This is a Justification for Urgent Acquisition submitted to the Contracting Officer at Fleet Logistics Center (FLC) Norfolk. The document supports expedited processing of a procurement request (Procurement Request No: TBD) under Federal Acquisition Regulation 18.104, allowing deviation from standard 20-30 day solicitation cycles.

The requirement involves four (4) wooden ramps with overlap boards, fasteners, and shoring sections for attachment to a C-17 aircraft. The ramps are needed to support MESG-2's mission to deploy 40-foot patrol boats to forward combatant commands. The requirement was first identified on 17 September 2026, submitted to the contracting department on 21 September 2026, with a required delivery date of 26 October 2026. The contractor's estimated production lead time is twenty (20) business days after award. This is designated as a sole source requirement to Coastal Craft Repair, LLC due to the emergent and critical nature of the need. Coastal Craft Repair, LLC possesses the required drawings and manufacturing capability, and any delay in seeking alternate vendors would create unacceptable operational risk. The justification states that delays in material receipt would directly impede the shipment of combatant craft to forward-deployed locations in support of active mission operations. No other firms were contacted, as the document marks this section "Not Applicable" given the sole source determination based on the company's unique possession of required drawings and capability to meet the urgent timeline.

View the file

Other files

File Type Posted
SSJ At or Below SAT_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To: Contracting Officer, Fleet Logistics Center (FLC) Norfolk

Subj: JUSTIFICATION FOR URGENT ACQUISITION

Ref: (a) Procurement Request No: TBD

(b) Federal Acquisition Regulation 18.104

1. URGENCY: This justification is provided to support the processing of reference (a) on an urgent basis (i.e., more quickly than the routine cycle timeframes of 20 days for requirements less than $25,000 and 30 days for requirements greater than $25,000 but less than $100,000. Processing of a requirement on an urgent basis may allow the soliciting from a single source if Contracting Officer determines that the circumstances deem only one source reasonably available. This justification is based on the following facts:

17 September 2026 date on which the requirement was first identified.

21 September 2026 is the date on which the requirement was submitted to the contracting department.

26 October 2026 is the required delivery date as indicated on the requisition.

X Explanation of the special circumstances and conditions that exist validating the requirement as "urgent”.

The requirement is urgent because it supports an emerging operational need that was identified on a last-minute basis and cannot be deferred without affecting mission execution. MESG-2 has received tasking from higher echelon to provide four (4) wooden ramps for attachment to a C-17 aircraft, complete with all overlap boards, fasteners, and shoring sections in support of the active mission.

X How this requirement will impact your mission (i.e., the specific harm that would result) if you do not receive the material or service by the required delivery date.

MESG-2 is currently unable to deploy 40-foot patrol boats to forward combatant commands. Delays in material receipt from Coastal Craft Repair, LLC will directly delay the shipment of combatant craft to the forward-deployed location in support of the active mission.

X Estimated production lead time for the item (how long will it take the contractor to produce the item or complete the service once the contract is awarded).

The required items have a twenty (20) business day ARO delivery time.

The following firms were contacted and have indicated that they cannot provide an item that will meet the needs of the Government.

This is a sole source requirement to Coastal Craft Repair, LLC due to an emergent and critical need.

Coastal Craft Repair, LLC has the required drawings and have the capability of providing the required items as needed. Any further delay in seeking an alternate vendor would create unacceptable operational risk.

1. Not Applicable _________ (Company Name & Phone number) (Person Contacted) (Date of call)

(Reason*)

2._ __________

(Reason*)

3. _____________ _________

(Reason*)

*Possible reasons that a firm could not provide a supply or service include it is something the company does not manufacture, their product line does not meet the minimum performance requirements of the Government, they could not meet the Governments delivery requirement and/or other similar reasons.

2. I hereby certify that the above information is accurate and complete to the best of my knowledge and belief