UPS_System_Maintenance_&_PM_Requirements.pdf

PDF 349 KB Posted

Attached to
UPS System Maintenance & PM Requirements
Solicitation number
Comms 11/17/2026
Issued by
Escambia County, Florida

About this file

This is an Invitation to Quote (ITQ) issued by Escambia County, Florida for one-year full maintenance coverage of uninterruptible power supply (UPS) systems and static transfer switches (STS). The county seeks comprehensive maintenance services for two Liebert UPS units and five STS units, including unscheduled services available Monday through Friday from 8:00 AM to 5:00 PM and emergency services available Monday through Friday from 5:00 PM to 8:00 AM and continuously on weekends and holidays, with a maximum response time of four hours or less. The scope of work encompasses detailed preventive maintenance inspections for both UPS and battery systems, covering visual inspections, temperature checks, voltage and current measurements, connection verification, calibration, operational testing, and comprehensive written reports documenting any deficiencies and corrective actions. The ITQ was released on November 23, 2026, with a question submission deadline of December 7, 2026, and a response deadline of December 10, 2026, at 3:00 PM. Submissions must be made electronically through the county's procurement portal at https://secure.procurenow.com/portal/escambiacountyfl.

Vendors must be authorized service providers for Liebert power product lines and must submit documentation proving this authorization status. The pricing table requires vendors to provide annual service costs, hourly rates for unscheduled services, hourly rates for emergency call outs, and material cost information with applicable discounts. All parts, labor, and expenses are included in the annual maintenance coverage. Vendor submissions must include proof of Sunbiz registration (required for all vendors before payment or award finalization), a completed W-9 form, and supporting documentation such as a bid form, certificate of insurance or letter of insurability, and technical specifications. Vendors outside Florida are eligible to participate but must register with Sunbiz prior to award finalization. The specific UPS systems requiring maintenance are two Liebert s610 SMS UPS units with EnerSys batteries, each containing 40 jars of VRLA cells.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITQ

Comms 11/17/2026

UPS SYSTEM MAINTENANCE & PM REQUIREMENTS

Escambia County

213 Palafox Place

Pensacola, FL 32502-5822

RELEASE DATE: November 23, 2026

DEADLINE FOR QUESTIONS: December 7, 2026

RESPONSE DEADLINE: December 10, 2026, 3:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

https://secure.procurenow.com/portal/escambiacountyfl https://secure.procurenow.com/portal/%7bproject.government.code%7d

ITQ

UPS System Maintenance & PM Requirements

1. Introduction

2. Project Details

3. Pricing Table

4. Vendor Submissions

ITQ #Comms 11/17/2026 Title: UPS System Maintenance & PM Requirements

1. Introduction

1.1. Summary

• One (1) year full maintenance coverage: (2 Liebert UPS & 5 STS)

• Unscheduled Services 0800-1700 Mondays - Fridays

• Emergency Service 1700-0800 Monday – Friday and 0700-0700 Saturdays and

Sundays and Holidays.

• All parts, labor and expenses

• Response time: four (4) hours or less

• One PM Inspections: (2 Liebert UPS @ 5 STS)

• System overview with customer and detailed inspection report

Vendor must be an authorized service provider for Liebert power product lines (uninterruptible power supply/battery, static transfer switch, etc.) Documentation showing authorized service provider status must be submitted with quote.

1.2. Background

STATIC TRANSFER SWITCH

SCOPE OF WORK

• Perform a complete visual inspection of the equipment, including sub-assemblies, wiring harnesses, contacts, cables and major components.

• Check all mechanical connections for tightness and heat discoloration, making corrections where necessary.

• Clean foreign material and dust from internal compartments. Perform a status check of alarm circuits.

• Calibration of the equipment to meet manufacturer’s specifications.

• Operational checkout of the system to include transfers and proper status indications.

• Install or perform Engineering Field Change Notices (FCN) as necessary.

• Return unit to operational service with normal load then measure and verify display indications.

• Perform additional checks as consistent with customary commercial practice.

• Review system performance with customer to address any questions and to schedule any repairs.

• Provide a detailed written report noting any deficiencies and corrective action needed, taken and/or planned.

BATTERY SYSTEM

SCOPE OF WORK

• Clean normal cell top dirt accumulation.

• Measure and record the total battery float voltage and charging current.

• Measure and record the overall AC ripple voltage.

• Visually inspect the jars and covers for cracks and leakage.

• Visually inspect for evidence of corrosion.

• Measure and record the ambient temperature.

• Verify the integrity of the battery rack/cabinet.

• Measure and record 100% of the jar temperatures.

• Measure and record the float voltage of all jars.

• Measure and record all internal ohmic readings.

• Re-tighten all connections to the battery manufacturer's specifications, if required.

• Measure and record all battery connection resistances in micro-ohms, when applicable.

• Refurbish cell connections as deemed necessary.

• Check integrity of battery cabinet.

• Check for NO-OX grease or oil on all connections (if applicable).

• Check battery jars for proper liquid level (if flooded cells).

• Check for corrosion on all the terminals and cables.

• Examine the physical cleanliness of the battery room and jars.

• Measure and record DC bus ripple voltage (if applicable). Measure and record total battery float voltage.

• Perform additional checks as consistent with customary commercial practice.

• Review system performance with customer to address any questions and to schedule any repairs.

UNINTERRUPTIBLE POWER SYSTEMS

• Perform temperature check on all breakers, connections, and associated controls.

Repair and/or report all high temperature areas.

• Perform a complete visual inspection of the equipment including subassemblies, wiring harnesses, contacts, cables, and major components.

• Check air filters for cleanliness. (if applicable)

• Check rectifier and inverter snubber boards for discoloration.

• Check power capacitors for swelling or leaking oil.

• Check for DC capacitor vent caps that have extruded more than 1/8". (if applicable)

• Record all voltage and current meter readings on the module control cabinet or the system control cabinet.

• Measure and record harmonic trap filter currents.

• Check the inverter and rectifier snubbers.

• Check all nuts, bolts, screws, and connectors for tightness and heat discoloration.

• Check fuses on the DC capacitor deck for continuity (if applicable).

• With customer approval, perform operational test of the system including unit transfer and battery discharge.

• Calibrate and record all electronics to system specifications.

• Check or perform Engineering Field Change Notices (FCN) as necessary. Measure and record all low-voltage power supply levels.

• Record phase-to-phase input voltage and currents.

• Perform additional checks as consistent with customary commercial practice.

• Review system performance with customer to address any questions and to schedule any repairs.

UPS SYSTEM INFO

1. Liebert s610 SMS UPS Model # UDA63154A36AD68 Tag # 1303573

Battery:

Manufacturer: ENERSYS No of Jars: 40

Model: HX505-FR Cells per Jar: 6

Battery Type: VRLA Cells per string: 240

MBCPM Model# U36MB15430AA25S TAG# 1303576

2. Liebert s610 SMS UPS Model # UDA63154A36AD68 Tag # 1303573

Model: HX505-FR Cells per Jar: 6

Battery Type: VRLA Cells per string: 240

1.3. Contact Information

Mark Carter

Communications Chief

6575 N. W Street

Pensacola, FL 32502-5822

Email: mwcarter@myescambia.com

Phone: (850) 471-6315

Department:

Public Safety

1.4. Timeline

Release Project Date November 23, 2026

Question Submission Deadline December 7, 2026, 3:00pm

Quote Submission Deadline December 10, 2026, 3:00pm

2. Project Details

2.1. Important Instructions for Electronic Submittal

UPS System Maintenance & PM Requirements mailto:mwcarter@myescambia.com tel:(850)471-6315

Sundays and Holidays.

static transfer switch, etc.) Documentation showing authorized service provider status must be submitted with quote.

2.2. Scope of Work or Project Details

UPS System Maintenance & PM Requirements

Sundays and Holidays.

static transfer switch, etc.) Documentation showing authorized service provider status must be submitted with quote.

STATIC TRANSFER SWITCH

• Perform a complete visual inspection of the equipment, including sub-assemblies, wiring harnesses, contacts, cables and major components.

• Check all mechanical connections for tightness and heat discoloration, making corrections where necessary.

• Clean foreign material and dust from internal compartments. Perform a status check of alarm circuits.

• Calibration of the equipment to meet manufacturer’s specifications.

• Operational checkout of the system to include transfers and proper status indications.

• Install or perform Engineering Field Change Notices (FCN) as necessary.

• Return unit to operational service with normal load then measure and verify display indications.

• Perform additional checks as consistent with customary commercial practice.

• Review system performance with customer to address any questions and to schedule any repairs.

BATTERY SYSTEM

• Clean normal cell top dirt accumulation.

• Measure and record the total battery float voltage and charging current.

• Measure and record the overall AC ripple voltage.

• Visually inspect the jars and covers for cracks and leakage.

• Visually inspect for evidence of corrosion.

• Measure and record the ambient temperature.

• Verify the integrity of the battery rack/cabinet.

• Measure and record 100% of the jar temperatures.

• Measure and record the float voltage of all jars.

• Measure and record all internal ohmic readings.

• Re-tighten all connections to the battery manufacturer's specifications, if required.

• Measure and record all battery connection resistances in micro-ohms, when applicable.

• Refurbish cell connections as deemed necessary.

• Check integrity of battery cabinet.

• Check for NO-OX grease or oil on all connections (if applicable).

• Check battery jars for proper liquid level (if flooded cells).

• Check for corrosion on all the terminals and cables.

• Examine the physical cleanliness of the battery room and jars.

• Measure and record DC bus ripple voltage (if applicable). Measure and record total battery float voltage.

• Perform additional checks as consistent with customary commercial practice.

• Review system performance with customer to address any questions and to schedule any repairs.

UNINTERRUPTIBLE POWER SYSTEMS

• Perform temperature check on all breakers, connections, and associated controls.

Repair and/or report all high temperature areas.

• Perform a complete visual inspection of the equipment including subassemblies, wiring harnesses, contacts, cables, and major components.

• Check air filters for cleanliness. (if applicable)

• Check rectifier and inverter snubber boards for discoloration.

• Check power capacitors for swelling or leaking oil.

• Check for DC capacitor vent caps that have extruded more than 1/8". (if applicable)

• Record all voltage and current meter readings on the module control cabinet or the system control cabinet.

• Measure and record harmonic trap filter currents.

• Check the inverter and rectifier snubbers.

• Check all nuts, bolts, screws, and connectors for tightness and heat discoloration.

• Check fuses on the DC capacitor deck for continuity (if applicable).

• With customer approval, perform operational test of the system including unit transfer and battery discharge.

• Calibrate and record all electronics to system specifications.

• Check or perform Engineering Field Change Notices (FCN) as necessary. Measure and record all low-voltage power supply levels.

• Record phase-to-phase input voltage and currents.

• Perform additional checks as consistent with customary commercial practice.

• Review system performance with customer to address any questions and to schedule any repairs.

UPS SYSTEM INFO

1. Liebert s610 SMS UPS Model # UDA63154A36AD68 Tag # 1303573

MBCPM Model# U36MB15430AA25S TAG# 1303576

2. Liebert s610 SMS UPS Model # UDA63154A36AD68 Tag # 1303573

3. Pricing Table

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 Annual Service Cost 1 Total

2 Hourly Rate for Unscheduled Service 1 Total

3 Hourly Rate for Emergency Call Outs 1 Total

Line Item Description Quantity Unit of

Measure Unit Cost Total

TOTAL

Line Item Description Unit of Measure Percentage

1 Material Cost plus discount 1

4. Vendor Submissions

4.1. I understand that this is a written quote request not a formal bid or solicitation. *

☐ Yes

☐ No

*Response required

4.2. I confirm that the pricing submitted in the Pricing Table is valid for the purposes of this written quote request*

☐ Please confirm

*Response required

4.3. Supporting Documents or Specifications for Quotes*

Please upload any supporting documents for your quote here such as: Bid Form, Certificate of Insurance or Letter of Insurability,and technical or detailed specifications for solution provided.

*Response required

4.4. Proof of Sunbiz Registration*

Please provide proof of Sunbiz registration in your submission packet for the quote. Vendors outside the State of Florida are still eligible to participate in purchases with Escambia County, but you must register in Sunbiz before we can issue a payment or finalize the award.

*Response required

4.5. W-9*

Please Provide a copy of your W-9. If awarded the quote, the department will need your W9 to add you to our system for issuing a Purchase Order.

*Response required

1. Introduction
1.1. Summary
1.2. Background
1.3. Contact Information
1.4. Timeline
2. Project Details
2.1. Important Instructions for Electronic Submittal
2.2. Scope of Work or Project Details
3. Pricing Table
4. Vendor Submissions
4.1. I understand that this is a written quote request not a formal bid or solicitation. *
4.2. I confirm that the pricing submitted in the Pricing Table is valid for the purposes of this written quote request*
4.3. Supporting Documents or Specifications for Quotes*
4.4. Proof of Sunbiz Registration*
4.5. W-9*

File details come from the government source that posted it. Updated .