USCGC William Tate (WLM 175) DS FY20 Specification REV0.pdf
PDF 4 MB Posted
- Attached to
- Dockside (DS): USCGC William Tate FY20 Repair
- Solicitation number
- 70Z085-20-S-P4595400
About this file
This document is a Sources Sought Notice issued by the U.S. Coast Guard Surface Forces Logistics Center to identify sources capable of providing dockside maintenance services for the USCGC William Tate. The notice seeks information to determine if commercial services are available to satisfy requirements and conduct market research for an upcoming solicitation. Services will include labor, materials, and equipment to perform dockside repairs and maintenance to the 175-foot buoy tender at its homeport in Philadelphia, PA between August 11 and September 22, 2020. Responses to this notice will help inform competition and set-aside decisions for the solicitation. Interested parties are requested to identify if they are able to meet the period of performance or propose an alternative 42-day schedule. Preliminary specifications are provided in an attached document but remain subject to change by the Coast Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USCGC William Tate DS FY20 Sources Sought Notice.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC WILLIAM TATE (WLM 560)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2020
Developed By: Alessandra K Twomey
(Rev-0, 27 February 2020)
USCGC WILLIAM TATE (WLM-175) DOCKSIDE AVAILABILITY FY2020
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics - TENDER ......................................................................................................... xiii General Requirements WORK ITEM 1: Voids (Accessible), Clean and Inspect WORK ITEM 2: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 3: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 4: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 5: Vent Ducts (Engine And Motor Room All), Commercial Cleaning WORK ITEM 6: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning WORK ITEM 7: Vent Ducts (Laundry Exhaust), Commercial Cleaning WORK ITEM 8: Vent Ducts (All Other), Commercial Cleaning WORK ITEM 9: Potable Water Pneumatic Tank(s), Clean and Inspect WORK ITEM 10: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift . 42 WORK ITEM 11: Hydraulic Chain Stoppers, Inspect and Service WORK ITEM 12: Hydraulic Crossdeck Winches, Inspect And Service WORK ITEM 13: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 14: Mechanical Chain Stoppers, Inspect and Service WORK ITEM 15: Warping Capstan (Aft), Inspect and Service WORK ITEM 16: Single Point Davit, Disassemble and Inspect WORK ITEM 17: Buoy Crane, Inspect And Service WORK ITEM 18: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 19: Sewage Piping, Clean And Flush WORK ITEM 20: Crane Winch DCV, Replace WORK ITEM 21: Oily Water Separator, Replace WORK ITEM 22: Thruster Quick Disconnects (QDs), Install WORK ITEM 23: Sea Trial Performance, Support, Provide WORK ITEM 24: Ceiling Tiles, Renew WORK ITEM 25: Auxiliary AC Motor, Overhaul WORK ITEM 26: Power Circuit Breakers, Inspect, Maintain & Test WORK ITEM 27: Hawse Pipe Covers , Renew WORK ITEM 28: Vent Spaces, Deck, Preserve WORK ITEM 29: Pump Room, Deck, Preserve WORK ITEM 30: Gooseneck Vent and Cofferdam, Renew WORK ITEM 31: Gooseneck Vents and Cofferdams, Preserve WORK ITEM 32: Stanchions, Renew WORK ITEM 33: Main Diesel Engine, Check Alignment WORK ITEM 34: Tanks (Sewage Holding), Preserve “100%” WORK ITEM 35: Tanks (Sewage Holding), Preserve “Partial” WORK ITEM 36: Vents, Preserve and Renew Covers iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing (DWG) 175-WLM-201-002, Rev D, Machinery Removal Routes
Coast Guard Drawing (DWG) 175-WLM-320-002, Rev G, Pwr Sys Dk Plan Fr24-Fwd Hull Blk 910 &
Coast Guard Drawing (DWG) 175-WLM-437-007, Rev P, Buoy Dk Control Sys Block, ISO & Elem Wrg
Diag
Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover
Coast Guard Drawing 175 WLM 185-001, Rev -, Foundation Incidental to Boss 2.2 GPM OWS
Installation
Coast Guard Drawing 175 WLM 201-001, Rev C, Machinery Spaces Arrangement
Coast Guard Drawing 175 WLM 202-002, Rev G, MPCMS Wiring Data (COED)
Coast Guard Drawing 175 WLM 243-2, Rev E, Propulsion Shaft Arrangement
Coast Guard Drawing 175 WLM 256-001, Rev J, Seawater Cooling System Diagram
Coast Guard Drawing 175 WLM 259-001, Rev A, Combustion Exhaust Diagram
Coast Guard Drawing 175 WLM 259-005, Rev C, Combustion Exhaust A&D, Hull Block 970
Coast Guard Drawing 175 WLM 262-001, Rev J, Lube Oil System Diagram
Coast Guard Drawing 175 WLM 262-002, Rev H, Waste Oil System Diagram
Coast Guard Drawing 175 WLM 262-005, Rev G, Lube Oil System A/D – Hull Blocks 910, 930, 940, &
Coast Guard Drawing 175 WLM 320-001, Rev AL, Electrical One-Line Diagram
Coast Guard Drawing 175 WLM 320-004, Rev G, Power System Deck Plan ER and Pump Rm Hull
Block 920
Coast Guard Drawing 175 WLM 320-012, Rev -, Power System Mods Incidental to OWS
Removal/Installation One-Line Diagram
Coast Guard Drawing 175 WLM 506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagram
Coast Guard Drawing 175 WLM 506-007, Rev D, Vents & Sndg Tubes Main Deck & Above A/D Hull
Block 970
Coast Guard Drawing 175 WLM 506-008, Rev C, Oil Containment Coamings
Coast Guard Drawing 175 WLM 512-001, Rev E, HVAC Diagram
Coast Guard Drawing 175 WLM 512-005, Rev A, HVAC A & D FR 6-FWD Hull Block 901
Coast Guard Drawing 175 WLM 512-006, Rev D, HVAC A & D FR 24-6 Hull Block 910 v (Rev-0)
Coast Guard Drawing 175 WLM 512-011, Rev E, HVAC A & D FR 70-50 Main Deck & Above Hull
Block 960
Coast Guard Drawing 175 WLM 512-012, Rev D, HVAC A & D FR 70-88 Main Deck & Above Hull
Block 970
Coast Guard Drawing 175 WLM 512-013, Rev C, HVAC Standard Details and General Instructions
Coast Guard Drawing 175 WLM 533-001, Rev G, Potable Water System Diagram
Coast Guard Drawing 175 WLM 549-001, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 175 WLM 549-1, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 175 WLM 551-001, Rev J, Compressed Air System Diagram
Coast Guard Drawing 175 WLM 568-2, Rev M, Bow Thruster Assembly (Model 125 Fixed Pitch)
Coast Guard Drawing 175 WLM 573-001, Rev T, Buoy Deck Arrangement
Coast Guard Drawing 175 WLM 573-001, Rev T; Buoy Deck Arrangement
Coast Guard Drawing 175 WLM 573-050, Rev A, Hydraulic Piping Installation for Chain Stopper
Coast Guard Drawing 175 WLM 573-051, Rev B, Chain Stopper Structural Modifications for Hydraulic
Roller Assembly
Coast Guard Drawing 175 WLM 593-001, Rev G, Sewage & Waste Water System Diagram
Coast Guard Drawing 175 WLM 593-001, Rev G, Sewage and Waste Water System Diagram
Coast Guard Drawing 175 WLM 593-002, Rev H, Oily Bilge System Diagram
Coast Guard Drawing 175 WLM 593-009, Rev E, Independent Tanks, Sewage Holding Tank
Coast Guard Drawing 175 WLM 593-013, Rev C, Oily Water Separator A&D
Coast Guard Drawing 175 WLM 593-014, Rev A, OWS System Operating Instructions BOSS 2.2T-107-
YM
Coast Guard Drawing 175 WLM 601-001, Rev R; General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 175 WLM 601-001, Rev T, General Arrangement Inboard & Outboard Profiles
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564)
Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection
Coast Guard Drawing 175 WLM 801-015, Rev C, Scantlings, Decks & Platforms
Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels
Coast Guard Drawing 175 WLM-528-001, Rev E, Plumbing and Interior Deck Drains Diagram
Coast Guard Drawing 175-WLM 320-1, Rev AL, Electrical One-Line Diagram
Coast Guard Drawing 175-WLM 516-004, Rev A, HVAC Refrigeration System Piping Arrangement &
Details
Coast Guard Drawing 175-WLM 549-001, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 175-WLM 549-1, Rev C, Onboard Lubrication Requirements
Coast Guard Drawing 175-WLM 556-1, Rev J, Hydraulic System Diagram
Coast Guard Drawing 175-WLM 573-001, Rev R, Buoy Deck Arrangement
Coast Guard Drawing 175-WLM 601-001, Rev T, General Arrangement Inboard and Outboard Profiles
Coast Guard Drawing 175-WLM-612-001, Rev G, Lifelines/Rails & Stanchions
Coast Guard Drawing 175-WLM-637-001 Rev H., Joiner, Sheathing & Ceilings Arrangement & Details
Coast Guard Drawing FL 2605-031, Rev D, Mechanical Chain Stopper, 1-7/8" Buoy Chain
Coast Guard Drawing FL 2605-034, Rev D, Mechanical Chain Stopper Repair Kit: 1-7/8", 1-5/8" & 1-
1/4"
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1 vi (Rev-0)
Coast Guard Fleet Drawing FL-2605-029, Rev L, Chain Stopper System – Rising Sheave Assembly
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3605A, Nov 2007, MPCMS Operating Manual (Volume 1)
Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch - Model
No. D-WK-787
Coast Guard Technical Publication (TP) 3613, Oct 1997; Flexible Coupling
Coast Guard Technical Publication (TP) 3619, Mar 2001 Switchboard, Ship Service & Emergency
Coast Guard Technical Publication (TP) 3626, Manufacturers Instruction Book-SWBS Group(s) 516-533, SWBS 516, Section B, Pump, AC Heat
Coast Guard Technical Publication (TP) 3627, Section A, SWBS 556, Feb 2007, HPU Deck Machinery -
Model 7D3-05575
Coast Guard Technical Publication (TP) 3628, SWBS 568, Section A, March 2017, Bow Thruster –
(Bird-Johnson Company)
Coast Guard Technical Publication (TP) 3630, 07-JAN-97, Manufacturers Instruction Book-SWBS
Group(s) 573
Coast Guard Technical Publication (TP) 3630, SWBS 573, Section A (573A), Jun 2015, Manufacturer's
Instruction Book-SWBS Group 573, Buoy Crane
Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS
Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463
Coast Guard Technical Publication (TP) 3632, March 2014, Chapter 583, Section C, Technical Manual for Slewing Arm Davit Model D6000CT
Coast Guard Technical Publication (TP) 3632, Section 582-A, March 2014, Manufacturer's Instruction
Book-SWBS Groups 582-583, Aft Capstan
Coast Guard Technical Publication (TP) 3749, 26-APR-05, 1-7/8 Inch ATON Mechanical Chain Stopper
Coast Guard Technical Publication (TP) 3939, SWBS 573-A, Apr 2007, Rising Sheave Chain Stopper
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2018, General
Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3020, 2012, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3042, 2018, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Requirements for Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2018, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard
Electrical Cable Test vii (Rev-0)
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, And Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2018, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/National Electrical Manufacturers Association (ANSI/NEMA) AB
4, Mar 2011, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit
Breakers Used in Commercial and Industrial Applications
American Society for Testing and Materials (ASTM) International F1508, 2016, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and
Welding End
American Welding Society (AWS) D1.1/D1.1M, 2010, Structural Welding Code - Steel
Appleton Marine Control Valve Retrofit Manual 20793
ASTM International (ASTM) A106, 2015, Standard Specification for Seamless Carbon Steel Pipe, for
High-Temperature Service
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN)
ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation viii (Rev-0)
MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
Recovered Energy, Inc, BOSS 107 Separator System Operation & Maintenance Manual – YM Model
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
Underwriters Laboratories Inc. (UL) 1066, Low-Voltage AC and DC Power Circuit Breakers Used in
Enclosures, Apr 2012 ix (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
11 N Repair Kit Assembly NSN: 2040-01-496-9418 2 ea. 1,968.67
11 N Rod Seal Repair Kit
(FL-2605-29 PC#37)
NSN: 2040-01-496-9422 2 ea. 3,030.07
11 N Repair Kit, Cable
Chain (Includes Pads)
(FL-2605-29 PC#36)
NSN: 3020-01-538-0684 16 ea. 257.99
11 N Cylinder Assembly
Actuating, Linear
NSN: 3040-01-496-9424 4 ea. 1,969.24
12 Y Hydraulic Brake
Assembly
NSN: 2530-01-550-7474 4 ea. 399.00
12 N Winch Gear Box
Assembly
NSN: 3010-01-F16-4570 PN:
SK9052AZ-SAEB-31.4-H1
(Nord Gear Corp) or YMD-
7914 (Appleton Marine Inc)
4 ea. 1,000.00
12 Y Hydraulic Motor NSN: 4320-01-470-8467 4 ea. 900.00
12 N Wire Rope NSN: 4010-01-620-9604 4 ea. 577.95
12 N Counter Balance Valve NSN: 4820-01-324-4269 8 ea. 107.50
12 N Shuttle Valve NSN: 4820-01-317-2748 8 ea. 34.78
12 N Needle Valve NSN: 4820-01-329-0051 4 ea. 38.00
12 Y **Directional Control
Valve
NSN: 4810-01-543-3252 4 ea. 3,465.17
12 N Electrical Connector, Hirshmann
NSN: 5935-01-640-6747 8 ea. 32.00
13 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00
13 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25
13 N Level wind pivot bushing
NSN: 3120-01-621-2293 1 ea. 1,139.00
13 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
13 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29
13 N Rexroth Sandwich
Flow Control
NSN: 4810-01-505-9289 1 ea. 250.00
13 N Sun Sandwich Relief
Valves
NSN: 4820-01-439-2451 2 ea. 900.00
13 Y Level Wind Hydraulic
Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
13 N 3:1 Pilot Ratio, Vented
Counterbalance Valve
Assembly
NSN: 4820-01-563-5841 1 ea 98.70
13 N Fully Adjustable
Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75 x (Rev-0)
13 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00
13 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998
13 N **Pump, Hydraulic
Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
13 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00
13 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
14 N Hardware Kit, Pins NSN: 2030-01-485-7209 2 ea. 528.47
14 N Hardware Kit, Mechanical
NSN: 2030-01-485-7215 2 ea. 538.91
16 N Swing Brake Seal Kit NSN: 2030-01-351-2820 2 ea 138.80
16 N Swing Brake Disc &
Bearing Kit
NSN: 2030-01-349-9486 2 ea 937.70
16 N Wire Rope Assembly, Single Leg
NSN: 4010-01-602-8365 1 ea. 234.00
16 Y **Winch Assembly NSN: 2030-01-505-1581 1 ea. 17,454.50
17 N Wire Rope, Crane Aux
Fall
NSN: 3950-01-617-1692 1 ea 522.54
17 N Wire Rope, Crane
Main Fall
NSN: 3950-01-617-1700 1 ea 1,275.49
17 N Luff Cylinder Seal kit NSN: 5330-01-433-6307 1 ea 357.99
17 N Holding Valve NSN: 4810-01-353-0586 2 ea 67.33
17 N Shuttle Valve NSN: 4820-01-317-2748 2 ea 24.32
17 N Needle Valve NSN: 4820-01-329-0051 1 ea 38.11
17 Y Valve Assembly, Manifold
NSN: 4810-01-506-7738 1 ea. 19,892.60
17 N Bushing, Heel NSN: 5365-01-F12-2920 4 ea 67.00
17 N Hydraulic swivel seal kit
NSN: 4730-01-566-2864 1 ea 1,298.00
17 N **Pin, Heel NSN: 5315-01-500-6931 2 ea 2,463.45
17 N **Hand pump w/
Stainless Steel Option, P18
NSN: 4320-01-517-1444 1 ea 1,724.57
17 N **Plate, Backing, Brake (Item 231 and
234)
NSN: 3040-00-119-9848 2 ea 1,500.40
17 N **Plate, Brake (Item
232)
NSN: 3040-01-068-7647 1 ea. 377.00
17 N **Driver Plate (Item
233)
NSN: 3040-01-F14-3994 1 ea. 138.34
17 N **Packing Assortment, Preformed
NSN: 5330-01-191-2622 1 ea. 10.94
17 N **Disc-Friction, Brake NSN: 3040-01-051-3606 1 ea. 15.74
17 N **Spring, Helical, Comp
NSN: 5360-01-268-0044 12 ea 12.12
17 N **PD12C Seal kit NSN: 2590-01-398-5741 1 ea 147.76
17 N **Disc, Steel NSN: 2530-01-066-9585 1 ea 38.38
17 N **Master brake rebuild kit
NSN: 5330-01-F16-4572 PN:
98-015-3001 (Eskridge Inc)
3 ea 556.39
17 N **Aux Hoist Hook NSN: 4030-01-572-3945 1 ea 2,800.00 xi (Rev-0)
(Overhaul Ball)
17 Y **Block, Tackle NSN: 3940-01-566-2929 1 ea 3,806.87
17 N **Relief Valve
Cartridge
NSN: 4820-01-481-7116 PN:
RPIC-LAN (Sun Hydraulics
Inc)
1 ea 117.35
17 N **Control Stand
Selector Valve
Assembly
NSN: 4730-01-507-3516 1 ea 1,247.94
17 N **Bushing, Luff
Cylinder
NSN: 3120-01-363-7629 4 ea 89.53
17 N **Pin, Luff Cylinder NSN: 5315-01-F12-2922 PN:
MMD-2232
2 ea 2,432.30
17 Y **Valve Assembly, Directional Control
NSN: 4810-01-F17-5027 1 ea. 14,806.50
20 N HDRAULIC
CONTROL VALVE
ASSEMBLY PARTS
KIT
PN: AMD-2633 ACN 4810-
01-F18-5588
1 15,061.00
21 N Boss 2.2 GPM OWS NSN: 4330-01-F13-3461 PN:
BOSS 2.2T-107 YM
1 ea. 14,300.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Hydraulically Operated Cargo Hatch, Inspect and Service
11 Hydraulic Chain Stoppers, Inspect and Service
12 Hydraulic Crossdeck Winches, Inspect And Service
13 Hydraulic Inhaul Winch, Inspect And Service
14 Mechanical Chain Stoppers, Inspect and Service
15 Warping Capstan (Aft), Inspect and Service
16 Single Point Davit, Disassemble and Inspect
17 Buoy Crane, Inspect And Service
20 Crane Winch DCV, Replace
26 Power Circuit Breakers, Inspect, Maintain & Test
28 Vent Spaces, Deck, Preserve
29 Pump Room, Deck, Preserve xiii (Rev-0)
PRINCIPAL CHARACTERISTICS - TENDER
175' WLM, BUOY TENDER
PHYSICAL
Length overall 174' 8"
Length between perpendiculars 155' 1"
Depth 14' 8"
Maximum beam 36' 0"
Designed draft 8' 0"
Mast height (above 8' waterline) 58' 8"
Frame spacing 20"
Full load displacement 855.15 Long Tons SW
Light load displacement 719.78 Long Tons SW
Minimum op condition displ 852.19 Long Tons SW
HULL
Hull material Steel
MACHINERY
Main propulsion Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM
Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM
Reduction gears Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio
Shaft seal John Crane Type ND
Shaft bearings Five pedestal mounted, Cooper split roller bearings
Number of propellers 2
Number of blades 4
Diameter 57.1"
Rudders None; Z-drive
Ship's service generators Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800
RPM
Emergency diesel generator One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM
TANK CAPACITIES
Diesel oil capacity (100%) 16,385 gal
Fresh water capacity (100%) 7,339 gal
Lubricating oil (100%) 86 gal
1 (Rev-0)
00000_0618_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction(COMDTINS) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is “Large Quantity”
Generator.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.
3 (Rev-0)
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved
4 (Rev-0) changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 Change to SFLC Std Spec 0000, paragraph 1.3. ‘Acronyms and term definitions’, page 5, “PCL (Paint
Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.1.1 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of
SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”
3.7.2 Change to Std Spec 5000, paragraph D2.2.1.1 bullet, "For running rigging, furnish class 6x37, uncoated, independent wire rope core (IWRC), right regular lay (RRL) wire rope or Dyform-18, rotation resistant wire rope," to "For running rigging, furnish class 6x36, uncoated, independent wire rope core (IWRC), right regular lay
(RRL) wire rope or Dyform-18, rotation resistant wire rope."
3.7.2.1 Change to Std Spec 5000, page D-2, Table D-1 title from "DYFORM-18, 6X19 AND 6X37 IWRC RRL," to " DYFORM-18, 6X19 AND 6X36 IWRC RRL"
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
8 (Rev-0)
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
12 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
13 (Rev-0)
12316_0617_FLT
REC_12316_FLT175’ WLM (ALL) (0813)
WORK ITEM 1: Voids (Accessible), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following void(s):
TABLE 1 - VOIDS
TYPE OF STRUCTURE LOCATION CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
Void 3-18-0-T 2,000 50
Void 3-52-0-V 5,000 50
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 601-003, Rev F, Booklet of General Drawings (552-564)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
OTHER REFERENCES
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
14 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel’s components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.1.5 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the TLI’s for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.
3.2 Cleaning and inspection requirements. The Contractor shall refer to Coast Guard Drawing 175 WLM
601-003 for guidance. to accomplish the following tasks:
3.2.1 Content removal. The Contractor shall remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations.
3.2.2 Cleaning. The Contractor shall remove access cover(s). Clean the designated structure’s interior surfaces free of all foreign materials, such as sediment, sludge and fungal growth. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the compartment during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.2.3 Inspection. The Contractor shall visually inspect all interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
Structural condition.
Inaccessible areas, if any.
Condition of coating, including measurements taken, percentage, location, and type of coating failure.
Tank level indicator (TLI) and/or float switch condition.
15 (Rev-0)
Sounding tube and striker plate condition.
Suction and discharge piping condition.
Fastener material and condition.
3.3 Closing. The Contractor shall ensure that the compartment(s) remain open for approximately 24 hours after completion of the tasks specified above. Notify the COR at least 24 hours prior to closing the compartment(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close the manhole cover(s) with new gasket material conforming to ASTM D1330 and cotton grommets on the studs (as applicable). The Contractor shall renew up to 10% of missing or damaged nuts and washers.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.4 Operational test, post repairs. After completion of work and in the presence of the Coast Guard inspector, the Contractor shall thoroughly test and demonstrate the TLI’s for tanks listed in paragraph 1.1
(Intent), to be in satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
16 (Rev-0)
16700_ACC_0318_IBCT
REC_16700_CrgHtchInspctSrvc_IBCT_175 WLM (ALL)(0815)
WORK ITEM 2: Hydraulically Operated Cargo Hatch, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspections and service for the hydraulically-operated cargo hatch.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe
Cover
Coast Guard Drawing 175 WLM 549-001, Rev E, Onboard Lubrication Requirements
Coast Guard Drawing 175 WLM 601-001, Rev R; General Arrangement Inboard and Outboard
Profiles
Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch
- Model No. D-WK-787
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
None
17 (Rev-0)
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2 (Tasks to be accomplished) – Task #1.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Electrical and hydraulic switches.
Dogs.
Toggles.
Hydraulic cylinders.
Hydraulic lines.
Electrical cables.
Hoses.
Overhead insulation.
3.2 Tasks to be accomplished. The Contractor shall perform the following tasks:
CAUTION
Do not paint gaskets or any moving parts, including dogs, nuts, wedges, spindles, yokes, packing, connecting rods and hinge pins.
CAUTION
For Task #2, failure to remove hinge interferences during hatch removal/reinstallation may result in damage to coaming and hinges. Protect hinges during hatch removal and reinstallation.
18 (Rev-0)
ADDITION REQUIREMENTS
# TASK TYPE QTY COMPONENT
OR ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
1 Operate and
Inspect
1 Cargo hatch assembly
3.2.1 (Operate and inspect)
1. Check hatch for proper operation of all indicators, switches, dogging un-dogging and overall operation.
2. Check entire coaming and drains for signs or debris or clogging of drains.
3. Conduct a visual inspection of the hatch. Check all linkages.
4. Inspect both inner and outer knife-edges for proper height and evenness of wear.
5. Inspect entire hatch structure, for signs of paint wear and corrosion.
6. Inspect gasket channels for corrosion.
7. Take 10 UT measurements of gasket channel surfaces, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C.
8. Inspect hydraulic hose condition.
9. Check condition of dogs and wedges.
Submit A CIR.
2 Remove and reinstall
1 Cargo hatch assembly
N/A Remove hatch, to facilitate inspections and service tasks, and reinstall hatch, upon completion of work.
Coaming in way of hatch hinges may be an interference to hatch removal. Inspect hinge clearance prior to commencing unshipping operations and determine if modifications are required.
Modify/remove as necessary and return to original configuration at hatch reinstallation.
Failure to remove interferences may result in damage to coaming and hinges. Protect hinges during hatch removal and reinstallation.
3 NDE 1 Cargo hatch assembly
3.2.5 (NDE) Components designated for NDE: All welds.
Submit a CFR.
4 Service and
Inspect
1 Hydraulic hatch lift cylinder
3.2.2 (Service and inspect)
Submit CFR
5 Renew 1 Cargo hatch gasket
N/A See CG TP-3610.
Conduct gasket compression test, upon installation. Submit CFR.
6 Preserve 1 Cargo hatch assembly
3.2.4
(Preservation)
Use Coating System: “Weather Decks
(Weather Deck, Buoy Tender Working
Deck)” in accordance with in SFLC Std
Spec 6310, Appendix A (Cutter and Boat
19 (Rev-0)
ADDITION REQUIREMENTS
# TASK TYPE QTY COMPONENT
OR ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
Exterior Painting Systems).
Submit CFR.
7 Groom And
Lubricate
1…