USCG Base Honolulu Station Galley SOW.doc
DOC document 70 KB Posted
- Attached to
- COUNTERTOPS INSTALLATION SERVICES
- Solicitation number
- 52090PR260000217
About this file
This is a Statement of Work (SOW) for countertop installation services at USCG Base Honolulu Station Galley. The contractor is required to measure existing cabinets and a pony wall, pick up granite countertop materials and a sink from Selective Stone LLC (with a Coast Guard member accompanying the pickup), cut the granite to fit the installation areas, create openings for an undermount sink and faucet holes, adhere the countertops to cabinets and pony wall using proper adhesive, install the undermount sink, and seal all connecting corners with appropriate sealant.
The contractor must perform all work in compliance with OSHA safety standards, Federal and State of Hawaii safety and health regulations, 29 CFR 1910 and 1926, ANSI-A10.6-1990 Safety Requirements for Demolition Operations, and the U.S. Army Corps of Engineers' Safety and Health Requirements Manual (EM 385-1-1). All accidents and property damage must be reported to the Contracting Officer's Representative (COR). The contractor is responsible for securing all materials, tools, and equipment, with the Government assuming no responsibility for loss or damage. The SOW explicitly excludes removal and disposal of hazardous waste materials from the contractor's scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF18 Solicitation Request Form REQ 52090PR260000217.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
INSTALL COUNTERTOPS IN STATION HONOLULU GALLEY
I. INSTALL COUNTERTOPS
1. Contractor shall measure existing cabinets and pony wall for granite installation.
2. Contractor shall pick up materials from Selective Stone LLC. (Granite countertop and sink). A US Coast Guard member will accompany/meet contractor at Selective Stone LLC, for pickup.
3. Contractor to cut granite to fit cabinets and pony wall.
4.Contractor shall cut opening for undermount sink and faucet holes.
5. Contractor shall adhere granite countertops to cabinets and pony wall using proper adhesive
6. Contractor will install undermount sink provided.
7. Contractor will seal all connecting corners with proper sealant.
II. SAFETY AND SECURITY
1.Perform all work in accordance with O.S.H.A. Safety standards to prevent injury to the building, occupants, or workforce.
2.Comply with Federal and State of Hawaii safety and health regulations. When standards differ, the more stringent shall apply. Contract Clause FAR 52.236-13 prescribes standards for compliance. The Contractor shall also comply with all pertinent provisions of 29 CFR 1910, 29 CFR 1926, ANSI-A10.6-1990 Safety Requirements for Demolition Operations, and the U.S.Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-1-1. Report all accidents and property damage to the COR.
3.Secure all material, tools and equipment. The Government shall not be responsible for their loss.
IIII. EXCLUSIONS
1. Removal & disposal of hazardous waste materials if needed.