updated 6.1.22 Foa_Content_of_F22AS00272.pdf

PDF 397 KB Posted

Attached to
Butte Creek - Sutter Bypass Weir 1 Feasibility Study and Alternatives Analysis.
Opportunity number
F22AS00272
Issued by

About this file

updated 6.1.22 Foa_Content_of_F22AS00272.pdf

View the file

Other files

File Type Posted
Supplemental Information F22AS00272 Site Visit.docx DOCX document
Foa_Content_of_F22AS00272.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Fish and Wildlife Service

FWS - Fisheries https://home.grantsolutions.gov/home/ or https://www.grants.gov/

Butte Creek - Sutter Bypass Weir 1 Feasibility Study and Alternatives Analysis.

Fiscal Year: 2022

F22AS00272

Due Date for Applications: 07/03/2022

Table of Contents A. Program Description

B. Federal Award Information

B1. Total Funding

B2. Expected Award Amount

B3. Expected Award Funding and Anticipated Dates

B4. Number of Awards

B5. Type of Award

C. Eligibility Information

C1. Eligible Applicants

C2. Cost Sharing or Matching

C3. Other

D. Application and Submission Information

D1. Address to Request Application Package

D2. Content and Form of Application Submission

D3. Unique Entity Identifier and System for Award Management (SAM)

D4. Submission Dates and Times

D5. Intergovernmental Review

D6. Funding Restrictions

D7. Other Submission Requirements

E. Application Review Information

E1. Criteria

E2. Review and Selection Process

E3. CFR – Regulatory Information

E4. Anticipated Announcement and Federal Award Dates

F. Federal Award Administration Information

F1. Federal Award Notices

F2. Administrative and National Policy Requirements

F3. Reporting

G. Federal Awarding Agency Contact(s)

G1. Program Technical Contact

G2. Program Administration

G3. Application System Technical Support

H. Other Information

A. Program Description Authority:

This NOFO is issued under the authority of the Central Valley Project Improvement Act—Fish and Wildlife Restoration Activities (Pub. L. 102-575, §3406(b), 106 Stat. 4714 and 4719).

Assistance Listing Number:

15.648 Background, Purpose and Program Requirements:

This funding opportunity is provided by the Central Valley Project Improvement Act (CVPIA), Title 34, Public Law 102-575 Section 3406 b(1) the Anadromous Fish Restoration Program (AFRP) which is tasked with doubling the natural production of anadromous fish in CVP streams. The AFRP works toward this goal through a variety of habitat restoration projects that work to increase the spawning, rearing, and migration success of anadromous fish. The funding for this project was approved in the FY2019 CVPIA Annual Work Plan.

Relevant purposes of the CVPIA include:

(a) To protect, restore, and enhance fish, wildlife, and associated habitats in the Central Valley and Trinity River basins of California; (b) To address impacts of the Central Valley Project on fish, wildlife and associated habitats; (c) To improve the operational flexibility of the Central Valley Project; (d) To increase water-related benefits provided by the Central Valley Project to the State of California through expanded use of voluntary water transfers and improved water conservation; (e) To contribute to the State of California's interim and long-term efforts to protect the San Francisco Bay/Sacramento-San Joaquin Delta Estuary; (f) To achieve a reasonable balance among competing demands for use of Central Valley Project water, including the requirements of fish and wildlife, agricultural, municipal and industrial and power contractors.

The U.S. Fish and Wildlife Service (Service) Fish Red Bluff Fish and Wildlife Office (RBFWO), CVPIA Program is soliciting proposals for the completion of a Feasibility Study and Alternatives Analysis to assess potential solutions for adult salmonid fish passage at Butte Creek – Sutter Bypass West Borrow Canal Weir 1. Weir 1 is located immediately upstream of the intersection of the Tisdale Weir Bypass with the west bank of the Sutter Bypass. Its geographical coordinates are 39° 2'5.27"N, 121°44'37.09"W.

Funds under this award will be used to complete an alternative development, data collection and evaluation for a Feasibility Study and Alternatives Analysis, including cost estimates.

Anticipate project start date would be in Fiscal Year 2022 (August – September 2022 (fiscal year begins on October 1) with an expected project duration of 12 months.

The work effort will consist of identification, development and feasibility of alternatives for a fish passage solution at Weir 1. This will include facilitating meetings with the Technical Advisory Committee, composing of members from the Service, California Department of Fish and Wildlife (CDFW), California Department of Water Resources (DWR) and National Marine Fisheries Service (NOAA Fisheries). The Service and Project Management Team intend to select a preferred alternative at the conclusion of this process for permitting, design and implementation.

The project objectives and applicant responsibilities are the following:

1. Information gathering and site reconnaissance

2. Project Management

3. Facilitate, plan, and provide notes from Technical Advisory Committee meetings

4. Data Collection and Evaluation

5. Alternative development and cost estimates

The Butte Creek Sutter Bypass West Borrow Canal (WBC) Weir #1 is a dilapidated weir and fish ladder structure and is no longer used as a weir for the purposes of diverting or delivering water. Weir 1 was originally constructed in 1924 by the Reclamation Board for the Northern California Land Company. It is reported that the Weir 1 was rebuilt in 1974 by the Service and a fish ladder was added (Jones and Stokes 2002). Documentation to support recent management by the Service’ Fisheries or Refuge Programs is scarce or non-existent. The current infrastructure sits on property owned by the Sacramento –San Joaquin Drainage District and managed as flood control. The Service, CDFW, DWR and NOAA Fisheries are investigating if the removal of the existing structure and fish ladder will maintain water surface elevations adequate to provide sufficient flows for adult salmonid upstream passage. The fish passage flows should be consistent with minimum flow agreement requirements (M&T Ranch Agreement Decree Diversion 50) as well as flows through the fish passage at the upstream Giusti Weir approximately 3.75 mile upstream. Additional flow agreements provide water to users in the West Borrow Canal. It is purported that Weir #1 is required to maintain fish passage at the earthen Giusti Weir that is upstream in the WBC (Jones and Stokes 2002). The flows of Butte Creek are diverted past the natural outlet to the Sacramento River (known as the Butte Slough Outfall Gates or BSOG) under most conditions and are directed downstream through the Butte Slough. The Butte Slough is bifurcated at a point just upstream of the State Route 20 bridge crossing, identified as the East-West Diversion Weir. The East-West Diversion splits the flows of Butte Slough to approximately 60% to the East and 40% to the West side borrow canals. Butte Slough above the East-West Diversion Weir is capable of handling a flow of up to approximately 2,000 cfs within its natural banks (Jones & Stokes 2002).

The CVPIA Science Integration Team and Core Team recommended improving adult & juvenile passage on Butte Creek and identified it as a high priority for FY2018. The project has been funded in the CVPIA FY19 Annual Work Plan.

Butte Creek is one of the most productive streams in the Sacramento River Valley for federal and state listed spring-run Chinook salmon (SRCS). SRCS migrate through the Sutter Bypass to Butte Creek, navigating past several water control structures on their way to spawning areas in the upper Butte Creek system. Months later, the juvenile salmon reverse this route on their way to the Pacific Ocean. The migration of anadromous fish, which includes (fall and spring) Chinook salmon and Central Valley steelhead, is impeded by this weir and ladder structure at Weir 1 in the Sutter Bypass. There is also potential for outmigrating juveniles to be impacted by contact and turbulence created by the defunct infrastructure that remains instream. Ideally, it can be replaced by a natural fishway, roughened channel or rock ramp over the existing infrastructure.

The following tasks are to be completed

1) Develop alternatives for improved adult upstream fish passage

a. No action or weir removal – This action would leave existing infrastructure in place and describe current conditions..

b. Weir removal –Remove all or most of existing weir infrastructure and replace it with a type of natural fishway or roughened channel. This approach would potentially change water surface elevations at and above the existing Weir 1 site.

c. Replacement of weir with constructed rock ramp that leaves some infrastructure in place.

This approach would build a similar structure to one that was constructed on Deer Creek, Tehama County at the Deer Creek Irrigation District Diversion Dam in 2019. The proof of concept project eliminated the need for a fish ladder for upstream adult SRCS passage while maintaining in stream hydraulic head for water diverters.

d. Construction of an operable weir and fish ladder similar to the Obermeyer Weir and Half- Ice Harbor fish ladder infrastructure on the Sutter Bypass East Barrow Canal at Weir 2.

2) Hydrology, Hydraulic Connectivity and Water Surface Elevation Modeling Scope –

a. Use Multi-dimensional hydrodynamic models such as 2D HEC-RAS, RMA2, Sutter Bypass TUFLOW or similar, to identify seasonal changes in surface elevation in West Borrow Canal from inflow and diversions.

b. Model annual fluctuations under four alternative fish passage scenarios identified in task 1.

c. Model canal groundwater changes under existing conditions with seasonal flow fluctuations and under proposed alternatives.

d. Measure bypass groundwater impacts at the Sutter NWR and other adjacent properties outside of the West Borrow Canal.

3) Geomorphic Scope –

a. Complete a geomorphic survey of the West Borrow Canal Substrate between Tisdale Bypass and Weir 5 to determine if any changes in sediment transport or bedload mobility would occur under any of the alternatives. This analysis should provide adequate information for the feasibility of constructing a natural fishway, roughened channel, rock ramp alternative or sediment deposition under the operable weir alternative.

b. Identify if any type of gradient control is necessary to reduce the likelihood of channel incision.

c. Identify channel bed composition at site for stability.

4) Diversions impacts to water surface elevations Scope –

a. Discover water diversions between East-West Diversion Weir and Weir 1 and flow agreements that convey water through the West Borrow Canal.

b. Identify West Borrow Canal annual fluctuations based on water diversions and diversion timing.

c. Describe any impacts to water users under various alternatives.

5) Juvenile Salmonid Rearing Scope –

a. Determine existing juvenile salmonid rearing habitat in the West Borrow Canal by habitat type and include food availability, emigration duration timing, water temperature suitability and any other factors that increase or decrease habitat suitability.

b. Estimate changes in salmonid habitat under various alternatives.

c. Quantify juvenile benefits under various alternatives.

B. Federal Award Information B1. Total Funding Estimated Total Funding $300,000 There is $300,000 available through the U.S. Fish and Wildlife Service Anadromous Fish Restoration Program to complete the Alternatives Analysis and Feasibility Study for the Butte Creek Sutter Bypass West Borrow Canal Weir 1 Fish Passage Improvement Project.

B2. Expected Award Amount Maximum Award $300,000 Minimum Award $1

B3. Expected Award Funding and Anticipated Dates Expected Award Funding $300,000 Expected Award Date July 15, 2022

B4. Number of Awards Expected Number of Awards

B5. Type of Award Funding Instrument Type G - Grant

C. Eligibility Information

C1. Eligible Applicants Eligible Applicants 99 – Unrestricted (i.e. open to any type of entity above), subject to any clarification in the text field entitled "Additional Information on Eligibility" Additional Information on Eligibility C2. Cost Sharing or Matching Cost Sharing / Matching Requirement No Percentage of Cost Sharing / Matching Requirement There is no cost-share requirement for projects/applications using the CVPIA Section 3406 b(1) Anadromous Fish Restoration Program authority.

C3. Other The USFWS will conduct a site visit to all interested applicants tentatively on June 1, 2022 from 1-4 pm.

The site visit will include walking on a levee to get an overview of the project area and walking around and possible instream above and below the Weir 1 depending on flows. Please be prepared to walk on uneven terrain that has potential to be highly vegetated, and possibly walk up to a mile. Boots and pants are highly recommended and waders and stream boots for those entering the west borrow canal. Please contact Jim Earley (contact information in the RSVP section) if you have any questions.

RSVP: Please contact Jim Earley, Project Manager, at james_earley@fws.gov or 530-527-3043 ext 261 by 12 pm PDT on 05/26/2022 if you wish to attend.

Foreign Entities or Projects:

State Sponsors of Terrorism: This program will not fund projects in countries determined by the U.S. Department of State to have repeatedly provided support for acts of international terrorism and therefore are subject to sanctions restricting receipt of U.S. foreign assistance and other financial transactions.

Office of Foreign Assets Control Sanctions: This program will not fund projects in countries subject to comprehensive sanction programs administered by the U.S. Department of Treasury, Office of Foreign Asset Control without proper licenses.

In-Country Licenses, Permits, or Approvals: Entities conducting activities outside the U.S.

are responsible for coordinating with appropriate U.S. and foreign government authorities as necessary to obtain all required licenses, permits, or approvals before undertaking project activities. The Service does not assume responsibility for recipient compliance with the laws, regulations, policies, or procedures of the foreign country in which they are conducting work.

Excluded Parties:

The DOI conducts a review of the SAM.gov Exclusions database for all applicant entities and their key project personnel prior to award. The DOI cannot award funds to entities or their key project personnel identified in the SAM.gov Exclusions database as ineligible, mailto:james_earley@fws.gov?subject=RSVP%20to%20Butte%20Creek%20Sutter%20Bypass%20Weir%201%20Project%20Site https://www.state.gov/j/ct/list/c14151.htm https://www.state.gov/j/ct/list/c14151.htm https://www.state.gov/j/ct/list/c14151.htm http://www.treasury.gov/resource-center/sanctions/Pages/default.aspx http://www.treasury.gov/resource-center/sanctions/Pages/default.aspx prohibited/restricted or otherwise excluded from receiving Federal contracts, certain subcontracts, and certain Federal assistance and benefits, as their ineligibility condition applies to this Federal program.

D. Application and Submission Information D1. Address to Request Application Package Program Website Link https://home.grantsolutions.gov/home/ or https://www.grants.gov/

D2. Content and Form of Application Submission SF-424, Application for Federal Assistance

All applicants must submit the Standard Form (SF)-424, Application for Federal Assistance. This form is available with the announcement on Grants.gov and in GrantSolutions. The form must be complete and signed by an Authorized Representative. For all applicants except individuals and commercial entities, the Authorized Representative’s signature on a standard application form submitted to the Service represents their certification that the entity’s financial management system meets 2 CFR §200.302 financial management requirements. The non-Federal entity’s financial management system must be sufficient to:

1. Permit the preparation of required reports;

2. Trace funds to a level of expenditures adequate to establish that the entity has used such funds per Federal statutes, regulations, and terms and conditions of the Federal award;

3. Provide for the requirements in 2 CFR §200.302(b); and

4. Comply with §200.334 Retention requirements for records, §200.335 Requests for transfer of records, §200.336 Methods for collection, transmission, and storage of information, and §200.337 Access to records.

If this application requests more than $100,000 in Federal funds, the Authorized Representative’s signature on or submission of the SF-424 form in GrantSolutions also represents their certification of the statements in 43 CFR Part 18, Appendix A-Certification Regarding Lobbying.

When completing the SF-424 Application form, enter only the amount requested from this Federal program in Box 18a, Estimated Federal Funding. Include any other Federal sources of funding in Box 18e. Estimated Other Funding and identify any such sources and amounts in the required Budget Narrative (see below). For individuals applying as a private citizen (i.e., unrelated to any business or nonprofit organization you may own or operate in your name), do NOT include your Social Security Number on this or any other document to be submitted with your application! When completing the SF-424 Application form, individuals must enter in Box 8b. Employee/Taxpayer Identification Number (EIN/TIN) the substitute number “444-44- 4444.” Individuals may register in SAM.gov but are not required to have a SAM.gov registration. For individuals without a SAM.gov registration enter in Box 8c. the substitute Unique Entity Identifier (UEI) “KA5HQCLKUVW1 “

SF 424B, Assurances for Non-Construction Programs Individuals applying for and receiving funds separate from a business or non-profit organization https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/section-200.302 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/section-200.302 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR4acc10e7e3b676f/section-200.334 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR4acc10e7e3b676f/section-200.335 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR4acc10e7e3b676f/section-200.336 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR4acc10e7e3b676f/section-200.337 he/she may own or operate, and entities waived from the SAM.gov registration requirements by the funding bureau or office must submit the signed and dated SF-424B, Assurances for Non- Construction Programs form. All required application forms are available with this announcement on Grants.gov and in GrantSolutions. All other financial assistance applicants must complete the “Financial Assistance General Certifications and Representations” as part of their SAM.gov entity record.

Project Abstract Summary (OMB Number 4040-0019) Applicants must complete and submit the Project Abstract Summary form. The Project Abstract Summary form must provide a brief award description. The description must be in plain language that the public can understand without viewing the full application proposal. It should include a brief, simple description of the project purpose, activities to be performed, deliverables and expected outcomes, intended beneficiaries, and subrecipient activities, if known at the time of submission.

Do not include personally identifiable, sensitive, or proprietary information in the award description as this is available to the public. Use only English characters, numbers, punctuation, and standard symbols. Use of non-English, non-standard characters (also referred to as special or extended ASCII characters) will result in the award description failing to be reported correctly to USASpending.gov. Award descriptions are limited to 4,000 characters or less. Applicants should check the length of the award description and proofread for proper grammar and spelling.

For applicants applying through Grants.gov: Applicants must download and complete the Grants.gov “Project Abstract Summary” form from the full text announcement. To submit the Grants.gov “Project Abstract Summary” form with the application, applicants must add the form as an attachment to the Grants.gov “Attachments” form that is included in the application package.

For applicants applying through GrantSolutions-Grants Management Module (GS- GMM): Applicants must enter the information in the Project Abstract Summary screen. Do not upload a document in place of entering the information directly into GS-GMM Project Abstract Screen.

Project Narrative SF-424A, Budget Information for Non-Construction Programs Applicants must complete and submit the SF-424A Budget Information form for Non- Construction Programs or Projects. All required application forms are available with this announcement on Grants.gov or in GrantSolutions. Federal award recipients and subrecipients are subject to Federal award cost principles in Title 2 of the Code of Federal Regulations (CFR) part 200. Applicants must show funds requested from this Federal program separately from any other Federal sources of funding. In “Section A – Budget Summary” on the SF-424A form enter the funding requested from this Federal program in the first row. Identify any other Federal funding sources and amounts in the required Budget Narrative (see below).

Budget Narrative Applicants must include a budget narrative that describes and justifies requested budget items and costs. In your budget narrative, describe how the SF-424 Budget Information, “Object Class Category” totals were determined. For personnel salary costs, generally describe how estimates were determined by identifying what type of staff will support the project and how much time they will contribute to the project (in hours or workdays). Describe any proposed items of cost that require prior approval under the Federal award cost principles, including any anticipated subawarding, transferring, or contracting out of any work under the award. If equipment previously purchased with Federal funds is available for the project, provide a list of that equipment and identify the Federal funding source. Identify any third-party cash or in-kind contributions that a partner or other entity will contribute to the project and describe how the contributions directly and substantively benefit completion of the project. For in-kind contributions, identify the source, the amount, and the valuation methodology used to determine the total value. See 2 CFR §200.306 for more information.

Conflict of Interest Disclosure Per the Financial Assistance Interior Regulation (FAIR), 2 CFR §1402.112, applicants must state in their application if any actual or potential conflict of interest exists at the time of submission.

a. Applicability.

1. This section intends to ensure that non-Federal entities and their employees take appropriate steps to avoid conflicts of interest in their responsibilities under or with respect to Federal financial assistance agreements.

2. In the procurement of supplies, equipment, construction, and services by recipients and by sub recipients, the conflict of interest provisions in 2 CFR§200.318 apply.

b. Notification.

1. Non-Federal entities, including applicants for financial assistance awards, must disclose in writing any conflict of interest to the DOI awarding agency or pass- through entity in accordance with 2 CFR §200.112.

2. Recipients must establish internal controls that include, at a minimum, procedures to identify, disclose, and mitigate or eliminate identified conflicts of interest. The recipient is responsible for notifying the Financial Assistance Officer in writing of any conflicts of interest that may arise during the life of the award, including those that have been reported by sub recipients.

c. Restrictions on lobbying. Non-Federal entities are strictly prohibited from using funds under a grant or cooperative agreement for lobbying activities and must provide the required certifications and disclosures pursuant to 43 CFR §18 and 31

USC §1352.

d. Review procedures. The Financial Assistance Officer will examine each conflict of interest disclosure on the basis of its particular facts and the nature of the proposed grant or cooperative agreement, and will determine whether a significant potential conflict exists and, if it does, develop an appropriate means for resolving it.

Enforcement. Failure to resolve conflicts of interest in a manner that satisfies the government may be cause for termination of the award. Failure to make required disclosures may result in any of the remedies described in 2 CFR §200.339, Remedies for noncompliance, including suspension or debarment (see also 2 CFR §180).

https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200#200.407 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200#200.407 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200#subpart-E https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/section-200.306 https://ecfr.federalregister.gov/current/title-2/subtitle-B/chapter-XIV/part-1402/subpart-B https://www.ecfr.gov/current/title-2/subtitle-B/chapter-XIV/part-1402/subpart-B/section-1402.112 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d/section-200.318 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d/section-200.318 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-B/section-200.112 https://www.ecfr.gov/current/title-43/subtitle-A/part-18 https://www.govinfo.gov/content/pkg/USCODE-2019-title31/pdf/USCODE-2019-title31-subtitleII-chap13-subchapIII-sec1352.pdf https://www.govinfo.gov/content/pkg/USCODE-2019-title31/pdf/USCODE-2019-title31-subtitleII-chap13-subchapIII-sec1352.pdf https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR86b76dde0e1e9dc/section-200.339 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-I/part-180

Uniform Audit Reporting Statement All U.S. states, local governments, Indian tribes, institutions of higher education, and non- profit organizations expending $750,000 USD or more in Federal award funds in the applicant’s fiscal year must submit a Single Audit report for that year through the Federal Audit Clearinghouse’s Internet Data Entry System, in accordance with 2 CFR 200 subpart F. U.S. state, local government, Indian tribes, institutions of higher education, and non- profit applicants must state if your organization was or was not required to submit a Single Audit report for the most recently closed fiscal year. If your organization was required to submit a Single Audit report for the most recently closed fiscal year, provide the EIN associated with that report and state if it is available through the Federal Audit Clearinghouse website.

Certification Regarding Lobbying Applicants requesting more than $100,000 in Federal funding must certify to the statements in 43CFR Part 18, Appendix A-Certification Regarding Lobbying. If this application requests more than $100,000 in Federal funds, the Authorized Official’s signature on the appropriate SF-424, Application for Federal Assistance form also represents the entity’s certification of the statements in 43 CFR Part 18, Appendix A.

Disclosure of Lobbying Activities Applicants and recipients must not use any federally appropriated funds (annually appropriated or continuing appropriations) or matching funds under a Federal award to pay any person for lobbying in connection with the award. Lobbying is influencing or attempting to influence an officer or employee of any U.S. agency, a Member of the U.S. Congress, an officer or employee of the U.S. Congress, or an employee of a Member of the U.S. Congress connection with the award. Applicants and recipients must complete and submit the SF-LLL, “Disclosure of Lobbying Activities” form if the Federal share of the proposal or award is more than $100,000 and the applicant or recipient has made or has agreed to make any payment using non-appropriated funds for lobbying in connection with the application or award. The SF-LLL form is available with this Funding Opportunity on Grants.gov. See 43 CFR, Subpart 18.100 for more information on when additional submission of this form is required.

Overlap or Duplication of Effort Statement Applicants must provide a statement indicating if there is any overlap between this Federal application and any other Federal application, or funded project, in regard to activities, costs, or time commitment of key personnel. If no such overlap or duplication exists, state, “There are no overlaps or duplication between this application and any of our other Federal applications or funded projects, including in regard to activities, costs, or time commitment of key personnel”. If any such overlap exists, provide a complete description of overlaps or duplications between this proposal and any other federally funded project or application in regard to activities, costs, and time commitment of key personnel, as applicable. Provide a copy of any overlapping or duplicative proposal submitted to any other potential funding entity and identify when that proposal was submitted, to whom (entity name and program), and when you anticipate being notified of their funding decision. When overlap exists, your statement must end with “We understand that if at any time we receive funding from another source that is duplicative of the funding we are requesting from the U.S. Fish and Wildlife Service in this application, we will immediately notify the U.S. Fish and Wildlife Service point of contact identified in this Funding Opportunity in writing.”

https://harvester.census.gov/facides/Account/Login.aspx https://harvester.census.gov/facides/Account/Login.aspx https://harvester.census.gov/facdissem/Main.aspx https://www.ecfr.gov/current/title-43/subtitle-A/part-18 https://www.ecfr.gov/current/title-43/subtitle-A/part-18 https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html https://www.grants.gov/web/grants/forms/post-award-reporting-forms.html

D3. Unique Entity Identifier and System for Award Management (SAM) Identifier and System for Award Management (SAM.gov) Registration:

This requirement does not apply to individuals applying for funds as an individual (i.e., unrelated to any business or nonprofit organization you may own, operate, or work within), or any entity with an exception to bypass SAM.gov registration with prior approval from the funding bureau or office in accordance with bureau or office policy. All other applicants are required to register as a financial assistance recipient in SAM.gov prior to submitting a Federal award application and obtain a Unique Entity Identifier (UEI) which replaced the Data Universal Numbering System (DUNS) number from Dun & Bradstreet in April 2022. A Federal award may not be made to an applicant that has not completed the SAM.gov registration. If an applicant selected for funding has not completed their SAM.gov registration by the time the program is ready to make an award, the program may determine the applicant is not qualified to receive an award. Federal award recipients must also continue to maintain an active SAM.gov registration with current information through the life of their Federal award(s). Entities already registered in SAM.gov should review their registration to confirm that they are registered as a financial assistance recipient, which requires completion of the SAM.gov “Financial Assistance General Certifications and Representations”. See the “Submission Requirements” section of this document below for more information on SAM.gov registration.

Applicants can register on the SAM.gov website. The “Help” tab on the website contains User Guides and other information to assist you with registration. The Grants.gov “Register with SAM” page also provides detailed instructions. Applicants can contact the supporting Federal Service Desk for help registering in SAM. Once registered in SAM, entities must renew and revalidate their SAM registration at least once every 12 months from the date previously registered. Entities are strongly encouraged to revalidate their registration as often as needed to ensure their information is up to date and reflects changes that may have been made to the entity’s IRS information. If applicable, foreign entities who want to receive payment directly to a U.S. bank account must enter and maintain valid, current banking information in SAM.

D4. Submission Dates and Times Due Date for Applications 07/03/2022 Application Due Date Explanation Electronically submitted applications must be submitted no later than 11:59 PM., ET, on the listed application due date.

Competetive discretionary

D5. Intergovernmental Review An intergovernmental review may be required for applications submissions from a U.S. state or local government prior to submission. Applicants must contact their State’s Single Point of Contact (SPOC) to comply with the state’s process under Executive Order 12372. The State https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/iae-systems-information-kit/unique-entity-identifier-update http://www.sam.gov https://www.grants.gov/help/html/help/Register/RegisterWithSAM.htm https://www.grants.gov/help/html/help/Register/RegisterWithSAM.htm https://www.archives.gov/federal-register/codification/executive-order/12372.html

Single Point of Contact list is available on the OMB Office of Federal Financial Management website.

D6. Funding Restrictions Indirect Costs: Individuals Individuals applying for and receiving funds separate from a business or non-profit organization they may operate are not eligible to charge indirect costs to their award. If you are an individual applying for funding, you must not include any indirect costs in your proposed budget.

Indirect Costs: Organizations The Federal awarding agency that provides the largest amount of direct funding to your organization is your cognizant agency for indirect costs, unless otherwise assigned by the White House Office of Management and Budget (OMB). If the Department of the Interior (DOI) is your organization’s cognizant agency, the Interior Business Center (IBC) will negotiate your indirect cost rate. Contact the IBC by phone 916-930-3803 or using the IBC Email Submission Form. See the IBC Website for more information.

Organizations must have an active Federal award before they can submit an indirect cost rate proposal to their cognizant agency. Failure to establish an approved rate during the award period renders all costs otherwise allocable as indirect costs unallowable under the award. Recipients may not shift unallowable indirect costs to another Federal award unless specifically authorized to do so by legislation.

Required Indirect Cost Statement to be submitted by Organization:

U.S. state or local government entities receiving more than $35 million in direct Federal funding must include the following statement in their application and attach a copy of their most recently negotiated rate agreement:

We are a U.S. state or local government entity receiving more than $35 million in direct Federal funding. We submit our indirect cost rate proposals to our cognizant agency. Our current indirect cost rate is [insert rate]. Attached is a copy of our most recently negotiated rate agreement/certification.

U.S. state or local government entities receiving $35 million or less in direct Federal funding must include the applicable statement from this list:

We are a U.S. state or local government entity receiving $35 million or less in direct Federal funding. We prepare and retain for audit an indirect cost rate proposal and documentation per 2 CFR 200, Appendix VII. Our current indirect cost rate is [insert rate], which is charged against [insert a complete description of the direct cost base used to distribute indirect costs to the award].

We are a U.S. state or local government entity receiving $35 million or less in direct Federal funding. We have not prepared an indirect cost rate proposal and documentation per 2 CFR §200, Appendix VII and elect to charge the de minimis rate of 10% of Modified Total Direct Costs as defined in 2 CFR §200.1. We understand we must use this methodology consistently for all Federal awards until we choose to establish a rate per 2 CFR §200. We understand we must notify the Service in writing if we establish a rate https://www.whitehouse.gov/omb/management/office-federal-financial-management/ https://www.whitehouse.gov/omb/management/office-federal-financial-management/ https://ibc.doi.gov/ICS/contact-us https://ibc.doi.gov/ICS/contact-us https://ibc.doi.gov/ICS/icrna that changes the methodology used to charge indirect costs during the award period. We understand that additional Federal funds may not be available to support an unexpected increase in indirect costs during the project period and that such changes are subject to review, negotiation, and prior approval by the Service.

All other organizations must include the applicable statement from this list and any related documentation in their application. Please note, an organization with a current negotiated (including provisional) rate may not elect to charge the 10% de minimis rate of Modified Total Direct Costs during the period covered by their current negotiated rate.

We are an organization with a current negotiated indirect cost rate. In the event we receive an award, we will charge indirect costs per our current negotiated rate agreement.

Attached is a copy of our current rate agreement.

We are an organization with a negotiated indirect cost rate that has expired. Attached is copy of our most recently negotiated rate agreement. If we receive an award, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award date. We understand we must provide the Service a copy of our approved rate agreement before charging indirect costs to the Federal award.

We are an organization that has never negotiated an indirect cost rate with our cognizant agency. Our indirect cost rate is [insert rate], which is charged against [insert a complete description of the direct cost base used to distribute indirect costs to the award]. If we receive an award, we will submit an indirect cost rate proposal to our cognizant agency within 90 calendar days after the award date. We understand we must provide the Service a copy of our approved rate agreement before charging indirect costs to the Federal award.

We are an organization that does not have a current negotiated (including provisional) rate. In the event an award is made, we elect to charge the de minimis rate of 10% of Modified Total Direct Costs as defined in 2 CFR §200.1. We understand we must use this methodology consistently for all Federal awards until such time as we negotiate a different rate with our cognizant agency. We understand that we must notify the Service in writing if during the award period we establish a rate that changes the methodology used to charge indirect costs to the award. We understand that additional Federal funds may not be available to support an unexpected increase in indirect costs and that such changes are subject to review, negotiation, and prior approval by the Service.

We are an organization submitting a [insert either “Cooperative Fish and Wildlife Research Unit Program” or “Cooperative Ecosystem Studies Unit Network”] project proposal, which has an indirect cost rate cap of [insert rate; CRU is currently 15%; CESU is currently 17.5%]. In the event we receive an award, we understand that if we have a current negotiated (including provisional) rate we must charge the program’s capped indirect cost rate to the same base identified in our approved indirect cost rate agreement, per 2 CFR §1402.414. If we do not have current negotiated (including provisional) rate, we understand we must charge the capped indirect cost rate against Modified Total Direct Costs (MTDC) as defined in 2 CFR §200.1.

We are an organization that will charge all costs directly.

D7. Other Submission Requirements The Service uses the GrantSolutions system to manage financial assistance applications and awards. Applicants must register in and conduct any subsequent award business with the Service in GrantSolutions. To apply, your organization and organization officials must be established in GrantSolutions. To register your organization in GrantSolutions, send an email to help@grantsolutions.gov with the following information:

Subject: New Organization Request

Organization/Individual Name Point of Contact first and last name, email, and phone number Organization Type SAM.gov Unique Entity Identifier (not required for individuals or Service-waived entities) Organization Employer Identification Number (Applicants that are INDIVIDUALS DO

NOT include your social security number) Address

Organizational details should match those in the organization’s SAM.gov registration. To establish organization official accounts and user role(s), complete a Recipient User Account Request Form for each official and email it to help@grantsolutions.gov. The GrantSolutions entity user roles are: Authorizing Official (ADO); Principal Investigator/Program Director (PI/PD); Support Specialist (GSS); Financial Officer (FO); and Financial Support Staff (FSS).

All roles can do the following: enter applications, amendments, and reports, view awards, and view and create notes. The ADO and the PI/PD roles can also submit applications, amendments, and reports. The FO role can also submit reports. At a minimum, registered organizations must assign someone to the ADO and PI/PD roles. For more information, see the GrantSolutions Recipient Training and FAQs web page. For GrantSolutions registration, submission, and other assistance contact their Customer Support by telephone at 1-866-577-0771 or by email at help@grantsolutions.gov.

E. Application Review Information E1. Criteria Applicants will be rated on a combination of experience level, proposed technical approach, and budget estimates. To be considered for funding, applications must provide information that shows they meet the following criteria:

1. Demonstrate expertise in hydrology and hydrological modeling.

2. Demonstrate expertise in fish passage engineering

3. Demonstrate expertise in aquatic habitat mapping

4. Experience working on anadromous salmonid restoration projects (minimum of 3) in

California streams and rivers,

5. One or more of the applicants and/or sub-recipients must be a qualified geomorphologist with experience (10+ years) designing or modifying salmonid fish passage projects mailto:help@grantsolutions.gov mailto:help@grantsolutions.gov.

mailto:help@grantsolutions.gov.

6. One or more of the applicants and/or sub-recipients must be a qualified fish passage engineer or hydrologist with experience (10+ years) working in watersheds with similar geology of Butte Creek and has experience modeling flows,

7. Applicant’s and sub-recipients record of performance and expertise,

8. Proposal’s clearly state goals, objectives, and methods,

9. Economic efficiency, budget is reasonable and provide good value for funds requested, and

10. Demonstrate ability to provide timely updates to the Project Manager.

E2. Review and Selection Process Prior to award, the program will review any applicant statement regarding potential overlap or duplication between the project to be funded and any other funded or proposed project in terms of activities, funding, or time commitment of key personnel. Depending on the circumstances, the program may request modification to the application, other pending applications, or an active award, as needed to eliminate any duplication of effort, or the FWS may choose not to fund the selected project.

The program may not make a Federal award to an applicant that has not completed the SAM.gov registration. If an applicant selected for funding has not completed their SAM.gov registration by the time the Bureau is ready to make an award, the program may determine that the applicant is not qualified to receive an award. The program can use that determination as a basis for making an award to another applicant.

Prior to award, the program will evaluate the risk posed by applicants as required in 2 CFR §200.206. Prior to approving awards for Federal funding in excess of the simplified acquisition threshold (currently $250,000), the Bureau is required to review and consider any information about or from the applicant found in the Federal Awardee Performance and Integrity Information System. The Bureau will consider this information when completing the risk review. The Bureau uses the results of the risk evaluation to establish monitoring plans, recipient reporting frequency requirements, and to determine if one or more of the specific award conditions in 2 CFR §200.208 should be applied to the award.

Three Service staff biologists (two from RBFWO and one from Sacramento River National Wildlife Refuge – Sutter Wildlife National Refuge) and at least two biologist or engineers external to the Service will review the applications. Applicants selected for funding may require revision based on internal and/or external review comments. The selection recommendation of the review team (both Federal and external reviewers) will be provided to the RBFWO Project Leader, who is the Selection Official. The Selection Official will make the final award decision. All applicants will be notified of the results of the selection process by the Grants/Agreements Assistant.

E3. CFR – Regulatory Information See the Service’s General Award Terms and Conditions for the general administrative and national policy requirements applicable to Service awards. The Service will communicate any https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-C/section-200.206 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-C/section-200.206 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-C/section-200.208 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-C/section-200.208 https://www.fws.gov/library/collections/financial-assistance-general-award-terms-and-conditions other program- or project-specific special terms and conditions to recipients in their notices of award.

E4. Anticipated Announcement and Federal Award Dates

F. Federal Award Administration Information

F1. Federal Award Notices

F2. Administrative and National Policy Requirements See the DOI Standard Terms and Conditions for the administrative and national policy requirements applicable to DOI awards.

See the Service’s General Award Terms and Conditions for the general administrative and national policy requirements applicable to Service awards.

As required by Section 70914 of the Bipartisan Infrastructure Law (also known as the Infrastructure Investment and Jobs Act), P.L. 117-58, on or after May 14, 2022, none of the funds under a federal award that are part of a Federal financial assistance program for infrastructure may be obligated for a project unless all of the iron, steel, manufactured products, and construction materials used in the project are produced in the United States, unless subject to an approved waiver. The requirements of this section must be included in all subawards, including all contracts and purchase orders for work or products under this program.

Data Availability Per the Financial Assistance Interior Regulation (FAIR), 2 CFR §1402.315:

a. All data, methodology, factual inputs, models, analyses, technical information, reports, conclusions, valuation products or other scientific assessments in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual, resulting from a financial assistance agreement is available for use by the Department of the Interior, including being available in a manner that is sufficient for independent verification.

b. The Federal Government has the right to:

1. Obtain, reproduce, publish, or otherwise use the data, methodology, factual inputs, models, analyses, technical information, reports, conclusions, or other scientific assessments, produced under a Federal award; and

2. Authorize others to receive, reproduce, publish, or otherwise use such data, methodology, factual inputs, models, analyses, technical information, reports, conclusions, or other scientific assessments, for Federal purposes, including to allow for meaningful third-party evaluation.

https://www.doi.gov/grants/doi-standard-terms-and-conditions https://www.fws.gov/library/collections/financial-assistance-general-award-terms-and-conditions https://www.govinfo.gov/content/pkg/PLAW-117publ58/pdf/PLAW-117publ58.pdf https://www.ecfr.gov/cgi-bin/text-idx?SID=1bfd0da1190f850482e94794cca23a5d&mc=true&node=20190830y1.1 https://www.ecfr.gov/current/title-2/subtitle-B/chapter-XIV/part-1402/subpart-D/section-1402.315

F3. Reporting Financial Reports All recipients must use the SF-425, Federal Financial Report form for financial reporting. At a minimum, all recipients must submit a final financial report. Final reports are due no later than 120 calendar days after the award period of performance end date or termination date. For awards with periods of performance longer than 12 months, recipients are required to submit interim financial reports on the frequency established in the Notice of Award. The only exception to the interim financial reporting requirement is if the recipient is required to use the SF 270/271 to request payment and requests payment at least once annually through the entire award period of performance. We will describe all financial reporting requirements in the Notice of Award.

Non-Construction Performance Reports Performance reports must contain a comparison of actual accomplishments with the established goals and objectives of the award; a description of reasons why established goals was not met, if appropriate; and any other pertinent information relevant to the…