAFAASAAASHA2+AALF), required for installation on the USNS Oscar V. Peterson (FY27 MTA – WI 0503). The required delivery period spans January 14, 2027 through May 25, 2027. The specified source is Endress+Hauser c/o Caretek Inc., located at 2350 Endress Place. The product is not designated as critical ship equipment under COMSCINST 4490.1 and SMS Procedure 10.6-002-ALL.

The contracting officer selected "Only One Responsible Source" as the determination basis. The justification cites multiple factors: exclusive licensing agreements, as the original equipment manufacturer (Badger Meter) is obsolete with parts and service unavailable, making the AER-approved OEM replacement from Endress+Hauser the only viable option; standardization requirements per COMSCINST 4790.3 to maintain fleet configuration baseline for TAO 205 Class Vessels; compatibility as a direct replacement part for the existing BADGER METER RCS200-S-FAA-M-H1-N-XKN equipment; and other reasons related to maintaining the same functional configuration. The document was signed by Austin Amory, Contracting Officer, on May 25, 2026.

View the file

Other files

File Type Posted
Solicitation - N3220526Q7216.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .