Updated G2S-2025-050 C5ISR for W912CH25Q0072.xlsx
XLSX spreadsheet 119 KB Posted
- Attached to
- Tubing Assembly
- Solicitation number
- W912CH25Q0072
- Issued by
-
Department of the Army
About this file
This is a DLA (Defense Logistics Agency) Gateway to Sustainment (G2S) Order Form for a Tubing Assembly solicitation (W912CH25Q0072) set aside exclusively for small businesses under the C5ISR contract (G2S-2025-050). The solicitation covers multiple line items for various tubing assembly configurations, with quantities ranging from 3 to 14 units per line item, totaling approximately 62 units. The procurement is a one-time buy with non-commercial, firm-fixed-price contract terms, utilizing a Lowest Price Technically Acceptable (LPTA) evaluation method.
Key requirements include first article testing for some line items, compliance with specialty metals regulations, and specific packaging and quality standards (ISO 9001:2015). The solicitation emphasizes small business participation, with the government reserving the right to award line items individually or collectively to one vendor. Inspection and acceptance will occur at origin, with various technical and quality documentation requirements, including configuration management, light phosphate finishing, and potential hazardous material considerations. The order form provides detailed specifications for each tubing assembly line item, including NSN numbers, production lead times, and specific technical requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Customer Instructions & Notes When opening this file, select "Enable Macros," this will allow the code to run and hide columns based on your selections
C5ISR Gateway to Sustainment (G2S) Order Form Instructions & Notes For Government Customers/Requiring Activities The G2S Exhibit A - Statement of Work (SOW) has requirements that are applicable to all G2S delivery/task orders.
The G2S Exhibit B - ILSC Supplemental SOW has requirements that may applicable to individual G2S delivery/task orders.
Note(s):
All incoming requirements from the Army Communications-Electronics Command (CECOM) should be submitted from the CECOM Supply Chain Management Directorate (SCMD) Procurement Planning and Contracts Division to DLA Land Aberdeen via the Army Paperless Contract Files (PCF) System.
| o The initial submission should include an Independent Government Cost Estimate (IGCE) and any available Acquisition History for the item(s). Unless directed otherwise, this Acquisition History does not need to include a Sources Sought Announcement or a formal Market Research Summary. | |
| o DLA Land Aberdeen Management then reviews to determine the best contract vehicle/strategy. | |
| o If assigned to G2S, DLA Land Aberdeen will provide the most current version of the following documents. | |
| G2S Order Form. (Applicable Tabs shall be completed by each stakeholder in the following order: 1. DLA-G2S Team, 2. Logistics POC, and 3. Technical POC.) | |
| Other required documents (e.g., Covered Defense Information (CDI) Memorandum , Brand-name Justification Memorandum, Technical Data Packages (TDPs), etc.). |
Please DO NOT complete any forms from previous acquisitions (prior versions may be obsolete).
If you have any suggestions or recommended improvements to this G2S Order Form, please direct them to DLA-G2S@dla.mil).
All incoming requirements from other Government organizations should be routed through the DLA Land Aberdeen Acquisition Division Chief (laura.veety@dla.mil).
**PLEASE NOTE**
Each tab is named according to the POC required to fill out the information. CDRLs and Packaging sheets are to be filled out by the Army Engineer/Technical POC.
This is Workbook includes code. Certain selections may lead to columns/sheets being hidden. This is done to simplify Order Form requirements and maximize accurate completion.
(For instance, selecting "Supplies" will cause Service-related columns and sheets to be hidden.)
Some columns contain notes on how to enter information/requirements of certain selections. The cell's corresponding notes are in the above cell.
The "RFP" tab may or may not be hidden upon receipt of this order form. Please DO NOT edit any information in this worksheet. It will automatically pull the information entered from other worksheets as it is entered.
G2S Team Note:
* Per the G2S contract Narrative A0001: IAW FAR 19.502-2, the Government reserves the right to set-aside future delivery/task orders under $250,000 solely for small business prime Contractors.
* Per the G2S contract Narrative H0001: After the contracts are awarded, the Contracting Officer intends to reserve all orders under $250,000 for small business G2S prime Contractors. However, if it is determined through market research (e.g. the quarterly forecasting results) that there is NOT a reasonable expectation that two or more small business G2S prime Contractors will submit competitive offers in terms of market prices, quality and delivery, the Contracting Officer may decide to not set aside the order.
* Per the G2S contract Exhibit A Section 2.2.1: The Contracting Officer intends to reserve all orders under $250,000.00 for small business awardee(s), except for orders that are awarded using the Rapid Ordering Catalog Supplement – Automated Ordering process. However, if it is determined through market research (e.g. the quarterly forecast results) that there is not a reasonable expectation that two or more small business G2S prime Contractors will submit competitive offers in terms of market prices, quality and delivery, the Contracting Officer may decide to not set aside the order. Note:
* Army Item Manager & Engineering/Technical POC may provide any input below for consideration.
* Per FAR 15.101-1, a Tradeoff source selection process is appropriate when it may be in the best interest of the Government to consider award to other than the lowest priced offeror. This would allow consideration of alternative delivery schedules or offers that cannot comply with the Government required delivery schedule.
* Per FAR 15.101-2, a Lowest Price Technically Acceptable (LPTA) source selection process is appropriate when best value is expected to result from selection of the technically acceptable proposal with the lowest evaluated price. This eliminate any offers that do not fully comply with all technical requirements including the Government required delivery schedule.
* Per FAR 15.402, either way the Government must only purchase supplies and services from responsible sources at fair and reasonable prices.
| * A combination of both methods would not normally occur in the same acquisition. | Note: | |
| - Normally Firm-Fixed-Priced (FFP) | Note: |
-Normally "No"
| G2S Order RFP Number | Order RFP Line Item Number | ||
| (Automatically input by Excel) | Reserved for G2S Small Business Prime Contractors | Best Value Offer Evaluation/Determination Method to be Used by the Government Tradeoff, or Lowest Price Technically Acceptable (LPTA) | Applicable Clauses from the basic contract (Commercial or Non-Commercial) |
| Note: Separate delivery/task orders required for Commercial and Non-Commercial (Commercial requires FFP) | Pricing Type | Contract Financing Included (Yes/No) | |
| G2S-2025-050 C5ISR |
Logistics POC Info
| https://home.daas.dla.mil/eDoDAAD/s_search/search_menu.asp | (For select items that are high demand, and/or high priority, to establish up to two (2) years of catalog prices and order details) - Note this process may take longer than a One-Time Buy and is generally recommended for items with recurring predictable demand | (Contracting Officer will use this to help establish the Government Target Quantity Ranges) | |||
| G2S Order RFP Number | Order RFP Line Item Number | ||||
| (Automatically input by Excel) | For CECOM Requirements |
PCF Cabinet Number (e.g., PANAPG-XX-P-0000 XXXXXX) For CECOM Requirements Directorate
| (C3T, PED, IEWS, ESA, etc.) | Is this Request for Supplies or Services? | FSC | NIIN | Management Control Number (MCN) |
| assigned by the Army for Items without an NSN | Item Name | Material Category | ||
| (MATCAT) 2-character Code | System Name spelled out (Along with any Abbreviated Name and/or Acronym) | Ship To | ||
| DoDAAC | If this item is high priority |
(e.g., gap in coverage, supply availability, backorders, etc.)
provide narrative/explanation below
| if applicable | Is This a One-Time Buy |
| or a Request to Establish Pricing for a Rapid Ordering Catalog Supplement | Total Quantity Required for One-Time Buy |
| Note: Quantity purchased per order allows for quanity adjustments of +/- 20% of the quantities listed below without revisions to this RFP | Rapid Ordering Catalog Supplement |
First Ordering Year (Refer to basic contracts)
Minimum Order Quantity Rapid Ordering Catalog Supplement
First Ordering Year (Refer to basic contracts)
Maximum Order Quantity Rapid Ordering Catalog Supplement
Second Ordering Year (Refer to basic contracts)
Minimum Order Quantity Rapid Ordering Catalog Supplement
Second Ordering Year (Refer to basic contracts)
Maximum Order Quantity Government Target Initial/First Shipment Quantity Government Target Initial/First Shipment Production Lead Time (PLT) Days After Receipt of Order (ARO) or Days After FAT approval
| (For new sources of supply) | Government Target Follow-on Shipment Quantity |
| (For any phased/incremental deliveries) | Government Target |
Follow-on Shipment PLT Days (For any phased/incremental deliveries, Normally every 30 days except for long lead items)
| G2S-2025-050 C5ISR |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
https://home.daas.dla.mil/eDoDAAD/s_search/search_menu.asp Technical POC Info
| Note that the AMRC is a 2-character code with the AMC followed by the AMSC | Note that the AMRC is a 2-character code with the AMC followed by the AMSC | Note: Orders for commercial | |||||||
| supplies/services will be issued separately from noncommercial supplies/ services and must be Firm-Fixed-Priced (FFP). | Note that Brand-Name Justification MFR approval would be required | Note that Brand-Name Justification MFR approval would be required | Normally COMBO | If Yes, the Customer needs to supply the Draft DD-254 | |||||
| G2S Order RFP Number | Order RFP Line Item Number | Item Name | Item Nomenclature | ||||||
| as listed in FLIS | CAGE Code of the RNCC/RNVC: 3/2 Source | ||||||||
| as listed in FLIS | Part Number of the RNCC/RNVC: 3/2 Source | ||||||||
| as listed in FLIS | Company Name of the RNCC/RNVC: 3/2 Source | ||||||||
| as listed in FLIS | AMC | ||||||||
| as listed in FLIS | AMSC | ||||||||
| as listed in FLIS | Unit of Issue (UI) | ||||||||
| as listed in FLIS | Unit of Measure (UM) |
as listed in FLIS
| *if different from the UI | Does the Government own the full Technical Data Package (TDP) required to manufacture this item? | |
| (Yes/No) | Has the Government owned TDP been scrubbed for accuracy & completeness? | |
| (Yes/No) | Has the Government owned TDP been provided to DLA as a consolicated ZIP file with the file name corresponding to the NIIN? | |
| (Yes/No) | Government Target FAT lead time, days after receipt of order until final FAT approval for new sources of supply Default is normally 275 days per the standard timeline in the G2S Exhibit B, ILSC Supplemental SOW CDRL: L001 | |
| (Or N/A if FAT not required) | Is this item known to be Commercially Available? | |
| (Yes/No) | Is this item Brand-Name Specific? | |
| (Required to be procured from a specific source for this action regardless if there is a Government owned TDP) | Is there a statute that expressly authorizes/requires that this item be made from a specific source? | |
| (If so, provide the citation) | List of any current Government Approved Source(s) Name(s) & CAGE Code(s) | |
| If none, state None | Names/CAGE Codes for any companies identified during the Government's previous market research as possible sources of supply for each item. Note that this information is provided as a courtesy, not to be considered an endorsement by the Government. | Government Inspection/Acceptance Location |
(Origin if DCMA needs to inspect before shipment, or
| Destination if the supplies may be inspected at the point of delivery) | DCMA Production Surveillance Criticality Designator (SCD) | Government Required FOB Point |
| (Origin or Destination) | Type of WAWF Receiving Report/Invoice | IUID Required? |
| (Yes/No) | RFID Required? | |
| (Yes/No) | ITAR Export Controlled Item? | |
| (Yes/No) | DD-254 Security Classification Controlled Item? | |
| (Yes/No) | Is there any Government Furnished Property (GFP) anticipated for this item? | |
| (Yes/No) | Critical Safety Item (CSI) or Critical Application Item (CAI)? |
(Yes/No)
| G2S-2025-050 C5ISR | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
Technical CDRLs - Supplies
| Normally Yes | Normally Yes | |||
| G2S Order RFP Number | Order RFP Line Item Number | Item Name | Exhibit A SOW |
Section 4.4 Production Status Report
CDRL A001
Production Status Report Applicable?
(Yes/No) Exhibit A SOW Section 4.12 Obsolescence Status Report
CDRL B001
Obsolescence Status Report Applicable?
(Yes/No) Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A002 Data Accession List Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A003 Reliability Test Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A004 Environmental Stress Screening Procedures and Implementation Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A005 Environmental Stress Screening Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A006 Failure Analysis and Corrective Action Reports Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A007 Record of Meeting/Minutes Report: Failure Review Board Meeting Minutes Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
B002 Technical Report, Study-Services: 10-year Rolling Technology Refreshment Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
C001 Training Conduct Support Document Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
C002 Course Conduct Information Package Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
D001 Test Plans/Test Procedures Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E001 Failure Summary and Analysis Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E002 Notice of Revision Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E003 Specification Change Notice Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E004 Logistics Management Information Data Products Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F001 Engineering Change Proposal Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F002 Failure Modes, Effects, Criticality Analysis Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F003 Scientific and Technical Reports: Corrosion Prevention and Control Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F004 Test Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F005 Parts Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F006 Product Engineering Design Data and Associated Lists Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F007 Reliability and Maintainability Program Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
G001 Supply Chain Risk Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
H001 Production Surge Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I001 Special Packaging Instructions Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I002 Program-Unique Specification Documents Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I003 Configuration Baseline Drawings Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I004 Logistics Product Data Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I005 Logistics Product Data Summaries Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
J001 Supplier's Configuration Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
J002 Configuration Status Accounting Information Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
J003 Request for Variance Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
K001 Commercial Engineering Design Data and Associated Lists Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
L001 First Article Test/Inspection Procedures and Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
M001 First Article Qualification Test Plan and Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
N001 Test Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
O001 Quality Assurance Program Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
P001 Manufacturing Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q001 Diminishing Manufacturing Sources and Material Shortages Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q002 Bill of Material for Logistics and Supply Chain Risk Management Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q003 Obsolescence Alert Notice Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q004 Technical Report - Study/Services: Case Management Reports Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q005 Technical Report - Study/Services: DMSMS Roadmap Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q006 Technical Report - Study/Services: DMSMS Metrics Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q007 Technical Report - Study/Services: DMSMS Health Assessment Applicable ?
| G2S-2025-050 C5ISR | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
Technical Packaging - Supplies
| G2S Order RFP Number | Order RFP Line Item Number | Item Name | Packaging | |
| (Commercial or Military) | Packaging Reference or Special Packaging Instruction | |||
| (PKG-REF or SPI) | Packaging Unit of Issue | |||
| (UI, As listed in FLIS) | Packaging Quantity Unit Pack | |||
| (QUP, As listed in FLIS) | Packaging Intermediate Container Quantity (ICQ) maximum allowed | Packaging Req't Code |
I.
(MP) Packaging Req't Code
II.
(CD) Packaging Req't Code
III.
(PM) Packaging Req't Code
IV.
(WM) Packaging Req't Code V.
(CD) Packaging Req't Code
VI.
(CT) Packaging Req't Code
VII.
(UC) Packaging Req't Code VAI.a (IC) Packaging Req't Code
VIIIA.
(OPI) Packaging Req't Code
IX.
(PK) Packaging Req't Code X.
| (SM) | Packaging Special Markings | Packaging Supplemental Info (If applicable) | |
| G2S-2025-050 C5ISR | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 | ||
| 0 | 0 |
Technical CDRLs - Services
G2S Order RFP Number Order RFP Line Item Number Item Name Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R001 Overhaul Repair Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R002 Maintenance Service Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R003 Significant Maintenance Historical Documentation Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R004 Repair of Repairables Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R005 Repairable Item Inspection Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R006 Teardown Deficiency Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R007 Technical Report - Study/Services: Performance Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R008 Contractor's Risk Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R009 Risk Management Plan Status Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R010 Technical Report - Study/Services: Technical Report - Study/Services Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R011 Test/Inspection Report: Unscheduled Maintenance Inspection Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S001 Subsystem Design Analysis Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S002 System/Design Trade Study Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S003 Personnel Qualification Standard Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S004 Scientific Technical Papers: Operator/Maintenance TM With Repair Parts and Special Tools List (RPSTL) Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S005 Reliability and Maintainability Predictions Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S006 Reliability and Maintainability Block Diagrams and Mathematical Models Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T001 Implementation Plan: P3 Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T002 Repair Procedure: System Reset/Refurbishment Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T003 PPP Funded Organic Workload Forecast Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T004 Test/Inspection Report: System Overhaul Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
U001 Contractor Government Furnished Material (GFM) Requisition and Inventory Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
U002 Government Property (GP) Inventory Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.3 Software
CDRL
V001 Technical Report - Study/Services: Software Problem Report Applicable ?
| G2S-2025-050 C5ISR | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
| 0 | 0 |
Order RFP
| G2S Order RFP Number | Order RFP Line Item Number | Reserved for G2S Small Business Prime Contractors | Best Value Offer Evaluation/Determination Method to be Used by the Government Tradeoff, or Lowest Price Technically Acceptable (LPTA) | Applicable Clauses from the basic contract (Commercial or Non-Commercial) | |
| Note: Separate delivery/task orders required for Commercial and Non-Commercial (Commercial requires FFP) | Pricing Type | Contract Financing Included (Yes/No) | Army-ILSC |
PCF Cabinet Number (e.g., PANAPG-XX-P-0000 XXXXXX) Army-ILSC Directorate
| (C3T, PED, IEWS, ESA, etc.) | Is this Request for Supplies or Services? | FSC | NIIN | Management Control Number (MCN) |
| assigned by the Army for Items without an NSN | Item Name | Material Category | ||
| (MATCAT) 2-character Code | System Name spelled out (Along with any Abbreviated Name and/or Acronym) | Ship To | ||
| DoDAAC | If this item is high priority |
(e.g., gap in coverage, supply availability, backorders, etc.)
provide narrative/explanation below
| if applicable | Is This a One-Time Buy |
| or a Request to Establish Pricing for a Rapid Ordering Catalog Supplement | Total Quantity Required for One-Time Buy |
| Note: Quantity purchased per order allows for quanity adjustments of +/- 20% of the quantities listed below without revisions to this RFP | Rapid Ordering Catalog Supplement |
First Ordering Year (Refer to basic contracts)
Minimum Order Quantity Rapid Ordering Catalog Supplement
First Ordering Year (Refer to basic contracts)
Maximum Order Quantity Rapid Ordering Catalog Supplement
Second Ordering Year (Refer to basic contracts)
Minimum Order Quantity Rapid Ordering Catalog Supplement
Second Ordering Year (Refer to basic contracts)
| Maximum Order Quantity | Government Target Initial/First Shipment Quantity | Government Target Initial/First Shipment Production Lead Time (PLT) |
| Days with FAT | Government Target Follow-on Shipment Quantity | |
| (For any phased/incremental deliveries) | Government Target |
Follow-on Shipment PLT Days
| (For any phased/incremental deliveries, Normally every 30 days except for long lead items) | Item Nomenclature |
| as listed in FLIS | CAGE Code of the RNCC/RNVC: 3/2 Source |
| as listed in FLIS | Part Number of the RNCC/RNVC: 3/2 Source |
| as listed in FLIS | Company Name of the RNCC/RNVC: 3/2 Source |
| as listed in FLIS | AMC |
| as listed in FLIS | AMSC |
| as listed in FLIS | Unit of Issue (UI) |
| as listed in FLIS | Unit of Measure (UM) |
as listed in FLIS
| *if different from the UI | Does the Government own the full Technical Data Package (TDP) required to manufacture this item? | |||||||||||||
| (Yes/No) | Has the Government owned TDP been scrubbed for accuracy & completeness? | |||||||||||||
| (Yes/No) | Has the Government owned TDP been provided to DLA as a consolicated ZIP file with the file name corresponding to the NIIN? | |||||||||||||
| (Yes/No) | Government Target FAT lead time, days after receipt of order until final FAT approval for new sources of supply Default is normally 275 days per the standard timeline in the G2S Exhibit B, ILSC Supplemental SOW CDRL: L001 | |||||||||||||
| (Or N/A if FAT not required) | Is this item known to be Commercially Available? | |||||||||||||
| (Yes/No) | Is this item Brand-Name Specific? | |||||||||||||
| (Required to be procured from a specific source for this action regardless if there is a Government owned TDP) | Is there a statute that expressly authorizes/requires that this item be made from a specific source? | |||||||||||||
| (If so, provide the citation) | List of any current FAT Approved Source(s) Name(s) & CAGE Code(s) | |||||||||||||
| If none, state None | Names/CAGE Codes for any companies identified during the Government's previous market research as possible manufacturing sources for each item. | Section E: Higher level Req. | Section E: FAT Testing | Section E: Destructive Testing | Section E: CDRL | Section E: Initial Product Inspection | Quality: FCDD-ACE-QP 367 REQ Selection #14 Acceptance Inspection Equipment (AIE) | Quality: FCDD-ACE-QP 367 REQ Selection #21 First Aricle Test (Contractor Testing) | Quality: FCDD-ACE-QP 367 REQ Selection #24 Destructive Testing | Quality: FCDD-ACE-QP 367 REQ Selection #25 Initial Product Inspection (IPI) | Certification | DEMIL Code | DEMIL & TSC Clause HS 7144 | Government Inspection/Acceptance Location |
(Origin if DCMA needs to inspect before shipment, or
| Destination if the supplies may be inspected at the point of delivery) | DCMA Production Surveillance Criticality Designator (SCD) | Government Required FOB Point |
| (Origin or Destination) | Type of Receiving Report/Invoice | IUID Required? |
| (Yes/No) | RFID Required? | |
| (Yes/No) | ITAR Export Controlled Item? | |
| (Yes/No) | DD-254 Security Classification Controlled Item? | |
| (Yes/No) | Is there any Government Furnished Property (GFP) anticipated for this item? | |
| (Yes/No) | Critical Safety Item (CSI) or Critical Application Item (CAI)? | |
| (Yes/No) | Exhibit A |
CDRL A001
Engineering Change Proposal (Yes/No) Exhibit A CDRL A002 Request for Variance (Yes/No) Exhibit A CDRL A003 Notice of Revision Exhibit A CDRL A004 Acceptance Inspection Equipment Report Exhibit A CDRL A005 Test Procedure - Light Phosphate Coating Exhibit A CDRL A006 First Article Test Report (FATR) Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A006 Failure Analysis and Corrective Action Reports Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
A007 Record of Meeting/Minutes Report: Failure Review Board Meeting Minutes Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
B002 Technical Report, Study-Services: 10-year Rolling Technology Refreshment Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
C001 Training Conduct Support Document Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
C002 Course Conduct Information Package Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
D001 Test Plans/Test Procedures Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E001 Failure Summary and Analysis Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E002 Notice of Revision Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E003 Specification Change Notice Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
E004 Logistics Management Information Data Products Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F001 Engineering Change Proposal Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F002 Failure Modes, Effects, Criticality Analysis Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F003 Scientific and Technical Reports: Corrosion Prevention and Control Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F004 Test Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F005 Parts Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F006 Product Engineering Design Data and Associated Lists Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
F007 Reliability and Maintainability Program Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
G001 Supply Chain Risk Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
H001 Production Surge Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I001 Special Packaging Instructions Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I002 Program-Unique Specification Documents Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I003 Configuration Baseline Drawings Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I004 Logistics Product Data Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
I005 Logistics Product Data Summaries Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
J001 Supplier's Configuration Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
J002 Configuration Status Accounting Information Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
J003 Request for Variance Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
K001 Commercial Engineering Design Data and Associated Lists Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
L001 First Article Test/Inspection Procedures and Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
M001 First Article Qualification Test Plan and Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
N001 Test Procedure Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
O001 Quality Assurance Program Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
P001 Manufacturing Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q001 Diminishing Manufacturing Sources and Material Shortages Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q002 Bill of Material for Logistics and Supply Chain Risk Management Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q003 Obsolescence Alert Notice Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q004 Technical Report - Study/Services: Case Management Reports Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q005 Technical Report - Study/Services: DMSMS Roadmap Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q006 Technical Report - Study/Services: DMSMS Metrics Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.1 Hardware
CDRL
Q007 Technical Report - Study/Services: DMSMS Health Assessment Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R001 Overhaul Repair Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R002 Maintenance Service Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R003 Significant Maintenance Historical Documentation Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R004 Repair of Repairables Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R005 Repairable Item Inspection Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R006 Teardown Deficiency Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R007 Technical Report - Study/Services: Performance Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R008 Contractor's Risk Management Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R009 Risk Management Plan Status Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R010 Technical Report - Study/Services: Technical Report - Study/Services Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
R011 Test/Inspection Report: Unscheduled Maintenance Inspection Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S001 Subsystem Design Analysis Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S002 System/Design Trade Study Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S003 Personnel Qualification Standard Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S004 Scientific Technical Papers: Operator/Maintenance TM With Repair Parts and Special Tools List (RPSTL) Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S005 Reliability and Maintainability Predictions Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
S006 Reliability and Maintainability Block Diagrams and Mathematical Models Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T001 Implementation Plan: P3 Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T002 Repair Procedure: System Reset/Refurbishment Plan Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T003 PPP Funded Organic Workload Forecast Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
T004 Test/Inspection Report: System Overhaul Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
U001 Contractor Government Furnished Material (GFM) Requisition and Inventory Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.2 Services
CDRL
U002 Government Property (GP) Inventory Report Applicable ? Exhibit B ILSC Supplemental SOW Section 3.3 Software
CDRL
V001 Technical Report - Study/Services: Software Problem Report
| Applicable ? | Packaging | |
| (Commercial or Military) | Packaging Reference or Special Packaging Instruction | |
| (PKG-REF or SPI) | Packaging Unit of Issue | |
| (UI, As listed in FLIS) | Packaging Quantity Unit Pack | |
| (QUP, As listed in FLIS) | Packaging Intermediate Container Quantity (ICQ) maximum allowed | Packaging Req't Code |
I.
(MP) Packaging Req't Code
II.
(CD) Packaging Req't Code
III.
(PM) Packaging Req't Code
IV.
(WM) Packaging Req't Code V.
(CD) Packaging Req't Code
VI.
(CT) Packaging Req't Code
VII.
(UC) Packaging Req't Code VAI.a (IC) Packaging Req't Code
VIIIA.
(OPI) Packaging Req't Code
IX.
(PK) Packaging Req't Code X.
(SM) Packaging Special Markings Packaging Supplemental Info (If applicable) G2S Prime Contractor proposal expiration date (By default, the Government requests the proposal be valid for 90 days) G2S Prime Contractor proposing the product of a FAT Approved Source (Yes/No, or
| N/A if FAT not required) | G2S Prime Contractor proposed manufacturer Name & CAGE Code |
| (If the G2S Offeror is the proposed manufacturer, enter the G2S Offeror Name & CAGE Code) | G2S Prime Contractor proposed manufacturer Country of Origin |
| (Even if USA, the G2S Offeror must state USA) | G2S Prime Contractor |
proposed FAT lead time, days after receipt of order until final FAT approval (N/A if Offering the product of a FAT Approved Source) G2S Offeror proposed lump sum price for FAT (N/A if Offering the product of a FAT Approved Source) G2S Prime Contractor proposed Inspection/Acceptance CAGE Code (If Government Source Inspection/Acceptance specified) G2S Prime Contractor proposed Initial/First Shipment Quantity G2S Prime Contractor proposed Initial/First Shipment Production Lead Time (PLT) Days After Receipt of Order (ARO) or Days After FAT approval if proposing a new source G2S Prime Contractor proposed Follow-on Shipment Quantity (For any phased/incremental deliveries) G2S Prime Contractor proposed Follow-on Shipment PLT Days (For any phased/incremental deliveries) G2S Prime Contractor proposed unit price for One-Time Buy To be completed by the DLA-G2S Team (For any long-term pricing requestr)
Government Target Quantity Range #1 From To be completed by the DLA-G2S Team (For any long-term pricing requests)
Government Target Quantity Range #1 To G2S Prime Contractor proposed Quantity Range #1 From G2S Prime Contractor proposed Quantity Range #1 To G2S Prime Contractor proposed unit price for Quantity Range #1 Year 1 G2S Prime Contractor proposed unit price for Quantity Range #1 Year 2 To be completed by the DLA-G2S Team (For any long-term pricing requests)
Government Target Quantity Range #2 From To be completed by the DLA-G2S Team (For any long-term pricing requests)
Government Target Quantity Range #2 To G2S Prime Contractor proposed Quantity Range #2 From G2S Prime Contractor proposed Quantity Range #2 To G2S Prime Contractor proposed unit price for Quantity Range #2 Year 1 G2S Prime Contractor proposed unit price for Quantity Range #2 Year 2 To be completed by the DLA-G2S Team (For any long-term pricing requests)
Government Target Quantity Range #3 From To be completed by the DLA-G2S Team (For any long-term pricing requests)
Government Target Quantity Range #3 To G2S Prime Contractor proposed Quantity Range #3 From G2S Prime Contractor proposed Quantity Range #3 To G2S Prime Contractor proposed unit price for Quantity Range #3 Year 1 G2S Prime Contractor proposed unit price for Quantity Range #3 Year 2
| G2S-2025-050 C5ISR | 0001 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-575-2011 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 14 | 0 | 0 | 0 | 0 | 14 | 183 | 0 | 0 | 0 | 0 | 12491142 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | Yes - Contractor | N/A | YES |
| G2S-2025-050 C5ISR | 0002 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-575-2011 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 14 | 0 | 0 | 0 | 0 | 14 | 183 | 0 | 0 | 0 | 0 | 12491142 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | Yes - Contractor | N/A | Yes |
| G2S-2025-050 C5ISR | 0003 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-574-9058 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 3 | 0 | 0 | 0 | 0 | 3 | 183 | 0 | 0 | 0 | 0 | 12491162 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | YES- contractor testing, 3 units, 15 days, PCO, PCO, 90 days. FAT Justification: IAW all QAPs and requirements if not purchased from approved suppliers list. FAR 52.209-3 | N/A | Test/Inspection Report (DI-NDTI-80809) | N/A |
| G2S-2025-050 C5ISR | 0004 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | First Article Contractor Testing | 4710-01-574-9058 | First Article Contractor Testing | 0 | 0 | One-Time Buy | 1 | 0 | 0 | 0 | 0 | 1 | 516 | 0 | 0 | 0 | 0 | 12491162 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | 303 | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | YES- contractor testing, 3 units, 15 days, PCO, PCO, 90 days. FAT Justification: IAW all QAPs and requirements if not purchased from approved suppliers list. FAR 52.209-3 | N/A | Test/Inspection Report (DI-NDTI-80809) | N/A |
| G2S-2025-050 C5ISR | 0005 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-574-9058 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 3 | 0 | 0 | 0 | 0 | 3 | 183 | 0 | 0 | 0 | 0 | 12491162 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | YES- contractor testing, 3 units, 15 days, PCO, PCO, 90 days. FAT Justification: IAW all QAPs and requirements if not purchased from approved suppliers list. FAR 52.209-3 | N/A | Test/Inspection Report (DI-NDTI-80809) | N/A |
| G2S-2025-050 C5ISR | 0006 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-574-9065 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 6 | 0 | 0 | 0 | 0 | 6 | 183 | 0 | 0 | 0 | 0 | 12491164 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | YES- contractor testing, 3 units, 15 days, PCO, 30 days, 90 days. FAT Justification: Environmental tests, inspection and welding requirements. FAR 52.209-3 | Yes- contractor | AIE Documentation (DI-MGMT-81979) Test/Inspection Report (DI-NDTI-80809) | N/A |
| G2S-2025-050 C5ISR | 0007 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | First Article Contractor Testing | 4710-01-574-9065 | First Article Contractor Testing | 0 | 0 | One-Time Buy | 1 | 0 | 0 | 0 | 0 | 1 | 516 | 0 | 0 | 0 | 0 | 12491164 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | 303 | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | YES- contractor testing, 3 units, 15 days, PCO, 30 days, 90 days. FAT Justification: Environmental tests, inspection and welding requirements. FAR 52.209-3 | Yes- contractor | AIE Documentation (DI-MGMT-81979) Test/Inspection Report (DI-NDTI-80809) | N/A |
| G2S-2025-050 C5ISR | 0008 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-574-9065 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 6 | 0 | 0 | 0 | 0 | 6 | 183 | 0 | 0 | 0 | 0 | 12491164 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | YES- contractor testing, 3 units, 15 days, PCO, 30 days, 90 days. FAT Justification: Environmental tests, inspection and welding requirements. FAR 52.209-3 | Yes- contractor | AIE Documentation (DI-MGMT-81979) Test/Inspection Report (DI-NDTI-80809) | N/A |
| G2S-2025-050 C5ISR | 0009 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-574-9067 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 3 | 0 | 0 | 0 | 0 | 3 | 183 | 0 | 0 | 0 | 0 | 12491165 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | N/A | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0010 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-574-9067 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 3 | 0 | 0 | 0 | 0 | 3 | 183 | 0 | 0 | 0 | 0 | 12491165 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | N/A | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0011 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-574-9068 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 6 | 0 | 0 | 0 | 0 | 6 | 183 | 0 | 0 | 0 | 0 | 12491166 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | N/A | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0012 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-574-9068 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 6 | 0 | 0 | 0 | 0 | 6 | 183 | 0 | 0 | 0 | 0 | 12491166 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | N/A | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0013 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-575-2010 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 9 | 0 | 0 | 0 | 0 | 9 | 183 | 0 | 0 | 0 | 0 | 12491143 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0014 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-575-2010 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 9 | 0 | 0 | 0 | 0 | 9 | 183 | 0 | 0 | 0 | 0 | 12491143 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0015 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-574-9052 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 9 | 0 | 0 | 0 | 0 | 9 | 183 | 0 | 0 | 0 | 0 | 12491140 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0016 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-574-9052 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 9 | 0 | 0 | 0 | 0 | 9 | 183 | 0 | 0 | 0 | 0 | 12491140 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0017 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Tubing Assembly, Non | 4710-01-574-9054 | Tubing Assembly, Non | 0 | 0 | One-Time Buy | 8 | 0 | 0 | 0 | 0 | 8 | 183 | 0 | 0 | 0 | 0 | 12491161 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | N/A | N/A | N/A |
| G2S-2025-050 C5ISR | 0018 | yes | LPTA | Non-Commercial | FFP | No | W912CH-25-Q-0072 | 0 | supplies | 4710 | 0 | N/A | Option: Tubing Assembly, NON | 4710-01-574-9054 | Option: Tubing Assembly, Non | 0 | 0 | One-Time Buy | 8 | 0 | 0 | 0 | 0 | 8 | 183 | 0 | 0 | 0 | 0 | 12491161 | 0 | 0 | 0 | each | 0 | yes | 0 | Request | N/A | No | No | No | None | None | ISO 9001:2015 (21 Oct 2015) or equivalent. FAR 52.246-11 FAR 52.246-26 | N/A | N/A | N/A | N/A |
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | **The Government reserves the right to award line by line or all to 1 vendor | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
image1.gif
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .