USACE_Research__Development_PWS_03_23_2020.doc
DOC document 71 KB Posted
- Solicitation number
- W912HQ20Q0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| USACE_Research__Development_PWS_08_19_2020.doc | DOC document | |
| W912HQ20Q0008 Questions and Answers 2.docx | DOCX document | |
| W912HQ20Q0008 Questions and Answers.docx | DOCX document | |
| CSS - USACE Comprehensive History - R and D.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
A HISTORY OF RESEARCH & DEVELOPMENT IN THE ARMY CORPS OF ENGINEERS, 1802-2020
1. GENERAL DESCRIPTION
The Office of History, HQ, U.S. Army Corps of Engineers is preparing a series of survey histories on selected topics on the history of the U.S. Army Corps of Engineers from the American Revolution to the present. The contractor will research and write a volume in that series focusing on the history of Research & Development in the Army Corps of Engineers from 1802 to 2020. The text will be accompanied by informative and visually appealing images.
2. SCOPE OF WORK
This approximately 40,000-word volume will trace the history of USACE Research & Development (R&D) from 1802 to the present. This history would cover early research by the Corps of Engineers in the nineteenth century including experimental work initiated at Willet’s Point Engineer School of Application and, later, by the Mississippi River Commission (1879). The bulk of the study will focus on the twentieth century. This period includes research and development conducted at the Engineer School and published in the Occasional Papers before, during, and after the First World War; R&D produced by the Waterways Experiment Station in Vicksburg in the interwar years and beyond; World War II-era research focused on military R&D to include runway and pavement research, weaponry, and Cold Weather Research; the rapid expansion of Corps research in the years after the war to include topographical research, the consolidation of Cold Regions Research, the establishment of the Coastal Engineering Research Center, and renewed focus on Construction Research; “green” environmental research in the 1960s and 70s; and technological and computer R&D in the Information Age to include advances in topographical engineering, Geographic Information System (GIS), and the establishment of the Information Technology Laboratory; and later advances in Civil Works to include the merging of Coastal and Hydraulics Research; the militarization of Geotechnical Research; the growth of Civil Structural Research; and the standup of ERDC.
During the preparation of the manuscript, the contractor will work closely with the editors of the comprehensive history and the contracting officer’s representative (COR) for the contract. The contractor will also read related portions of the comprehensive history in order to ensure continuity and coherence among the various volumes and coverage of all-important topics. The history to be researched and written under this contract is to be an analytical and comprehensive synthesis relying largely on printed primary and secondary sources. Archival research, in addition to that required to obtain photographs and other images, will also be necessary; and the contractor should anticipate conducting, in coordination with the editors and COR, ten days of primary source research at the National Archives (NARA) and/or other appropriate Records Centers, private collections, etc. Up to an additional twenty days of additional archival research may be authorized under Options One and Two.
3. CONTENT
In addition to the major themes identified above, the contractor will cover the following general topics at a minimum:
· Trace Army Engineer R&D in the Old Army going back to the American Revolution and continuing through the War of 1812, the Mexican War and the Pacific Railroad Surveys (1851-57).
· Detail the relevant R&D efforts of Army Engineers in the Civil War to include railroad development, munitions, fortifications, map-making, etc.
· Discuss experimental work initiated by Henry Abbot and others at Willet’s Point Engineer School of Application (1866-1901).
· Review the experimental channelization and flood control work conducted by the Mississippi River Commission (1879) in its early years under James B. Eads and Quincy Gillmore.
· Track R&D efforts at Washington Barracks Engineer School (1901-1920) and review relevant articles published in the Occasional Papers before, during, and after the First World War.
· Trace the development of R&D efforts at the Waterways Experiment Station (1931) in Vicksburg, Mississippi, during the interwar years and beyond.
· Detail World War II-era research focused on military R&D to include runway and pavement research, weaponry, and Cold Weather Research.
· Track the rapid expansion of Corps research in the years after the Second World War to include topographical research, the consolidation of Cold Regions Research, the establishment of the Coastal Engineering Research Center, and renewed focus on Construction Research.
· Identify and recount “green” environmental research in the 1960s and 70s.
· Investigate and document technological and computer R&D in the Information Age to include advances in topographical engineering, Geographic Information System (GIS), and the formation of the Information Technology Laboratory.
· Detail later advances in Civil Works to include the merging of Coastal and Hydraulics Research; the militarization of Geotechnical Research; the growth of Civil Structural Research; and the standup of ERDC.
· Summarize the R&D efforts of the various ERDC centers and laboratories.
· Place R&D efforts in the Corps of Engineers within the greater R&D environment, both in the US and abroad.
4. RESEARCH
The research is to be conducted in published primary, secondary, and archival sources. Published primary sources may include congressional reports, hearings, and records; Corps reports; newspapers; and published reports of other agencies. Important published and unpublished sources include the following:
· Biographies and memoirs
· General histories of the Corps of Engineers
· Articles in scholarly journals
· Materials in the research collections of the Office of History, U.S. Army Corps of Engineers
· Secondary sources including:
· USACE District and Division Histories available online.
· Damon Manders, Research and Development in the US Army Corps of Engineers: Improving the Common Stock of Knowledge (US Army Engineer District, St. Louis, 2011).
· Occasional Papers (US Army Engineer School)
· Professional Memoirs (Engineer Bureau)
· National Archives (NARA) – Record Group 77 (RG77)
5. MAJOR WORK TASKS
Base Contract
a. Prepare outline and research proposal
b. Prepare detailed outline
c. Collect photographs and prepare captions and credits
d. Prepare supporting information for charts, graphs, and maps
e. Prepare draft manuscript
f. Prepare final manuscript
g. Prepare index terms
h. Prepare bibliography with bibliographic essay
i. Prepare list of key index terms Option One
a. Conduct ten additional days of archival research.
Option Two
b. Conduct ten additional days of archival research
The contactor will include separate pricing for each Option. The offeror’s cost proposals must be submitted in accordance with the format provided in Table 1 which is displayed below for convenience.
| TABLE 1 |
| Labor |
| Materials |
| Travel |
| Total |
Base Task
Option One
Option Two
6. SCHEDULE
a. Within five days of award, the contractor will meet with contracting officer’s representative (COR), Dr. Matthew Pearcy, at the Office of History, HQ, U.S. Army Corps of Engineers, in Alexandria, Virginia, to receive additional guidance. Additional telephone calls and meetings with the COR and with the editors of the history will be held at the request of any of the parties involved. All telephone calls and meetings are considered part of the contract, and no additional payment will be provided for participating in them.
b. Within 35 days of award, contractor will prepare and submit to the Office of History a preliminary outline and research proposal as well as a schedule for completion of the history. The outline will include a subject breakdown and indicate major themes. The research proposal will contain the contractor's research plans and a preliminary bibliography of works to be consulted. The Office of History's comments on the outline and bibliography will be returned to the contractor within 15 days of receipt.
c. Within four months of award the contractor will submit a detailed outline that establishes, in considerable detail, outlines the entire history, provides significant amount of information on each topic to be addressed, and includes a preliminary bibliography. The outline is a key step between research and writing, for it allows the contractor to compile and arrange their research, thereby demonstrating the contractor’s understanding of the material and allowing the COR the opportunity to alter the contractor’s research methodology or historical focus before writing begins.
d. A draft manuscript, including footnotes and bibliography, will be submitted to the Office of History not later than 10 months after the date of award. This draft will be returned to the contractor within 30 days of receipt.
e. The entire revised manuscript will be resubmitted to the Office of History within 30 days of receipt of the Office of History's comments. The Office of History will complete its review of the revised draft within 30 days of receipt and will send comments to the contractor. If further revisions or corrections are required, the contractor will have 30 days after receipt of the Office of History's comments to complete and return them.
7. FORMAT AND ORGANIZATION OF MANUSCRIPT
The draft and final manuscript will contain at a minimum the following elements:
a. Title page;
b. Acknowledgements;
c. Author’s preface, including a short, separate paragraph containing biographical information about the author;
d. Table of contents with chapter titles;
e. A minimum of 60 images to illustrate the text. Color images are preferred. The images will be provided in separate digital files complete with a table listing the appropriate captions and credits. Hard copy images will be scanned as 600 dpi TIFF files and provided to the government electronically. The contractor will provide digital images at a minimum resolution of 300 pixels per inch (ppi) at 5x7 inches, resulting in a minimum file size of approximately 1.6 megabytes. The contractor will also write the appropriate captions and credits for all of the images and identify the placement of an appropriate number of these 60 images (20 to 30 or so) in the manuscript. The Contractor will also secure releases, where necessary, for all of the images.
f. A minimum of 3 draft map proposals.
j. The information necessary to produce the charts, graphs, and maps to accompany the manuscript. The cost of preparing the charts, graphs, and maps will be the responsibility of the government.
d. Text with endnotes (endnotes should be put at end manuscript, double‑spaced);
e. Glossary, if necessary;
f. Bibliography.
8. FINAL PRODUCT
a. The final manuscript will be submitted on 8.5 by 11‑inch white bond paper using 12-point type and 1-inch margins. The manuscript will be double‑spaced using Microsoft Word software. The text should be clean and clear. The entire narrative will be approximately 40,000 words, not counting photographs, charts, graphs, maps, endnotes and bibliography. The narrative shall be descriptive and analytical and will conform in matters of format, style, and grammar to the latest edition of A Manual for Writers of Term Papers, Theses, and Dissertations (University of Chicago Press) as modified by the Office of History “Style Sheet” prepared for the comprehensive history. Additional guidance will be available from Mr. Douglas Wilson, editor, Office of History, at (703) 428-6566.
b. The final manuscript will also be delivered in digital form in Microsoft Word format.
c. All copies of documents, including illustrations, collected during the research are the property of the Government and will be turned over to the Office of History upon completion of the history.
9. EQUIPMENT AND MATERIALS
All equipment and materials will be provided by the contractor. The Corps will provide access to official files and documents in its possession. The Office of History will also provide the contractor with access to its copying and scanning equipment.
10. PUBLICATION DATA
All publications and other data furnished by the Government in support of this contract shall remain the property of the Government and shall be returned to the COR upon completion of the contract. All information and data generated in the course of accomplishing this contract shall become the property of the U.S. Government.
11. CONTRACTOR QUALIFICATIONS AND EXPERIENCE
The historian for the effort must demonstrate that they have at least ten years experience researching and writing military history. To qualify, a wide-ranging knowledge of the history and missions of the U.S. Army engineers is required. Writing experience will be based on the number and quality of historical publications completed.
12. USE OF INFORMATION COLLECTED
The contractor will not use the information collected during this contract for any purpose prior to the public release of the printed material without the prior written consent of the CO or COR.
13. PAYMENTS
10% of the award price will be paid to the contractor after submission of a preliminary satisfactory outline and research proposal; 25% percent of the award price will be paid to the contractor after submission of a satisfactory detailed outline; and 40% of the award price will be paid to the contractor after acceptance of a satisfactory draft manuscript complete with images and the descriptive information necessary to produce the required charts, tables, and maps. The 40% payment for the draft manuscript can be paid in installments upon submission of satisfactory significant elements (ex. chapters). The remainder of the award price will be paid after the contractor submits a satisfactory final manuscript and turns over to the Office of History all Government property as described above.
14. SECURITY REQUIREMENTS
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
15. Local Security Policy. All contractor employees who require physical access to government controlled facilities or logical access to government information and or information systems are subject to a fitness determination and appropriate vetting. To assist in the vetting process, the contractor must submit a notice of visit form for each employee who will perform work on the contract, including at the minimum, the name, social security number and date of birth of each employee performing work on the contract that need physical and or logical access.
Documents containing personally identifiable information may only be submitted via encrypted email, by first class mail or it may be hand carried to the security office. Notice of visits must be submitted through the government contracting officer representative (COR) or technical representative who will deliver them to the security office. All notice of visits must be received three business days in advance of the contractor reporting for work.
The contractor will work through the COR or technical representative for the contract who will serve as the liaison between the security office and the contractor. Contractor employees who are not sponsored by a government employee will not be granted access to any facilities under HECSA control nor will HECSA security approve logical access to information systems if a notice of visit containing either the DOD ID number or the social security number is not provided to the security office.
Contractor personnel who do not require a common access card may be granted physical access based on favorable results of an NCIC III records check. Contractors who need a common access card must have the minimum of a favorably adjudicated NACI. If no investigation is on file the CAC will not be issued until a favorable FBI fingerprints check is received by the security office and the NACI has been initiated in PSIP. HECSA Security will initiate all NACI investigations. Contractors who require access to classified information must be performing work on a classified contract and the contract company is responsible for initiating all required investigations for the appropriate security clearance.
If an employee has been the subject of a previous favorably adjudicated investigation, it may be reciprocally accepted if there has not been a two year break in service and there is no presence of new and potentially unfavorable information that casts doubt about the subject’s suitability. When a background check is reciprocally accepted but is more than 5 years old, the security office may initiate an NCIC III check to ensure no new unfavorable information exists.
Contractor employees whose access to classified information has been suspended or revoked will not be authorized logical access to government information systems IAW AR 25-2 paragraph 4-14 b (2) until that investigation is favorably adjudicated. These personnel will also not be allowed unescorted access to government facilities until the investigation has been favorably adjudicated by the Command Security Manager. OPM Final Credentialing Standards allow agencies to deny a CAC or PIV card to any individual who has had their access to classified information denied or revoked. Further due process is not required in these situations. The contractor must provide employees who can be cleared to perform work and must immediately provide replacement employees for those who cannot be cleared.
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.