UH-72A Draft PWS 2025 Award.pdf

PDF 518 KB Posted

Attached to
UH72A Follow-On
Solicitation number
N0042124RFPREQ51000MA0044
Issued by

About this file

This sources sought notice requests capability statements from interested parties for a follow-on UH-72A helicopter logistics support services contract. The current incumbent is Airbus Helicopter, Inc. under contract N00421-20-D-0010 which expires on 14 January 2025.

The Naval Air Warfare Center Aircraft Division will issue a request for proposal as a single-award indefinite delivery/indefinite quantity contract with cost-plus-fixed-fee, cost, and firm-fixed price contract line items. The North American Industry Classification System code is 488190 and size standard is $40 million. Interested parties must submit capability statements by 12:00 PM Eastern on 7 March 2024 demonstrating experience, technical skills, and any existing data agreements to perform maintenance, engineering, and logistics requirements for five UH-72A helicopters as described in the attached draft performance work statement. The notice requests company profile and small/large business status information for market research purposes.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT FOR THE

U.S. NAVY TEST PILOT SCHOOL UH-72A HELICOPTER

PERFORMANCE-BASED LOGISTICS SUPPORT CONTRACT

1 Scope

This Performance Work Statement (PWS) is to provide Performance-Based Logistic (PBL) support services required to support five (5) U.S. Navy (USN) UH-72A helicopters owned by the U.S. Naval Test Pilot School (USNTPS), Patuxent River, Maryland. This effort shall include all maintenance support services and equipment to include

Sustaining Engineering. The UH-72A is a commercial derivative of the Euro-Copter EC-145, a Federal Aviation

Administration (FAA) certified medium helicopter. The Contractor shall provide FAA certified “Ready to Fly” aircraft for USNTPS with the use of a PBL Support contract. This is a "dry" contract in which the Contractor will not be expected to purchase fuel. The Original Equipment Manufacturer (OEM) is Airbus Helicopter, Inc. located in Grand Prairie, Texas. The OEM owns the technical data necessary to support the maintenance of this aircraft.

1.1 The Contractor shall provide comprehensive material and maintenance support services to provide “Ready to

Fly” FAA certified aircraft to meet the USNTPS training requirements. The Contractor shall provide FAA Airframe and Powerplant (A&P) mechanics to perform all touch labor, support and ground handling equipment (e.g. ground handling wheels, maintenance stands, tow- bars), spares and any other logistics items required to provide turnkey logistics support to the UH-72A fleet in accordance with FAA requirements.

1.2 The Contractor shall provide the engineering support for the UH-72A program. The Contractor shall have access to the technical data required to maintain the airworthiness of the five (5) USNTPS UH-72A Aircraft. These engineering services are required to support existing and planned Navy-specific modifications to the aircraft and for continuing support of Navy-specific engineering data requests and consultation. The Contractor shall ensure that all services are performed by qualified personnel. The services provided include engineering analyses, technical liaison, Designated Engineering Representative support, technical publications and logistical support. The Contractor shall be available in the case where there is an incident or accident whose analysis and recommended repair is beyond the technical scope of the maintenance support services.

2 Applicable documents:

All work performed by the contractor shall be accomplished in accordance with applicable publications, technical directives, instructions, standards, and procedures contained in pertinent manuals using blueprints, drawings or schematics as provided by USNTPS squadron. All applicable technical manuals, forms, publications, bulletins, directives, specifications, standards, and field procedures guides shall be used and will be provided by the

Government. The contractor shall utilize the most recent document. In the case there is a conflict between this and any applicable document, the Contractor will be referred to the USNTPS Technical Point of Contact (TPOC) or the

Contracting Officer’s Representative (COR) for resolution.

2.1 Reference Documents:

Document type Instruction / Manual

Date

Title

COMFISCINST 5090.1 Ch.8 6 November 2018 Hazardous Material Control and Management

(HSC&S) Plan

COMNAVREGSIDLANT

6280.1A

21 May 2018 Regional Consolidated Hazardous Material

Reutilization and Inventory Management Program

(CHRISP)

DOD Manual 4145.26-S 13 March 2008 DOD Contractor’s Safety Manual for Ammunition and Explosives

DoD Manual 5200.02 21 March 2014 DoD Personnel Security Program

DoD Manual 5200.01 9 September 2018 DoD Information Security Program: Controlled

Unclassified Information (CUI) Vol. 4

DoD Manual 5230.24 Revision 3 15 October 2018 Distribution Statements on Technical Documents

System Safety

DoDM 5400.07 25 January 2017 Freedom of Information Act (FOI) Program

SIL-STD-882 Series 11 May 2012 Foreign Object Damage (FOD)

SIL-STD-980 Series 30 July 1982 Prevention in Aerospace Products

National Aerospace Standard

(NAS) 411

Hazardous Materials Management Program

NASPAXRIVINST 3710.5 Series Air Operations Manual

NASPAXRINST 5510.15Q 7 March 2012 Naval Air Station Patuxent River Maryland Security

Access

NAVAIRINST 5510.38 7 February 2013 Naval Air Station Patuxent River Maryland Security

Access

NAVAIRINST 13030.1A 10 October 1989 Acceptance for Navy Service and Release for Flight of Commercial Aircraft

NAVAIRINST 13050.6A 5 June 2012 Configuration Management Policy, Procedures and

Responsibilities for Aircraft Assigned to Naval Air

Systems Command Aircraft Controlling Custodian

NAVAIRINST 13100.15 30 March 2002 Engineering Technical Review of Commercial

Derivative Aircraft Programs

NAVAIRINST 3710.1H 27 May 2016 Contractor’s Flight and Ground Operations

NAVAIRWARCENACDIV

5510.1 Series

5 June 2014 Naval Air Warfare Center Aircraft Division

Personnel, Information, and Industrial Security

Program

NTWLINST 3140.1 Series 9 April 2014 Disaster Response and Destructive Weather/ Aircraft

Evacuation Plan

NTWLINST 3710.7 Series 29 November 2018 Naval Test Wing Atlantic General Flight and

Operating Instructions

NTWLINST 8020.1 Series Naval Test Wing Atlantic Ordnance Standard

Operating Procedures

CNAF S-3710.7 5 May 2017 NATOPS General Flight and Operating Instruction

OPNAVINST 3750.6 Series 13 May 2014 The Naval Aviation Safety Management System

OPNAVINST 5090.1 Series 10 January 2014 Environmental Readiness Program Manual

OPNAVINST 3440.17 Series 1 August 2014 Navy Installation Emergency Management Plan

OPNAVINST 5100.23 Series 30 December 05 Safety and Occupational Health Program

OPNAVINST 5102.1 Series 7 January 2005 Navy and Sarine Corps Mishap and Safety

Investigation, Reporting and Record Keeping

OPNAVINST 5239.1 Series 18 July 2018 Navy Information Assurance (IA) Program

OPNAVINST 8000.16 Series 24 May 2012 Naval Ordnance Management Policy

OPNAVINST 8020.14 Series 15 February 2013 Department of the Navy Explosives Safety

Management Policy Manual

SECNAVINST 5239.3 Series 2 May 2016 Department of the Navy Cybersecurity

SECNAV S-5510.30

30 June 2006 DON Personnel Security Program Manual

SECNAV S-5510.36 1 June 2006 Information Security Program

3 Requirements

3.1 General Requirements

3.1.1 Compatibility: The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government’s Information Technology (IT) environment through the security classification of Unclassified. The operating environment required for this effort includes, but is not limited to, current versions of applicable Microsoft Office products, internet browsers (Google, MS Edge, etc), and Adobe Acrobat.

3.1.2 The Contractor shall maintain the ability to interface with and transfer data to and from the requiring office software applications and their upgraded versions. The Contractor shall maintain current anti-virus software to ensure virus-free media when delivered. The Contractor shall be capable of Internet and local area network (LAN) communications with USNTPS, COR and the Naval Air Warfare Center Aircraft Division

(NAWCAD) contracting office. The Contractor personnel shall maintain real-time communications, both voice and data transfer capabilities, with Government during working hours whether at Contractor work site or on travel.

3.1.3 Work Location and Facilities:

3.1.3.1 Work Location: Approximately 100% of the effort outlined in paragraph 3.3.1 shall be performed at the

Government’s primary site of performance, Naval Air Station Patuxent River, Maryland. The Contractor performing on-site support will be provided access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks.

3.1.3.2 The Contractor personnel are not required to reside at place of performance in Patuxent River, MD to support paragraph 3.3.2, however some limited travel may be required to make repairs on the aircraft.

3.1.3.3 Meeting Support: The Contractor shall have the capability to host and conduct non-classified meetings via Video Teleconference (VTC) for a minimum of 15 persons, to include the capability for project presentations as required in paragraph 3.1.1.

3.1.4 Contract Status Reporting: The Contractor shall provide data deliverables as specified in Exhibit A, DD

Form 1423 Contract Data Requirement List (CDRL A001 – A009) in accordance with the PWS.

3.1.4.1 Monthly Progress and Financial Status Report: The Contractor shall provide a Monthly Progress and

Financial Status Report in accordance with Exhibit A, CDRL A001.

3.1.4.2 The Contractor shall host the initial Program Management Review (PSR) at the USNTPS facility six (6) months after the performance start date of the contract. The annual follow-on PSR may be held at

Contractor’s facility or NAS Patuxent River, MD at the Government’s discretion. The Contractor shall be prepared to conduct PSR via VTC and/or face-to-face at the Government's discretion. The Contractor shall submit the PSR Agenda and Notes in accordance with Exhibit A, CDRL A002.

3.1.4.3 The Contractor shall provide a daily and monthly status report to the Government on sustainability of the

USN UH-72A in accordance with Exhibit A, CDRLs A006 and A008.

3.1.4.4 It is the intention of the Government that technical data developed and delivered in execution of this contract shall become Government property upon acceptance of the technical requirements. As the

Technical Data will be developed and delivered as Over and Above on separate task orders, the technical data will be negotiated on a case-by-case basis. Technical Data shall be submitted in accordance with

Exhibit A, CDRL A003.

3.1.4.5 Contract Data Requirements List:

• CDRL A001 - Monthly Status Report (SSR)

• CDRL A002 - Program Management Review Agenda and Notes

• CDRL A003 - Technical Data

• CDRL A004 – Phase-Out Transition Plan

• CDRL A005 - O&A Status Report

• CDRL A006 - Daily Aircraft Readiness / Availability Status Report

• CDRL A007 - Logbooks and Records, Aircraft and Aeronautical Equipment

• CDRL A008 - Flight Hour Monthly Recap Report

• CDRL A009 - Contractor Ground and Flight Operating Procedures

3.1.5 Work Schedule: The Contractor shall provide the required services and staffing coverage during normal working hours. The normal USNTPS operational flight hours are from 8:00 AM to 6:00 PM. Although not currently scheduled, occasional evening operational hours may be required up to 11:00 PM. In case of evening flight operations, the flight day shall be limited to 10 hours. The Contractor may be required to provide support for surge capability on weekends, on a case-by-case basis. Notification of night and weekend surge operations will be provided no later than 48-hours prior to the Contractor requirement.

Normal workdays are usually 8.5 hours (including a 30-minute lunch break) each Monday through Friday

(except on the legal holidays specified in paragraph 3.1.5.2).

3.1.5.1 Compressed Work Schedule (CWS), if authorized by USNTPS, is an alternative work schedule to the traditional five 8.5-hour workdays (which includes a 30-minute lunch) worked per week. Under a CWS schedule, an employee completes the following schedule within a two-week period of time: eight weekdays are worked at 9.5 hours each (which includes a 30-minute lunch), one weekday is alternately worked as 8.5 hours (which includes a 30-minute lunch) and one weekday is not worked by the employee. The result is 80 hours worked every two weeks, with 44 work hours one week and 36 work hours the other. If the Contractor is authorized and chooses to allow its employees to work a CWS schedule in support of this contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this contract and shall not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage when required by the Government.

3.1.5.2 Holidays: The Government observes the following holidays. With the exception of the events in section

3.1.5.3, the Contractor is permitted to observe the following Holidays in accordance with its company policy.

• New Year’s Day, January 1

• Martin Luther King’s Birthday, the third Monday in January

• President’s Birthday, the third Monday in February

• Memorial Day, the last Monday in May

• Juneteenth June 19

• Independence Day, July 4

• Labor Day, the first Monday in September

• Columbus Day, the second Monday in October

• Veteran’s Day, November 11

• Thanksgiving Day, the fourth Thursday in November

• Christmas Day, December 25

3.1.5.3 Installation Closure: When Federal facilities are closed by the Government, or when Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents Federal personnel from working at the

Government facility, Contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies.

3.1.5.4 The Contractor may be allowed to work at the Government’s facility in very limited circumstances without Government oversight, if the work is deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by

Contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer must concur with any determination that work being performed by

Contractor personnel is mission essential.

3.1.5.5 Overtime cannot be charged directly to the contract unless first approved in writing by the Contracting

Officer’s Representative (COR) and the Chief of Contracting Office (CCO).

3.1.6 Other Direct Costs (ODC): The Contractor shall not be allowed to charge ODC unless prior approval is granted, in writing, by the Contracting Officer, or as delegated to the COR. The Contractor shall not, under any circumstances exceed the total amount obligated for the specific work request until the amount is expressly modified by the Contracting Officer via a written contract modification.

3.1.6.1 Non-emergent travel, not to include aircraft recovery (PWS para 3.3.1.14.1), will be quoted and approved as an Over and Above at the task order level. Temporary travel to other locations in support of program tasking may be required. Travel to Patuxent River, MD for the purpose of technical reviews, meetings, and possible field team actions may be required.

3.1.6.2 All materials not depleted during the performance of this contract shall become Government property upon completion of this contract. The Contractor shall transfer all materials that have not been depleted to the TPOC by way of Material Inspection and Receiving Report (DD Form 250), or DD Form 1149.

3.1.7 Management of Contractor Personnel: The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances will the

Government assign tasks to, or prepare work schedules for, individual contractor employees. The

Contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services.

3.1.7.1 Provisions stated herein shall be clearly and effectively communicated to all subcontractors and consultants providing support under this contract by the prime contractor. All provisions of this PWS shall flow down to subcontractors providing support under this contract via the prime contractor and the

Government will not take position to advise or conduct business directly with sub-contractors.

3.1.8 Transition Out Strategy: The Contractor’s overall transition out strategy shall be built around maintaining the mission of the USNTPS UH-72 program with minimal impact, not only in terms of timeliness of performance but also to ensure that critical data and knowledge transfer occurs. Upon termination or expiration of the contract, the Contractor shall ensure an orderly transition of responsibilities, while minimizing impact to the operation. Within sixty (60) days of completion of the contract, the Contractor shall cooperate with the Government and any new Contractor(s) to provide transition assistance during the transition period. Such assistance shall be focused on providing continuity of contractual requirements during this period and shall include transitional planning to allow uninterrupted performance of necessary logistics support by the successor Contractor (would be selected prior to the end of this contract). The

Contractor shall continue to be responsible for contractual logistic support during this transition period. The

Contractor shall submit a Transition Out Plan, to include the minimum elements listed below and in accordance with Exhibit A, CDRL A004.

3.1.8.1 The Contractor shall provide a plan of action to effectively transfer services that are in process at the expiration or termination of the contract to the successor company. The Contractor shall establish and maintain effective communication with the incoming Contractor and the Government personnel for the period of transition via weekly status meetings.

3.1.8.2 The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period to the successor company.

3.1.8.3 The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.

3.1.8.4 The Contractor shall provide a plan of action to ensure transfer of Government-owned equipment during the transition period to the successor company.

3.1.8.5 The Contractor shall comply with federal, state, local, and international laws and regulations concerning hazardous material management. The Contractor shall prepare a Hazardous Materials Management

Program (HSSP) Plan in accordance with (IAW) National Aerospace Standard (NAS) 411. The

Contractor shall request approval to use substances identified in the Environmental Protection Agency

Fiscal Year 2017 list. The Contractor shall not use any Class 1 Ozone Depleting Chemical/Ozone

Depleting Substance in the maintenance of items required by this contract without waiver from the

Contracting Officer.

3.1.8.6 The Contractor shall provide a plan of action for the efficient inventory and transfer of Government owned technical program data and maintenance information to the successor company.

3.1.9 Over and Above (O&A) Work Requests, in accordance with DFARS 252.217-7028, “Over and Above

Work.” The Government Contracting Officer will issue all Work Requests to the Contractor. The

Contractor is NOT authorized to proceed with any O&A work without prior approval from the Contracting

Officer.

3.1.9.1 The Contractor’s O&A work shall be issued using either the Standard Method or Urgent Method as described in paragraph 3.1.9.5 or 3.1.9.6 unless authorized under the urgent method (see below), the authorization to proceed must be via a modification executed by the Contracting Officer.

3.1.9.2 For each of the items contained within the applicable O&A work request, the Contractor shall propose a reasonable degree of detail to support the basis of the effort. The Government will review the

Contractor’s proposal for reasonableness and completeness and if the proposal is acceptable, the

Government will issue a contract modification authorizing execution of the required effort along with any special instructions.

3.1.9.3 The Contractor shall propose labor categories with labor rates, materials and ODC (travel and materials) to establish a firm-fixed-price for travel in support of the PWS and O&A requirements that shall be authorized in advance by the Contracting Officer and quoted as Over and Above actions.

3.1.9.4 Each O&A request shall have a tracking number assigned to it using the following convention:

3.1.9.4.1 OA-(2-digit fiscal Year) - (3-digit sequential number). For example, the first O&A work request issued for FY19 would be OA-19-001; the second OA-19-002 and so forth. The tracking number should be indicated on all correspondence regarding the specific O&A effort including the Government work request, the Contractor’s estimate and the associated contract modification.

3.1.9.5 Standard Method: When O&A effort is required, the Contractor shall promptly notify the Contracting

Officer via a Contractor O&A work request. The Contractor O&A work request can be in Contractor format but shall include at a minimum:

• Date prepared.

• Work request number.

• Aircraft identification.

• Location of Aircraft.

• Detailed description of work to be performed including damage, problem or other maintenance issue, proposed corrective action, and reason it is required.

• Certification that work to be performed is not otherwise covered by the flying hour rate CLIN in effect at the time.

• Proposed repair schedule.

• CLIN(s) that work is to be performed under (O&A, Maintenance, Travel, Material and

Transportation, etc.).

• Cost breakout by CLIN, appropriate to described effort to be performed.

• Labor Categories and estimated man-hours.

• Material and ODC breakout with estimated cost.

• Proposed travel.

3.1.9.6 Urgent Method: Certain situations may require expedited execution of O&A labor effort and associated

(material, travel, etc.) CLIN. Such situations may include, but are not limited to, precautionary landings, natural disaster or a national emergency. In such a scenario, the Contracting Officer, after ensuring that sufficient funds are available to initiate the effort, may provide the Contractor with a verbal or e-mailed authorization to proceed with the engineering analysis required to establish the O&A proposal along with instructions on a not to exceed price (funded ODC CLIN) ceiling price. Depending on the nature of the urgency, this authorization may be issued either prior to or after receipt of the Contractor’s work request.

In the case where the authorization is provided prior to receipt of the Contractor’s work request, the

Contractor and the Contracting Officer will jointly agree to a schedule for submission of the Contractor’s work request, as described above in the Standard Method section 3.1.9.2, as well as a schedule for execution of the contract modification. Any verbal information provided by either the Contractor or the

Contracting Officer or the Contracting Officer’s Representative will be confirmed in writing within forty-eight (48) hours of transmission of the verbal information.

3.1.9.7 In the case of component replacement actions which the contractor believes to be subject to the limitations, exclusions, or other exceptions to contractor responsibility for component replacement under full PBL coverage, the Contractor shall submit its estimate to the Contracting Officer or delegated representative in accordance with the notification method described in paragraph above. No liability against the Government for payment shall be presumed unless and until such estimate shall be presented and accepted by the Government and all matters regarding assertion of such rights that are not amicably resolved, if any, shall be a matter subject to the Disputes Clause.

3.1.10 Personnel

3.1.10.1 The Contractor shall maintain the personnel, organization, and administrative control necessary to ensure that the work delivered meets contract flight hour requirements and specifications.

3.1.10.1.1 The work history of each Contractor employee must contain experience directly related to the labor category he/she is intended to perform under this contract.

3.1.10.1.2 All Airframe & Powerplant (A&P) mechanics shall have EC-145 and Arriel 1E2 familiarization training documented within 6 months of employment.

3.1.10.1.3 The Government reserves the right, during the life of the resulting contract, to request work histories on any Contractor employee for the purpose of verifying compliance with the applicable labor category qualification assignment.

3.1.10.2 The Contractor shall establish labor categories with fixed labor rates and materials and ODC (travel and other materials) at cost to establish a firm-fixed-price for O&A in support of Material and Maintenance

Support Services, paragraph 3.3.1.

• Program/ Project Management

• Program/ Project Analysis

• Engineer

• Engineer Technician

• Mechanic / Technician

3.1.10.3 The Contractor shall establish labor categories with fixed labor rates and materials and ODC (travel and other materials) at cost to establish a firm-fixed-price for orders in support of paragraph 3.3.2.

• Program/ Project Management

• Program/ Project Analysis

• Engineer

• Engineering Technician

• Mechanic/ Technician

3.1.10.4 As part of contract overhead and management, the Government desires defined and empowered Contractor

Program Manager and Site Maintenance Manager.

3.1.10.4.1 Program Manager/ Project Manager: The Contractor Program Manager (Prime Contractor) is considered the single point of contact whom coordinates the Government customer access to the varied logistics, business and engineering disciplines required to maintain a flight-ready fleet of helicopters under the contract. The Contractor Program Manager’s ability to interface with all disciplines in the Contractor's organization is designed to streamline Government communication in support of the mission.

3.1.10.4.2 Site Manager: NAS Patuxent River Site Manager (specific to Maintenance Support Services paragraph

3.3.1 and O&A performance of paragraph 3.3.1 and 3.3.2) shall be the interface of the users of these aircraft and the Contractor. This individual must have knowledge of both U.S. Navy Operations and

FAA based maintenance. The Site Manager shall be available on-site during normal business hours, be an A&P mechanic with at least four years of experience managing a similar aircraft maintenance organization, with demonstrated experience effectively interacting with Government Oversite, Government Operations and Military Command Structures.

3.1.10.5 The Government will provide the following support:

• Basic facilities and infrastructure such as office and secure storage space, hangar, storage room and shelves

• Adequate back shop support facilities

• Fuel truck services including pump system operator

• Emergency medical care for Contractor personnel should on-site medical emergencies occur

• Fire inspection and firefighting services for Contractor occupied facilities

• Hazmat removal and waste disposal services

• Access to the Government facilities as needed to facilitate the Contractor’s operations. The five

(5) Government-owned UH-72A aircraft will operate from and be stored in hangar 110 while office space will be provided in the adjacent building

• Flight line and hangar deck fire extinguishers

• An UH-72A forecasted flight schedule 24 hours in advance of normal training operations, and

“head’s up” information of any known deployments or potential “short-notice” missions 48 hours in advance unless designated as support for national emergency contingency operations

• Provide the Contractor with a planned monthly flight hour schedule within thirty (30) days of each month

• Debrief Contractor as part of immediate post-flight procedures or as soon as possible relative to any discrepancies

• Minimum Equipment List

• Petroleum, Oils and Lubricants products listed in BK-117 C-2 Aircraft Maintenance Manual identified with a “CS-No.” in the 100 series (1xx)

• Ferry-fly serviceable UH-72A to any sustainment/depot facilities and back to the primary performance site

• Perform post-maintenance function check flights

• Flight Test Instrumentation System Mission Equipment Package (SEP) installation, removal, repair and configuration management, including software and documentation

• Furnish all data and technical information specific to the operation and mission of USNTPS not held by the Contractor in order to facilitate the requested analyses

3.2 Security

3.2.1 Citizenship Requirements: Only U.S. citizens may perform under this contract. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request should include:

3.2.1.1 The individual's name, date and place of birth, position title, and current citizenship.

3.2.1.2 A statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements.

3.2.1.3 A statement of the unusual expertise possessed by the applicant.

3.2.1.4 A statement that access shall be limited to a specific Government contract (specify contract number).

3.2.1.5 A statement that the Contractor has obtained an export license for the information required to perform the contract.

3.2.2 Investigative Requirements

3.2.2.1 Security Clearances: Security clearances are not required for the contracted workers. NAS Patuxent

River access for the Contractor employees shall be as prescribed in NAVAIRINST 5510.38, and

NASPAXRINST 5510.15 Series.

3.2.2.2 The Contractor shall provide sufficient measures of security as needed to protect Government-provided information as well as Contractor provided data, equipment, personnel and materials, especially as aggregate visibility may expose fleet operational readiness and sensitive logistics information. In addition, access by non-U.S. citizen contracted workers is controlled as prescribed in NAVAIRINST 5510.38, and

NASPAXRINST 5510.15 Series. The Contractor shall be responsible for furnishing a security identification and certification, as required for personnel engaged in work for the support of the UH-72A

Aircraft.

3.2.2.3 Unclassified: However, all Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAV S-5510.30. All Contractor personnel are required to have a favorably adjudicated

Tier-3 investigation from the Office of Personnel Management. The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor’s Electronic Questionnaires for Investigations Processing (eQIP)), shall do a preliminary screening of the Contractor’s e-QIP for suitability and derogatory information. The

Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The

Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor’s e-QIP. In such cases, the Contractor employee may not perform on the contract.

3.2.2.4 The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with SECNAV S-5510.36. All Contractor facilities shall provide an appropriate means of storage for controlled unclassified information and materials. All controlled unclassified information shall be appropriately identified and marked as For Official Use Only in accordance with DoDM 5200.01, Information Security Program: Controlled Unclassified Information

(CUI) Volume 4 (enclosure 3).

3.2.2.5 Controlled Unclassified Information including For Official Use Only and Covered Defense Information

(meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoDM 5200.01 (DoD Information Security Program:

Controlled Unclassified Information (CUI)) Vol. 4 (enclosure 3 pages 11-18) available at http://www.dtic.mil/whs/directives/corres/pdf/520001_vol4.pdf. Any product containing Covered

Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24 (Distribution Statements on Technical Documents); and have this statement displayed per DoDI 5230.24, Enclosure 3.

3.2.2.6 All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s).

• Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (dated: __). Other requests shall be referred to:

Commander, Naval Air Systems Command, Attn: United States Navy Test Pilot School, 22783

Cedar Point Road, Patuxent River, SD 20670.

3.2.3 Common Access Card (CAC)/ Public Key Infrastructure (PKI), System Authorization Access Request

(SAAR-N).

3.2.3.1 All Contractor personnel requiring access to Government Information Technology (IT) systems shall have an approved System Authorization Access Request (SAAR-N) Form OPNAV 5239/14 (Rev Sep 2011) on file, and complete required Annual Information Awareness Training. New employees must submit their

SAAR forms within thirty (30) days of their first day of work. Instructions for processing the SAAR-N forms are available at:

http://www.cnrc.navy.mil/publications/Forms/OPNAV_5239_14_SAAR_N.pdf. SAAR-N forms shall be submitted to the COR, TPOC, or to the assigned Government Trusted Associate Sponsorship System

Trusted Associate.

3.2.3.2 Contractor CACs and facility specific identification badges will be issued by the Government to on-site

Contractor personnel and shall be visible at all times while personnel are at the Government site. The

Contractor shall furnish all requested information required to facilitate issuance of identification badges and shall conform to USNTPS Facility Requirements. All CACs and identification badges issued to

Contractor employees shall be returned to the Government Security Department at the Government site in accordance with USNTPS Facility Requirements following completion of the contract, re-location or termination of an employee, or upon request from the COR. The Government will provide the Contractor access to Government facilities, as required, for performance of tasks under this contract. Contractor personnel shall comply with USNTPS Facility Requirements.

3.2.4 Information Security. If the work is performed at the Contractor’s facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with

SECNAV S-5510.36. If the work is performed at the Government’s facility, the Contractor shall comply with USNTPS Facility Requirements.

3.2.4.1 All information generated by the Contractor shall be properly marked. For Official Use Only information generated and/or provided under this contract shall be marked in accordance with DoDS 5200.01.

Technical information shall also be marked with appropriate Distribution Statements and Export Control warnings in accordance with DoDI 5230.24 and program Security Classification Guidance.

3.2.4.2 Public Release for Classified and Unclassified Information: Any controlled information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as

Facebook or Twitter, unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release via the PEO, and through the Public Affairs Office, 47123 Buse Road, RADS William A. Moffett Building, Patuxent

River, Maryland 20670-1547.

3.2.4.3 All instances of loss, compromise and electronic spillage of classified or controlled unclassified information shall be reported to the COR, TPOC and Government Security Office within 24 hours of the incident occurring.

3.2.5 Operations Security (OPSEC): The Contractor shall develop, implement, and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance and Communications Security (COSSEC). The OPSEC program shall be in accordance with National Security Decision Directive (NSDD) 298, and at a minimum shall include: a.

Assignment of responsibility for OPSEC direction and implementation.

b. Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.

c. Establishment of OPSEC education and awareness training.

d. Provisions for management, annual review, and evaluation of OPSEC programs.

e. Flow down of OPSEC requirements to subcontractors when applicable.

3.2.5.1 While performing aboard NAVAIR or NAVAIR sites, the contractor shall comply with facility OPSEC program instructions and contribute to organization-level OPSEC efforts. The Contractor shall include

OPSEC as part of its ongoing security awareness program and take all required Agency training. The

Contractor shall be responsive to the Supporting OPSEC Manager on a non-interference basis. The

Contractor shall protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the requiring office and contractor in support of the mission.

3.2.6 Anti-Terrorism Force Protection and Emergency Management: The work performed on this contract is not

Emergency Essential in accordance with OPNAVINST 3440.17A and Government Emergency

Management, Antiterrorism and/or Continuity of Operations Plans. Contractor personnel shall comply with all Government Emergency Management, Antiterrorism and/or Continuity of Operations Plans and directives. Contractor personnel shall not report for work at Government facilities upon declaration of

Force Protection Condition CHARLIE or in any event or emergency where Government official’s direct curtailment of operations to “Mission Essential Only”. All Contractor personnel assigned to a Government facility shall complete annual Antiterrorism (Level One) and Active Shooter training.

3.3 Detailed Requirements

3.3.1 Material and Maintenance Support Services (CLIN 0005)

3.3.1.1 This PWS applies to the five (5) USNTPS UH-72A aircraft, and subordinate flight systems and components required to perform the USNTPS mission. The Contractor's effort shall provide the capability to support the USNTPS estimated annual UH-72A fleet flight hour plan for 1,200 flight hours at a fixed price per hour rate, with an established minimum monthly flight hour executed rate of 60 flight hours.

3.3.1.1.1 USNTPS estimates yearly usage to be 1,100 flight hours in any contract year. Monthly flight hour execution is estimated to range from 60 to 120 flight hours.

3.3.1.1.2 Total flight hours in any contract year beyond 1,200 hours will be negotiated as an Over and Above

(O&A) per paragraph 3.1.9.

3.3.1.2 Performance Objectives: Sixty percent (60%) Aircraft Operational Availability (Ao) average for the UH-

72A fleet over a 30-day period interval.

3.3.1.2.1 The Contractor’s performance with respect to Ao shall be measured in monthly increments from the 1st day of the month to the last day of the month with payment allocated against actual flight hours during each performance increment. Aircraft flight hours shall be counted in full hours where .5 or higher of an hour as a fractional hour for monthly reporting.

3.3.1.2.2 Aircraft availability shall be reported for the USNTPS fleet in accordance with Exhibit A, CDRL A006.

3.3.1.2.3 For the purpose of calculating Ao, the UH-72A aircraft shall be classified as Full Mission Capable

(FSC) or Non-Mission Capable (NSC) for the assigned mission in accordance with the “Department of

Transportation, Federal Aviation Administration (FAA), Master Minimum Equipment List (MMEL)

Amended to Reflect Additional Requirements for U.S. Naval Test Pilot School”, with current changes

SSEL with the exceptions of exclusions provided in Tables 1 and 2.

3.3.1.2.4 The term “Total Aircraft Hours” shall be calculated as the sum of the hours from the 1st to the last day of the month. The “Total Aircraft Hours” shall be the sum of the hours the five (5) Navy UH-72A are

FSC within the report period. Any assessed penalties shall adjust the contract flight hour payables for said reporting period. The formula for calculating Ao is as follows:

Ao = Total Aircraft FSC Hours During Month / Total Aircraft Hours for the Month

General Operation Availability (Ao) Exclusions

Government restricts Contractor’s access to work spaces.

Mission Equipment Packages (MEP) Items awaiting material purchase/delivery

Labor related to trouble shooting, removal and replacement of SEP

Aircraft grounding, the fleet or portion thereof, resulting from the issuance of any Airworthiness Directives or

Alert Service Bulletins and such grounding is not the proximate results of any negligence or wantonness effort by the Contractor.

Incorporation of optional Service Bulletins (SB).

Customer delay in removal of SEP and related activity from aircraft that is impeding, preventing, or delaying

Contractor performance on Non-Mission Capable maintenance.

Maintenance action arising from evening/weekend operations when 48-hour advance notice is not provided.

In any month that exceeds 110 flight hours, the Ao is suspended and no penalty shall be assessed.

Table 1: Operational Availability

3.3.1.3 In order to facilitate best commercial practice to the concept of “Parts Exchanging” with the civil fleet, the Contractor shall partner with the U.S. Navy to ensure that the USN UH-72A aircraft: (1) remain IAW the type certificate or FAA authorized modifications, (2) hold an FAA airworthiness certificate or the military's equivalent, and (3) are maintained in accordance with the OES's maintenance program. The

UH-72A shall operate in accordance with the FAA approved flight manual or as modified by FAA airworthiness directives.

3.3.1.4 The Contractor shall make the decision to inspect, repair, replace, or overhaul as necessary for the equipment to meet the availability objectives of this contract. Any repair, manufacture, or overhaul work shall be done in accordance with FAA / Commercial standards and Original Equipment Manufacturer

(OEM) process and procedures.

3.3.1.4.1 The Contractor shall provide all necessary personnel, tools, support equipment and serviceable parts to establish an operational capability commensurate with the first date of this contract.

3.3.1.4.2 The Contractor shall provide appropriate OEM Tools, Fixtures, and UH-72A Support Equipment maintaining currency and maintenance support of tools, fixtures, and support equipment as well as common and peculiar support equipment. The Contractor shall be responsible for providing spares and overhaul services for components and systems associated with the UH-72A aircraft.

3.3.1.4.3 The Contractor shall provide routine and periodic aircraft maintenance, as required to be performed to maintain FAA certified aircraft in accordance with the contract approved SSEL. The Contractor need not anticipate any changes in the current FAA certified maintenance philosophy to achieve availability objectives.

3.3.1.5 The Contractor shall be responsible for all aspects of support and material and maintenance support services to include inventory requirements to support fleet requirements of five (5) USNTPS UH-72A aircraft, to include serviceable parts IAW FAA regulations at both Field and Depot Levels.

3.3.1.5.1 All parts shall be evaluated for disposal of condemned or uneconomical to repair spare/repair parts IAW

OES procedures and FAA regulations. The management of its parts is not required to be a “closed loop system” (i.e., overhauled and repaired UH-72A parts can be drawn from and released to commercial pools).

3.3.1.5.2 Ownership of any inventory (parts and support equipment) shall remain with the Contractor, except when such inventory has been attached to the USN UH-72A fleet as part of the Contractor’s USN UH72A program.

3.3.1.5.3 The Contractor shall ensure availability and response to failures in the operating area (25 nautical miles).

3.3.1.5.4 The Contractor shall provide aircraft and support equipment configuration management to include maintaining aircraft logbooks in accordance with FAA requirements (Exhibit A, CDRL A007)

3.3.1.5.5 The Contractor shall provide maintenance of source data package reflecting technical changes.

3.3.1.5.6 The Contractor shall provide configuration management of technical data to include, but not limited to electronic technical manuals, instructions, bulletins, diagrams, etc…

3.3.1.5.7 The Contractor shall provide configuration management of Aircraft Flight Manuals carried in aircraft and in Contractor work spaces.

3.3.1.5.8 The Contractor shall provide, receive, and forward to USNTPS Technical Library all changes to staff and student flight manuals. Approximately 55 Aircraft Flight Manuals have been issued to the

USNTPS students and staff.

3.3.1.5.9 The Contractor shall provide consignment of parts inventory and allowance determination.

3.3.1.5.10 The Contractor shall provide and report proactive obsolescence management initiatives, in accordance with Exhibit A, CDRL A003.

3.3.1.5.11 The Contractor shall provide and maintain equipment and inventory at the organizational-level (O-level).

3.3.1.5.12 The Contractor shall provide daily aircraft status reports via electronic submission in accordance with

Exhibit A, CDRL A006.

3.3.1.5.13 The Contractor shall provide at least two (2) on-site mechanics qualified for non-crewmember status in accordance with NAVAIRINST 3710.1 to support functional check flights. The Contractor shall coordinate flight physiology/ Naval Aviation Survival Training Program (NASTP) requirements and cost through the COR and USNTPS Flight Operations for Contractor non-crewmembers

3.3.1.5.14 The Contractor shall develop and enforce safe and effective Contractor Ground and Flight Operating

Procedures as set forth in the NAVAIRINST 3710.1 (version in effect at time of award) for all

Contractor ground and flight operations at the USNTPS facilities.

3.3.1.5.14.1 The Contractor shall submit interim Contractor Ground and Flight Operating Procedures (GOPs and

FOPs) to the Ground Flight Representative (GFR) for review 30 days prior to the period of performance on the base Indefinite Delivery Indefinite Quantity (IDIQ) contract. Both the interim

GOPs and FOPs shall be approved no later than the first day of the period of performance. (Exhibit A, CDRL A009)

3.3.1.5.14.2 All maintenance of Government-owned aircraft performed at the Contractor’s facilities shall be conducted solely under the Contractor’s certified Federal Aviation Administration (FAA) Repair

Station. The Contractor will not be required to comply with a Government approved Contractor Flight and Ground Operations procedures while at the Contractor’s facilities; however, in place of the

Ground and Flight Risk Clause, the Contractor shall purchase and maintain commercial liability insurance IAW the policies of FAR Subpart 28.3 Insurance. The Contractor shall provide the

Government a copy of the renewed insurance policy or Certificate of Insurance on an annual basis with a submittal date no later than 31 December each year. The contractor shall provide insurance coverage for each Government-accepted aircraft against all risks of physical loss or damage, whilst in flight, taxiing or on the ground and/or whilst rotors are in motion or not in motion, through the aircraft flyaway date. The contractor shall be responsible for insurance deductibles.

3.3.1.5.15 For Flight-Line Services, the Contractor shall provide the following services for launch, recovery and ground handling of the aircraft at NAS Patuxent River, SD. In example, but not limited to, the

Contractor shall:

• Refuel the aircraft

• Call the NAS Patuxent River Fuel Farm to dispatch fuel truck

• Fuel aircraft when fuel truck arrives

• Maintenance preflight and post-flight inspection

• Preparation for flight duties

• Answer status questions of flight crew

• Remove tie-downs

• Remove covers and plugs

• Post flight duties

• Receive flight crew post flight report

• Install tie-downs

• Install covers and plugs

• Provide a fire guard (in addition to any other required ground crew) during refueling, starting the aircraft, shutdown of the aircraft

• Provide a ground guide to marshal the aircraft out of and into parking spots on the USNTPS line for all flight operations

3.3.1.5.16 Destructive weather regularly occurs in the vicinity of NAS Patuxent River, including hurricanes, thunderstorms, and hail. The Contractor shall maintain contact with the Squadron Duty Officer to obtain flight schedule cancellations and take proactive measures to hangar aircraft expeditiously.

3.3.1.6 The Contractor shall adhere to a System Safety approach consistent with FAA requirements and using

SIL-STD-882 Series as a guide.

3.3.1.6.1 The Contractor's System Safety approach shall delineate processes to ensure operational safety and that the level of safety and crashworthiness present in the USN UH-72A shall not be degraded.

3.3.1.6.2 The Contractor shall allow the Government to review and evaluate any safety issues and safety data.

3.3.1.6.3 The Contractor shall review, evaluate, and address all safety issues as well as Government identified safety issues, which may adversely impact the USN UH-72A using a Safety Risk Management Matrix.

3.3.1.6.4 The Contractor shall present safety information (i.e.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .