UPDATED ALPHA SOW Tent Structure.pdf

PDF 94 KB Posted

Attached to
Tent Shade for Alpha Warrior Pad
Solicitation number
FA441724Q0258
Issued by

About this file

This document is a Statement of Work (SOW) for the purchase and installation of a vinyl tent structure for the 1 SOW FSS at the Alpha Warrior Pad located behind the Aderholt Fitness Center. The SOW outlines the requirements for the 50' x 58' tent structure, including its dimensions, materials, electrical and lighting components, and hurricane rating. The contractor shall provide all necessary management, tools, supplies, equipment, and labor to install the tent structure and will be responsible for a 12-month warranty on the labor and materials. The related federal contract opportunity, Solicitation Number FA441724Q0258, is for the procurement of this tent shade structure for the Department of the Air Force Special Operations Command.

View the file

Other files

File Type Posted
RFQ FA441724Q0258_AMD0001.pdf PDF
UPDATED ALPHA SOW Tent Structure.docx DOCX document
RFQ FA441724Q0258.pdf PDF
Solicitation - FA441724Q0258.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Purchase equipment and labor to provide tent structure for 1 SOW FSS.

1. Description of Services.

The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install the vinyl tent structure complete with all accessories. The tent will be installed and secured to concrete located behind the Aderholt Fitness Center, Alpha Warrior Pad.

The 1 SOW FSS is looking to schedule the installation date as soon as the vendor is capable.

2. Requirements

2.1 The vinyl tent structure shall be 50’ Wide X 58’ Long X 23’ Center Height X 15’ Side wall 18 OZ. Cover. A skirt to seals the base.

2.2 The structure will include openings on each end, 15’wide x 10’high.

2.3 Material shall be flame retardant PVC Laminated fabric with polyester scrim. The STTS/RAS will be responsible to connect the main power and connection to the panel box.

2.4 The vinyl tent structure shall have a hurricane rating that meets Florida (local) building code.

2.5 The vinyl tent structure will include the appropriate Lightning Protection kit, with associated hardware, installed.

2.6 The vinyl tent structure shall include electrical and lighting, 6ea. 400watt 120volt single phase metal halide lights, “Reloc” (or equivalent plug and play light system), switches and panel box capable of receiving power from an outside source.

After installation and assembly, the contractor shall inspect and test the tent structure and all utilities/accessories. The Government shall be present for this test and inspection. Acceptance of the structure will not occur until testing is complete and everything is shown to be in working order.

3. Warranty

The Contractor shall warrant all labor and provided materials to be free from defects and deficiencies for a period of twelve months from the date of final inspection.

4. Contractor Qualification

Individuals installing components shall be factory trained and certified. All individuals performing work shall be a factory authorized warranty dealer capable of fulfilling manufacturer’s warranties.

File details come from the government source that posted it. Updated .