Updated Lift Spec Attachment A.docx
DOCX document 137 KB Posted
- Attached to
- IFB 13-23 Rotary Mobile Column Lifts
- Solicitation number
- BD-23-1206-40000-40000-84748
- Issued by
- Suffolk County, Boston City, Massachusetts
About this file
This document is a technical specification from the Massachusetts Bay Transportation Authority (MBTA) for the supply and setup of mobile column bus lifts at multiple locations. The specification outlines the MBTA's requirements for furnishing and delivering heavy-duty mobile column lifts capable of lifting the MBTA's entire bus fleet. The lifts must be fabricated to withstand the harsh environments commonly found in MBTA facilities. The contract will be awarded to the lowest qualified and responsive bidder able to meet the technical specifications. The specification includes details on the lift descriptions and requirements, execution and testing, training, and contract award and payment.
The specification includes a schedule of bid prices for the wheel-engaging mobile column lifts, training, and a contingency allowance. The contractor must provide operating and maintenance manuals for the equipment supplied. This opportunity is related to IFB 13-23 Rotary Mobile Column Lifts, a state and local contract opportunity in Massachusetts.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 13-23 Initial Bid Opening Summary Form Updated.pdf | ||
| IFB 13-23 Bid Document~1.docx | DOCX document | |
| IFB 13-23 Bid Opening Summary Form.pdf | ||
| IFB 13-23 Minimum Insurance Requirements.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MASSACHUSETTS BAY
TRANSPORTATION AUTHORITY
SPECIFICATION FOR
SUPPLY AND SETUP OF MOBILE COLUMN BUS LIFTS
AT MULTIPLE LOCATIONS
PREPARED BY:
Engineering and Maintenance
January 13, 2023
| 1/13/2023 |
| SECTION 6 – CONTRACT AWARD AND PAYMENT |
Initials:_____ Date:_____
TABLE OF CONTENTS
| SECTION 1 – GENERAL | 3 |
| SECTION 2 – MATERIALS | 3 |
| SECTION 3 – LIFT DESCRIPTIONS AND SPECIFICATION | 5 |
| SECTION 4 – EXECUTION | 8 |
| SECTION 6 – CONTRACT AWARD AND PAYMENT | 9 |
Please read entire specification carefully and return this filled-out contract with bid package. The MBTA encourages questions be asked if this or any specification is not clear.
Company Name:
Reviewer Name:
Reviewer Title:
Reviewer Signature:
Date:
SECTION 1 – GENERAL
1. SCOPE OF WORK
a. These specifications outline the MBTA's requirement for furnishing and delivery of Heavy Duty Mobile column Lifts. Lifts must be specifically fabricated to withstand the harsh environments commonly found in MBTA environment.
b. The work includes all labor, equipment and materials to complete the delivery, including travel time, freight, service charges, parts, material and warranties to complete delivery. Also included in this work is the demolition, proper transport and disposal, and clean up, if applicable.
c. Lift should be able to pick up the entire MBTA bus fleet, including all different types of MBTA buses, as needed.
2. LOCATIONS – Mobile column sets are to be delivered to the locations listed below in accordance with the Schedule of Prices. Delivery cost is to be included in the quoted price per column.
a. Everett Bus – 80 Broadway, Everett, MA, 02149
b. Cabot Bus Training – 275 Dorchester Ave, Boston, MA, 02127
c. Arborway Bus - 3570 Washington Street, Boston, MA, 02130
3. CONTRACTOR REQUIREMENTS
a. Contractor must be an authorized inspector of the lift system they propose to provide. Proof of authorization shall be supplied with the bid.
4. GUARANTEE
a. Lift system shall be warranted for a minimum period of two (2) years labor and two (2) years parts, and the hydraulic cylinder shall be warranted for minimum five (5) years.
b. Manufacturer must warrantee in writing spare parts availability for twenty-five (25) years from date of delivery of the lift system.
c. The manufacturer or supplier of the aforementioned type vertical lift system shall have been in the business of supplying heavy duty lifts with a minimum of 10 years experience.
d. Contractor shall supply all necessary labor and materials to perform warranty work without any additional cost to the MBTA.
e. Contractor shall perform all warranty work on a 24-hour basis until all work is completed and the lift system is back in operation.
f. All parts and equipment supplied for warranty work shall be manufacturer’s original equipment, no substitutes allowed.
g. Equipment shall be of new manufacture. Used or demonstrator equipment shall not be acceptable.
SECTION 2 – MATERIALS
1. GENERAL
a. Furnish and deliver heavy duty mobile column Vehicle Lift to elevate large trucks, buses, and other heavy duty vehicles for the purpose of inspection, maintenance, servicing and cleaning.
b. Scissor lifts, four post lifts, drive on platform lifts, and parallelogram lifts are not acceptable. All material and hardware shall be new. Used or demonstrator equipment shall not be acceptable.
c. Lift shall be specifically fabricated to withstand and the harsh environments commonly found in a MBTA environment.
d. Equipment shall comply with all applicable US Federal, State and local safety regulations and the latest version of ALI/ALCTV.
e. The company manufacturing the lift shall be certified to ISO 9001 and the certificate shall accompany the bid.
f. Entire lift system shall have been approved and certified by the ALI (Automotive Lift Institute) certification program, including mechanical as well as electrical testing. Proof of certification as well as testing report showing testing at the certified capacity of the lift must be submitted with bid at the time of bid.
g. Contractor is responsible for determining correct material and equipment lift dimensions in the field. The MBTA will not be responsible for any extra costs due to Vehicle Lifts which do not fit.
2. LIFT DESCRIPTIONS
a. Lift Description and specification is in Section 3 of this technical specification.
3. PREOUALIFICATION OF BIDDERS
a. The MBTA reserves the right to reject any or all bids if it is in the public interest to do so.
4. TERMS
a. The contractor shall provide labor and management, which can work in harmony with the MBTA and all other elements of labor employed or to be employed by the MBTA.
b. The contractor will pay their workers the prevailing rates of wages for their trades as published by the Massachusetts Department of Labor and Industries.
SECTION 3 – LIFT DESCRIPTIONS AND SPECIFICATION
1. GENERAL
a. SECTION INCLUDES
i. Vehicle lifts including safety equipment, controls and accessories of the following types: at least 72,000 lb capacity surface mounted wheel engaging mobile column lifts.
b. QUALITY ASSURANCE
i. Lift and all components shall be new. Used or refurbished lift and components not acceptable.
2. PRODUCTS
a. 72,000 LB. CAPACITY SURFACE MOUNTED WHEEL ENGAGING MOBILE COLUMN LIFTS
i. Lift Characteristics:
1. The intent of this specification is to establish the minimum standards of quality and performance for portable mobile column lifts which will be used to lift a variety of vehicles including Trucks, Buses, Passenger Vehicles, Fork Lifts and other general service vehicles. This specification shall describe a mobile column surface mounted, wheel engaging lifting system designed to elevate vehicles for the purpose of inspection and maintenance. One Lifting System shall consist of four electric-hydraulic mobile columns sustaining 72,000 lb (32659 kgs) capacities (18,000 lbs (8165 kgs) per mobile column). Mobile columns may be added, (not exceeding 8 columns), removed, or changed out. All mobile columns shall operate synchronously from any one of the lifting units by means of a control interface. The control system shall have replaceable printed circuit boards equipped with quick-connect electrical couplers. The mobile columns shall be battery operated with a DC charging system built into each column for easy recharge and communication cable cord reel for cable management.
ii. Mobile Columns: 18,000 lbs. per column.
1. 30 foot buses – 4 columns
2. 48 foot buses – 6 columns
iii. Lifting Fork Length: 14 inches forks accommodate rim sizes 9 inches (229 mm) minimum to 24.5 inches maximum.
iv. Rise: 70 inches
v. Fabrication:
1. Column Assemblies:
a. Columns shall be constructed of formed channel fabrication from a single steel plate and shall not require welded seams to form the column structure.
b. Rigid column design shall be protected from corrosion via sand blasted enamel painting of metal surfaces.
c. Each column shall be fabricated to a set of legs that will sit directly on the floor and provide a stable platform when lifting a load. When unloaded the mobile columns ride on a set of wheels to allow the units to be moved. When a vehicle is lifted, the wheels shall automatically retract and the lift shall sit down flat on its steel base and no lifted weight shall remain on the casters. Legs have an extended fork configuration that allows for extensions to be added at any time. Such extensions will permit the addition of longer forks to lift dual wheel assemblies or optional assemblies for lifting vehicles further away form the column assembly.
d. Each of the lifting units shall contain a mechanical locking latch mechanism completely separate from the drive of lifting system.
2. Hydraulic System:
a. Each lifting unit shall be equipped with an electric hydraulic power unit, consisting of a DC motor, gear pump, reservoir, check valve, pressure relief valve, and two control valves. Entire power unit totally enclosed to protect from dirt and water.
b. The direct drive lifting cylinder shall be installed in such a manner as to push the carriage up, using no chains or cables. The extension of the cylinder shall occur inside of the carriage as to keep the plunger of the cylinder protected from dirt, sand, or any possible mechanical damage.
c. Hydraulic check valve shall hold load at any position of the cylinder. Redundant mechanical safety lock shall be continuously engaged except while lift is being lowered.
d. Pressure relief valve shall prevent overloading of the lifting unit.
e. Unit shall be equipped with two control valves that shall be used to maintain synchronous operation when a lifting system of more than one column is being commanded to raise or lower.
f. Hydraulic system is self-lubricating and shall require little to no maintenance.
g. A velocity fuse shall be installed directly to the end of the cylinder in order to keep hydraulic fluids from discharging if there is a fast leak somewhere after the cylinder, which could cause the load to unintentionally be lowered.
3. Control System: Premium, wireless system.
a. All mobile columns shall have identical control panels and shall be designed to be interchangeable without regard to master/slave relationships.
b. All mobile columns shall have a manual lowering override due to lose of power to the unit.
c. Indication lights on each control panel shall show mobile column configurations for an individual mobile column, paired mobile columns, grouped mobile columns, or all mobile columns.
d. "UP" and "Down" buttons shall have momentary function "Dead Man" type switches while depressed and operate from only one control panel at a time.
e.
f. "Emergency Stop Button" on each panel will shut down all connected mobile columns.
g. All control panels have automatic synchronization through the full stoke of the hydraulic cylinder with a maximum tolerance of 1 inch.
h. Lift shall come equipped with a lower to lock function.
i. Lift shall come equipped with a slow lowering function.
j. The lift control interfaces shall include visual representations showing the relationships between the lift columns and a vehicle, such as lift column icons positioned around a vehicle icon.
k. Lift shall come equipped with a three color battery charge indicator. The charger shall also indicate the status of the battery.
l. System set up must be accomplished in a single trip set up around columns to minimize set up time and user confusion, direction and operation will not matter.
b. The MBTA will accept and review all bids. Any discrepancies from the technical specification must be noted and highlighted and returned with the bid package.
SECTION 4 – EXECUTION
1. GENERAL
a. Contractor shall supply all necessary labor, materials, tools and equipment required to complete the work outlined in these specifications.
b. Contractor shall coordinate work with the MBTA's Garage supervisor to minimize interruptions to the garage's normal activities and operations. The contractor shall not store any materials, tools or equipment without written permission of the garage supervision. Contractor shall be responsible for the security of stored materials, tools and equipment left on MBTA property.
c. All work shall be complete and ready to operate (TURN-KEY).
2. TESTING
a. Upon completion of the work, Contractor shall notify the MBTA Mechanical Engineer & MBTA Machinist Foreman who then shall perform a final inspection and test of the lifts system. The Lift system shall be demonstrated to be fully operational and in accordance with these specifications and all proprietary software be turned over before final acceptance is made.
b. LIFT CERTIFICATION – Each mobile column lifting set is to be set up, inspected, certified for use before payment is to be made. Certification must be completed by an ALI certified lift inspector and must include a certification sticker affixed to each column and an accompanying report sent to the Mechanical Engineer. Lift certification cost must be included in the price in the Schedule of Prices and will not be invoiced separately. Certification is to be good for one year.
c. Provide the Inspection Checklist following manufacturer's instruction, including Structural, Electrical, Mechanical/ Operational Inspection details
3. TRAINING
a. Lift operation
i. General lift operation training shall be provided to technicians and maintenance personnel who will be using the equipment during the course of everyday work. Personnel operating the equipment are generally mechanics with the associated skillset
b. Lift maintenance
i. General lift maintenance training shall be provided for typical problem troubleshooting and typical electrical or mechanical design of the system.
SECTION 6 – CONTRACT AWARD AND PAYMENT
1. AWARD OF CONTRACT
a. The contract shall be awarded to the lowest qualified and responsive bidder that is able to meet these technical specifications.
2. SHEDULE OF BID PRICES
a. The contractor shall pricing to include lift, delivery and setup.
| Line |
| Description |
| Location |
| Qty |
| Unit Cost |
| Total Cost |
| A |
| B |
| A x B |
| 1 |
| Wheel engaging mobile column lifts as specified |
| Everett – 1 set of 6 columns |
Cabot – 1 set of 6 columns
Arborway – 1 set of 4 columns
| 16 columns |
| $ |
Per column
| 2 |
| Training as requested |
| All |
| 40 Hours |
| $ |
Per hour
| 3 |
| Contingency Allowance |
| ~ |
| 1 |
| $5,000 |
| $5,000 |
| GRAND TOTAL OF ALL LINES 1-3 |
| $ |
3. SUBMITTALS
a. The contractor shall submit to the MBTA six (3) sets of Operating and Maintenance Manuals for each Equipment and Materials supplied under these specifications with replacement pans list. No payment will be approved until these manuals have been submitted and approved by the MBTA.