USCG STA Oswego - MBH Product Specification Sheet.docx

DOCX document 35 KB Posted

Attached to
Mobile Boat Hoist STA Oswego, NY
Solicitation number
70Z04023XXXXXXXXX
Issued by

About this file

This document is a product specification sheet outlining requirements for a mobile boat hoist system for the United States Coast Guard Station in Oswego, New York. The specification requires a hoist with a maximum height of 24 feet, width of 30 feet to 20 feet 2 inches, and length of 25 feet. It must have a minimum working load limit of 35 metric tons and maximum weight of 24,000 pounds. Key features include independent strap control, overload alarm system, corrosion resistant coating, powered sling adjustment, and wireless remote control. The manufacturer must provide training, manuals, and a minimum two-year warranty. The hoist must be manufactured in the United States and delivered within 120 days of award. The related federal contract opportunity is for solicitation number 70Z04023XXXXXXXXX to replace the existing 30AMO mobile boat hoist at the facility, with the Department of Homeland Security US Coast Guard serving as the contracting agency.

View the file

Other files

File Type Posted
45-RB-M-084-002 -Docking plan.pdf PDF
47B-MLB-801-002 Docking Plan.pdf PDF
TS_583-4_Shore_Based_Boat_Hoisting_Systems.pdf PDF
ASME B30.2-2011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOBLIE BOAT HOIST PRODUCT SPECIFICATION SHEET

The Government’s Requirement is for a Mobile Boat Hoist system. Located at USCG Station Oswego, Oswego, New York.

USCG STA Oswego Specifications:

Hoist System: Each end of the hoisting strap (control) must be capable on moving independently.

Hoist System Travel speed: Proportional Hoist Controls Wire rope: Must have a minimum rating of 110% of the Working Load Limit.

Slings: Sling Spacing must be adjustable. Min spacing 12.75’, Max spacing 22’9”. Slings must provide Spacing and configuration IAW 45-RBM-084-002, 47B-MLB-801-002, and 49A-085-003 Drive System: All Wheel Drive System Shall have a maximum Hoist height of 24’- Based on MBH Boat House Shall have a maximum Hoist Width of 30’ and a minimum hoist width of 20’ 2” Shall have a maximum Hoist Length of 25’. No minimum length as long as it meets the sling spacing measurements identified above.

Hoist Weight: Not to exceed 24000 lbs based on pier rating.

Working Load Limit: Minimum of 35 Metric Tons Wireless Remote control Standard equipment: Vendor shall provide product sheet for hoist system they may choose to propose that can meet (or exceed) the standard equipment requirements identified here.

Wireless Remote control Greaseable pivot trunnion with Zerk fittings All greaseable sheaves/pins Bolting flange in top beam No sheet metal.

O-ring face hydraulic fittings.

316 Stainless steel hydraulic tubing Inline hoist block sheaves Powered sling adjustment Independent hoisting strap control (capable of synchronization) Load indicators Use Corrosion resistant Coating System based on Federal, State, and Local environmental requirements.

Weighted Chine pads for each sling.

Shall have both drive lights and work lights designed to provide safe nighttime operating capabilities.

Overload alarm system installed in accordance with SFLC Technical Standard (TS) 583-4, which is included as Attachment 1.1.

Manufacturer shall provide all maintenance and (2) operating manuals, drawings and a consumable parts list.

Manufacturer shall provide a minimum of a 2-year parts and labor warranty.

Manufacturer shall provide onsite maintenance training – Government expectation is for 2-3 days of training.

Manufacturer shall provide onsite operator training – Government expectation is for 2-3 days of training. Would this also include the generator or propulsion power system? Can you also provide a certification for this training as well?

Manufacturer: Hoist must be manufactured in the United States 3rd party inspection of final assembly prior to acceptance, which includes 3 Static and 3 Dynamic Weight Tests - Resistance load fixture that tests full machine is acceptable. Due to environmental restrictions, water MAY NOT be allowed to be drained on site Hoist shall be built to comply with all federal, state, and local standards.

Manufacture shall provide reaction data provided with proposal.

Hoist must be delivered and installed within 120 days after award.

Manufacturer shall conduct an initial site visit to verify measurements.

Contractor is responsible for removing the old hoist and disposing of it properly in accordance with Federal, State and Local regulations. Current MBH Manufacturer: Marine Travel Lift , Model: 30AMO.

Coast Guard Facilities to Provide A staging area sufficient for delivery and installation of the hoist.

File details come from the government source that posted it. Updated .