This document is a Statement of Work (SOW) for the repair of sewage piping aboard the USCGC Heriberto Hernandez. The United States Coast Guard Surface Forces Logistics Command (SFLC) has a requirement to make repairs to the damaged sewage piping on this vessel. The work includes gas-freeing the space, removing the damaged piping, and replacing it with new piping matching the existing material, size, and configuration. The work must be completed within 24 hours due to the cutter's operational requirements. The period of performance is June 8-19, 2024, and the Contracting Officer's Representative is CWO Brian E. Clontz. The location is USCG Base San Juan, Puerto Rico. Interested contractors must submit firm fixed price quotes by June 4, 2024, at 9:00 AM EST. Award will be made to the contractor providing the best value to the government, considering price, past performance, and quality.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Repair of sewage piping. USGCC Heriberto Hernandez

1. BACKGROUND: The United States Coast Guard Surface Forces Logistics Command (SFLC) has a requirement for funding support to make repairs to the sewage piping.

2. SCOPE: This work item describes the requirements for the Contractors to provide new piping and fittings to make repairs to the damaged sewage piping. Contractors will gas free the space to make safe for hot work if required. Contractors will remove damaged section of piping. Contractors will replace the section will new piping to match the existing material, size, and configuration. The work must be performed with 24 hours due to Cutters habitable for live watch.

Dates: POP is 08-19 June2024 COR: CWO Brian E Clontz Location: USCG BASE SAN JUAN 5 Calle La Puntilla San Juan PR 00901

ATTN: USCGC HERIBERTO HERNANDEZ

3. REQUIREMENTS: The vendor will provide support for the following:

a. The Contractors will perform the following.

i. All work will need to be completed with in 24 hours as this work renders the sewage system not usable and cutter crew stand a live 24/7 watch section on the cutter.

· Gas free space for hot work to be performed if required.

· Remove damage piping.

· Replace new piping with piping called out in standard drawing for the sewage piping system.

· Test for leaks.

· Remove all waste in space where work was performed.

· Return Sewage system back to normal operation.

4. POINTS OF CONTACT: MKC Scotty Baskins, (706)988-4194 or CWO Alex Colon (787) 729-4367. Secondary, CWO Brian E. Clontz (410) 844-1808.