US 421 CFPUA Interconnect.pdf
PDF 65 MB Posted
- Attached to
- US 421 Interconnect Project
- Solicitation number
- 27-002
- Issued by
- Pitt County, North Carolina
About this file
US 421 CFPUA Interconnect Project Summary
This document is a project specification and technical requirements file for the US 421 Interconnect Project, a water infrastructure construction initiative involving the Cape Fear Public Utility Authority (CFPUA) in North Carolina. The project encompasses the construction of approximately 1,000 linear feet of 12-inch PVC pipeline with a specialized crossing of US Highway 421 utilizing boring and jacking techniques to avoid surface disruption. The scope includes construction of an interconnection control site featuring meter installation, double check valves, gate valves, ductile iron piping, three underground vaults, pump connection ports, electrical power supply and lighting infrastructure, and a driveway. Additional appurtenances include the installation of a fire hydrant and sampling stations to support system monitoring and emergency response capabilities.
The project specifications establish technical requirements and construction standards necessary for the interconnection infrastructure to integrate with existing water distribution systems. The document provides detailed engineering parameters and construction methodologies, including specifications for materials, installation procedures, and quality assurance measures. Specific pricing terms, bid submission deadlines, site visit schedules, pre-bid conferences, contract award dates, and funding sources are not addressed in this particular file, indicating that such information would be contained in separate solicitation documents or bidding instructions issued by CFPUA.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .