USCGC RAYMOND EVANS SSDG SOW.doc
DOC document 47 KB Posted
- Solicitation number
- 52000QR250002017
About this file
This Statement of Work and associated solicitation detail crane services needed for the USCG Cutter RAYMOND EVANS, located in Key West, FL, to replace the starboard Ship's Service Diesel Generator (SSDG). The work involves removing and reinstalling an awning, bolt-on patch (approximately 1,000 lbs), and the SSDG engine (3,080 lbs) using crane and rigging services.
The period of performance has two proposed timeframes: January 22-29, 2025 or January 24-31, 2025 per the SOW, while the solicitation lists January 30-February 7, 2025. Quotes must be submitted by January 30, 2025 at 9:00 AM EST to Josh Miller and Damon Jones via email. Award will be made as a firm-fixed-price contract using simplified acquisition procedures to the responsible contractor offering best value considering specification, price, past performance and quality. Vendors must be registered in SAM.gov and provide warranty information, cost breakdown, unit costs, extended price, total price, payment terms, and prompt payment discount details in their quotes.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work for USCGC CGC RAYMOND EVANS SSDG
Location of work to be performed:
CGC RAYMOND EVANS
100 TRUMBO PT RD
KEY WEST FL 33040-0000
USA
Period of Performance:
1ST Choice:
22 JAN 2025, 29 JAN 2025
2nd Choice:
24 JAN 2025, 31 JAN2024
Points of Contact:
MKC Michael Parks Engineer Petty Officer
CGC Raymond Evans (WPB-1110)
Cell: (8130 995-4616 michael.l.parks@uscg.mil Product Line Support:
CWO Jeff Woody (757)620-9013 Jeff.J.Woody@uscg.mil Vessel Details:
CGC RAYMOND EVANS is Homeport at Key West FL during period of performance. RAYMOND EVANS is replacing the starboard SSDG and requires crane services to remove interferences and the SSDG.
Description of Problem:
The STBD SSDG needs replaced weight of the SSDG is 3080 LB.
Work to be performed:
Crane and riggers will remove awning, bolt on patch (appx 1000 lb) and generator engine and place in staged locations. Unit will prepare the SSDG, blot on patch and awning for removal. Once new SSDG is ready for install crane and riggers will place SSDG engine bolt on patch then awning.
Technical references:
154-WPC_85_201 PROPULSION SYSTEM, SSDG, EDG INSTALLATION DRAWINGS
154B-WPC_204_301 EQUIPMENT REMOVAL PLANS
154B-WPC_131_301 SCANTLINGS - SCANTLINGS - MAIN DECK
TP 8206 AWNING REMOVAL AND MAINTENANCE GUIDE