US 23 North Side Petition Project Bid Sheet.docx
DOCX document 21 KB Posted
- Attached to
- D01 Wyandot 23 Petition Ditch Project
- Solicitation number
- SRC0000027647
- Issued by
- Wayne County, Ohio
About this file
This is a bid sheet for the US 23 North Side Petition Project listing required pay items and quantities. The project involves significant drainage infrastructure work, including the installation of 450 feet of 18" gasketed dual wall plastic pipe, 2,562 feet of 15" gasketed dual wall plastic pipe, and 96 feet of 6" gasketed dual wall plastic pipe. The scope includes the removal of 3,000 feet of existing 15" corrugated plastic pipe, installation of four 3' x 3' catch basins with risers and heavy-duty grates, and construction of a 20' x 10' splash pad. Additional components include an 18" animal guard, an 18" x 15" reducer, and the use of various aggregates including 601C riprap and ODOT #57 aggregate.
The bid sheet requires contractors to provide unit pricing for each line item as well as total costs, with mobilization and maintaining traffic listed as lump sum items. The sheet includes space for bidders to enter their unit prices and calculate total costs for each component, culminating in a total bid price for the entire project. No specific pricing terms, set-asides, or funding requirements are specified in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US 23 North Side Petition Project Bid Sheet
| Pay Items | Quantity | Unit | Bid per Unit | Total Cost | ||||
| Item 624 Mobilization | Lump Sum | Lump Sum | ___________ | __________ | ||||
| Item 614 Maintaining Traffic | Lump Sum | Lump Sum | ___________ | __________ | ||||
| 18” Animal Guard (Sta. 55+00) | 1 | Each | ___________ | __________ |
20’ x 10’ splash pad Figure 6 (Sta. 55+00)
| 601C Riprap | 33 | Ton | __________ | __________ | |||||||
| Aggregate | 17 | Ton | __________ | __________ | |||||||
| 18” Gasketed Dual Wall Plastic Pipe (Sta. 55+00 to 59+50) | 450 | Feet | __________ | __________ | |||||||
| 18” x 15” Reducer | 1 | Each | __________ | __________ |
15” Gasketed Dual Wall Plastic Pipe (Sta. 59+50 to 85+00, 66+00, 68+00) 2,562 Feet __________ __________ Removal of Existing 15” Corrugated Plastic Pipe (Sta. 55+00 to 85+00) 3,000 Feet __________ __________ 3’ x 3’ Catch Basin with riser and Heavy-Duty Grate (Sta. 60+90, 62+90, 66+00, 68+00) 4 Each __________ __________ 6” Gasketed Dual Wall Plastic Pipe
| (Sta. 60+90, 62+90, 65+80, 67+85) | 96 | Feet | __________ | __________ | |||||
| ODOT #57 Aggregate for Catch Basins and Tile Repair | 100 | Ton | __________ | __________ | |||||
| Total Bid Price | __________ |