UPDATED_Statement of Work.docx
DOCX document 4 MB Posted
- Attached to
- USFS Redbird Ranger District Generator Installation Federal contract opportunity
- Solicitation number
- 12443925Q0013
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Statement of Work (SOW) for the Daniel Boone National Forest (DBNF) Redbird Ranger District. The contract requires a certified electrical and natural gas contractor to install three Generac Guardian Series 22kW standby generators and three 200A service entrance automatic transfer switches (ATS) at three quarters located in Peabody, KY. The project involves comprehensive generator and electrical system installations, including disconnecting existing service devices, installing new electrical meters, upgrading natural gas meters, connecting supply lines, and completing factory technician testing.
The solicitation is a 100% small business set-aside under NAICS code 561210 with a small business threshold of $47.0M in average annual receipts. Award will be made to the most highly scored offeror based on an evaluation matrix, with technical acceptability determined by equipment/personnel capabilities and demonstrated experience. The U.S. Department of Agriculture Forest Service will use firm fixed-price purchase order procedures, and all contractors must have an active SAM registration. Technical questions should be directed to Dalton Bundy at dalton.bundy@usda.gov, and a pre-offer site visit is available upon request.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Owners Manual for Automatic Transfer Switch 200A Service Entrance.pdf | ||
| Clay County KY Wage Determinations.pdf | ||
| Attachment 2 - Installation Guidelines 60 Hz Air-Cooled Generators.pdf | ||
| 2025 Manditory Contractor Training and DOL Posters 2025.pdf | ||
| Experience and Past Performance Questionnaire.docx | DOCX document | |
| SF18 and Clauses 12443925Q0013.pdf | ||
| UPDATED_Evaluation Factor Rating Descriptions and Socring Matrix.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Daniel Boone National Forest
USDA is an equal opportunity provider, employer, and lender.
Daniel Boone National Forest (DBNF) Redbird Ranger District – Quarters - Installation of Three (3) Generac Generators and Three (3) Service Entrance Automatic Transfer Switches
Statement of Work
1. Purpose The DBNF requires the professional services of a certified electrical and certified natural gas Contractor familiar with local code requirements to perform the installation of three (3) Generac Guardian Series 22kW standby air-coiled gas engine generator and three (3) 200A service entrance automatic transfer switches (ATS) at three (3) quarters located on the Redbird Ranger District in Peabody, KY. Location depicted in Figure 1.
Figure 1: Location of the Redbird Ranger District. Address: 91 Peabody Road, Big Creek, KY 40914.
The Contractor shall provide the labor, supervision, equipment, tools, materials and incidental supplies required to install a fully functional generator in accordance with these specifications and the provisions of the contract, manufacture’s specifications, and the below work items. The Contractor shall:
1. Provide instruction on generator pad placements.
2. Disconnect and remove the existing 200A combination service entrance devices and replace with new 200A electrical meters.
3. Prepare the mount rack and install new 200A service entrance ATS.
4. Install 200A feeder from the generator to the new ATS.
5. Install control wiring from generator to the ATS.
6. Upgrade natural gas meters for each quarter (ounces to lbs).
7. Install 3 new natural gas supply lines to each generator.
8. Connect supply line to the quarters to a natural gas regulator.
9. Connect supply line to a natural gas regulator and to the generator.
10. Provide test and start up by a factory trained technician.
The DBNF will provide:
1. Three Generac Guardian Series 22kW standby air-coiled gas engine generator - Model G007043.
2. Three 200A service entrance ATS – Model RXSW200A3.
3. Three DieHard Platinum AGM Batteries: 35 Group Size, 650 CCA, 810 CA, 100 Minute Reserve Capacity.
4. Six American Meter Company natural gas regulators.
5. Three generator placement pads.
6. Positioning the generator on the placement pad.
7. All trenching and filling - exposing of the natural gas tie-in points, ditch digging and backfilling.
8. Seeding and mulching of the disturbed areas.
2. Technical Requirements Please refer to the Attachment 1 – Owner’s Manual for Automatic Transfer Switch 200A, Service Entrance and Attachment 2 - Installation Guidelines 60 Hz Air-Cooled Generators for the manufacturer’s specific detailed installation instructions. The final generator installation configuration for each quarter is to be similar to that in Figure 2.
Figure 2: Final generator installation configuration.
2.1. Electrical Connections
Detailed electrical connections instructions are covered in Attachment 1 – Section 3 Installation and Attachment 2 – Section 6 Electrical Connections.
The 200A combination service entrance device switches mounted on each electrical pole are to be replaced with new 200A electrical meters and 200A ATS mounted below the meter. New mounting racks may be needed. Generators are to be connected to the 200A service entrance ATS. Locations are depicted in Figures 3-5.
Figure 3: Apartment #1, 155 Peabody Road, Big Creek, KY 40914.
Figure 4: Apartment #2, 155 Peabody Road, Big Creek, KY 40914.
Figure 5: House, 179 Peabody Road, Big Creek, KY 40914.
2.2. Natural Gas Connections
Detailed natural gas connections instructions are covered in Attachment 2 – Section 5 Fuel Conversion/Gas Connections. All pipe sizing, construction, and layout must comply with NFPA 54 for natural gas applications and local code requirements. The three gas meters are to be replaced (ounces to lbs) and regulators installed on the lines to the quarters.
2.2.1. Natural Gas Pipe Sizing
AGA-approved gas pipe is to be tied into the current line. Approximate pipeline distances required are 96’ (Apartment #1), 114’ (Apartment #2) and 119’(House). Correct natural gas pipe size is to be determined using Attachment 2 – Section 5 Fuel Conversion/Gas Connections Table 5-1. All tie-in points will be exposed. Line connections are to be fused and a tracer wire buried with the run. American Meter Company regulators are to be used at the connection point to the house and to the generator. Regulators will be provided.
2.2.2. Fuel Shutoff Valve
The generators will require an external manual fuel shutoff valve on the fuel line. The fuel shutoff valve is to have a manometer port for making fuel pressure checks. The fuel shutoff valve must be installed at a readily accessible location, and within 6 ft of generator fuel inlet.
2.2.3. Flexible Fuel Line
The installation of a flexible fuel line is a gas code requirement. When connecting the flexible fuel line to the generator use a listed assembly meeting the requirements of ANIS Z21.75 – Connections for Outdoor Gas Appliances and Manufactured Homes or AGA-approved flexible fuel line in accordance with local regulations. The flexible fuel line must not be connected directly to the generator fuel inlet. The flexible fuel line must be installed horizontally and must be installed between the fuel shutoff valve and generator fuel inlet. Approved gas fittings must be used. All labels and tags are to remain on the line.
2.2.4. Checking Connections
All installed gaseous fuel piping must be purged, and leak tested prior to initial startup in accordance with local codes, standards, and regulations. Fuel pressure is to be within specifications on the fuel data decal.
2.2.5. Fuel System Leak Test
A final fuel system leak test is to be completed before starting each generator. The entire fuel system is to be tested from supply to regulator by spraying all connection points with a non-corrosive gas leak detection fluid.
3. Housekeeping The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the government.
4. Environmental Protection Containers for excess and/or waste material, trash, etc. shall be provided by the Contractor at the site, and the site will be inspected/cleaned daily. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the work. The Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
5. Pre-Offer Site Visit A formal pre-offer meeting is available upon request by contacting dalton.bundy@usda.gov. The Contracting Officer (CO) should be contacted for questions concerning submission of offers at molly.sikkink@usda.gov. All technical questions should be directed to dalton.bundy@usda.gov.
6. Basis of Award Award will be made to the most highly scored offeror based on the attached Evaluation Factor Rating Descriptions and Scoring Matrix. Failure to submit documentation required in the Evaluation Factor Rating Descriptions and Scoring Matrix will result in a rating of POOR for that category.
7. PRE-WORK MEETING
This contract will be administered by the Contracting Officer (CO). The CO may designate a Contracting Officer’s Representative (COR) or Forest Service Representative (FSR) for the purpose of ensuring compliance with the specifications and provisions of this contract.
Prior to commencement of work, the CO or Contracting Officer's Representative (COR) will arrange a meeting with the Contractor to discuss the contract terms and work performance requirements. The Contractor shall designate in writing a person to act in the Contractor’s absence. The Contractor or the designated representative shall be on the job whenever work is in progress. In the absence of the Contractor, the authorized representative will act as required to keep the job progressing under the terms of the contract.