This is an Invitation for Bids (IFB) #2023-IFB-118 from the City of Rock Hill, South Carolina, seeking a contractor for Underground Electric Equipment Maintenance. The project involves comprehensive inspection, maintenance, and painting services for underground electric utility equipment, including single and three-phase transformers, junction boxes, and switchgears. The contract will run for 36 months beginning July 1, 2023, with two additional 12-month options potentially available. Key dates include a mandatory virtual pre-bid meeting on May 4, 2023, a question submission deadline of May 11, 2023, and a bid submission deadline of May 18, 2023 at 2:00 pm. The work will include detailed tasks such as visual inspections, fire ant removal, equipment resurfacing, painting, data collection, and infrared testing, with an estimated 575 inspections and various maintenance activities anticipated annually.
The pricing proposal is structured as a unit price contract with different rates for various equipment types and sizes, including inspections ranging from single-phase transformers to large three-phase transformers up to 3,000 KVA. The city has incorporated local purchasing preferences, potentially offering a 5% adjustment for businesses located within Rock Hill municipal limits and a 3% adjustment for businesses in York County. The maximum adjustment is capped at $25,000. Bidders must have at least 5 years of utility experience working with high-voltage equipment, provide comprehensive insurance coverage, and comply with various local regulations including business licensing, immigration reform, and disadvantaged business enterprise guidelines. The contract emphasizes professional conduct, with specific requirements for employee behavior, uniforms, and customer interactions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Overhead_Door_Repair_Installation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BIDS (IFB)
2023-IFB-118
UNDERGROUND ELECTRIC EQUIPMENT MAINTENANCE, REBID
City of Rock Hill
757 S. Anderson Road, Building 103
Rock Hill, SC 29730
RELEASE DATE: April 20, 2023
DEADLINE FOR QUESTIONS: May 11, 2023
RESPONSE DEADLINE: May 18, 2023, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/cityofrockhill
City of Rock Hill
INVITATION FOR BIDS (IFB)
2023-IFB-118
Underground Electric Equipment Maintenance, Rebid
I. Introduction II. Invitation for Bids
III. Scope of Work IV. Terms and Conditions V. Vendor Questionnaire
VI. Pricing Proposal
Invitation for Bids (IFB) #2023-IFB-118 Title: Underground Electric Equipment Maintenance, Rebid
1. INTRODUCTION
1.1. Summary
The City of Rock Hill, South Carolina, is seeking competitive proposals from qualified companies to provide the City with underground electric utility equipment inspection, maintenance, and painting on a unit price basis. Bidders must be willing to provide service for all events listed below. All work must be completed by March 31, 2024.
1.2. Contact Information
Tom Stanford
Procurement Analyst
Email: tom.stanford@cityofrockhill.com
Phone: (803) 329-7070
Department:
Electric Utilities
1.3. Timeline
Solicitation Release Date April 20, 2023
Pre-Bid Meeting (Mandatory) May 4, 2023, 9:00am
Agenda
Microsoft Teams Meeting
Join on your computer, mobile app or room device
Click the link at the bottom of this section to join the meeting
Meeting ID: 262 213 605 519
Passcode: P8c5L2
Or call in (audio only)
+1 332-249-0603,,584653217# United States, New
York City
Phone Conference ID: 584 653 217#
Question Submission Deadline May 11, 2023, 4:00pm mailto:tom.stanford@cityofrockhill.com tel:(803)329-7070 https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA3OWEyMjgtNDY3OS00OGFiLWE0NjQtOGJiODk4ZDYzN2Y5%40thread.v2/0?context=%7b%22Tid%22%3a%22b5b85cb4-4b04-4c3b-ac09-53026bc9423b%22%2c%22Oid%22%3a%2264b6ef1f-84be-4445-af7c-3efd399ca7af%22%7d
Bid Submission Deadline May 18, 2023, 2:00pm
Bids only received through OpenGov portal.
2. INVITATION FOR BIDS
PROJECT: Underground Electric Equipment Maintenance, Rebid
IFB Number: 2023-IFB-118
Bid DUE DATE: Thursday, May 18, 2023 before 2:00 pm
2.1. General Information
Electronic submissions will be received by the Procurement Division of the City of Rock Hill, South
Carolina via the City's eProcurement Portal up to but not later than the published date and time. The eProcurement Portal clock is the official timekeeper for the determination of all deadline dates and times. Without exception, responses will not be accepted after the submission deadline regardless of any technical difficulties such as poor internet connections. The City strongly recommends completing your response well ahead of the deadline.
2.2. Virtual Mandatory Pre-Bid Meeting
A virtual mandatory pre-bid meeting will be held at 9:00 am on Thursday, May 4, 2023 in the Microsoft
Teams Meeting Join on your computer, mobile app or room device Click the link at the bottom of this section to join the meeting Meeting ID: 262 213 605 519 Passcode: P8c5L2 Or call in (audio only) +1 332-
249-0603,,584653217# United States, New York City Phone Conference ID: 584 653 217#.
Inspection, questions, and work review will take place at this time. Only those companies with representatives in attendance or on the conference call can submit a bid.
https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA3OWEyMjgtNDY3OS00OGFiLWE0NjQtOGJiODk4ZDYzN2Y5%40thread.v2/0?con text=%7b%22Tid%22%3a%22b5b85cb4-4b04-4c3b-ac09-
53026bc9423b%22%2c%22Oid%22%3a%2264b6ef1f-84be-4445-af7c-3efd399ca7af%22%7d
2.3. Purpose
The City of Rock Hill, South Carolina is seeking competitive bids from qualified companies to provide the
City with Underground Electric Equipment Maintenance, Rebid. The Electric Utilities Division is responsible for this project. The term of the agreement will be for 36 months, beginning on July 1, 2023, with two additional 12-month options, if options are exercised.
2.4. Competition Intended
The process of responding to this Invitation for Bid (IFB) should involve interested companies reviewing and analyzing the information provided herein and responding to all items where a response is requested.
2.5. Definitions
Bidder/Company: This term is used to encompass the party seeking to have an agreement with the City of Rock Hill.
City: This term is defined as the City of Rock Hill, South Carolina. All communications relating to the bid process or the resulting purchase should be directed to the City’s Procurement Office or its designated https://procurement.opengov.com/portal/cityofrockhill https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA3OWEyMjgtNDY3OS00OGFiLWE0NjQtOGJiODk4ZDYzN2Y5%40thread.v2/0?context=%7b%22Tid%22%3a%22b5b85cb4-4b04-4c3b-ac09-53026bc9423b%22%2c%22Oid%22%3a%2264b6ef1f-84be-4445-af7c-3efd399ca7af%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA3OWEyMjgtNDY3OS00OGFiLWE0NjQtOGJiODk4ZDYzN2Y5%40thread.v2/0?context=%7b%22Tid%22%3a%22b5b85cb4-4b04-4c3b-ac09-53026bc9423b%22%2c%22Oid%22%3a%2264b6ef1f-84be-4445-af7c-3efd399ca7af%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA3OWEyMjgtNDY3OS00OGFiLWE0NjQtOGJiODk4ZDYzN2Y5%40thread.v2/0?context=%7b%22Tid%22%3a%22b5b85cb4-4b04-4c3b-ac09-53026bc9423b%22%2c%22Oid%22%3a%2264b6ef1f-84be-4445-af7c-3efd399ca7af%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA3OWEyMjgtNDY3OS00OGFiLWE0NjQtOGJiODk4ZDYzN2Y5%40thread.v2/0?context=%7b%22Tid%22%3a%22b5b85cb4-4b04-4c3b-ac09-53026bc9423b%22%2c%22Oid%22%3a%2264b6ef1f-84be-4445-af7c-3efd399ca7af%22%7d contact.
Purchase: This term means the agreement to be executed by the City and the successful Bidder.
2.6. Discrepancies and Questions
Companies shall have no contact related to this project with the City of Rock Hill elected or appointed officials or employees during the solicitation process, other than the contact person specified within this solicitation. Any such contact will subject the Company to immediate disqualification for consideration for this project.
Should the Company have questions, find discrepancies in the plans and/or specifications, or be in doubt as to the meaning or intent of any part thereof, the Company shall request clarification from the City via the eProcurement Portal, not later than 4:00 pm on Thursday, May 11, 2023.
All questions will be answered and any changes will be communicated through an addendum posted on the City’s eProcurement Portal. As a registered Company, you will also receive addenda notifications in your email by clicking “Follow” on this project. It is the Company's responsibility to check the website for this information before submitting. Failure to request such clarification is a waiver of any claim by the
Company for additional expenses because its interpretation was different from the City’s.
2.7. Bidder’s Minimum Qualification
A qualified vendor is defined for this purpose as one that meets, or by the date of bid acceptance can meet, all requirements for licensing, insurance, and service contained within this IFB.
2.8. Bid Preparation
All responses shall be:
1. Prepared and submitted electronically via the City's eProcurement Portal by an authorized Company representative.
2. Each bid constitutes an offer and may not be withdrawn except as provided herein. Bid prices are to remain firm for the period stated in the Invitation for Bids.
3. Each bid shall include the name, address, telephone number, and e-mail address of at least three (3) current customers for whom they have provided similar products/services. These references may be contacted, and if so, their responses may constitute a significant part of the evaluation process.
4. The City of Rock Hill assumes no responsibility for costs incurred in responding to this IFB.
2.9. Bid Submission
Bids not received before 2:00 pm on Thursday, May 18, 2023 shall not be considered.
The City assumes no responsibility for late bids. No bid may be withdrawn for a period of sixty (60) calendar days after the date set for the opening thereof unless approved in writing by the Procurement
Manager. All bids must be approved by the Rock Hill City Manager and the department(s) in charge of the project. Should the bids be higher than the amount allocated by the City for this project, the City reserves the right to negotiate in good faith with the low Bidder. Failing an agreement, the City may reject all bids and resubmit for new bids or make any other decisions it deems to be in its own best interest.
https://procurement.opengov.com/portal/cityofrockhill
The e-Procurement Portal uses an 'electronic lock box' system to receive and protect all Company responses. Only the Company can see that they have submitted a response and the information contained in that response. The Company may withdraw their submission and resubmit anytime until the due date and time. Once the submission phase has ended, the City can view the submissions and begin the evaluation of all received.
2.10. Availability of the e-Procurement Portal
All responses to the Solicitation must be submitted electronically through the e-Procurement Portal.
Should there be any technical issues with the Portal (not user/Supplier issues) that prevent any Supplier from submitting a response within the two (2) hours immediately before the due time, the Solicitation due date and time shall be extended for a period of 24 hours. The technical issue must be by the Portal provider (OpenGov) and affects all participating Suppliers. The City shall verify the technical issue or unavailability of the Portal with OpenGov, the system provider. Technical issues localized to a single supplier will not be considered cause for an extension.
The e-Procurement Portal will not allow submissions after the established due date and time have passed.
2.11. Errors in Bid
Bidders or their authorized representatives are expected to fully inform themselves as to the conditions, requirements, and specifications before submitting bids. Failure to do so will be at the Bidder’s own risk.
In case of an error in the extension of prices in the bid, the unit price shall govern. If an error is made before submitting, the Bidder may withdraw its bid electronically through the City's eProcurement
Portal and re-submitted prior to the stated submission deadline. The City reserves the right to waive any informalities, technical defects, and minor irregularities in bids received.
2.12. Award Criteria
The award shall be made to a bidder that submits the lowest responsible and responsive bid taking into consideration product quality, past performance, and compliance with the stated terms, conditions, and specifications. Notwithstanding the foregoing, the City of Rock Hill reserves the right to reject any or all bids, to accept any bid submitted, waive any informality, and negotiate with the low Bidder or Bidders on any changes which the City of Rock Hill considers necessary or desirable for its own interests. The City alone shall make such determination. In addition, the City of Rock Hill’s Procurement Policies and
Procedures Manual, as amended or supplemented from time to time is hereby incorporated by this reference and shall apply to this Invitation for Bids. The City reserves all alternatives, terms, and conditions as set forth therein.
2.13. Compliance with Laws
The successful Bidder shall obtain and maintain all licenses, permits, liability insurance, and worker’s compensation insurance, and comply with all other standards or regulations required by federal, state, county, or City statutes, ordinances, and rules during the performance of any purchase between the
Bidder and the City. Any such requirement specifically outlined in any purchasing document between the Bidder and the City shall be supplementary to this section and not in substitution thereof.
2.14. Suspension and Debarment
The Bidder certifies, by submission of this bid, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal, state, or local agency. Where the Bidder is unable to certify any of the statements in this certification, such Offeror shall attach an explanation to this proposal.
2.15. Subcontractors
The awarded Bidder agrees that they shall not delegate, subcontract, or assign all or any portion of the project to any third party without the express written consent of the City.
2.16. Brand Name
The use of a brand name is for the sole purpose of describing the standard of quality, performance, and a characteristic desired and is not intended to limit or restrict competition.
2.17. Retainage
The City reserves the right to hold up to 10% of the invoice amount in retainage to ensure that the project, materials, and services are delivered to the City’s satisfaction. All retainages will be paid when all issues, in the sole opinion of the City, have been resolved, and retainage may be held until the project completion.
2.18. Local Providers
Bidders should keep in mind the City’s goal of supporting local businesses and supply houses for materials and labor whenever practicable, so long as pricing and other contract conditions are not adversely affected.
3. SCOPE OF WORK
3.1. Project Overview
Applicants must be qualified and able to complete the following work on an energized underground 25 kV electrical distribution system:
A. Visual inspection of pad-mounted equipment (transformer, switchgears, junction boxes, etc.) to include fire ant removal and fire ant treatment application (City-provided).
B. Resurfacing of metal and fiberglass equipment (patching, sanding, priming, and painting).
C. Inspection and repair of Penta head locking mechanism.
D. Removal of landscaping within 3’ of equipment.
E. Application of warning stickers (City-provided).
F. Provide year & company inspection sticker (Contractor-provided).
G. Perform items listed under “Additional Services” (on bid form).
H. Data collection through a City furnished laptop computer.
I. The items repaired and maintained will vary based on the areas of greatest need.
J. The contractor will be required to assume the sole responsibility for the complete effort as this
IFB requires. The contractor selected for this project shall provide all labor and equipment, including all materials as specified, to accomplish this project within the time spans allocated by
City. The City will consider the contractor to be its sole point of contact with regard to contractual matters. Subcontractors are not permitted to perform work under the terms of this contract.
K. The fault indicators to be tested are battery-operated with LED indicators. These are typically manufactured by Horstmann. Specific model may vary.
3.2. Preparation of Surface for Painting
A. When painted, all surfaces shall be dry and free of dirt, dust, sand, grit, mud, oil, grease, rust, loose mill scale, or other objectionable substance. Cleaning and painting shall be done in a manner that will prevent dust or other airborne particles from contaminating freshly painted surfaces. Areas of heavy oil or grease shall be washed with clean rags.
B. Clean clothes and clean fluids shall be used to avoid leaving a film of greasy residue on the surface being cleaned. Surfaces not intended to be painted shall be adequately protected from contamination, discoloration, or other damage resulting from cleaning or painting operations.
C. Leaking or damaged equipment will be reported to the City representative immediately so repairs may be performed by the City.
3.3. Cleaning
Metal surfaces shall be cleaned as follows:
A. All metal surfaces shall be solvent, or pressure washed, as required to loosen old paint and rust using a brush-off blast cleaning.
B. After all paint and residue are removed, metal surfaces shall be rinsed down with water to remove any residual caustic solutions. A final rinse, with a 5% solution of phosphoric acid shall be used to neutralize any remaining caustic solution and help to protect the metal until the surface is painted.
C. Where the existing coating is damaged or corrosion is evident, metal surfaces shall be sandblasted, power sanded, or hand sanded to remove damaged paint or corrosion and expose clean bare metal. All sand-blasted metal will be primed within four hours of sandblasting. No sandblasted metal may be left unprimed overnight without re-blasting.
3.4. Paint Application
Surfaces to be painted shall be at a temperature not less than the minimum surface temperature recommended by the paint manufacturer. In no case shall paint be applied under any of the following conditions:
A. When the surface temperature or air temperature is below 45 degrees F.
B. When insects or windblown dust, dirt, or debris would adhere to the freshly applied paint.
C. When exterior surfaces are wet or damp.
D. All painting materials shall be applied in accordance with the manufacturer's recommendations by competent and experienced painters.
The contractor should use PPG epoxy primer and Spectracon urethane topcoat or approved equivalent products.
3.5. Protection of Surfaces
Throughout the work, the contractor shall provide and use proper drop cloths, masking tapes, and other protective measures necessary to protect surfaces, customer homes, vehicles, lawns, and other items from overspray or paint splashes, from accidental spraying, spattering, or spilling of paint, or spray, mists, or vapors of material such as strippers. Surfaces accidentally sprayed or spattered shall be thoroughly cleaned and all residues removed. The contractor shall be responsible for and shall correct and repair any damaged condition resulting from the operations or from the operations of those who are responsible to the contractor. Any paint deposited on surfaces, which are not being painted at the time, shall be immediately removed at the contractor’s expense.
3.6. Cleanup
The contractor shall leave all areas clean and free from rubbish and accumulated material left from the work. The contractor will be responsible for meeting all Environmental Protection Agency (EPA) requirements in regard to the disposal of cleaning solutions, rinse waters, coatings, cans, thinners, shrubs, and the like which may alter the surrounding environment. The contractor must remove all materials from the job site and may not use City of Rock Hill trashcans or dumpsters.
3.7. Painting Coating
All equipment shall be painted "Munsell green." Any variation must be approved through the City of
Rock Hill Electric Department. The application process shall satisfy the paint manufacturer’s warranty requirements.
3.8. Hours of Operation
Work may be performed from 7:30 AM – 6:00 PM or dusk (whichever occurs first) Monday through
Friday and adhere to the City’s holidays schedule.
3.9. General Requirements
A. Only qualified bidders that have 5 years or more of utility experience working with high-voltage equipment will be considered.
B. The contractor shall comply with all applicable laws, regulations, and standards describing traffic safety and control procedures and shall post appropriate signs, barricades, and flagmen to protect against dangers associated with the contractor’s activities.
C. The selected contractor shall be responsible for all services and supplies necessary to effectively perform the work defined (unless otherwise noted). This includes all labor, equipment, supplies, personal protective equipment, and materials.
D. When utilizing non-English speaking employees, each crew shall have at least one fluent English-speaking employee to communicate with customers and City personnel.
E. The contractor shall employ only such workers as are skilled in the tasks to which they are assigned. The City reserves the right to require the contractor to remove and/or not to assign any employee the City deems incompetent, careless, insubordinate, or otherwise objectionable to working on City projects.
F. All personnel shall be equipped with required Personal Protective Equipment as required by safety standards, provided by the contractor. Personnel shall have all tools required to perform the duties of each held position.
G. Any old or obsolete materials removed and/or replaced from equipment by the contractor should be properly disposed of by the contractor.
H. The contractor must keep copies of the safety data sheets (SDS) on-site for any chemical materials used.
I. All work should be conducted according to OSHA standards and regulations.
J. The majority of the equipment will be on the front of the lots, but there is some back lot underground on the City’s system.
3.10. Invoicing
The contractor shall furnish the City with Equipment Inspection Reports on a weekly basis. Billing invoices will be itemized and submitted on a weekly basis, with the Equipment Inspection Reports.
If follow-up work is needed to address the grading around the pad following a dig-out, the contractor should note this and report to the City.
3.11. Data Collection:
As part of the inspection process, the contractor is required to collect equipment data using a City-owned laptop. Inspection data to include the following:
A. Tag #
B. Size
C. Voltage
D. Manufacture Date
E. Manufacture
F. Secondary Voltage
G. Impedance
H. Inspection Date
I. Inspection Notes
J. Painted
3.12. Warranty/Workmanship:
A. Any work deemed by the City to be not satisfactory should be properly redone at the contractor’s expense.
B. Workmanship shall be free of defects for a period of (1) year from the final inspection. If a workmanship problem is found during the contract period because of poor workmanship, the contractor will be responsible to make necessary repairs at the contractor’s expense.
C. The contractor will be responsible for repairing all property damage caused by their work. The contractor will be responsible to communicate within 24 hours with a customer and resolve this in a timely manner. If the contractor fails to take corrective actions, the City reserves the right to withhold payment until damages are corrected or to correct damage and invoice the contractor for the cost incurred. If property damage is unavoidable and completion of work justifies such risk, the contractor shall notify the Contract Manager for approval prior to commencing work.
Work shall not commence until satisfactory arrangements have been made between the City and all affected property owners.
4. TERMS AND CONDITIONS
4.1. Insurance
The Company agrees that the Company shall keep and maintain general automobile liability insurance for $ 1,000,000 per occurrence for each vehicle and $1,000,000 in aggregate for all vehicles which the
Company brings onto City property or use in any manner in the provision of services, including transportation to and from the site(s) where the services are rendered; and the Company further agrees that the Company shall maintain general liability insurance for at least $2,000,000 per incident/occurrence and $2,000,000 in aggregate for all incidents/occurrence during the policy period;
and the Company agrees that the Company shall maintain Worker’s Compensation Insurance on all of the Company’s employees. In no event shall the Company serve as self-insurer for the purpose of
Workers Compensation Insurance.
The Company also agrees that the Company shall provide, in a form acceptable to the City, certificates of Worker’s Compensation Insurance, Automobile Liability Insurance, and General Liability Insurance.
Coverages must be maintained throughout the life of the contract, including any applicable warranty period.
4.2. Illegal Immigration Reform Act Compliance
The Bidder certifies that it will comply with South Carolina Code of Laws Sections 8-14-10 through 8-4-90
(as amended) titled, “Unauthorized Aliens and Public Employment,” and agrees to provide to the City any documentation required to establish, as applicable, (i) the inapplicability of such laws to the Bidder, its subcontractor(s) and its sub-subcontractor(s); and (ii) the compliance with these laws by the Bidder, its subcontractors, and its sub-subcontractors. Illegal Immigration Reform Act Compliance :
4.3. Indemnification
The Contractor shall indemnify and hold harmless the City from and against all liability, loss, damages, or injury, and all costs and expenses (including attorneys’ fees and costs of any suit related thereto), suffered or incurred by the City, to the extent arising from Contractor’s or its subcontractors’ (i) negligent performance of the Work under the Final Contract; (ii) intentional misconduct, negligent acts, or omissions during the performance of the Work; and (iii) breach of any term, covenant, representation, or warranty of the Final Contract.
4.4. Freedom of Information Act
All bids will be public information, per FOIA guidelines.
4.5. Iran Divestment Act
By submitting its Bid, the Bidder certifies that it:
(i) is not identified on the list of persons determined by the Executive Director of the State Fiscal
Accountability Authority to engage in investment activities in the country of Iran as described in South
Carolina Code of Laws Section 11-57-310 (as amended), or any other list of prohibited investments created by the State legislature;
(ii) will not take any action causing it to appear on any such list during the term of the Final Contract;
and
(iii) will not utilize any subcontractor that is identified on any such list to provide goods or services thereunder.
4.6. Non-Appropriation of Funds
This Agreement shall be subject to the availability and appropriation of funds by Management and City
Council. Management and City Council appropriate funding on an annual basis during each fiscal year. If
Management or City Council does not appropriate the funding under this agreement, the City will not be obligated to pay amounts due beyond the fiscal year for which funds were appropriated. No act or omission by the City, which is attributable to non-appropriation of funds, shall constitute a breach of or default under this Agreement.
4.7. Statement on Disadvantaged Business Enterprises (DBE)
(i) The City recognizes that business firms owned and operated by minority persons and women have been historically restricted from full participation in our free enterprise system to a degree disproportionate to other businesses.
(ii) The City believes that it should work to ameliorate past discrimination by facilitating the participation of underrepresented groups in the City’s economic community and that such participation is in its best interests and the best interests of its citizens.
(iii) The City will work to ensure that such underrepresented groups, and the businesses they own and lead, are afforded the maximum practicable opportunity—in balance with financially safe and sound business practices–to compete for and perform contracts when the City is procuring construction services, supplies, equipment contracts, lease agreements, or consultant and other services, within the laws of the State of South Carolina.
(iv) The City endeavors to develop, establish, implement, and administer its policies, programs, and procedures to promote balanced economic growth throughout its community.
Accordingly, the City shall not discriminate and shall prohibit discrimination in its selection and retention of contractors, subcontractors, and suppliers, against any person or business on the basis of race, color, national origin, religion, sex, sexual orientation, gender identity, marital status, status as a parent, age, disability, genetic information, or military status. The City recognizes that disparate treatment on any such basis in the pursuit of economic opportunities is intolerable discrimination.
4.8. City Business License
The winning Bidder, prior to execution of the Final Contract, must possess or obtain a City of Rock Hill
Business License. Such license must be maintained throughout the duration of the Work. If the Bidder is not currently doing other business inside the City limits, the fee for such a license is based on the amount of the Final Contract. If the winning Bidder is currently doing other business within the City limits and does not possess a business license, then the fee for the license is based on the total gross receipts from customers within the City limits. Contact the City Business License Office at 803-329-5590 to determine the exact amount of the fee or ask other pertinent questions regarding doing business in the City of Rock Hill.
4.9. Excluded Bidders
Bids from companies may be excluded for any of the following reasons:
(i) Reason to believe collusion exists among the companies
(ii) The Company is involved in any litigation against the City
(iii) The Company is in arrears on any existing contract or has defaulted on a previous contract with the
City
(iv) Lack of financial stability
(v) Failure to perform under previous or present contracts with the City
(vi) Is currently debarred by the State of South Carolina Procurement Services
Excluded vendors/contractors can resubmit complete company information with references for City review after a minimum of one (1) year from the last excluded Bid. The City will contact the submitting vendor/contractor with its decision within thirty (30) days of company information submittal. The City reserves the right to include or exclude said vendor/contractor based on findings.
4.10. Local Purchasing
It is the City of Rock Hill’s intent to promote the use of local businesses and hire citizens living within the local Rock Hill/York County area when possible.
(i) Local vendors, services, contractors, companies, and businesses (Rock Hill/York County) with a valid
City of Rock Hill business license may have the opportunity to receive a 3% or a 5% adjustment factor during the consideration of bids. A local vendor, service, contractor, company, or business is defined as a business offering the services and or products being bid. The business must have been established for not less than one year within York County limits along with holding a valid City of Rock Hill Business
License for the entire year prior to the bid date. City Council shall be entitled to make the final decision as to whether such business is local and may at its discretion consider factors such as the length of time before issuance of the local business license, the actual physical presence within the corporate limits or within York County, property taxes attributable to such entity received by the City of Rock Hill, local employment, and any other reasonable factors to ensure that this policy is not being circumvented.
(ii) Businesses located within the Rock Hill municipal limits may be considered for a 5% adjustment factor. Businesses located in York County outside the Rock Hill municipal limits may be considered for a
3% adjustment factor.
(iii) The maximum value of the percentage adjustment factor will be capped at $25,000.
(iv) If a local business is within the percentage guideline not exceeding $25,000 of the lowest Bid received, the local business may be considered the bid award if it is willing to provide goods or services at the price of the lowest bid received.
(v) If conditions above are met, and the local business is not willing to provide goods or services at the price of the lowest Bid received, the consideration of the bid award will revert to the lowest Bid received or the next lowest local business within the percentage (maximum $25,000) adjustment factor threshold.
(vi) The contractor and or business must make a reasonable attempt to hire local Rock Hill/York County residents.
(vii) Selected contractor (s) must make a reasonable effort to purchase/lease all material, equipment, and supplies associated with the awarded Bid from a local business with a valid City of Rock Hill Business
License.
(viii) Contractor(s) receiving the award must supply the City with a list of their employees working on the project which includes the cityown in which they reside along with a list of all equipment, material, suppliers, and subcontractors and their addresses (This list will be used in the evaluation process).
(ix) Special consideration may be given to companies that have products produced and/or manufactured in the United States.
(x) Local Purchasing provisions of this section will be in effect and apply to bidding until June 30, 2023, and expire unless re-authorized by the City Council.
(xi) Local Purchasing adjustment factors cannot apply:
(a) to Federally Funded Projects
(b) to State-Funded Projects where the State restricts the use of local preferences under such circumstances; or
(c) to projects funded by Bond proceeds where the Bond covenants restrict the manner of procurement.
(xii) Utilization of the Local Purchasing program requires a minimum of three bids; if three or more bids are not received, the Local Purchasing program cannot be utilized.
4.11. Customer Service
Please remember, although you are a contracted City service, you each represent the City of Rock Hill during all work performed, face-to-face as well as telephone conversations. These guidelines are to give all contract employees a solid feeling of what the City of Rock Hill expects from any contracted service.
Overview:
• Be friendly, courteous, and helpful
• Company uniforms must be worn at all times
• Staff members must look and act professionally at all times
Company's Employees:
Before the contractor can enter the project site, it shall investigate and determine that its employees working on the project site are not listed on the sexual offender registry. The contractor shall require all subcontractors to make a similar investigation. One such investigation within six (6) months of commencement of the project work, by the employer, fulfills the City’s requirement for the project.
The Rock Hill Police Department along with the City of Rock Hill also reserves the right to cancel any contracts, agreements, purchasing or distribution, etc., if they feel the project, purchasing, vehicle(s), and or property(s) may be in jeopardy due to the contractor’s employee(s) having a criminal history which may lead to ethical issues while dealing with City workings or investigative activities.
5. VENDOR QUESTIONNAIRE
5.1. ........................................................................................................ Bi dder Information*
Please provide the following information:
• Company (legal name)
• Name and Title of Primary Contact
• Telephone Number
• Email Address
• Address
*Response required
5.2. ........................................................................................................ Bi dder Confirmation*
The Bidder affirms that we have read and understand the enclosed IFB requirements and specifications and do submit this proposal for: Underground Electric Equipment Maintenance, Rebid.
☐ Please confirm
5.3. ........................................................................................................ Re ferences*
Please provide the name, address, telephone number, and e-mail address of at least three (3) recent customers for whom your company has provided similar products/services.
*Response required
5.4. ........................................................................................................ Su spension and Debarment Certification*
The Company certifies, by submission of this bid, that neither it nor its principals are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal, state, or local agency. Where the submitting entity is unable to certify any of the statements in this certification, such company shall attach an explanation to the submission.
☐ Please confirm
5.5. ........................................................................................................ Ille gal Immigration Reform Act Compliance*
The Company certifies that it will comply with South Carolina Code of Laws Sections 8-14-10 through
8-4-90 (as amended) titled, “Unauthorized Aliens and Public Employment,” and agrees to provide to the City any documentation required to establish, as applicable, (i) the inapplicability of such laws to the Company, its subcontractor(s) and its sub-subcontractor(s); and (ii) the compliance with these laws by the Company and any subcontractors or sub-subcontractors.
☐ Please confirm
*Response required
5.6. ........................................................................................................ Ira n Divestment Act *
The Company certifies that it:
1) is not identified on the list of persons determined by the Executive Director of the State Fiscal
Accountability Authority to engage in investment activities in the country of Iran as described in South
Carolina Code of Laws Section 11-57-310 (as amended), or any other list of prohibited investments created by the State legislature;
2) will not take any action causing it to appear on any such list during the term of the Final Contract;
and
3) will not utilize any subcontractor that is identified on any such list to provide goods or services thereunder.
☐ Please confirm
*Response required
5.7. ........................................................................................................ Cu stomer Service Confirmation*
The Company representative has read and agrees to the standards set forth in the City's Customer
Service agreement.
☐ Please confirm
*Response required
5.8. ........................................................................................................ ** *The questions below are for tracking purposes only and will have no bearing on the award of the contract.***
5.8.1. Is your Company located within the Rock Hill City limits? *
☐ Yes
☐ No
*Response required
5.8.2. Is your Company located within York County?*
☐ Yes
☐ No
*Response required
5.8.3. Is your company a disadvantaged business enterprise (DBE)?*
DBEs are for-profit small business concerns where minority individuals or women own at least a 51% interest and also control management and daily business operations. African Americans, Hispanics, Native Americans, Asian-Pacific, and Subcontinent Asian Americans are presumed to be minorities.
☐ Yes
☐ No
*Response required
5.8.4. If your company is a DBE, is it registered and certified with an authorized agency?
Examples of South Carolina agencies authorized to certify are:
• Department of Transportation (SCDOT) South Carolina Unified Certification Program (SCUCP)
• SC Division of Small and Minority Business Contracting and Certification
☐ Yes
☐ No https://www.scdot.org/business/bus-development-dbe-certification.aspx https://osmba.sc.gov/index.html
6. PRICING PROPOSAL
PRICING FOR INSPECTIONS & SERVICES
Quantities based on estimated number of services/year.
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Inspection - Single Phase Transformer
(Rusted holes, leaks, level of the unit, Penta head locking mechanism, transformer pad condition, condition of elbows and cables, grounding connection, warning decal, infrared test, data collection, and cleaning out ant mounds and treatment)
329 each
2 Inspection - Three Phase Transformer
(Rusted holes, leaks, level of the unit, Penta head locking mechanism, transformer pad condition, condition of elbows and cables, grounding connection, warning decal, infrared test, data collection, and cleaning out ant mounds and treatment
52 each
3 Inspection -Single Phase junction box
(Rusted holes, leaks, level of the unit, Penta head locking mechanism, transformer pad condition, condition of elbows and cables, grounding connection, warning decal, infrared test, data collection, and cleaning out ant mounds and treatment.
35 each
4 Inspection -Three Phase Junction Box
(Rusted holes, leaks, level of the unit, Penta head locking mechanism, transformer pad condition, condition of elbows and cables, grounding connection, warning decal, infrared test, data collection, and cleaning out ant mounds and treatment.
138 each
Line Item Description Quantity Unit of
Measure Unit Cost Total
5 Inspections - Switchgear (Rusted holes, leaks, level of the unit, Penta head locking mechanism, transformer pad condition, condition of elbows and cables, grounding connection, warning decal, infrared test, data collection, and cleaning out ant mounds and treatment
21 each
6 Dig Out - Single Phase Transformer
(Dig out from around unit approximately 3" below pad)
40 each
6 Dig Out - Single Phase Junction Box
(Dig out from around unit approximately 3" below pad)
5 each
7 Dig Out - Three Phase Junction Boxes -
(Dig out from around unit approximately 3" below pad)
7 each
8 Dig Out - Switchgears (Dig out from around unit approximately 3" below pad)
2 each
Unit Cost Total
9 Painting - Single Phase Transformers
(Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and information)
120 each
Unit Cost Total
10 Painting - Three Phase Transformers
Between the Range of 75 - 150 KVA
(Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and
16 each
Unit Cost Total
11 Painting - Three Phase Transformers
Between the Range of 225 - 500 KVA
(Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and
10 each
Unit Cost Total
12 Painting - Three Phase Transformers
Between the Range of 750 - 1,500 KVA
(Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and
3 each
Unit Cost Total
13 Painting - Three Phase Transformers
Between the Range of 2,000 - 3,000
KVA (Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and
1 each
Unit Cost Total
14 Painting - Switchgears (Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply
Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with
Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc. required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and
5 each
Unit Cost Total
15 Painting - Single Phase Junction Boxes
(Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and
5 each
Unit Cost Total
16 Painting - Three Phase Junction
Boxes(Clean all rust from around sill and from around the penta locking mechanism, patch any small holes with
Vanfastic where needed and fill in with putty, sand outside of unit with air sander, wire brush in areas hard to reach, apply Neutra Rust 661 with brush to all rusted areas and in the groove around sill, lid, and locking mechanism, prime unit with Keeler and Long primer on all heavily sanded areas, paint unit with Keeler and Long finish coat, apply proper KVA stickers on location required by customer specifications, put warning and danger stickers on per customer specifications, close unit up, tighten penta bolt up and install locks, etc.
required by the customer, pick up all debris from around unit and put in trash container on a truck, double check and make sure inspection form has been properly filled out with correct Map I.D. number and information)
20 each
17 Patching Unit - up to 3 Sq-Inch for transformers, switchgears, and junction boxes that requires a major hole patch.
10 each
18 Patching Unit - 4 - 6 Sq-Inch for transformers, switchgears, and junction boxes that requires a major hole patch.
20 each
19 Patching Unit - Greater Than 6 Sq-Inch for transformers, switchgears, and junction boxes that requires a major hole patch.
15 each
20 New Penta Head Bolt 12 each
Unit Cost Total
21 Installing Retrofit Penta Head Locking
Mechanism 10 each
22 Cut all limbs, shrubs and grass, etc.
from around unit for proper working area; approximately 2 to 3 feet
2 each
23 Underground Fault Indicator Battery testing.
100 each
24 Infrared Inspection 575 each
TOTAL