The file's text, extracted by GovTribe without its formatting.
No Cost IGE Railroads
| FOR OFFICAL USE ONLY |
| EXHIBIT LINE ITEM NUMBERS |
| POP: 15 JUN 2021-14 JUN 2026 |
| Maintenance of Railroad Tracks at Katterbach and Illesheim |
| Basic Period: 15 JUN 2021 - 14 JUN 2022 | | | | | |
| ELINs | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | | |
| A000 | Basic Service | | | | |
| A001 | General basics | 12 | svc |
| IAW wit PWS 5.1.1 | | |
| A002 | Inspection and measure of turnout including interlocking device | 1 | svc |
| IAW with PWS 5.1.2 | | |
| A003 | Inspection and measure railroad crossings | 1 | svc |
| IAW with PWS 5.1.3 | | |
| A004 | Inspection walk of complete rail infrastructure | 1 | svc |
| IAW with PWS 5.1.4 | | |
| A005 | Inspection of railroad culverts | 1 | svc |
| IAW with PWS 5.1.5 | | |
| A006 | Inspection of railroad loading ramps | 1 | svc |
| IAW with PWS 5.1.6 | | |
| A007 | Superstructure inspection and measurement | 1 | svc |
| IAW with PWS 5.1.7 | | |
| A008 | Vegetation control of the complete rail track and rail crossings including the railhead | 1 | svc |
| IAW with PWS 5.1.8 | | |
| A009 | Vegetation control of daylight profile | 1 | svc |
| IAW with 5.1 9 | | |
| A010 | Vegetation Control at Railroad bed trenches of Railroad Tracks | 4,000 | lnm |
| IAW with PWS 5.1.10 | | |
| A011 | Vegetation Control at Railroad dams of Railroad Tracks | 250 | sqm |
| IAW with PWS 5.1.11 | | |
| A012 | Vegetation Control at Railroad Culverts of Railroad Tracks | 300 | sqm |
| IAW with PWS 5.1.12 | | |
| A013 | Inspection of bumpers | 1 | svc |
| IAW with PWS 5.1.14 | | |
TOTAL AMOUNT
| First Option year 15 JUN 2022 - 14 JUN 2023 | | | | | |
| ELINs | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | | |
| B000 | Basic Service | | | | |
| B001 | General basics | 12 | svc |
| IAW wit PWS 5.1.1 | | |
| B002 | Inspection and measure of turnout including interlocking device | 1 | svc |
| IAW with PWS 5.1.2 | | |
| B003 | Inspection and measure railroad crossings | 1 | svc |
| IAW with PWS 5.1.3 | | |
| B004 | Inspection walk of complete rail infrastructure | 1 | svc |
| IAW with PWS 5.1.4 | | |
| A005 | Inspection of railroad culverts | 1 | svc |
| IAW with PWS 5.1.5 | | |
| B006 | Inspection of railroad loading ramps | 1 | svc |
| IAW with PWS 5.1.6 | | |
| B007 | Superstructure inspection and measurement | 1 | svc |
| IAW with PWS 5.1.7 | | |
| B008 | Vegetation control of the complete rail track and rail crossings including the railhead | 1 | svc |
| IAW with PWS 5.1.8 | | |
| B009 | Vegetation control of daylight profile | 1 | svc |
| IAW with 5.1 9 | | |
| B010 | Vegetation Control at Railroad bed trenches of Railroad Tracks | 4,000 | lnm |
| IAW with PWS 5.1.10 | | |
| B011 | Vegetation Control at Railroad dams of Railroad Tracks | | |
| IAW with PWS 5.1.11 | 250 | sqm |
| B012 | Vegetation Control at Railroad Culverts of Railroad Tracks | 300 | sqm |
| IAW with PWS 5.1.12 | | |
| B013 | Inspection of bumpers | 1 | svc |
| IAW with PWS 5.1.14 | | |
TOTAL AMOUNT
| Second option year : 15 JUN 2023 - 14 JUN 2024 | | | | | |
| ELINs | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | | |
| C000 | Basic Service | | | | |
| C001 | General basics | 12 | svc |
| IAW wit PWS 5.1.1 | | |
| C002 | Inspection and measure of turnout including interlocking device | 1 | svc |
| IAW with PWS 5.1.2 | | |
| C003 | Inspection and measure railroad crossings | 1 | svc |
| IAW with PWS 5.1.3 | | |
| C004 | Inspection walk of complete rail infrastructure | 1 | svc |
| IAW with PWS 5.1.4 | | |
| C005 | Inspection of railroad culverts | 1 | svc |
| IAW with PWS 5.1.5 | | |
| C006 | Inspection of railroad loading ramps | 1 | svc |
| IAW with PWS 5.1.6 | | |
| C007 | Superstructure inspection and measurement | 1 | svc |
| IAW with PWS 5.1.7 | | |
| C008 | Vegetation control of the complete rail track and rail crossings including the railhead | 1 | svc |
| IAW with PWS 5.1.8 | | |
| C009 | Vegetation control of daylight profile | 1 | svc |
| IAW with 5.1 9 | | |
| C010 | Vegetation Control at Railroad bed trenches of Railroad Tracks | 4,000 | lnm |
| IAW with PWS 5.1.10 | | |
| C011 | Vegetation Control at Railroad dams of Railroad Tracks | | |
| IAW with PWS 5.1.11 | 250 | sqm |
| C012 | Vegetation Control at Railroad Culverts of Railroad Tracks | 300 | sqm |
| IAW with PWS 5.1.12 | | |
| C013 | Inspection of bumpers | 1 | svc |
| IAW with PWS 5.1.14 | | |
| TOTAL AMOUNT | | | | |
| Third option year : 15 JUN 2024 - 14 JUN 2025 | | | | | |
| ELINs | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | | |
| D000 | Basic Service | | | | |
| D001 | General basics | 12 | svc |
| IAW wit PWS 5.1.1 | | |
| D002 | Inspection and measure of turnout including interlocking device | 1 | svc |
| IAW with PWS 5.1.2 | | |
| D003 | Inspection and measure railroad crossings | 1 | svc |
| IAW with PWS 5.1.3 | | |
| D004 | Inspection walk of complete rail infrastructure | 1 | svc |
| IAW with PWS 5.1.4 | | |
| D005 | Inspection of railroad culverts | 1 | svc |
| IAW with PWS 5.1.5 | | |
| D006 | Inspection of railroad loading ramps | 1 | svc |
| IAW with PWS 5.1.6 | | |
| D007 | Superstructure inspection and measurement | 1 | svc |
| IAW with PWS 5.1.7 | | |
| D008 | Vegetation control of the complete rail track and rail crossings including the railhead | 1 | svc |
| IAW with PWS 5.1.8 | | |
| D009 | Vegetation control of daylight profile | 1 | svc |
| IAW with 5.1 9 | | |
| D010 | Vegetation Control at Railroad bed trenches of Railroad Tracks | 4,000 | lnm |
| IAW with PWS 5.1.10 | | |
| D011 | Vegetation Control at Railroad dams of Railroad Tracks | | |
| IAW with PWS 5.1.11 | 250 | sqm |
| D012 | Vegetation Control at Railroad Culverts of Railroad Tracks | 300 | sqm |
| IAW with PWS 5.1.12 | | |
| D013 | Inspection of bumpers | 1 | svc |
| IAW with PWS 5.1.14 | | |
TOTAL AMOUNT
| 4th Option year 15 JUN 2025- 14 JUN 2026 | | | | | |
| ELINs | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | | |
| E000 | Basic Service | | | | |
| E001 | General basics | 12 | svc |
| IAW wit PWS 5.1.1 | | |
| E002 | Inspection and measure of turnout including interlocking device | 1 | svc |
| IAW with PWS 5.1.2 | | |
| E003 | Inspection and measure railroad crossings | 1 | svc |
| IAW with PWS 5.1.3 | | |
| E004 | Inspection walk of complete rail infrastructure | 1 | svc |
| IAW with PWS 5.1.4 | | |
| E005 | Inspection of railroad culverts | 1 | svc |
| IAW with PWS 5.1.5 | | |
| E006 | Inspection of railroad loading ramps | 1 | svc |
| IAW with PWS 5.1.6 | | |
| E007 | Superstructure inspection and measurement | 1 | svc |
| IAW with PWS 5.1.7 | | |
| E008 | Vegetation control of the complete rail track and rail crossings including the railhead | 1 | svc |
| IAW with PWS 5.1.8 | | |
| E009 | Vegetation control of daylight profile | 1 | svc |
| IAW with 5.1 9 | | |
| E010 | Vegetation Control at Railroad bed trenches of Railroad Tracks | 4,000 | lnm |
| IAW with PWS 5.1.10 | | |
| E011 | Vegetation Control at Railroad dams of Railroad Tracks | | |
| IAW with PWS 5.1.11 | 250 | sqm |
| E012 | Vegetation Control at Railroad Culverts of Railroad Tracks | 300 | sqm |
| IAW with PWS 5.1.12 | | |
| E013 | Inspection of bumpers | 1 | svc |
| IAW with PWS 5.1.14 | | |
TOTAL AMOUNT
1st option
| FOR OFFICAL USE ONLY |
| IGE Basic period |
| Maintenance, Inspection and Repair of Helicopter Service Stations |
Maintenance, Inspection and Repair of Helicopter Service Stations at USAG Ansbach DPW O&M Division
| Basic Period: 01 June 2021 - 30 May 2021 | | | | | |
| CLINS | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | € | TOTAL € |
| E000 | Basic Service | | | | |
| E001 | General basics | 24 | each | 179.00 | € 4,296.00 |
| IAW wit PWS 5.1.1 | | | | |
| E002 | Delivery of Switch | 4 | each | 124.00 | € 496.00 |
| IAW with PWS 5.1.2 | | | | |
| E003 | Delivery of Valve | 14 | each | 293.00 | € 4,102.00 |
| IAW with PWS 5.1.3 | | | | |
| E004 | Dismounting of defective sockets for 28V/110V | 5 | each | 78.00 | € 390.00 |
| IAW with PWS 5.1.4 | | | | |
| E005 | Dismounting of defective fuse breakers | 5 | each | 300.00 | € 1,500.00 |
| IAW with PWS 5.1.5 | | | | |
| E006 | Dismounting of defective 230 V single phase sockets | 5 | each | 65.00 | € 325.00 |
| IAW with PWS 5.1.6 | | | | |
| E007 | Dismounting of defective 400 V three phase sockets | 5 | each | 150.00 | € 750.00 |
| IAW with PWS 5.1.7 | | | | |
| E008 | Dismounting of defective air outlet sockets | 5 | each | 50.00 | € 250.00 |
| IAW with PWS 5.1.8 | | | | |
| E009 | Dismounting of defective air hose set | 5 | each | 150.00 | € 750.00 |
| IAW with 5.1 9 | | | | |
| E010 | Dismounting of defective power cable set | 5 | each | 300.00 | € 1,500.00 |
| IAW with PWS 5.1.10 | | | | |
E011 Dismounting of defective internal wiring harness sets 5 each 225.00 € 1,125.00
IAW with PWS 5.1.11
| E012 | Maintenance and repair of existing custom made gauge | 9 | each | 30.00 | € 270.00 |
| IAW with PWS 5.1.12 | | | | |
| E013 | Installation of concrete cylinder barrel | 6 | each | 1,065.00 | € 6,390.00 |
| IAW with PWS 5.1.13 | | | | |
| E014 | Delivery and exchanging of Battery Block | 1 | each | 247.00 | € 247.00 |
| IAW with PWS 5.1.14 | | | | |
| E015 | Law Inspection according to BG regulation | 24 | each | 77.00 | € 1,848.00 |
| IAW with PWS 5.1.15 | | | | |
| E016 | On Call Emergency Services | 5 | svc | 150.00 | € 750.00 |
| IAW with PWS 5.1.16 | | | | |
TOTAL AMOUNT € 24,989.00
| Basic Service | | € 24,989.00 |
| GRAND TOTAL | | € 24,989.00 |
| PREPARED BY: | APPROVED BY: | |
| Stephan Knoblauch | Jerry Walters |
| Engineering Technician | DPW, C/O & M Divison |
| DPW, O & M Div., DSN 467-2850 | DSN 467-2998 |
| Certification: |
| Referring to DASA (P) Memorandum, dtd 13 April 2012 it is stated that the IGCE was developed independently |
| by the undersigned. |
| IGCE is based and established on the following criterias: |
| →Development of prices at the commercial market for the services asked for under subject contract. |
| →The evaluated/estimated prices have been compared with prizes from former contracts - no significant changes- |
| →Submitted IGCE's states the costs in regard to everage labor hour rates and labor rates according to the |
| business conditions of the Technical Control Board. |
| →Price investigations were made during a "Market Survey": |
| Responsible Government Employee: | Stephan Knoblauch |
| Engineering technician |
| DPW, O & M Division |
| DSN 467-2850 |
2nd option
| FOR OFFICAL USE ONLY |
| IGE 2nd option |
| Maintenance, Inspection and Repair of Helicopter Service Stations |
Maintenance, Inspection and Repair of Helicopter Service Stations at USAG Ansbach DPW O&M Division
| 2nd Option: 01 May 2022 - 30 June 2023 | | | | | |
| CLINS | SERVICES | EST | UNIT | UNIT PRICE | AMOUNT |
| | Qty | | € | TOTAL € |
| E000 | Basic Service | | | | |
| E001 | General basics | 24 | each | 190.00 | € 4,560.00 |
| IAW wit PWS 5.1.1 | | | | |
| E002 | Delivery of Switch | 4 | each | 137.00 | € 548.00 |
| IAW with PWS 5.1.2 | | | | |
| E003 | Delivery of Valve | 14 | each | 308.00 | € 4,312.00 |
| IAW with PWS 5.1.3 | | | | |
| E004 | Dismounting of defective sockets for 28V/110V | 5 | each | 90.00 | € 450.00 |
| IAW with PWS 5.1.4 | | | | |
| E005 | Dismounting of defective fuse breakers | 5 | each | 319.00 | € 1,595.00 |
| IAW with PWS 5.1.5 | | | | |
| E006 | Dismounting of defective 230 V single phase sockets | 5 | each | 69.00 | € 345.00 |
| IAW with PWS 5.1.6 | | | | |
| E007 | Dismounting of defective 400 V three phase sockets | 5 | each | 159.00 | € 795.00 |
| IAW with PWS 5.1.7 | | | | |
| E008 | Dismounting of defective air outlet sockets | 5 | each | 54.00 | € 270.00 |
| IAW with PWS 5.1.8 | | | | |
| E009 | Dismounting of defective air hose set | 5 | each | 159.00 | € 795.00 |
| IAW with 5.1 9 | | | | |
| E010 | Dismounting of defective power cable set | 5 | each | 319.00 | € 1,595.00 |
| IAW with PWS 5.1.10 | | | | |
E011 Dismounting of defective internal wiring harness sets 5 each 240.00 € 1,200.00
IAW with PWS 5.1.11
| E012 | Maintenance and repair of existing custom made gauge | 9 | each | 31.00 | € 279.00 |
| IAW with PWS 5.1.12 | | | | |
| E013 | Installation of concrete cylinder barrel | 6 | each | 1,115.00 | € 6,690.00 |
| IAW with PWS 5.1.13 | | | | |
| E014 | Delivery and exchanging of Battery Block | 1 | each | 239.00 | € 239.00 |
| IAW with PWS 5.1.14 | | | | |
| E015 | Law Inspection according to BG regulation | 24 | each | 81.00 | € 1,944.00 |
| IAW with PWS 5.1.15 | | | | |
| E016 | On Call Emergency Services | 5 | svc | 160.00 | € 800.00 |
| IAW with PWS 5.1.16 | | | | |
TOTAL AMOUNT € 26,417.00
| Basic Service | | € 26,417.00 |
| GRAND TOTAL | | € 26,417.00 |
| PREPARED BY: | APPROVED BY: | |
| Stephan Knoblauch | Jerry Walters |
| Engineering Technician | DPW, C/O & M Divison |
| DPW, O & M Div., DSN 467-2850 | DSN 467-2998 |
| Certification: |
| Referring to DASA (P) Memorandum, dtd 13 April 2012 it is stated that the IGCE was developed independently |
| by the undersigned. |
| IGCE is based and established on the following criterias: |
| →Development of prices at the commercial market for the services asked for under subject contract. |
| →The evaluated/estimated prices have been compared with prizes from former contracts - no significant changes- |
| →Submitted IGCE's states the costs in regard to everage labor hour rates and labor rates according to the |
| business conditions of the Technical Control Board. |
| →Price investigations were made during a "Market Survey": |
| Responsible Government Employee: | Stephan Knoblauch |
| Engineering technician |
| DPW, O & M Division |
| DSN 467-2850 |
2nd option