Upgrade HVAC B109 - Attachment II - Form 66_HVAC Eqpt..pdf

PDF 153 KB Posted

Attached to
Upgrade HVAC B109 Goodfellow AFB Federal contract opportunity
Solicitation number
FA303023Q0018
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade HVAC B109 Goodfellow AFB, newest first.
File Type Posted
Solicitation - FA303023Q0018.pdf PDF
Upgrade HVAC B109 - Attachement III - Environmental Requirements.docx DOCX document
CU2.jpg JPG image
AHU 3-10.jpg JPG image
AHU Barricade 1-1.jpg JPG image
Service_Order_Template.pdf PDF
AHU Barricade 1-2.jpg JPG image
AHU 2-4.jpg JPG image
AHU 3-3.jpg JPG image
AHU 3-6.jpg JPG image
AHU 1-5.jpg JPG image
AHU 2-5.jpg JPG image
AHU 3-2.jpg JPG image
AHU 2-6.jpg JPG image
CU1 DT.jpg JPG image
CU 1 and 2 Locations.jpg JPG image
AHU Barricade 1-3.jpg JPG image
AHU 2 -1.jpg JPG image
AHU 2-2.jpg JPG image
AHU 3-4.jpg JPG image
AHU 1-4.jpg JPG image
AHU 3-7.jpg JPG image
AHU 3-5.jpg JPG image
AHU 3-9.jpg JPG image
AHU 3-8.jpg JPG image
AHU 1-3.jpg JPG image
M4 Mechanical Schedule.pdf PDF
Upgrade HVAC B109 - SOW.pdf PDF
CU3.jpg JPG image
CU1.jpg JPG image
CU2 DT.jpg JPG image
CU3 DT.jpg JPG image
AHU 3-1.jpg JPG image
AHU 2-3.jpg JPG image
AHU1-2.jpg JPG image
AHU 1-1.jpg JPG image
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

ASoW, 1.5 in total Performance Period, Work Schedule/Plan

1 b GA

2 ASoW, 1.7.1 Safety 1 b

ASoW, 1.11, Part 4 Submittals: 1 1 1 1 b GA

ASoW, 1.12 Warranties 1 1 e GA

ASoW, 1.14.1.1Work Clearance Request, AF Form 103

1 c FIO

ASoW, 1.14.2 Utility Outages 1 c GA

ASoW, 1.12, DD Form 1354, Real Property Record

1 e GA

ASoW, 1.15 Detail/Red Line Drawings

1 e FIO

ASoW, 3.4 Material Data/Certificates of Compliance

1 1 1 d/e GA

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S A

ND

O

TH

ER

W

AR

RA

NT

IE

S

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

Bldg. 109 HVAC Equipment Upgrade

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

ATTACHMENT 2

PROJECT NUMBER: 1123527

SA

MP

LE

S

FORM66.xls

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S A

ND

O

RA

NT

IE

S

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

Bldg. 109 HVAC Equipment Upgrade

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

ATTACHMENT 2

PROJECT NUMBER: 1123527

SA

MP

LE

S

ASoW, 4.3.k Test and Commissioning Reports

1 d FIO

Asow, 3.2.d Equipment Service Order Report

1 e FIO

Attachment III, 4.4, Hazardous Chemicals Report

1 d/e FIO

Attachment III, 4.5, Hazardous Materials Report

1 d/e FIO

Attachment III, Part 6, Hazardous Wastes SDS and Report (If Applicable)

1 d/e GA

Attachment III, 11.3, Asbestos Free Certification

1 d/e FIO

Attachment III, Part 15, Air Emission Source Reporting

1 d/e GA

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S A

ND

O

RA

NT

IE

S

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

Bldg. 109 HVAC Equipment Upgrade

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

ATTACHMENT 2

PROJECT NUMBER: 1123527

SA

MP

LE

S

Attachment III,16.2 Appendix A, 2, Pg.

12 Disposal of Construction Waste Report

1 d/e GA

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract

(b) No Later Than 14 Calendar Days after NTP (c) (d)

(e) As Required per Specifications or Contract

Prior to Final Inspection No Later Than 14 Working Days Prior to Beginning On Site Work

Sheet1

File details come from the government source that posted it. Updated .