Unrestricted_2020 A-E Services_Announcement-synopsis-FINAL.pdf
PDF 135 KB Posted
- Solicitation number
- W9128F21R0010
About this file
This is a synopsis for five indefinite delivery, indefinite quantity architect-engineer services multiple award task order contracts with a total shared capacity value of $118 million to be awarded by the U.S. Army Corps of Engineers, Northwestern Division. Interested firms must submit an SF330 by January 29, 2021 at 2:00pm central time in accordance with the instructions provided. The resulting IDC contracts will have a four-year base period and one three-year option period for the preparation of studies, analysis, and design services for military and civil projects within the division under NAICS code 541330. Task orders will be issued on a firm-fixed-price basis as needs arise during the ordering period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Beta.SAM.gov Synopsis for A-E Services
INDEFINITE DELIVERY CONTRACTS FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR US
ARMY CORPS OF ENGINEERS NORTHWESTERN DIVISION – UNRESTRICTED
Reference number: W9128F21R0010 [target five (5) contracts]
1. CONTRACT INFORMATION: This contract is being procured in accordance with the Brooks A-E
Act as implemented in FAR Subpart 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. The services will consist of preparation of studies, analysis, and design services for Military and Civil projects within the United States Army Corps of
Engineers (USACE) Northwestern Division (NWD). Target five (5) indefinite delivery indefinite quantity
(IDIQ) contracts to be negotiated and awarded, with a seven-year ordering period (4-year base and one 3-year option) and $118,000,000 in shared capacity. Work will be issued by negotiated firm-fixed-price task orders. Previous task order totals for the Unrestricted set-aside ranged from $100,000.00 to
$3,000,000.00. Future task orders under the awarded IDCs are anticipated to be around this same dollar range. When two or more indefinite delivery contracts (IDCs) available to the procuring agency contain the same or overlapping scopes of work so that a particular task order might be issued under more than one IDC, the contracting officer will have available for consideration of the following factors in deciding which contractor will be selected to negotiate an order: performance and quality of deliverables under the current contract, current capacity to accomplish the order in the required time, professional qualifications necessary for satisfactory performance of required services, uniquely specialized experience and technical competence in the type of work required, etc. The Government also reserves the right to ask for updated
SF 330s at a later date or at a task order level basis from the firms awarded a contract under this announcement. North American Industrial Classification System code is 541330, which has a size standard of $15,000,000 in annual average gross receipts over the past three years. Competition for this procurement is Unrestricted. If an other-than-small (i.e. "large") business firm is selected for this contract, it will be required to submit a detailed subcontracting plan (reference FAR Subpart 19.7 and FAR Clause
52.219-9) during contract negotiation. The subcontracting plan is not required with this submittal, but will be required with the proposal of the firm selected for negotiations. Contract award is anticipated between April and May 2021. To be eligible for contract award, the Contractor must be registered in the
System for Award Management (SAM). Registration is free and can be accessed at: http://www.sam.gov.
Ensure representations and certifications in SAM are current.
2. PROJECT INFORMATION: The A-E selected would be required to have sufficient staff, flexibility, and capability to be available on an as-needed basis. Design and/or construction support services for specific facilities or projects will be assigned by Task Orders on the IDIQ contracts established as a result of this solicitation. All projects will be located within the USACE, Northwestern Division. The projects will include various types of horizontal and vertical facilities, structures, and sites, on military bases and other federal installations, as well as civil projects for the Corps of Engineers. Examples of military projects may include, but not be limited to barracks, hangars, utilities, battalion headquarters buildings, access control points, religious facilities, brigade and company operations facilities, officer quarters, and various others. These projects may include new construction, renovation, or maintenance of facilities.
Each task order to be issued will fully describe the project to be designed or the studies to be accomplished and will identify all work to be accomplished. Services to be performed include, but are not limited to, preparation of vertical and horizontal design/construction documents, preparation of design/build requests for proposals (RFPs), charrette/concept designs, schematic designs, planning, programming, site investigations, surveying and geotechnical investigations, space planning, interior design, parametric and construction cost estimating, feasibility studies, National Environmental Policy
Act (NEPA) documents, plan formulation, design and construction phase commissioning services and various construction phase services for both military and civil projects. Design of utilities, airfield http://www.sam.gov/ pavement, and airfield lighting may be required but are incidental to facility design. A-E may be required to provide master planning services such as: facility master planning for various federal customers such as
Army and Air Force, Public Works real property master planning, facility allowance analysis, economic and market analysis, preparation of installation design guides, MILCON DD Form 1391 development and other programming level analysis. Construction support services, when required, may include:
participation in on-site partnering/pre-construction meetings; review of construction contractor's submittals for government approval and for information only; participation in site visits and provide inspection reports at critical points of construction; participation in start-up and commissioning of the systems; attendance at warranty inspections; participation in lessons-learned sessions; and preparation of operations and maintenance support information manuals.
Construction cost estimating will be accomplished for all design projects using the Micro-Computer
Aided Cost Estimating System 2nd Generation (MII) software. All specifications shall be developed and edited using the SpecsIntact automated specification processing system. Firms should demonstrate experience with using and writing project specifications in the SpecsIntact processing system.
The A-E shall use advanced modeling practices in conjunction with an integrated design approach to complete the project design. Advanced modeling is a subset of geospatial technologies as defined EM-
1110-1-2909 GEOSPATIAL DATA AND SYSTEMS to include Building Information Modeling (BIM), Civil Information Modeling (CIM), Geographic Information Systems (GIS), and Computer-Aided
Drafting (CAD). Required technologies, design deliverable and bid set (electronic and hardcopy) format and requirements will be further described in each task order.
The A-E shall document their advanced modeling approach in an Advanced Modeling Project Execution
Plan (PxP), submitted to the government for approval. Each PxP shall document advanced modeling practices, roles, and responsibilities for each project, as well as reiterate the technologies, formats, modeling standards, quality control procedures, and deliverable requirements dictated by each task order.
The A-E shall have a robust knowledge of advanced modeling strategies, standards, and practices and shall be capable of delivering designs using a variety of tools and technologies to meet each set of task order deliverable requirements.
Sustainable design shall be accomplished using an integrated design approach and emphasizing environmental stewardship; energy and water conservation and efficiency; use of alternative energy, use of recovered and recycled materials; waste reduction; reduction or elimination of toxic and harmful substances in facilities construction and operation; efficiency in resource and materials utilization;
development of health, safe and productive work environments. Integration of Federal and agency energy and sustainability mandates is required on all building facilities. Design and documentation shall utilize
United States Green Building Council (USBGC), Leadership in Environmental and Energy Design A-E evaluation, Green Building Certification Institute, and Green Globes web-based certification methodology. Building envelope design will require knowledge with tested air barrier construction. The
A-E may also be required to perform and/or evaluate sustainability and energy audits.
Integration of current Antiterrorism and Force Protection (AT/FP) measures will be required on all military projects.
The A-E will be required to use the DR Checks design review and checking system.
3. SELECTION CRITERIA: The selection criteria are listed below in descending order of importance.
Criteria “a” through “e” are primary. Criteria “f” through “h” are secondary and will only be used as a
“tie-breaker” among firms that are essentially technically equal.
a. Specialized Experience and Technical Competence
b. Professional Qualifications
c. Past Performance
d. Capacity
e. Knowledge of Locality
f. SB/SDB Participation [NOTE: this is an additional secondary selection criterion applicable only to the unrestricted announcement.]
g. Geographic Proximity
h. Volume of DOD Contract Awards
PRIMARY CRITERIA:
a. Specialized Experience and Technical Competence. Only relatable experience on completed construction projects or completed designs from the last five years should be included in the submittal.
The following guidelines will be used to differentiate between completion date categories.
• For completed design projects where construction has not started or construction is not yet 90% complete, the design should have been completed within the past 5 years.
• For completed design projects where construction is 90% complete, the construction should have been completed within the past 5 years. Here, a design could be outside the 5-year window.
• For all those services that do not directly result in a construction project (master planning, studies, analysis, etc.), those services should have been completed within the past 5 years.
All projects cited shall identify design start/complete dates as well as the project size (cost and scope).
(SF 330, Part I, Section F) Submittals shall demonstrate the range and diversity of specialized experience and technical competence to execute the types of projects and activities as indicated above in paragraph 2, PROJECT INFORMATION, and in the bullet items below.
• Experience in horizontal and vertical design of projects representative of those listed in paragraph
2, PROJECT INFORMATION.
• Experience with construction phase services including participation in on-site partnering/pre-construction meetings; review of construction contractor's submittals for government approval and for information only; participation in site visits and furnishing inspection reports at critical points of construction; participation in start-up and commissioning of systems; attending warranty inspections; participation in lessons-learned sessions; preparation of operations and maintenance support information manuals;
• Experience in adapting standard design packages;
• Experience with USACE design guidance, including Unified Facility Criteria documents, Engineering Technical Letters (ETLs), and other military design criteria documents;
• Experience with preparing specifications using SpecsIntact software and Unified Facilities Guide
Specifications (UFGS);
• Experience with preparing cost estimates using Micro-Computer Aided Cost Estimating System
2nd Generation (MII) software;
• Experience with Department of Defense AT/FP design criteria and construction standards;
• Experience with life safety and fire protection design of military or civil facilities;
• Experience applying Advanced Modeling practices in conjunction with an integrated design approach to include BIM, CIM, GIS, CAD, and Facility Data;
• Experience with Sustainable Design or High Performance Sustainable Building design and construction concepts including energy efficiency, use of recovered materials, waste reduction, and pollution prevention, using the third party sustainability evaluation and certification process;
• Experience with Spatial Data Facilities Infrastructure (SDSFIE) and/or GEOBASE deliverables and standards; and
• Experience with historic preservation.
b. Professional Qualifications. Firms shall demonstrate professional personnel qualifications and specialized experience in the design of military and federal facilities for key design disciplines. Key disciplines that are required to be performed by registered and licensed professionals are: project management, facility planning, architecture, interior design, mechanical, electrical, fire protection, building commissioning, structural, Anti-Terrorism/Force Protection (AT/FP), civil, communications engineering, cost estimating, geotechnical, and land surveyor. Evaluation of these disciplines will consider education, training, relevant experience in design of military and federal facilities, and longevity with the firm. Any past design and/or planning experience on USACE military projects should be identified. (SF 330, Part I, Sections E & G). Resumes submitted for roles not identified herein will not be reviewed.
Provide resumes for two (2) project managers (team leaders) for task orders, both registered as a
Professional Engineer or Architect.
Provide resumes for two (2) designers in each of the following fields: architecture; civil, structural
(independent of civil), mechanical, and electrical engineering with at least two in each field professionally registered in the relevant professional field as an engineer or an architect.
Provide a resume for one (1) designer in the Anti-Terrorism/Force Protection field. Designer shall be a registered Professional Engineer and have at least five (5) years of experience and training related to compliance with Department of Defense AT/FP policy, standards and specifications. This designer is not required to be independent of other A-E designers.
Provide a resume for one (1) interior designer. Designer must be certified by the National Council of
Interior Design Qualifications (NCIDQ), registered interior designer, or registered architect with at least five years of experience and training in interior design.
Provide a resume for one (1) designer in each of the following fields: life safety, water/wastewater engineering, facility planning, geotechnical (soil engineering); communication distribution design
(RCCD), and landscape architecture. These individuals may be qualified by a combination of education, registration, certification, and/or training.
Provide a resume for one (1) cost engineer with at least 10 years of experience as a cost engineer.
Additional consideration will be given if the individual is a certified cost engineer (CCE), certified cost consultant (CCC), or comparable certification.
Provide a resume for one (1) commissioning authority (CxA) to lead the commissioning team. The CxA may be a mechanical or an electrical engineer and shall be a registered professional with a minimum of five years of heating, ventilation, and cooling or lighting and power distribution design experience and shall have documented experience as a CxA on at least two projects. The CxA must be certified as a commissioning authority and have an active certification. The certification shall be performed by a recognized organization such as The Association of Energy Engineers (A-EE), American Society of
Heating, Refrigerating, and Air Conditioning Engineers (ASHRA-E), or similar such organization.
Provide a resume for one (1) fire protection engineer who is a registered professional fire protection engineer with a minimum of five years dedicated to fire protection engineering, and has one of the following: (i) a degree in fire protection engineering from an accredited university or (ii) passed the
National Council of Examiners for Engineering and Surveys (NCEES) fire protection engineering examination. The fire protection engineer shall have an active license without any disciplinary actions.
Provide a resume for one (1) advanced modeling or BIM manager with a minimum of five years dedicated to managing advanced modeling projects. Additional consideration will be given to managers with degrees, training, and/or certifications relevant to the advanced modeling platforms and technologies described in this contract.
Provide a resume for one (1) sustainability manager with a minimum of five years dedicated to managing sustainability metrics, certification, and accreditation on projects. Additional consideration will be given to sustainability managers with degrees and certifications from recognized sustainability certification, assessment, and/or accreditation organizations. This includes but is not limited to US Green Building
Council (USGBC) LEED Accredited Professionals (LEED APs), Green Building Initatives’ Green
Globes Professionals (GGPs) and/or Federal Guiding Principles Compliance Professionals (GPCPs).
Provide a resume for one (1) land surveyor. Land surveyor must be a licensed Professional Land Surveyor with at least five years of professional experience.
c. Past Performance. Past performance on DoD and other contracts with respect to the quality of work, cost control (maintaining the project construction cost below the programmed amount), and compliance with performance schedules, as determined by ACASS and other sources. (Note: Past Performance
Questionnaires (PPQ) may be used to provide or supplement a firm’s past performance with other than
U.S. Governmental clients. Firms which choose to use the PPQ may obtain a PPQ standard form by submitting a request to the below referenced POC via email.) Past performance submittals should match projects submitted for Paragraph a. Specialized Experience and Technical Competence.
d. Capacity. Capacity is the ability to complete task orders within a reasonably aggressive schedule.
Firms shall demonstrate the capacity to accomplish at least four (4) $500,000 simultaneous individual task orders, or two (2) $1,000,000 simultaneous task orders. The evaluation will consider the availability of an adequate number of personnel in key disciplines to complete the task orders and offeror’s project execution strategy. The evaluation will consider the key persons identified in Sections D, E, and G of the
SF330, as well as other available staff and information provided in Section H and Part II.
A proposed Management Plan shall be presented that includes an organization chart (reference SF330, Part I, Section D) and addresses team organization (reference SF330, Part I, Section C), any anticipated sub-contractors or entities to supplement the design team, quality control procedures, cost control, coordination of in-house disciplines and consultants required to meet work capacity. The SF 330 shall clearly indicate the primary office where the work will be performed and the staffing at that office. (SF
330, Part I, Section H, Item 2).
e. Knowledge of Locality. Submittals shall demonstrate knowledge of performing the type of projects and activities as described in the PROJECT INFORMATION section listed above for the multiple locations and various military installations and civil sites within NWD. The localized knowledge includes demonstration of working with multiple agencies and other stakeholders to execute projects described herein. Knowledge of geological features, climatic conditions, and local construction methods specific to
NWD will also be evaluated.
SECONDARY CRITERIA:
f. SB/SDB Participation. Both Small Business and OTSB Offerors will be evaluated on the extent of participation of small business community (SBC) members in the performance of the acquisition.
Offerors shall propose their best efforts when projecting the level of participation of Small Businesses (as a Small Business prime and/or Small Business subcontractors) for the anticipated performance of this contract. Large Business primes may achieve the Small Business participation through subcontracting to
Small Business. Subcontracting Plans will be required from the Large Business primes during the negotiations of the IDIQ. Small Business primes may achieve Small Business participation through their own performance/participation as a prime and through subcontracting to other Small Businesses. (SF 330, Part I, Section H, Item 4).
g. Geographic Proximity. Submittals should address offerors geographic locations and their capability to address project work throughout the various NWD locations (SF 330, Part I, Section H).
h. Volume of DoD Contract Awards. Volume of DoD A-E contract awards in the last 12 months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including
SB and SDB (SF 330, Part I, Section H).
4. SUBMISSION REQUIREMENTS: Interested firms having the capabilities to perform this work must submit a copy of their SF 330 Part I and Part II for the prime firm and all consultants/subcontractors, to the following US Army Corps of Engineers Omaha District Contracting Personnel: Tyler Hegge;
tyler.hegge@usace.army.mil and Ericka Collins; ericka.t.collins@usace.army.mil not later than 2:00pm
Central time on the response date indicated in this announcement. PLEASE SEND SUBMITTAL
PACKAGES AS A SINGLE PDF FILE. Submittal must clearly identify the announcement number.
Regulation requires that the Selection Board not consider any submittals received after the specified time and date. Late proposal rules in FAR 15.208 will be followed for submittals received after 2:00pm Central time on the closing date specified in this announcement. The SF 330, 08/2016 edition, must be used, and may be obtained from the following web site: http://www.gsa.gov/portal/forms/download/116486.
Include DUNS number and CAGE code in SF330 Part I, Section B, Block 5. Additionally, the DUNS number and CAGE code should be identified in SF 330 Part I, Section C, Block 9, for EACH TEAM
MEMBER. The submittal shall have a page limit of 100 pages. A page is one side of a sheet. Blank sheets/Tabs separating the sections within the SF 330 will not count against the maximum page count. All fonts shall be at least 10 pitch or larger. Pages shall be 8-1/2 inches by 11 inches. Organizational charts may be presented on a sheet up to 11 inches by 17 inches. A Part II is required for each branch office of the prime firm and any consultants/subcontractors that will have a key role in the proposed contract (i.e. a
Part II is required for all entities identified in SF 330 Part I, Section C of the submittal). Part II of the SF
330 and Past Performance Submittals will not count towards the 100 page limit; however, cover letters, company literature and extraneous materials are not desired. Sections E and G of SF 330 Part I must include only individuals proposed to perform the anticipated work, including all consultants/subcontractors. In SF 330 Part I, Section G, Block 26, along with the name, include the firm with which the person is associated. A maximum of ten (10) projects including the prime and consultants/subcontractors will be reviewed for SF 330 Part I, Section F. Use no more than two pages per project. When listing projects in SF 330 Part 1, Section F, an Indefinite Delivery Contract (IDC) with multiple Task Orders as examples is not considered a project. A task order executed under an IDC contract is a project. SF 330, Part I, Section H (Additional Information) shall contain the following information. (1) Item 1 - Capacity. Reference Paragraph 3.d. above. Provide a 1-2 page narrative discussing the capacity of the design firm to meet schedules, including adequacy of qualified personnel available and past experience in meeting tight design schedules. (2) Item 2 – Management Plan – Include the information requested in Paragraph 3.d. above. (3) Item 3 - Volume of DoD Contract Awards –
Reference Paragraph 3.h. above. Provide a complete listing of all DoD A-E awards within the last 12 months. For IDCs, include total value of task orders actually issued by agencies in the last 12 months, not mailto:tyler.hegge@usace.army.mil mailto:ericka.t.collins@usace.army.mil http://www.gsa.gov/portal/forms/download/116486 the potential value of the IDCs. For all types of contracts, do not include for consideration options that have not been exercised.
Joint ventures shall submit the following additional documentation of the evidence of a joint venture entity: 1) Firms shall provide a copy of a legally binding joint venture agreement, and 2) Identification of the party who can legally bind the joint venture. Joint Venture agreements will not count against the page count. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. This is not a request for proposal.
ALL QUESTIONS SHALL BE SUBMITTED VIA THE BIDDER INQUIRY PORTAL in ProjNet at http://www.projnet.org/projnet. Questions should be submitted no later than Close of Business 19 JAN
2021 to allow time for a response. On this date and time the portal will be closed. For questions, no other means of communication, e-mail, fax, or telephone will be accepted. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below. A prospective vendor who submits a comment/question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our team. All timely questions and approved answers will be made available through
ProjNet. To submit and review inquiries, firms will need to be current registered users of the ProjNet system.
Registration for ProjNet Bidder Inquiry Access
(If you are already registered, go to Entering Bidder Inquiries in ProjNet Bidder Inquiry System below.)
1. From the ProjNet home page link above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed below.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Entering Bidder Inquiries in ProjNet Bidder Inquiry System
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your
Secret Question and Secret Answer to log in.
2. From the ProjNet home page link above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed below.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
8. Follow online screen instructions to enter specific bidder inquiries for the project.
The Solicitation Number is: W9128F-21-R-0010
The Bidder Inquiry Key is: RP3HUW-RY2PEX
Firms are requested to review the Bidder Inquiry Portal for previous questions and responses, prior to submission of a new inquiry in the Portal. Caution: Any inquiry submitted and answered within this system will be accessible to view by all interested firms on this solicitation. The call center for the http://www.projnet.org/projnet
ProjNet operates weekdays from 8 AM to 5 PM U.S. Central Time Zone. The telephone number is 1-800-
428-HELP.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload as described previously. The
“File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File
Description.) Submission shall be in Adobe PDF format.
The Government will not be responsible for submissions delivered to any location or to anyone other than those designated Government personnel identified to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are also responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
File details come from the government source that posted it. Updated .