UPC 121556 C-76 form.pdf

PDF 329 KB Posted

Attached to
Construction, University Drive Bike Lanes
Solicitation number
IFB-114424
Issued by
Fairfax County, Virginia

About this file

Form C-76 Contractor's Certificate of Compliance for Iron or Steel Items

This document is a Form C-76 certification form issued by the Virginia Department of Transportation (VDOT) for compliance with "Buy America" requirements under 23 CFR 635.410. The form serves as a contractor's certificate of compliance for iron or steel items used in permanent installations on VDOT projects. Contractors are required to submit this form to VDOT at the time of delivery of any items containing iron or steel to the project. The form accommodates multiple bid items across two pages, allowing contractors to list detailed information including bid item numbers, descriptions, product specifications, quantities, units of measurement (linear feet, square yards, cubic yards, etc.), and the total cost of any non-domestic steel and iron components. Supporting documentation to demonstrate compliance with Made in the USA requirements—such as mill test reports and manufacturer/supplier certifications—must be organized by Iron or Steel Submittal Number and retained by the contractor from the date of delivery through three years after project acceptance.

The form requires certification by the Prime Contractor's Project Superintendent and provides two certification options: one for domestic material (certifying that all iron or steel manufacturing processes occurred in the United States) and one for non-domestic material (acknowledging that all or part of the manufacturing process occurred outside the United States). When non-domestic material is used, contractors must track and report the cost of the steel and iron as delivered to the project to ensure the total non-domestic ferrous material does not exceed the maximum allowable threshold established under Buy America regulations. This compliance mechanism ensures federal-aid highway projects meet domestic content requirements while maintaining project quality standards.

View the file

Other files

File Type Posted
SQ105-000611-01.docx DOCX document
cn801-000100-00.docx DOCX document
SS321-002020-02.docx DOCX document
SS220-002020-01.docx DOCX document
SS235-002020-01.docx DOCX document
SP107-001510-06.docx DOCX document
cn105-000150-00.docx DOCX document
UPC 121556 C-105 form.pdf PDF
2 - Appendix A - Approved by City Attorney 6.2026.pdf PDF
SS236-002020-01.docx DOCX document
SP0F0-000100-00.docx DOCX document
SQ107-001300-00.docx DOCX document
SS246-002020-02.docx DOCX document
cq107-000130-00.docx DOCX document
SS315-002020-05.docx DOCX document
SP107-000120-00.docx DOCX document
SS318-002020-01.docx DOCX document
3 - UPC 121556 PW Standards & Specifications.pdf PDF
cn105-000140-00.docx DOCX document
SS407-002020-02.docx DOCX document
SS317-002020-01.docx DOCX document
12 - Bid Submission Form.pdf PDF
SS223-002020-02.docx DOCX document
SP109-000100-05.docx DOCX document
SS411-002020-01 .docx DOCX document
7 - IFB 114424 University Dr Bike Lanes Final Plans - UPC 121556.pdf PDF
SS234-002020-01.docx DOCX document
SS308-002020-01.docx DOCX document
10 - Standard Labor and Material Payment Bond - Fairfax City.pdf PDF
SP107-003100-00.docx DOCX document
cn100-000026-09.docx DOCX document
Prebid Conference Attendance.pdf PDF
SS512-002020-03.docx DOCX document
SS211-002020-03.docx DOCX document
1 - IFB 114424 University Dr Bike Lanes - UPC 121556.pdf PDF
cn103-000100-01.docx DOCX document
SP100-000051-00.docx DOCX document
5 - UPC 121556 Project Special Provisions.pdf PDF
SP0F0-000130-02.docx DOCX document
SS109-002020-01.docx DOCX document
UPC 121556 C-48 form.pdf PDF
SS319-002020-02.docx DOCX document
11 - Fairfax City Performance Bond.pdf PDF
SS248-002020-02.docx DOCX document
SS704-002020-02.docx DOCX document
SP0F0-000150-01.docx DOCX document
SS305-002020-02.docx DOCX document
SS309-002020-01 .docx DOCX document
UPC 121556 C-104 form.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form C-76 Rev. 10-1-25

CONTRACTOR’S CERTIFICATE OF COMPLIANCE

FOR IRON OR STEEL ITEMS

For Compliance with “Buy America” 23 CFR 635.410 Contract ID No.: Page 1 of

VDOT Project No.:

FHWA Project No.:

Iron or Steel Submittal No.:

Project Location & Description

The (Name of Manufacturer/Supplier) (Street Address) (City, State) (Phone) has furnished to (Name of Contractor) (Street Address) (City, State) (Phone) the following items containing iron or steel for permanent use in the above referenced project:

Bid Item No. Bid Item Description Product Description (if only a portion of the Bid Item) Quantity

Unit

(LF,YD²,

YD³, etc.)

Total Cost of Non-Domestic Steel and Iron in this Item

Submit this form to VDOT at the time of delivery of any items containing Iron or Steel to the project. Supporting documentation to demonstrate compliance with the Made in the USA requirements (such as mill test reports manufacturer/supplier certifications, etc.) shall be organized by Iron or Steel Submittal Number and maintained by the contractor from the date of delivery until three years after project acceptance. (Note that documentation such as off-site test reports, etc., when also required for other material quality purposes, is still required at time of delivery.)

Contractor’s Statement of Certification Domestic Material. I hereby certify that all iron or steel manufacturing processes (including melting, mixing, extruding, rolling, bending, casting, forging, etc., and the application of any coating, as applicable), occurred in the United States for the above listed materials and that those materials do meet all other requirements as set forth in the plans and specifications.

Non-Domestic Material. Although the above listed materials do meet all other requirements as set forth in the plans and specifications, all or part of the steel or iron manufacturing process may have occurred outside the United States, so the material is considered non-domestic. The cost of the steel and iron in this material, as delivered to the project, is $ and will be tracked to ensure the total non-domestic ferrous material does not exceed the maximum allowable.

By Title (Name of Prime Contractor’s Project Superintendent, Typed or Printed)

Date (Signature of Prime Contractor’s Project Superintendent)

Form C-76 Rev. 10-1-25

CONTRACTOR’S CERTIFICATE OF COMPLIANCE

FOR IRON OR STEEL ITEMS

For Compliance with “Buy America” 23 CFR 635.410 Contract ID No.: Page 2 of

VDOT Project No.:

FHWA Project No.:

Iron or Steel Submittal No.:

Bid Item No. Bid Item Description Product Description (if only a portion of the Bid Item) Quantity

Unit

(LF,YD²,

YD³, etc.)

Total Cost of Non-Domestic Steel and Iron in this Item

(Initials of Prime Contractor’s Project Superintendent)

Submit this form to VDOT at the time of delivery of any items containing Iron or Steel to the project. Supporting documentation to demonstrate compliance with the Made in the USA requirements (such as mill test reports manufacturer/supplier certificat...

Contract ID No:
Page 1 of:
VDOT Project No: UPC 121556
FHWA Project No:
Submittal No:
Project Location Description:
The:
has furnished to:
Bid Item NoRow1:
Bid Item DescriptionRow1:
Product Description if only a portion of the Bid ItemRow1:
QuantityRow1:
Unit LFYD² YD³ etcRow1:
Total Cost of NonDomestic Steel and Iron in this ItemRow1:
Bid Item NoRow2:
Bid Item DescriptionRow2:
Product Description if only a portion of the Bid ItemRow2:
QuantityRow2:
Unit LFYD² YD³ etcRow2:
Total Cost of NonDomestic Steel and Iron in this ItemRow2:
Bid Item NoRow3:
Bid Item DescriptionRow3:
Product Description if only a portion of the Bid ItemRow3:
QuantityRow3:
Unit LFYD² YD³ etcRow3:
Total Cost of NonDomestic Steel and Iron in this ItemRow3:
steel and iron in this material as delivered to the project is:
By 1:
Title:
Date:
Contract ID No_2:
Page 2 of:
VDOT Project No_2:
FHWA Project No_2:
Submittal No_2:
Bid Item NoRow1_2:
Bid Item DescriptionRow1_2:
Product Description if only a portion of the Bid ItemRow1_2:
QuantityRow1_2:
Unit LFYD² YD³ etcRow1_2:
Total Cost of NonDomestic Steel and Iron in this ItemRow1_2:
Bid Item NoRow2_2:
Bid Item DescriptionRow2_2:
Product Description if only a portion of the Bid ItemRow2_2:
QuantityRow2_2:
Unit LFYD² YD³ etcRow2_2:
Total Cost of NonDomestic Steel and Iron in this ItemRow2_2:
Bid Item NoRow3_2:
Bid Item DescriptionRow3_2:
Product Description if only a portion of the Bid ItemRow3_2:
QuantityRow3_2:
Unit LFYD² YD³ etcRow3_2:
Total Cost of NonDomestic Steel and Iron in this ItemRow3_2:
Bid Item NoRow4:
Bid Item DescriptionRow4:
Product Description if only a portion of the Bid ItemRow4:
QuantityRow4:
Unit LFYD² YD³ etcRow4:
Total Cost of NonDomestic Steel and Iron in this ItemRow4:
Bid Item NoRow5:
Bid Item DescriptionRow5:
Product Description if only a portion of the Bid ItemRow5:
QuantityRow5:
Unit LFYD² YD³ etcRow5:
Total Cost of NonDomestic Steel and Iron in this ItemRow5:
Bid Item NoRow6:
Bid Item DescriptionRow6:
Product Description if only a portion of the Bid ItemRow6:
QuantityRow6:
Unit LFYD² YD³ etcRow6:
Total Cost of NonDomestic Steel and Iron in this ItemRow6:
Bid Item NoRow7:
Bid Item DescriptionRow7:
Product Description if only a portion of the Bid ItemRow7:
QuantityRow7:
Unit LFYD² YD³ etcRow7:
Total Cost of NonDomestic Steel and Iron in this ItemRow7:
Bid Item NoRow8:
Bid Item DescriptionRow8:
Product Description if only a portion of the Bid ItemRow8:
QuantityRow8:
Unit LFYD² YD³ etcRow8:
Total Cost of NonDomestic Steel and Iron in this ItemRow8:
Bid Item NoRow9:
Bid Item DescriptionRow9:
Product Description if only a portion of the Bid ItemRow9:
QuantityRow9:
Unit LFYD² YD³ etcRow9:
Total Cost of NonDomestic Steel and Iron in this ItemRow9:
Bid Item NoRow10:
Bid Item DescriptionRow10:
Product Description if only a portion of the Bid ItemRow10:
QuantityRow10:
Unit LFYD² YD³ etcRow10:
Total Cost of NonDomestic Steel and Iron in this ItemRow10:
Bid Item NoRow11:
Bid Item DescriptionRow11:
Product Description if only a portion of the Bid ItemRow11:
QuantityRow11:
Unit LFYD² YD³ etcRow11:
Total Cost of NonDomestic Steel and Iron in this ItemRow11:
Bid Item NoRow12:
Bid Item DescriptionRow12:
Product Description if only a portion of the Bid ItemRow12:
QuantityRow12:
Unit LFYD² YD³ etcRow12:
Total Cost of NonDomestic Steel and Iron in this ItemRow12:
Bid Item NoRow13:
Bid Item DescriptionRow13:
Product Description if only a portion of the Bid ItemRow13:
QuantityRow13:
Unit LFYD² YD³ etcRow13:
Total Cost of NonDomestic Steel and Iron in this ItemRow13:
Bid Item NoRow14:
Bid Item DescriptionRow14:
Product Description if only a portion of the Bid ItemRow14:
QuantityRow14:
Unit LFYD² YD³ etcRow14:
Total Cost of NonDomestic Steel and Iron in this ItemRow14:
Bid Item NoRow15:
Bid Item DescriptionRow15:
Product Description if only a portion of the Bid ItemRow15:
QuantityRow15:
Unit LFYD² YD³ etcRow15:
Total Cost of NonDomestic Steel and Iron in this ItemRow15:
Bid Item NoRow16:
Bid Item DescriptionRow16:
Product Description if only a portion of the Bid ItemRow16:
QuantityRow16:
Unit LFYD² YD³ etcRow16:
Total Cost of NonDomestic Steel and Iron in this ItemRow16:
Initials of Prime Contractors:
Signature2_es_:signer:signature:
Domestic Material_es_:signature: Off
Non-Domestic Materials_es_:signature: Off

File details come from the government source that posted it. Updated .